HomeMy WebLinkAboutBID - 5856 VEHICLE STORAGE BUILDINGS (4)Administrative Services
Purchasing Divison
215 North Mason Street 2nd
Floor P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6775 Fax (970) 221-6707
www.fcgov.com
ADDENDUM No. 4
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid: 5856 Vehicle Storage Buildings
OPENING DATE: 2:00 P.M. (Our Clock) June 4, 2004
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
GENERAL:
1. As a part of the Base Bid the Contractor shall stub out for buildings “B” & “C” within
5’-0” of the proposed buildings.
2. Natural Gas lines between buildings “A” & “B” shall be installed by Xcel.
3. Provide a full size fire alarm cabinet as part of base bid to handle buildings B and C.
4. The main breakers in the switch gear for buildings B & C shall be included in the
alternates 1 & 2 respectively.
SPECIFICATIONS:
1. Section 03300 – Add the following to section 03300
3.14 SEALING AND FINISH APPLICATIONS
A. General: Consult with the manufacturer's representative prior to
application. Follow the manufacturer's printed instructions for applying
materials
B. Schedule of Exterior Hardening and Sealing Materials: Furnish and apply
concrete curing, sealing and hardening products for exterior concrete in
accordance with the following schedule:
1. Concrete Sidewalks, Slabs, Aprons and Curb and Gutter Sections:
Damp cure and Lapidolith, white pigment.
2. Exposed Surfaces of Retaining Walls: Kure-N-Seal.
3. Concrete not Scheduled for Other Finishes: Kure-N-Seal.
C. Schedule of Interior Hardening and Sealing Materials: Furnish and apply
concrete curing, sealing and hardening products for interior floor slabs in
accordance with the following schedule.
1. Slabs to Receive No Flooring: Damp cure and Lapidolith, white
pigment. Follow with a polyurethane dust-proofer/sealer to create a
tough, hard, deep gloss surface: Sonothane VOC.
D. Application Process: Apply curing, hardening and sealing products in
strict accordance with the manufacturer's written instructions and
recommendations.
E. Apply materials only after concrete surfaces are completely cured and dry. Follow the
manufacturer's recommended application instructions, generally applying it in three (3) coats
with ample drying time between coats. Remove surplus hardener after final application has
dried.
2. Section 16060 - Grounding: Delete counterpoise requirement, paragraph 3.3, A.
3. Section 16060 – Ground rod grid and test wells will not be required on buildings “B”
or “C”.
DRAWINGS:
1. Sheet L1.3 / sect 02831 – Contractor is to bid the post spacing shown on drawing
L1.3.
2. Sheet L1.3 – Drawing shows fence line posts as 2 7/8” Please use industry standard
sizes instead.
3. Sheet SD1.0 / L1.3 – The new chain link fence layout on the West side of the
property is correct on SD1.0 (L1.3 is not correct)
4. Sheet A5.0 / sect 02831 – Contractor is to bid the gate posts shown on drawing A5.0.
5. Sheet P1 – The Owner will be supplying the compressor only – the contractor will be
responsible for any required regulators, valves, or lines.
6. Sheet M1 – Contractor is to bid radiant piping as specified and shown on the
drawings.
7. Drawing E4 - Change feeder to panel VSB1 to the following: 2[(4#3/0 + 1#4G) 2"C].
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS
ADDENDUM HAS BEEN RECEIVED.