HomeMy WebLinkAboutBID - 5846 POUDRE TRAIL EXTENSION WEST OF TAFT HILL ROAD00800-1
SECTION 00800
SUPPLEMENTARY CONDITIONS
Conditions of the Contract
These Supplementary Conditions amend or supplement the General Conditions of the
Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins
modifications) and other provisions of the Contract Documents as indicated below.
SC-4.2 Subsurface and Physical Conditions:
A. Add the following language to paragraph 4.2.1 of the General Conditions.
4.2.1.1.1 The following report(s) of exploration and tests of subsurface
conditions at the site of the Work:
PROPOSED TAFT HILL ROAD PEDESTRIAN CROSSING
LAFARGE GRAVEL PIT AND BURLINGTON NORTHERN RAILROAD
FORT COLLINS, COLORADO
TERRACON PROJECT NO. 20025230
JANUARY 10, 2003
Contractor may rely upon the accuracy of the technical data contained in the
geotechnical documents, but not upon nontechnical data, interpretations or
opinions contained therein or upon the completeness of any information in the
report.
SC-5.4.8 Limits of Liability
A. Add the following language at the end of paragraph 5.4.8.
The limits of liability for the insurance required by the paragraph numbers of the General
Conditions listed below are as follows:
5.4.1 and 5.4.2
Coverage A - Statutory Limits
Coverage B - $100,000/$100,000/$500,000
5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000
combined single limits (CSL). This policy will include coverage for Explosion, Collapse,
and Underground coverage unless waived by the Owner.
5.4.6 The Comprehensive Automobile Liability Insurance policy will have limits of
$1,000,000 combined single limits (CSL).
5.4.9 This policy will include completed operations coverage/product liability coverage
with limits of $1,000,000 combined single limits (CSL).
00800-2
SC-12.3 Add the following language to the end of paragraph 12.3.
Contractor will include in the project schedule 4 days lost due to abnormal weather
conditions.