Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BID - 5839 ASPHALT OVERLAY PROJECT 2004 (7)
00330 BID SCHEDULE City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839 202.10 Grinding (planing) Surface Preparation < 3" S.Y. 500 $ 6.41 $ 3,205.00 202.20 Grinding (planing) Surface Preparation 3" to 5" S.Y. 500 $ 6.59 $ 3,295.00 202.30 Grinding (planing) Surface Preparation 5" to 7" S.Y. 500 $ 7.78 $ 3,890.00 202.40 Grinding (planing) Surface Preparation 7" to 9" S.Y. 500 $ 8.63 $ 4,315.00 202.50 Taper Planing Adjacent to Gutter L.F. 500 $ 4.27 $ 2,135.00 202.60 Bobcat Style Milling < 3" S.Y. 50 $ 22.69 $ 1,134.50 202.70 Bobcat Style Milling - Additional Inch Thickness S.Y.-inch 50 $ 12.69 $ 634.50 203.10 Excavation - General Less Than 100 CY C.Y. 50 $ 23.34 $ 1,167.00 203.11 Excavation - General Over 100 C.Y. C.Y. 100 $ 19.64 $ 1,964.00 203.20 Excavation - Muck C.Y. 100 $ 23.04 $ 2,304.00 203.30 Borrow - Less Than 100 Ton Ton 50 $ 15.38 $ 769.00 203.31 Borrow - Over 100 Ton Ton 100 $ 10.06 $ 1,006.00 210.01 Adjust Valve Box Each 129 $ 135.00 $ 17,415.00 210.02 Adjust Valve Box with Ring Each 40 $ 30.00 $ 1,200.00 210.03 Adjust Valve Box with Tyler 6860 Series, Item R 69, Screw Type Adjustable Riser Each 5 $ 59.99 $ 299.95 210.04 Adjust and Replace Top Section of Valve Box Each 10 $ 200.25 $ 2,002.50 210.05 Tyler 6850 Series, Item 58, 14" Valve Box Extension (Part Only) Each 5 $ 38.00 $ 190.00 210.06 Tyler 6860 Series, 16" Valve Box Top Section Without Lid (Part Only) Each 5 $ 43.00 $ 215.00 210.07 Tyler 6860 Series, 26" Valve Box Top Section Without Lid (Part Only) Each 10 $ 50.01 $ 500.10 210.08 Total Valve Box Replacement Each 5 $ 263.09 $ 1,315.45 210.09 Adjust Standard Manhole ≤ 24" Each 126 $ 335.00 $ 42,210.00 210.10 Adjust Special Manhole > 24" Each 2 $ 441.15 $ 882.30 210.11 Adjust Manhole with Ring Each 10 $ 99.35 $ 993.50 307.10 Class C Fly Ash Delivered and Spread 12" Depth @ 10% Ton 100 $ 42.00 $ 4,200.00 307.20 Stabilize Subgrade - Tilled, Watered & Compacted S.Y. 2,000 $ 2.46 $ 4,920.00 403.10 HBP - Grading SX Parking Lot Overlay Ton 85 $ 45.60 $ 3,876.00 403.15 HBP - Grading SX Basketball Court Ton 230 $ 45.95 $ 10,568.50 403.20 HBP - Grading SX Ton 8,600 $ 29.80 $ 256,280.00 Item No. Description Unit Quantity Unit Cost Total Cost Page 1 of 7 00330 BID SCHEDULE City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839 Item No. Description Unit Quantity Unit Cost Total Cost 403.30 HBP - Grading S, 64-28 Binder Ton 8,600 $ 35.08 $ 301,688.00 403.35 HBP - Grading S, 64-22 Binder Ton 2,500 $ 27.55 $ 68,875.00 403.40 HBP - Grading SG Ton 100 $ 26.04 $ 2,604.00 403.50 Patching Ton 1,320 $ 60.69 $ 80,110.80 403.55 10" Arterial Patching Ton 30 $ 69.69 $ 2,090.70 403.60 Geotextile Paving Fabric S.Y. 45,761 $ 0.79 $ 36,151.19 614.01 “No Parking” Sign With Stand Per Day Per Each 2,000 $ 1.26 $ 2,520.00 614.02 Vertical Panel Without Light Per Day Per Each 700 $ 0.50 $ 350.00 614.03 Drum Without Light Per Day Per Each 700 $ 0.70 $ 490.00 614.04 Type I Barricade Without Light Per Day Per Each 200 $ 0.50 $ 100.00 614.05 Type II Barricade Without Light Per Day Per Each 20 $ 0.50 $ 10.00 614.06 Type III Barricade Without Light Per Day Per Each 200 $ 2.22 $ 444.00 614.07 Size A Sign With Stand Per Day Per Each 1,500 $ 1.01 $ 1,515.00 614.08 Size B Sign With Stand Per Day Per Each 300 $ 1.26 $ 378.00 614.09 Size A Specialty Sign - Cost of Manufacturing Each 10 $ 44.55 $ 445.50 614.10 Size B Specialty Sign - Cost of Manufacturing Each 10 $ 54.68 $ 546.80 614.11 Cone With Reflective Strip Per Day Per Each 5,000 $ 0.50 $ 2,500.00 614.12 Safety Fence Per Day Per Roll 75 $ 3.04 $ 228.00 614.13 Light - Steady Burn Per Day Per Each 2,000 $ 0.20 $ 400.00 614.14 Light - Flashing Per Day Per Each 1,000 $ 0.20 $ 200.00 614.15 Advance Warning Flashing or Sequencing Arrow Panel Per Unit Per Day 20 $ 45.56 $ 911.20 614.16 Traffic Control Supervisor Per Day 45 $ 248.07 $ 11,163.15 614.17 Traffic Control Supervisor Per Hour 150 $ 24.81 $ 3,721.50 614.18 Flagging Per Hour 1,500 $ 17.16 $ 25,740.00 TOTAL COST $ 916,070.14 Parks $ 16,259.49 Engineering $ 899,810.65 $ 916,070.14 Page 2 of 7 00330 BID SCHEDULE - REVISED City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839 202.10 Grinding (planing) Surface Preparation < 3" S.Y. 500 $ 6.41 $ 3,205.00 $ 3.82 $ 1,910.00 $ 4.80 $ 2,400.00 202.20 Grinding (planing) Surface Preparation 3" to 5" S.Y. 500 $ 6.59 $ 3,295.00 $ 4.55 $ 2,275.00 $ 5.20 $ 2,600.00 202.30 Grinding (planing) Surface Preparation 5" to 7" S.Y. 500 $ 7.78 $ 3,890.00 $ 5.75 $ 2,875.00 $ 5.80 $ 2,900.00 202.40 Grinding (planing) Surface Preparation 7" to 9" S.Y. 500 $ 8.63 $ 4,315.00 $ 7.57 $ 3,785.00 $ 6.75 $ 3,375.00 202.50 Taper Planing Adjacent to Gutter L.F. 500 $ 4.27 $ 2,135.00 $ 3.32 $ 1,660.00 $ 3.50 $ 1,750.00 202.60 Bobcat Style Milling < 3" S.Y. 50 $ 22.69 $ 1,134.50 $ 8.20 $ 410.00 $ 20.00 $ 1,000.00 202.70 Bobcat Style Milling - Additional Inch Thickness S.Y.-inch 50 $ 12.69 $ 634.50 $ 8.20 $ 410.00 $ 10.00 $ 500.00 203.10 Excavation - General Less Than 100 CY C.Y. 50 $ 23.34 $ 1,167.00 $ 17.28 $ 864.00 $ 18.00 $ 900.00 203.11 Excavation - General Over 100 C.Y. C.Y. 100 $ 19.64 $ 1,964.00 $ 17.28 $ 1,728.00 $ 23.50 $ 2,350.00 203.20 Excavation - Muck C.Y. 100 $ 23.04 $ 2,304.00 $ 17.28 $ 1,728.00 $ 26.00 $ 2,600.00 203.30 Borrow - Less Than 100 Ton Ton 50 $ 15.38 $ 769.00 $ 16.40 $ 820.00 $ 20.00 $ 1,000.00 203.31 Borrow - Over 100 Ton Ton 100 $ 10.06 $ 1,006.00 $ 16.40 $ 1,640.00 $ 22.00 $ 2,200.00 210.01 Adjust Valve Box Each 129 $ 135.00 $ 17,415.00 $ 124.75 $ 16,092.75 $ 145.00 $ 18,705.00 210.02 Adjust Valve Box with Ring Each 40 $ 30.00 $ 1,200.00 $ 6.05 $ 242.00 $ 75.00 $ 3,000.00 210.03 Adjust Valve Box with Tyler 6860 Series, Item R 69, Screw Type Adjustable Riser Each 5 $ 59.99 $ 299.95 $ 60.50 $ 302.50 $ 80.00 $ 400.00 210.04 Adjust and Replace Top Section of Valve Box Each 10 $ 200.25 $ 2,002.50 $ 285.71 $ 2,857.10 $ 185.00 $ 1,850.00 210.05 Tyler 6850 Series, Item 58, 14" Valve Box Extension (Part Only) Each 5 $ 38.00 $ 190.00 $ 30.00 $ 150.00 $ 90.00 $ 450.00 210.06 Tyler 6860 Series, 16" Valve Box Top Section Without Lid (Part Only) Each 5 $ 43.00 $ 215.00 $ 35.00 $ 175.00 $ 90.00 $ 450.00 210.07 Tyler 6860 Series, 26" Valve Box Top Section Without Lid (Part Only) Each 10 $ 50.01 $ 500.10 $ 36.50 $ 365.00 $ 100.00 $ 1,000.00 210.08 Total Valve Box Replacement Each 5 $ 263.09 $ 1,315.45 $ 435.85 $ 2,179.25 $ 300.00 $ 1,500.00 210.09 Adjust Standard Manhole ≤ 24" Each 126 $ 335.00 $ 42,210.00 $ 322.00 $ 40,572.00 $ 340.00 $ 42,840.00 210.10 Adjust Special Manhole > 24" Each 2 $ 441.15 $ 882.30 $ 490.00 $ 980.00 $ 1,200.00 $ 2,400.00 210.11 Adjust Manhole with Ring Each 10 $ 99.35 $ 993.50 $ 30.25 $ 302.50 $ 100.00 $ 1,000.00 307.10 Class C Fly Ash Delivered and Spread 12" Depth @ 10% Ton 100 $ 42.00 $ 4,200.00 $ 53.25 $ 5,325.00 $ 48.00 $ 4,800.00 307.20 Stabilize Subgrade - Tilled, Watered & Compacted S.Y. 2,000 $ 2.46 $ 4,920.00 $ 3.32 $ 6,640.00 $ 2.05 $ 4,100.00 403.10 HBP - Grading SX Parking Lot Overlay Ton 85 $ 45.60 $ 3,876.00 $ 60.38 $ 5,132.30 $ 50.00 $ 4,250.00 403.15 HBP - Grading SX Basketball Court Ton 230 $ 45.95 $ 10,568.50 $ 56.66 $ 13,031.80 $ 48.00 $ 11,040.00 403.20 HBP - Grading SX Ton 8,600 $ 29.80 $ 256,280.00 $ 36.00 $ 309,600.00 $ 39.40 $ 338,840.00 403.30 HBP - Grading S, 64-28 Binder Ton 8,600 $ 35.08 $ 301,688.00 $ 41.50 $ 356,900.00 $ 45.10 $ 387,860.00 403.35 HBP - Grading S, 64-22 Binder Ton 2,500 $ 27.55 $ 68,875.00 $ 37.00 $ 92,500.00 $ 39.00 $ 97,500.00 403.40 HBP - Grading SG Ton 100 $ 26.04 $ 2,604.00 $ 34.25 $ 3,425.00 $ 35.50 $ 3,550.00 403.50 Patching Ton 1,320 $ 60.69 $ 80,110.80 $ 95.00 $ 125,400.00 $ 78.00 $ 102,960.00 403.55 10" Arterial Patching Ton 30 $ 69.69 $ 2,090.70 $ 105.00 $ 3,150.00 $ 150.00 $ 4,500.00 403.60 Geotextile Paving Fabric S.Y. 45,761 $ 0.79 $ 36,151.19 $ 1.68 $ 76,878.48 $ 1.60 $ 73,217.60 614.01 “No Parking” Sign With Stand Per Day Per Each 2,000 $ 1.26 $ 2,520.00 $ 1.75 $ 3,500.00 $ 1.70 $ 3,400.00 614.02 Vertical Panel Without Light Per Day Per Each 700 $ 0.50 $ 350.00 $ 0.61 $ 427.00 $ 0.65 $ 455.00 614.03 Drum Without Light Per Day Per Each 700 $ 0.70 $ 490.00 $ 0.61 $ 427.00 $ 0.75 $ 525.00 614.04 Type I Barricade Without Light Per Day Per Each 200 $ 0.50 $ 100.00 $ 0.61 $ 122.00 $ 0.65 $ 130.00 614.05 Type II Barricade Without Light Per Day Per Each 20 $ 0.50 $ 10.00 $ 0.48 $ 9.60 $ 0.65 $ 13.00 614.06 Type III Barricade Without Light Per Day Per Each 200 $ 2.22 $ 444.00 $ 1.75 $ 350.00 $ 2.70 $ 540.00 614.07 Size A Sign With Stand Per Day Per Each 1,500 $ 1.01 $ 1,515.00 $ 1.65 $ 2,475.00 $ 1.60 $ 2,400.00 614.08 Size B Sign With Stand Per Day Per Each 300 $ 1.26 $ 378.00 $ 1.75 $ 525.00 $ 1.75 $ 525.00 614.09 Size A Specialty Sign - Cost of Manufacturing Each 10 $ 44.55 $ 445.50 $ 42.00 $ 420.00 $ 43.00 $ 430.00 614.10 Size B Specialty Sign - Cost of Manufacturing Each 10 $ 54.68 $ 546.80 $ 48.00 $ 480.00 $ 49.00 $ 490.00 614.11 Cone With Reflective Strip Per Day Per Each 5,000 $ 0.50 $ 2,500.00 $ 0.60 $ 3,000.00 $ 0.65 $ 3,250.00 Item No. Description Unit Estimated Quantity Lafarge Unit Cost Lafarge Total Cost Connell Unit Cost Connell Total Cost Kehn Unit Cost Kehn Total Cost 00330 BID SCHEDULE - REVISED City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839 Item No. Description Unit Estimated Quantity Lafarge Unit Cost Lafarge Total Cost Connell Unit Cost Connell Total Cost Kehn Unit Cost Kehn Total Cost 614.12 Safety Fence Per Day Per Roll 75 $ 3.04 $ 228.00 $ 1.25 $ 93.75 $ 5.00 $ 375.00 614.13 Light - Steady Burn Per Day Per Each 2,000 $ 0.20 $ 400.00 $ 0.17 $ 340.00 $ 0.16 $ 320.00 614.14 Light - Flashing Per Day Per Each 1,000 $ 0.20 $ 200.00 $ 0.17 $ 170.00 $ 16.00 $ 16,000.00 614.15 Advance Warning Flashing or Sequencing Arrow Panel Per Unit Per Day 20 $ 45.56 $ 911.20 $ 32.00 $ 640.00 $ 32.00 $ 640.00 614.16 Traffic Control Supervisor Per Day 45 $ 248.07 $ 11,163.15 $ 345.00 $ 15,525.00 $ 400.00 $ 18,000.00 614.17 Traffic Control Supervisor Per Hour 150 $ 24.81 $ 3,721.50 $ 33.00 $ 4,950.00 $ 34.30 $ 5,145.00 614.18 Flagging Per Hour 1,500 $ 17.16 $ 25,740.00 $ 22.00 $ 33,000.00 $ 25.00 $ 37,500.00 TOTAL COST $ 916,070.14 $ 1,148,760.03 $ 1,219,925.60 Page 4 of 7 00330 BID SCHEDULE - REVISED City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839 202.10 Grinding (planing) Surface Preparation < 3" S.Y. 500 $ - $ - 202.20 Grinding (planing) Surface Preparation 3" to 5" S.Y. 500 $ - $ - 202.30 Grinding (planing) Surface Preparation 5" to 7" S.Y. 500 $ - $ - 202.40 Grinding (planing) Surface Preparation 7" to 9" S.Y. 500 $ - $ - 202.50 Taper Planing Adjacent to Gutter L.F. 500 $ - $ - 202.60 Bobcat Style Milling < 3" S.Y. 50 $ - $ - 202.70 Bobcat Style Milling - Additional Inch Thickness S.Y.-inch 50 $ - $ - 203.10 Excavation - General Less Than 100 CY C.Y. 50 $ - $ - 203.11 Excavation - General Over 100 C.Y. C.Y. 100 $ - $ - 203.20 Excavation - Muck C.Y. 100 $ - $ - 203.30 Borrow - Less Than 100 Ton Ton 50 $ - $ - 203.31 Borrow - Over 100 Ton Ton 100 $ - $ - 210.01 Adjust Valve Box Each 129 $ - $ - 210.02 Adjust Valve Box with Ring Each 40 $ - $ - 210.03 Adjust Valve Box with Tyler 6860 Series, Item R 69, Screw Type Adjustable Riser Each 5 $ - $ - 210.04 Adjust and Replace Top Section of Valve Box Each 10 $ - $ - 210.05 Tyler 6850 Series, Item 58, 14" Valve Box Extension (Part Only) Each 5 $ - $ - 210.06 Tyler 6860 Series, 16" Valve Box Top Section Without Lid (Part Only) Each 5 $ - $ - 210.07 Tyler 6860 Series, 26" Valve Box Top Section Without Lid (Part Only) Each 10 $ - $ - 210.08 Total Valve Box Replacement Each 5 $ - $ - 210.09 Adjust Standard Manhole ≤ 24" Each 126 $ - $ - 210.10 Adjust Special Manhole > 24" Each 2 $ - $ - 210.11 Adjust Manhole with Ring Each 10 $ - $ - 307.10 Class C Fly Ash Delivered and Spread 12" Depth @ 10% Ton 100 $ - $ - 307.20 Stabilize Subgrade - Tilled, Watered & Compacted S.Y. 2,000 $ - $ - 403.10 HBP - Grading SX Parking Lot Overlay Ton 85 $ - $ - 403.15 HBP - Grading SX Basketball Court Ton 230 $ - $ - 403.20 HBP - Grading SX Ton 8,600 $ - $ - 403.30 HBP - Grading S, 64-28 Binder Ton 8,600 $ - $ - 403.35 HBP - Grading S, 64-22 Binder Ton 2,500 $ - $ - Estimated Item No. Description Unit Quantity Unit Cost Total Cost Page 5 of 7 00330 BID SCHEDULE - REVISED City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839 Estimated Item No. Description Unit Quantity Unit Cost Total Cost 403.40 HBP - Grading SG Ton 100 $ - $ - 403.50 Patching Ton 1,320 $ - $ - 403.55 10" Arterial Patching Ton 30 $ - $ - 403.60 Geotextile Paving Fabric S.Y. 45,761 $ - $ - 614.01 “No Parking” Sign With Stand Per Day Per Each 2,000 $ - $ - 614.02 Vertical Panel Without Light Per Day Per Each 700 $ - $ - 614.03 Drum Without Light Per Day Per Each 700 $ - $ - 614.04 Type I Barricade Without Light Per Day Per Each 200 $ - $ - 614.05 Type II Barricade Without Light Per Day Per Each 20 $ - $ - 614.06 Type III Barricade Without Light Per Day Per Each 200 $ - $ - 614.07 Size A Sign With Stand Per Day Per Each 1,500 $ - $ - 614.08 Size B Sign With Stand Per Day Per Each 300 $ - $ - 614.09 Size A Specialty Sign - Cost of Manufacturing Each 10 $ - $ - 614.10 Size B Specialty Sign - Cost of Manufacturing Each 10 $ - $ - 614.11 Cone With Reflective Strip Per Day Per Each 5,000 $ - $ - 614.12 Safety Fence Per Day Per Roll 75 $ - $ - 614.13 Light - Steady Burn Per Day Per Each 2,000 $ - $ - 614.14 Light - Flashing Per Day Per Each 1,000 $ - $ - 614.15 Advance Warning Flashing or Sequencing Arrow Panel Per Unit Per Day 20 $ - $ - 614.16 Traffic Control Supervisor Per Day 45 $ - $ - 614.17 Traffic Control Supervisor Per Hour 150 $ - $ - 614.18 Flagging Per Hour 1,500 $ - $ - TOTAL COST - Pages 1 & 2 $ - Dollars and cents. Signed Address Company Phone/Fax Page 6 of 7 00330 BID SCHEDULE - REVISED City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839 Estimated Item No. Description Unit Quantity Unit Cost Total Cost Check One: Individual Doing Business in Company Name Corporation Partnership Page 7 of 7 Page 3 of 7