HomeMy WebLinkAboutBID - 5839 ASPHALT OVERLAY PROJECT 2004 (4)FRONT END DOCUMENT INFORMATION example to send to Purchasing NAME OF PROJECT Asphalt Overlay Project SECTION 00020 SUMMARY OF WORK This work shall consist of asphalt milling, asphalt patching, asphalt overlays, geotextile paving fabric, manhole and valve box adjustments, and the associated traffic control on designated streets in the City of Fort Collins. Specific locations are described in Section 3500, Project Map. DATE CONTRACTS WILL BE AVAILABLE Feb 25, 2004 REFUNDABLE FEE $50.00 PREBID CONFERENCE AND JOB WALK March 8 10:00 am @215 Mason – room tbd Bid Opening, March 17, 3:00 SECTION 00300 BID SCHEDULE Bid schedule under separate attachment SECTION 00430 SCHEDULE OF SUBCONTRACTORS Subcontractors performing over 15% of contract. SECTION 00520 ARCHITECT OR CONSULTANT NA CONTRACT TIMES Substantially complete within 45 working days Final completion within 5 days of substantial completion LIQUIDATED DAMAGES Substantial completion: $1000.00 Final Acceptance: $500.00 DRAWINGS NA SECTION 00800 SUBSURFACE AND PHYSICAL CONDITIONS: none LIMITS OF LIABILITY Or none lost due to weather.