HomeMy WebLinkAboutBID - 5839 ASPHALT OVERLAY PROJECT 2004 (2)00330 BID SCHEDULE City of Fort Collins 2004 Asphalt Overlay Project - Bid No. XXXX 202.10 Grinding (planing) Surface Preparation < 3" S.Y. 500 $ 2.07 $ 1,035.00 202.20 Grinding (planing) Surface Preparation 3" to 5" S.Y. 500 $ 3.88 $ 1,940.63 202.30 Grinding (planing) Surface Preparation 5" to 7" S.Y. 500 $ 4.86 $ 2,432.25 202.40 Grinding (planing) Surface Preparation 7" to 9" S.Y. 500 $ 6.52 $ 3,260.25 202.50 Taper Planing Adjacent to Gutter L.F. 500 $ 3.21 $ 1,604.25 202.60 Bobcat Style Milling < 3" S.Y. 50 $ 26.91 $ 1,345.50 202.70 Bobcat Style Milling - Additional Inch Thickness S.Y.-inch 50 $ 15.53 $ 776.25 203.10 Excavation - General Less Than 100 CY C.Y. 50 $ 17.49 $ 874.58 203.11 Excavation - General Over 100 C.Y. C.Y. 100 $ 9.11 $ 910.80 203.20 Excavation - Muck C.Y. 100 $ 18.63 $ 1,863.00 203.30 Borrow - Less Than 100 Ton Ton 50 $ 15.89 $ 794.36 203.31 Borrow - Over 100 Ton Ton 100 $ 12.01 $ 1,200.60 210.01 Adjust Valve Box Each 129 $ 238.05 $ 30,708.45 210.02 Adjust Valve Box with Ring Each 40 $ 25.88 $ 1,035.00 210.03 Adjust Valve Box with Tyler 6860 Series, Item R 69, Screw Type Adjustable Riser Each 5 $ 641.70 $ 3,208.50 210.04 Adjust and Replace Top Section of Valve Box Each 10 $ 424.35 $ 4,243.50 210.05 Tyler 6850 Series, Item 58, 14" Valve Box Extension (Part Only) Each 5 $ 30.64 $ 153.18 210.06 Tyler 6860 Series, 16" Valve Box Top Section Without Lid (Part Only) Each 5 $ 35.71 $ 178.54 210.07 Tyler 6860 Series, 26" Valve Box Top Section Without Lid (Part Only) Each 10 $ 37.78 $ 377.78 210.08 Total Valve Box Replacement Each 5 $ 476.10 $ 2,380.50 210.09 Adjust Standard Manhole ≤ 24" Each 126 $ 470.93 $ 59,336.55 210.10 Adjust Special Manhole > 24" Each 2 $ 657.23 $ 1,314.45 210.11 Adjust Manhole with Ring Each 10 $ 74.00 $ 740.03 307.10 Class C Fly Ash Delivered and Spread 12" Depth @ 10% Ton 100 $ 49.89 $ 4,988.70 307.20 Stabilize Subgrade - Tilled, Watered & Compacted S.Y. 2,000 $ 2.85 $ 5,692.50 403.10 HBP - Grading SX Parking Lot Overlay Ton 85 $ 39.85 $ 3,387.04 403.15 HBP - Grading SX Basketball Court Ton 230 $ 51.75 $ 11,902.50 403.20 HBP - Grading SX Ton 8,600 $ 36.43 $ 313,315.20 Estimated Quantity 2004 Estimated Unit Cost 2004 Estimated Item No. Description Unit Cost Page 1 of 5 00330 BID SCHEDULE City of Fort Collins 2004 Asphalt Overlay Project - Bid No. XXXX Estimated Quantity 2004 Estimated Unit Cost 2004 Estimated Item No. Description Unit Cost 403.30 HBP - Grading S, Modified Binder Ton 11,100 $ 36.17 $ 401,523.08 403.40 HBP - Grading SG Ton 100 $ 36.23 $ 3,622.50 403.50 Patching Ton 1,320 $ 109.71 $ 144,817.20 403.55 10" Arterial Patching Ton 30 $ 129.38 $ 3,881.25 403.60 Geotextile Paving Fabric S.Y. 45,761 $ 1.76 $ 80,516.48 614.01 “No Parking” Sign With Stand Per Day Per Each 2,000 $ 1.60 $ 3,208.50 614.02 Vertical Panel Without Light Per Day Per Each 700 $ 0.63 $ 441.95 614.03 Drum Without Light Per Day Per Each 700 $ 0.63 $ 441.95 614.04 Type I Barricade Without Light Per Day Per Each 200 $ 0.63 $ 126.27 614.05 Type II Barricade Without Light Per Day Per Each 20 $ 0.31 $ 6.21 614.06 Type III Barricade Without Light Per Day Per Each 200 $ 2.69 $ 538.20 614.07 Size A Sign With Stand Per Day Per Each 1,500 $ 1.66 $ 2,484.00 614.08 Size B Sign With Stand Per Day Per Each 300 $ 1.86 $ 558.90 614.09 Size A Specialty Sign - Cost of Manufacturing Each 10 $ 42.44 $ 424.35 614.10 Size B Specialty Sign - Cost of Manufacturing Each 10 $ 48.65 $ 486.45 614.11 Cone With Reflective Strip Per Day Per Each 5,000 $ 0.72 $ 3,622.50 614.12 Safety Fence Per Day Per Roll 75 $ 1.66 $ 124.20 614.13 Light - Steady Burn Per Day Per Each 2,000 $ 0.21 $ 414.00 614.14 Light - Flashing Per Day Per Each 1,000 $ 0.21 $ 207.00 614.15 Advance Warning Flashing or Sequencing Arrow Panel Per Unit Per Day 20 $ 34.16 $ 683.10 614.16 Traffic Control Supervisor Per Day 45 $ 341.34 $ 15,360.44 614.17 Traffic Control Supervisor Per Hour 150 $ 29.31 $ 4,396.68 614.18 Flagging Per Hour 1,500 $ 27.12 $ 40,675.50 TOTAL COST $ 1,159,288.18 Parks $ 18,822.72 Engineering $ 1,140,465.47 $ 1,159,288.18 Page 2 of 5 00330 BID SCHEDULE City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839 202.10 Grinding (planing) Surface Preparation < 3" S.Y. 500 $ - $ - 202.20 Grinding (planing) Surface Preparation 3" to 5" S.Y. 500 $ - $ - 202.30 Grinding (planing) Surface Preparation 5" to 7" S.Y. 500 $ - $ - 202.40 Grinding (planing) Surface Preparation 7" to 9" S.Y. 500 $ - $ - 202.50 Taper Planing Adjacent to Gutter L.F. 500 $ - $ - 202.60 Bobcat Style Milling < 3" S.Y. 50 $ - $ - 202.70 Bobcat Style Milling - Additional Inch Thickness S.Y.-inch 50 $ - $ - 203.10 Excavation - General Less Than 100 CY C.Y. 50 $ - $ - 203.11 Excavation - General Over 100 C.Y. C.Y. 100 $ - $ - 203.20 Excavation - Muck C.Y. 100 $ - $ - 203.30 Borrow - Less Than 100 Ton Ton 50 $ - $ - 203.31 Borrow - Over 100 Ton Ton 100 $ - $ - 210.01 Adjust Valve Box Each 129 $ - $ - 210.02 Adjust Valve Box with Ring Each 40 $ - $ - 210.03 Adjust Valve Box with Tyler 6860 Series, Item R 69, Screw Type Adjustable Riser Each 5 $ - $ - 210.04 Adjust and Replace Top Section of Valve Box Each 10 $ - $ - 210.05 Tyler 6850 Series, Item 58, 14" Valve Box Extension (Part Only) Each 5 $ - $ - 210.06 Tyler 6860 Series, 16" Valve Box Top Section Without Lid (Part Only) Each 5 $ - $ - 210.07 Tyler 6860 Series, 26" Valve Box Top Section Without Lid (Part Only) Each 10 $ - $ - 210.08 Total Valve Box Replacement Each 5 $ - $ - 210.09 Adjust Standard Manhole ≤ 24" Each 126 $ - $ - 210.10 Adjust Special Manhole > 24" Each 2 $ - $ - 210.11 Adjust Manhole with Ring Each 10 $ - $ - 307.10 Class C Fly Ash Delivered and Spread 12" Depth @ 10% Ton 100 $ - $ - 307.20 Stabilize Subgrade - Tilled, Watered & Compacted S.Y. 2,000 $ - $ - 403.10 HBP - Grading SX Parking Lot Overlay Ton 85 $ - $ - 403.15 HBP - Grading SX Basketball Court Ton 230 $ - $ - 403.20 HBP - Grading SX Ton 8,600 $ - $ - 403.30 HBP - Grading S, Modified Binder Ton 11,100 $ - $ - 403.40 HBP - Grading SG Ton 100 $ - $ - Item No. Description Unit Estimated Quantity Unit Cost Total Cost Page 3 of 5 00330 BID SCHEDULE City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839 Item No. Description Unit Estimated Quantity Unit Cost Total Cost 403.50 Patching Ton 1,320 $ - $ - 403.55 10" Arterial Patching Ton 30 $ - $ - 403.60 Geotextile Paving Fabric S.Y. 45,761 $ - $ - 614.01 “No Parking” Sign With Stand Per Day Per Each 2,000 $ - $ - 614.02 Vertical Panel Without Light Per Day Per Each 700 $ - $ - 614.03 Drum Without Light Per Day Per Each 700 $ - $ - 614.04 Type I Barricade Without Light Per Day Per Each 200 $ - $ - 614.05 Type II Barricade Without Light Per Day Per Each 20 $ - $ - 614.06 Type III Barricade Without Light Per Day Per Each 200 $ - $ - 614.07 Size A Sign With Stand Per Day Per Each 1,500 $ - $ - 614.08 Size B Sign With Stand Per Day Per Each 300 $ - $ - 614.09 Size A Specialty Sign - Cost of Manufacturing Each 10 $ - $ - 614.10 Size B Specialty Sign - Cost of Manufacturing Each 10 $ - $ - 614.11 Cone With Reflective Strip Per Day Per Each 5,000 $ - $ - 614.12 Safety Fence Per Day Per Roll 75 $ - $ - 614.13 Light - Steady Burn Per Day Per Each 2,000 $ - $ - 614.14 Light - Flashing Per Day Per Each 1,000 $ - $ - 614.15 Advance Warning Flashing or Sequencing Arrow Panel Per Unit Per Day 20 $ - $ - 614.16 Traffic Control Supervisor Per Day 45 $ - $ - 614.17 Traffic Control Supervisor Per Hour 150 $ - $ - 614.18 Flagging Per Hour 1,500 $ - $ - TOTAL COST - Pages 1 & 2 $ - Dollars $ Signed Address Company Phone/Fax Check One: Individual Doing Business in Company Name Page 4 of 5 00330 BID SCHEDULE City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839 Item No. Description Unit Estimated Quantity Unit Cost Total Cost Corporation Partnership Page 5 of 5