BID SCHEDULE
City of Fort Collins
2004 Asphalt Overlay Project - Bid No. XXXX
202.10 Grinding (planing) Surface Preparation < 3" S.Y. 500 $ 2.07 $ 1,035.00
202.20 Grinding (planing) Surface Preparation 3" to 5" S.Y. 500 $ 3.88 $ 1,940.63
202.30 Grinding (planing) Surface Preparation 5" to 7" S.Y. 500 $ 4.86 $ 2,432.25
202.40 Grinding (planing) Surface Preparation 7" to 9" S.Y. 500 $ 6.52 $ 3,260.25
202.50 Taper Planing Adjacent to Gutter L.F. 500 $ 3.21 $ 1,604.25
202.60 Bobcat Style Milling < 3" S.Y. 50 $ 26.91 $ 1,345.50
202.70 Bobcat Style Milling - Additional Inch Thickness S.Y.-inch 50 $ 15.53 $ 776.25
203.10 Excavation - General Less Than 100 CY C.Y. 50 $ 17.49 $ 874.58
203.11 Excavation - General Over 100 C.Y. C.Y. 100 $ 9.11 $ 910.80
203.20 Excavation - Muck C.Y. 100 $ 18.63 $ 1,863.00
203.30 Borrow - Less Than 100 Ton Ton 50 $ 15.89 $ 794.36
203.31 Borrow - Over 100 Ton Ton 100 $ 12.01 $ 1,200.60
210.01 Adjust Valve Box Each 129 $ 238.05 $ 30,708.45
210.02 Adjust Valve Box with Ring Each 40 $ 25.88 $ 1,035.00
210.03 Adjust Valve Box with Tyler 6860 Series, Item R 69,
Screw Type Adjustable Riser Each 5 $ 641.70 $ 3,208.50
210.04 Adjust and Replace Top Section of Valve Box Each 10 $ 424.35 $ 4,243.50
210.05 Tyler 6850 Series, Item 58, 14" Valve Box Extension
(Part Only) Each 5 $ 30.64 $ 153.18
210.06 Tyler 6860 Series, 16" Valve Box Top Section
Without Lid (Part Only) Each 5 $ 35.71 $ 178.54
210.07 Tyler 6860 Series, 26" Valve Box Top Section
Without Lid (Part Only) Each 10 $ 37.78 $ 377.78
210.08 Total Valve Box Replacement Each 5 $ 476.10 $ 2,380.50
210.09 Adjust Standard Manhole ≤ 24" Each 126 $ 470.93 $ 59,336.55
210.10 Adjust Special Manhole > 24" Each 2 $ 657.23 $ 1,314.45
210.11 Adjust Manhole with Ring Each 10 $ 74.00 $ 740.03
307.10 Class C Fly Ash Delivered and Spread 12" Depth @
10% Ton 100 $ 49.89 $ 4,988.70
307.20 Stabilize Subgrade - Tilled, Watered & Compacted S.Y. 2,000 $ 2.85 $ 5,692.50
403.10 HBP - Grading SX Parking Lot Overlay Ton 85 $ 39.85 $ 3,387.04
403.15 HBP - Grading SX Basketball Court Ton 230 $ 51.75 $ 11,902.50
403.20 HBP - Grading SX Ton 8,600 $ 36.43 $ 313,315.20
Estimated
Quantity
2004 Estimated
Unit Cost
2004 Estimated
Item No. Description Unit Cost
Page 1 of 5
00330
BID SCHEDULE
City of Fort Collins
2004 Asphalt Overlay Project - Bid No. XXXX
Estimated
Quantity
2004 Estimated
Unit Cost
2004 Estimated
Item No. Description Unit Cost
403.30 HBP - Grading S, Modified Binder Ton 11,100 $ 36.17 $ 401,523.08
403.40 HBP - Grading SG Ton 100 $ 36.23 $ 3,622.50
403.50 Patching Ton 1,320 $ 109.71 $ 144,817.20
403.55 10" Arterial Patching Ton 30 $ 129.38 $ 3,881.25
403.60 Geotextile Paving Fabric S.Y. 45,761 $ 1.76 $ 80,516.48
614.01 “No Parking” Sign With Stand Per Day Per Each 2,000 $ 1.60 $ 3,208.50
614.02 Vertical Panel Without Light Per Day Per Each 700 $ 0.63 $ 441.95
614.03 Drum Without Light Per Day Per Each 700 $ 0.63 $ 441.95
614.04 Type I Barricade Without Light Per Day Per Each 200 $ 0.63 $ 126.27
614.05 Type II Barricade Without Light Per Day Per Each 20 $ 0.31 $ 6.21
614.06 Type III Barricade Without Light Per Day Per Each 200 $ 2.69 $ 538.20
614.07 Size A Sign With Stand Per Day Per Each 1,500 $ 1.66 $ 2,484.00
614.08 Size B Sign With Stand Per Day Per Each 300 $ 1.86 $ 558.90
614.09 Size A Specialty Sign - Cost of Manufacturing Each 10 $ 42.44 $ 424.35
614.10 Size B Specialty Sign - Cost of Manufacturing Each 10 $ 48.65 $ 486.45
614.11 Cone With Reflective Strip Per Day Per Each 5,000 $ 0.72 $ 3,622.50
614.12 Safety Fence Per Day Per Roll 75 $ 1.66 $ 124.20
614.13 Light - Steady Burn Per Day Per Each 2,000 $ 0.21 $ 414.00
614.14 Light - Flashing Per Day Per Each 1,000 $ 0.21 $ 207.00
614.15 Advance Warning Flashing or Sequencing Arrow
Panel Per Unit Per Day 20 $ 34.16 $ 683.10
614.16 Traffic Control Supervisor Per Day 45 $ 341.34 $ 15,360.44
614.17 Traffic Control Supervisor Per Hour 150 $ 29.31 $ 4,396.68
614.18 Flagging Per Hour 1,500 $ 27.12 $ 40,675.50
TOTAL COST $ 1,159,288.18
Parks $ 18,822.72
Engineering $ 1,140,465.47
$ 1,159,288.18
Page 2 of 5
00330
BID SCHEDULE
City of Fort Collins
2004 Asphalt Overlay Project - Bid No. 5839
202.10 Grinding (planing) Surface Preparation < 3" S.Y. 500 $ - $ -
202.20 Grinding (planing) Surface Preparation 3" to 5" S.Y. 500 $ - $ -
202.30 Grinding (planing) Surface Preparation 5" to 7" S.Y. 500 $ - $ -
202.40 Grinding (planing) Surface Preparation 7" to 9" S.Y. 500 $ - $ -
202.50 Taper Planing Adjacent to Gutter L.F. 500 $ - $ -
202.60 Bobcat Style Milling < 3" S.Y. 50 $ - $ -
202.70 Bobcat Style Milling - Additional Inch Thickness S.Y.-inch 50 $ - $ -
203.10 Excavation - General Less Than 100 CY C.Y. 50 $ - $ -
203.11 Excavation - General Over 100 C.Y. C.Y. 100 $ - $ -
203.20 Excavation - Muck C.Y. 100 $ - $ -
203.30 Borrow - Less Than 100 Ton Ton 50 $ - $ -
203.31 Borrow - Over 100 Ton Ton 100 $ - $ -
210.01 Adjust Valve Box Each 129 $ - $ -
210.02 Adjust Valve Box with Ring Each 40 $ - $ -
210.03 Adjust Valve Box with Tyler 6860 Series, Item R 69,
Screw Type Adjustable Riser Each 5 $ - $ -
210.04 Adjust and Replace Top Section of Valve Box Each 10 $ - $ -
210.05 Tyler 6850 Series, Item 58, 14" Valve Box Extension
(Part Only) Each 5 $ - $ -
210.06 Tyler 6860 Series, 16" Valve Box Top Section
Without Lid (Part Only) Each 5 $ - $ -
210.07 Tyler 6860 Series, 26" Valve Box Top Section
Without Lid (Part Only) Each 10 $ - $ -
210.08 Total Valve Box Replacement Each 5 $ - $ -
210.09 Adjust Standard Manhole ≤ 24" Each 126 $ - $ -
210.10 Adjust Special Manhole > 24" Each 2 $ - $ -
210.11 Adjust Manhole with Ring Each 10 $ - $ -
307.10 Class C Fly Ash Delivered and Spread 12" Depth @
10% Ton 100 $ - $ -
307.20 Stabilize Subgrade - Tilled, Watered & Compacted S.Y. 2,000 $ - $ -
403.10 HBP - Grading SX Parking Lot Overlay Ton 85 $ - $ -
403.15 HBP - Grading SX Basketball Court Ton 230 $ - $ -
403.20 HBP - Grading SX Ton 8,600 $ - $ -
403.30 HBP - Grading S, Modified Binder Ton 11,100 $ - $ -
403.40 HBP - Grading SG Ton 100 $ - $ -
Item No. Description Unit Estimated
Quantity Unit Cost Total Cost
Page 3 of 5
00330
BID SCHEDULE
City of Fort Collins
2004 Asphalt Overlay Project - Bid No. 5839
Item No. Description Unit Estimated
Quantity Unit Cost Total Cost
403.50 Patching Ton 1,320 $ - $ -
403.55 10" Arterial Patching Ton 30 $ - $ -
403.60 Geotextile Paving Fabric S.Y. 45,761 $ - $ -
614.01 “No Parking” Sign With Stand Per Day Per Each 2,000 $ - $ -
614.02 Vertical Panel Without Light Per Day Per Each 700 $ - $ -
614.03 Drum Without Light Per Day Per Each 700 $ - $ -
614.04 Type I Barricade Without Light Per Day Per Each 200 $ - $ -
614.05 Type II Barricade Without Light Per Day Per Each 20 $ - $ -
614.06 Type III Barricade Without Light Per Day Per Each 200 $ - $ -
614.07 Size A Sign With Stand Per Day Per Each 1,500 $ - $ -
614.08 Size B Sign With Stand Per Day Per Each 300 $ - $ -
614.09 Size A Specialty Sign - Cost of Manufacturing Each 10 $ - $ -
614.10 Size B Specialty Sign - Cost of Manufacturing Each 10 $ - $ -
614.11 Cone With Reflective Strip Per Day Per Each 5,000 $ - $ -
614.12 Safety Fence Per Day Per Roll 75 $ - $ -
614.13 Light - Steady Burn Per Day Per Each 2,000 $ - $ -
614.14 Light - Flashing Per Day Per Each 1,000 $ - $ -
614.15 Advance Warning Flashing or Sequencing Arrow
Panel Per Unit Per Day 20 $ - $ -
614.16 Traffic Control Supervisor Per Day 45 $ - $ -
614.17 Traffic Control Supervisor Per Hour 150 $ - $ -
614.18 Flagging Per Hour 1,500 $ - $ -
TOTAL COST - Pages 1 & 2 $ -
Dollars
$
Signed Address
Company
Phone/Fax
Check One: Individual Doing Business in Company Name
Page 4 of 5
00330
BID SCHEDULE
City of Fort Collins
2004 Asphalt Overlay Project - Bid No. 5839
Item No. Description Unit Estimated
Quantity Unit Cost Total Cost
Corporation
Partnership
Page 5 of 5