Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5881 POUDRE TRAIL REHABILITATION (6)SECTION 00300 BID FORM PROJECT: POUDRE TRAIL REHABILITATION; BID N0, 5881 Place Lk4 a [ � Date O„L' _K��'�,y, 1. In compliance with your Invitation to Bid dated 0c+6b V- 5F106 y Lan subjecttoto all condi thereof, the undersigned L1J1►'1(��� inT��L1C�Dj5. I41G a ** Corporatio Limited Liability Company, Partnership, Joint V nture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certi i�e�d� "or cashier's check or standard Bid b d G the sum of �iftp.�4%5mrd, Lo-t�'1andµd p. /�4;.A q� guo c,J ($ A'sQ%.6S, ) in acco dance with e Id&itation To Biq and Instructions to Bidders. 3 4. The undersigned Bidder agrees to execute the Agreement and aO_P_erformance Bond .and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: n t4irenaJ AnnIAJrA*► InVIAAMP-1 Ll 5. All the various phases of Work enumerated in the ontract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No./ through 7/96 Section 00300 Page 1 I SECTION 00430 ' SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM SUBCONTRACTOR 1 I --- I I I 7/96 1 I I n Section 00430 Page 1 ' I ADDRESS: 8. BID SCHEDULE (Base Bid) Bid items are described in Section 01800 BID ESTIMATED UNIT ITEM' ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTA 1 Mobilization 1.00 LS V $ 2 Traffic Control 1.00 LS 03 $ 7To.Qi o o0 3 Demolition 72,944.00 SF 4 5" Colored Concrete Paving 91,180.00 SF�� Z Parking Lot 5 Improvements 1.00 LS :f "71�/. J ZZ. 6 Landscape Restoration 91,180.00 SF 7 Hydro Seeding 91,180.00 SF TOTAL OF BA� B D st /h'v erj I .�fJ�t/ % ��i /U„►c A�>� �1 / Oz $390,91f�� (written) 9. PRICES The. foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the compl.ete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. 7/96 Section 00300 Page 2 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. � r 1. Name of Bidder: L0�1P 6,cyk Co l'rY c6rs, In(, 2. Permanent main office address: y>o�S LO-U010 S} 3. When organized: 19 V7 4. If a corporation, where incorporated: AQAI lqq" 5. How many years have you been engaged in the contracting business.under your present firm or trade name? 1 -7 f4AoL.- 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate an� ici ted dates of Completion.) 7. General character of Work performed by your company: 8. Have you ever failed to complete any Work awarded to you?A)6_ I£ so, where and why? 9. Have your ever defaulted on a contract? jib If so, where and why? 10. Are you debarred by any government agency? i10 If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, 12 List your major equipment available for this contract. 5-� Gt , 13. Experience in construction Work similar in importance to this project: ? t itoo- S 14. Background and experience of the principal members of your organization, including 4. officers: I'S� S-Z 0—*$h agc) 15. Credit available:: $ 16. Bank reference: ((Ut 17. Will you, upon request, fill out a detailed financial statement and furnish any�s other information that may be required by the OWNER? W-S 18. Are you licensed as a General CONTRACTOR?010 I£ yes, in what city, county and state? What class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract?AJ() If yes, what percent of total contract? and to whom? 20. Are any lawsuits pending against you or your firm at this time?/_ If yes, ' DETAIL 7/96 Section 00420 Page 2 1 21. What are t-he limits of your public liability? DETAIL at company? 22. What are your 4� IM f 1 G" 's bonding limitations?G Mt 0 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at 17-'.30 IQM this a— day of 0C 0be.r _, 20&/. T" State of QdQ✓ c(6 County of acnp being duly sworn deposes and says that he is �f r-5 J� C P� 1a of � I C(�,h(nM1(0 f `'"and that name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and swoj7n to before me this day of 2 ob Notary Public My commission expires j ...... � 4 TA,Q0 9p,OGe L`G • VC 7/96 Section 00420 Page 3 Landlech Contractors, Inc. SCHEDULE OF UNCOMPLETED WORK ON HAND CONTRACTOR Job Description/Owner STATUS AS OF 6/28/04 Current Contract Original Estimated Total Billed Total Direct Revised Cost to Estimated Prices (Include Cost Plus To Date Cost Complete" Include Completion Date Ch.... n..ao-1 ,.e ^ -- Tower Ridge Townhome --- - - ---. 391,572 -« -...�. 387,923 ra.uauuo nnuuna e/ 5,090 tro uatel all Change Orders) Market Street 33,429 23,860 3,429 144,124 7,747 243,799 16,113 09/30/04 07/31/04 Suturn/C470 194,360 154,117 lg7l,027 7,807 150,852 3,265 07/31/04 Kalos Garden @ St. Catherin 79,634 65,685 1,954 1,734 63,951 07/31/04 McElwain Element School 119,143 98,420 64,495 33,925 07/31/04 Golden Pond Asst. Living 207,329 157,452 57,468 20,519 136,933 08/31/04 Lansing & Park Lane Cherry Creek Sitework 39,116 29,965 22,056 13,585 16,380 07/31/04 Aqua Vista/Sunrise Park 75,683 955,210 58,504 929,860 50,758 940,287 23,872 34,632 07/31/04 Stapleton Filing7/31/04 10 203,485 137,152 7,768 929,860 13,836 123,316 0 Bow Tie Park O1 m is Park 177,057 117,946 80,053 52,727 65219 ,478,167 0 O4//01/O1/05 APS Transportation Bldg, 520,567 41,985 32,180 207,622 249,307 228,860 07/31/04 Belmar Block and Sitework 32,740 24,631 76,160 34,004 75,469 43,132 1,378 5,206 1,956 3,883 30,224 20,748 09/30/04 07/31/04 Xcel Substation 96,197 - 2,614 73,546 08/15/04 Redwood Estate 48,960 8,514 3,991 30,013 8/15/04 Florence Square Redevelop. 101,570 - 1,197 74,272 0 TCF Bank Parcel/Detention 48,064 26,549 25,491 17,641 Erie High School South Filter/Woodmore Water 811,008 68,713 755,491 477,331 457,162 298,329 09/150/04 /3/04 06/35/05 Totals: 4,245,822 55,443 3.735.561 6,367 2,320,664 1,860 2,170,812 53,583 1,564,749 07/31/04 Hermine H. Schechs Work on Hand.x1s2004 .iMt ue a ivew r Tunate Of All Remaining Costs** Total Uncompleted Work Subcontractors Uncompleted Bonded Portion of Subcontractors Work Title: Controller $ 1,564,749 $ 347,662 8/4/2004 Entire List UNlT#j Location PLATE EXPIRE LaAsvowN YEAR Purchased Owned BY MAKE MODEL E10 Denim 135CGN Oct-04 OWN 1997 4/1/1997 Landtach Case _ 1845C Uniloader_ E12_ Derner No plate required Landmark 1997 4/2911997 - Landtech Barreto Tiller El3 Dereer 893ATP Apr-05 Landmark 1997 412911997 Land(ech Bareto For E12 Trailer 169US0414VL280033_ E15 PH7144 Feb-05 Landmark 1994 11/20/1997 Landtech Caterpillar 938F Loader _ E16 _Denver PH7145 Sa -04 Case 1997 12/8/1997 Landline Case 1845C UNILOADER E17 PH7146 Feb-05 Case 1997 12/8/1997 Landline _ Case 1845C UNILOADER E27 Denver B109512 r-05 Gle0y 1992 1128/1998 Landtech Trailer King TK70H Trailer _ E28 Denver 093FKD Nov-04 OWN 1987 6/29/1992 Landtech Eager Beaver Traller E32 Makeenaom B114635 Se -04 OWN 1 1997 1 8/21/1997 Landtech Big Tex Trailer Maintenance Trailer _ E33 B111979 Jul-04 OWN 1 1994 7/25/1996 Landtech Bin Tex Trailer Maintenance Trailer _ E39 _Malnenance Denier 766CGP Ma -05 OWN 1984 218/1996 Landtech Fruehauf TRAILER -1 E40 Demur 907HLL Feb-05 OWN 1985 10/14/1996 Landtech Fruehauf TRAILER -2 E41 Denver 8074228 S -04 OWN 1984 811/1996 Landtach Fruehauf TRAILER (V-3)____ E42 _ Denver B078532 Jun-04 OWN 1984 3/31/1997 Landtech Fruehauf TRAILER -4 _ E43 Denver 717EAA Se -04 OWN 1966 6/22/1995 Landtech Fruehauf TRAILER 5 E44 Denver B108749 NOV-04 OWN 1996 1IJ2011996 _ Landtedi HMO Water/Trailer E46 Maenemrx:e 767CGP Ma -05 OWN 19M 3/1411996 Landtech HMD Maintenance Trailer E47 Darner 012D458 Au 4 OWN 1966 10/WI994 Landach Ohio TRAILER 5 _ E49 Denver B112259 r-05 OWN 1997 W20/1997 Landtech Butler LT1014 Trailer E52 Denvm No ate- uired OWN 1997 5/3011997 Landtech Ryan Sod Cutter E53 Denver 718FAA r-05 OWN 1985 9110/1997 Landtech Stdck van trailer TRAILER -7 E54 Denim No Plates Required OWN Landtach Wacker Jumping Jack SS52Y _ E55 Demur No Plates Required OWN Landtech Black Decker Chop Saw 3935 Denver No Plates Required OWN Landtech 7a et-Bddc Saw Brick Saw 56Z-F292 Dever No Plates Required OWN 1998 21911998 Landtech Landa Pressure Washer OHW4-20021 Denver OWN 1998 6/30/1998 Landtech Butler Trailer ME59 Denver OWN 1990 7/9/1998 Landtech JAC Treller V12n9AVE j Case 1997 8/25/1997 Front Ran Case 460 Trencher Case 2000 4/20/2000 Front Ran a Case 1B45C Uniloader Denver Case 2000 4121/2000 Front Range Case 660 Trencher _ E64 Denver No Plates Required OWN 2D00 Sand Blaster 39841 E65 Denier No Plates Require OWN 2000 Landtech Wacker Jumping Jack _ BS50D _ E66 Denier 243BPJ Ma -05 Own 1998 2/27/2D01 TLC Case 570XLT Box Blade E67 Demur 302FKC Jun-04 OWN 1988 8122/2001 Landtach Stdch 28' TRAILER -8 E68 Demer 301FKC Jun-04 OWN 1992 8/2212001 Landtech Strich 28' TRAILER -9 E69 Demur 156CGN Oct-04 Case 2001 9/612(101 Landline Case 1845C UNILOADER _ E70 Denver 155CGN Dec-04 Trinity 1998 618/1999 Landline Cat426C LOADER BACKHOE E71 Denver No Plates Required OWN 101182DOI Landtech John Deere Gator E72 Dem No Plates Required OWN 1D/182001 Landtech John Deere Gator E73 Demx No Plates Required OWN Landtach Makita Circular Saw E74 Denver No Plates Required OWN Landtach Pulsar Ground Locator 2003 E75 Demur No Plates Required OWN 1998 41711998 Landtech Sakkia E32 Measuring Scopewith Td E76 Denim No Plates Required OWN 2001 11/21/2001 Landtech Sokkia LP31 Laser with Tripod Darner 121BPK Jul-04 Case 2002 2262002 Front Ra Case 460 Trencher Demer 122BPK Jul-04 Case 2002 2/2612002 Front Ran a Case 460 Trencher Denver 104BPK Jul-04 Case 1999 2I26I2G02 Front Ran a Case 460 Trencher Denim W104040 Jul-04 Case 20DO 222812002 Landtech Case 570XLT Box Blade I Denver 194CGN Au 4 Case 2002 Landline Case Skid Steer Denier No Plates Re uired OWN 2002 5/21/2002 Landtech White Ca Industrial GeneratorW/Whlkt 5( Denim 480DTI Jul-04 Own 1988 3I26/2002 Landtsch Fruehauf TRAILER -10 Denver 481 DTI Jul-04 OWN 1988 3/262002 Landtech Fruehauf TRAILER -11 E85 oenvm W03448 Jul-04 I Case 2002 7/3/2002 Front Range Vermeer V3550 Trencher E86 13 n 195CGN I Au -04 I OWN 2002 7/22/2002 Landtach John Deere 6420 Tractor E87 Demer 610FKE Oct-04kOWN19861986 10/1/2002 Landtech Fruehauf _ Triler -12EBB 0e No PlatesR uired002 6/122002 Landtach Honda Au rs Post Hole Di er E89 oerner 831HLL Jan-052003 1272003 Landtech HMD S rarTrailer E90 Denver 227CGN r-052003 3242003 Landtech Vermeer BC1000XL Brush Chi erE91 Denier W104743 Au 003 4/82003 Landtach Finn Co T-170H droseeder T69 E92 Denier No Plates Re uired 003 21272003 Landteeh Finn Co B40 Straw Blower E93 Denvar 764HOH Au -04003 4/24/2003 Landline Case 70XT Skid Steer LoaderE95 7581ZG Au 004 51182004 Landtach E96 Denvm 772HOH S -04003 8/212003 Landline Case 70XT Skid Steer Loader E97 Maimwap Pendin 004 4162004 Front nge Case Traneher660 E96 Denver Pending Case 2004 51142004 Front Range Case Trencher 460 E99 Denim Pending Case 20 X 5/142004 Front Range Case Trencher 460 '100 Denver P John Deere 2004 420/2004 Landtach John Deere 4710 Tractor :101 Denver OWN 2004 72/2004 Front Ran Case _ 70XT Skid Steer Loader Larry Overley President/CEO W TECH Contractors, Inc. ,OW ,na MI 7Wf&, _ • Landtech Team Since June 1987 With over 28 years experience in management, design, sales, and construction, Larry has made Landtech Contractors a very successful company. During a 15 year life, Landtech has risen from a $150,000.00 per year company to an extremely significant area contractor with over 10 million dollars in revenue per year. The company also staffs over 160 employees during the peak season. Prior to establishing Landtech, Larry worked as a project manager for a national landscape contractor managing such jobs as the Budweiser Plant in Ft. Collins, Stonegate in Parker, and Lonetree streetscapes in Highlands Ranch. Larry had the same commitment back then as he does today, 'Excellence in service and quality in workmanship'. Kevin Overley VP of Sales Marketing Manager Since March 1987 Since 1984, Kevin has been working in the landscape industry both in management and construction of large commercial landscape projects. He is highly experienced in both office and field operations. Kevin has a Bachelor of Science degree in Industrial Technology from Metropolitan State College of Denver. Kevin Fisher Operations Manager Since August 1995 Kevin Fisher has extensive experience in the landscape industry. His management and organizational skills have proven to be a great asset to Landtech's field operations. With over 26 years experience, Kevin's ability to manage multiple projects and work with general contractors, subcontractors, developers and architects has been very beneficial to our organizations success. Mark Zelymaker Division Project Manager Since June 1997 Mark began his landscape career in the summer of 1971 and has since been involved in every phase of the landscape industry for 32 years. He has worked in several states and a wide range of landscape applications from Colorado, Wyoming, Indiana and six years in Hawaii. His experience allows him a 'quality oriented' focus on the needs of our customers. DENVER HEADQUARTERS: 525 N. Laredo St., Aurora, CO 80011 Phone: (303) 344-4465 Fax: (303) 344-1518 COLORADO SPRINGS DIVISION: 2845 Ore Mill Road Colorado Springs, CO 80904 Phone: (719) 471-3199 Fax: (719) 632-3577 LONGMONT DIVISION: 10765 Turner Blvd, Unit C Longmont, CO 80504 Phone: (720) 494-9860 Fax: (720) 494-9752 W TECH Contractors, Inc. ��FW INAC/N(I TAfEde4 . Landtech Team Continued... Doug Goick Division Project Manager Since August 2004 Doug has spent many years in the landscape industry. He recently moved back to Denver from North Carolina. He has strong communication skills and is committed to excellence. We welcome him to our team. Robert W. Korinek Concrete Construction Manager Since January 2004 Robert has been in the concrete business since 1998. He has year of experience with residential and commercial concrete work. He strong background in leadership will be an asset to our team. Hermine Schechs Controller Since August 1998 With 20 years of experience in accounting and management. She has successfully re- organized our accounting system, re -enforced internal controls and established a great communication with her staff and upper management. Her commitment and dedication to Landtech is an asset to our company. Candy Lund Contract Administrator Since September 2002 Candy has enthusiasm and energy. She has tackled the accounts payable system and taken it to new levels. Her experience has been a great addition to our team. She is always looking for ways to improve the various aspects of her job. DENVER HEADQUARTERS: 525 N. Laredo St., Aurora, CO 80011 Phone: (303) 344-4465 Fax: (303) 344-1518 COLORADO SPRINGS DIVISION: 2845 Ore Mill Road Colorado Springs, CO 80904 Phone: (719) 471-3199 Fax: (719) 632-3577 LONGMONT DIVISION 10765 Turner Blvd, Unit C Longmont, CO 80504 Phone: (720) 494-9860 Fax: (720) 494-9752