Loading...
HomeMy WebLinkAboutAddenda - BID - 5884 LAKE STABILIZATION AT FOSSIL CREEK PARKCitv of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 1 BID #5884 LAKE STABILIZATION AT FOSSIL CREEK PARK SPECIFICATIONS AND CONTRACT DOCUMENTS Bid No. 5884 — Lake Stabilization at Fossil Creek Park OPENING DATE: November 16, 2004, 3:00 P.M. (Our Clock) To all prospective bidders under the specification and contract documents described above, the following changes are hereby made. 1. No questions regarding this bid will be accepted after November 9, 2004, 5:00 pm. 2. Please use the attached Bid Schedule when submitting your bid. 3. SPECIFICATIONS 1. Division 1, Section 01800, Definition of Bid Items: Bid Item 4a. — Earthwork - Haul and Dispose Contractor shall take unusable material from the pond and remove it from the site. Bid amount includes all labor, material and equipment for a complete item. Bid Item 9a. — Earthwork - Haul and Dispose Contractor shall take unusable material from the pond and remove it from the site. Bid amount includes all labor, material and equipment for a complete item. If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 ADDENDUM # 1.. LAKE STABILIZATION AT FOSSIL CREEK PARK BID SCHEDULE Bid items are described in Section 01800 BID ESTIMATED UNIT ITEM ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL GENERAL REQUIREMENTS 1 Mobilization 1 LS 2 General Conditions 1 LS 3 Traffic Control 1 LS FILL AREA - POND 1 AND 2 4 Dewatering 1 LS 4a Dewatering - Haul and Dispose 50 CY 5 Earthwork - Fill 125 CY 6 Pipe Extension 10 LF STABILIZATION AND SITTING ROCKS - POND 2 7 Riprap 520 LF 8 Sitting Rocks 40 TON STEPPING STONES - POND 2 9 Dewatering 1 LS 9a Dewatering - Haul and Dispose 10 CY 10 Riprap 10 LF 11 Stepping Stones 20 TON TOTAL OF BASE BID (written) Figure ADD ALTERNATE: 1 Rip Rap at Pond 1 270 LF 2 Topsoil 50 CY NOVEMBER 8, 2004 CITY OF FORT COLLINS PLANHOLDERS LIST FOR BID #5884 CONNELL RESOURCES 4305 E HARMONY FT. COLLINS, CO 80528-9527 PH 970-223-3151 FAX 970-223-3191 L&MINC. POBOXW BERTHOUD, CO. 80513 PH 970-532-3706 FAX 303-442-2231 53 CORPORATION 1100 WHISPERING OAK DR. CASTLE ROCK, CO 80104 PH 303-814 -9230 FAX 303-814-9233 CLARK CONSTRUCTION 1530 BOISE AVE. LOVELAND, CO 80538 PH 970-667-0674 FAX 970-663-7384 G. L. HOFF 1815 W. 12T" ST. LOVELAND, CO 80537 PH 970-669-3255 FAX 970-663-1566 AMERICAN EAGLE INDUSTRIES 1903 S GREELEY HWY. #234 CHEYENNE, WY 82007 PH 307-634-3157 FAX 970-897-2879 ATTENDANCE RECORD PRE CONFERENCE Project: LAKE STABILIZATION AT FOSSIL CREEK PARK Time: 10:00 A.M. Date: NOVEMBER 2, 2004 Location: 5821 SOUTH LEMAY AVENUE, SOUTH PARKING LOT NAME FIRM NAME ADDRESS TELEPHONE FAX # E-MAIL ADDRESS ��(i� �%�"� 'G�te-'0"7 G y� cf '�5 ,..-� C 4rg to tee! 154 �g4-v- /Vuuti Olo�f� s� g7a-9q7�7- .�•��J� d� �7% R'eii�he-�y vc'�..ue ICI FF lean —. Cep /530 50i5e Av:, gbN z0q (20 W3 910 W-0 mod- 7 uoAkv �of(Q,VV�T � Co �aef( e '� �� Mqv '"Y �� cs61 x Coys2 q� 2Z3 3151 gp-ZL3-3�g1 f ren1� onw�l( ' I N�`Jr a l JirAC%�l+'wrl.c_ },��KCr.�i4L> �� `' �Zl-(�7Z5 2Z�-�bZ�9'j �Q liY P. 01 TRANSACTION REPORT NOV-08-04 MON 02:03 PM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP NOV-08 01:42 PM 92233191 2107" 4 SEND ( M) OK 181 01:44 PM 913034422231 1'04" 4 SEND ( M) OK 181 :K 01:46 PM 913038149233 1106" 4 SEND ( M) OK 181 x 01:47 PM 96637384 1'12" 4 SEND ( M) OK 181 01:49 PM 96631566 1'07" 4 SEND ( M) OK 181 K 02:02 PM 919708972879 0 SEND ( M) BUSY 181 01:51 PM CONSTRUCTION NEWS SV 1'11" 4 SEND ( M) OK 181 01:53 PM BUILDERS EXCHANGE 1'05" 4 SEND ( M) OK 181 01:58 PM REED!CONST*NEWS 1'24" 4 SEND ( M) OK 181 01:55 PM DAILY JOURNAL 1'07" 4 SEND ( M) OK 181 02:03 PM PLAN ROOM'" 0 SEND ( M) BUSY 181 � >K TOTAL 11H 23S PAGES: 36 of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No.1 BID #6884 LAKE STABILIZATION AT FOSSIL CREEK PARK SPECIFICATIONS AND CONTRACT DOCUMENTS Bid No. 5884 — Lake Stabilization at Fossil Creek Park OPENING DATE: November 16, 2004, 3:00 P.M. (Our Clock) To all prospective bidders under the specification and contract documents described above, the following changes are hereby made. 1. No questions regarding this bid will be accepted after November 9, 2004, 5:00 pm. 2. Please use the attached Bid Schedule when submitting your bid. 3_ SPECIFICATIONS 1. Division 1, Section 01800, Definition of Bid Items: Bid Item 4a. — Earthwork - Haul and Dispose Contractor shall take unusable material from the pond and remove it from the site. Bid amount inrh,Aao �11 n-A .-.-. ........... .,a s_- - _____._._._