Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5884 LAKE STABILIZATION AT FOSSIL CREEK PARK (9)SECTION 00300 BID FORM PROJECT: LAKE STABILIZATION AT FOSSIL CREEK PARK; BID NO. 5884 Place (16 p-� roEl 0.11 ftAs Date I1 I t. I Zooy (W— �3:co 1. In compliance with your Invitation to Bid dated ,�� oZ OO`I �and subject to all conditions thereof, the undersigned 4t� - �otlSilZ11CT1ot 1T�1C� • a ** (CorporatiQ , Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid a certified or cashier's check or standard Bid bond in the sum of �21D ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance ancJ, payment bonds is as follows: NO bieoAaWAY WE:gl )e5rcre t �'i 1n� v,�r+r.,C ��rv,p y _. /V N, N V i1, os 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through C�, E . 7/96 Section 00300 Page 1 RESUME CHARLES P. WALSH 31 MAPLEWOOD DRIVE NORTHPORT, NEW YORK 11768 BACKGROUND & QUALIFICATIONS EDUCATION: TWO YEAR MECHANICAL ENGINERS COURSE AT FARMINGDALE (1968-1969) NORTHPORT HIGH SCHOOL GRAD CLASS OF 1968 HEAVY EQUIPMENT OPERATOR IN BUILDING, MECHANICAL AND ELECTRICAL CONSTRUCTION PIPELINE BRIDGE AND AIRPORT CONSTRUCTION BULKHEAD WORK LICENSES CALIFORNIA STATE ENGINEERING CONTRACTORS LICENSE NYS CLASS "A" DRIVERS LICENSE NYS ADULT EDUCATION TEACHING CERTIFICATE WORK EXPERIENCE PRESENT 1997 WALSH CONSTRUCTION INC-GENERAL MANAGER PREPARE BIDS ON MUNICIPAL WORK, SUPERVISE ALL NY PROJECTS, COORDINATE MATERIALS, LABOR, LIASON BETWEEN ENGINEERS & MGT. 1984-1997-SUPERVISOR FOR AMMA CONSTRUCTION, HUNTINGTON STA, NY ALL PHASES OF CONSTRUCTION, MUNICIPAL WORK, HEAVY HIGHWAY, AND BULKHEAD WORK 21. What are the limits of your public liability? DETAIL 1 oco ��,\ Oeeu � c� cee�coo A e� c oocco Lln t1� What company? E StIJ S ��Sts ey�ct , c� rcy 22. What are your company's bonding limitations? C000 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. (� l Dated at p-Oe�Q-1kc31 QS� this day of �oV�ry-� , 200 Name of Bi � ,r By: Title: State of �du\cCA�L County of FP \ ME ?,. \�rTl'EW 6v s\ being duIv Sworn fIPYI(ICPC rro ... _ t'Kr--S%CV4- JT oft,�\S-N LJemsl-q xo (t(K T-NC and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. scribed and swolrn to before me this QA *. C No y P lic - Lo b& 1� � ko- 3 8 . J My commission expires 7/96 Section 00420 Page 3 FROM (MON)NOV 15 2004 10:15/ST. 10:10/NO. 6365763904 P 3 SECTION 00410 BID BOND T INSlli1VV[k (1Mmy $ we, the undersigna KNOW ALL MEN BY THESE ?RES j QM' NSTR(MON, INC. as Principal, and surety, are hereby held and firmly��b�ound unto the City of Fore Collins, Colorado, as OWNER, in ,the sum Of s FIVE P�'11 ff BID for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, LAKE STABILIZATION AT FOSSIL CREEK PARK; BID NO. 5984. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) if said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and erfect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the. time. within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 2 FROM (MON)NOV 15 2004 10:15/ST.10:10/NO.6365763904 P 4 IN WITNESS WHEREOF, the Principal and the Surety have. hereunto set their hand and seals this 15 day of NUVOCER 2004 , and such of them as es corporations have caused their corporate seals to be hereto affixed and then presents to be signed by their proper officers, the day and year first set fora above. . 11 PRINCIPAL SURETY Name WSH ONSW OV INC. 4ESRMTER FIRE INUANCE COMPANY Address: 5828 N. ST. LOUIS AVENLE 140 6$OAM 41SY SIPM LpVEI�IPp;:' p0 01638,' NEW YOW M005 / Y. Title: AIS Nj Title: DLW P. ALESCI, ATTORU-IN-FACE ATTEST:.` By: C" � <� (SEAL) (SEAL) ;. ' •'Ary'lA�INL•NY;•. • 7/96 '01240410 Page '3 •a'• ::r�; fir•. •� • Fi4'i; N� ACKNOWLEDGMENT OF PRINCIPAL IF A CORPORATION STATE O� } COUNTY O Cb A ss}• On this / Aday of AIV/ Z00� before me personally came % /1A,-, me known, who b in by duly sword did depose and say that he/she resides at .5��VS AJ • Sf- �cuis 4-0,10 �{, � �O "'td. go-5-3 and that he/she is the ;461d(�--ti"r V'W-r-A NSt,EUje-fi%a nl f ar i(2, the corporation described in and which executed the foregoing instrument] that he/she knows the 11 said corporation; that one of the seals affixed to said instruments such seal, that it was so affixec�3iX of the directors of said corporation, and that he sinned his name theretdhv like order/G.• -Z•�O MYCOMMISSION ACKNOWLEDGMENT OF PRINCIPAL IF A PARTNERSHF-&IF-t STATE OF COUNTY OF }ss.: RY P G� :C On this day of I before me personally appeared to me known and known to me to be one of the members of the firm of described in and who executed the foregoing instrument and he acknowledged to me that he executed the same and or the act and deed of said firm. NOTARY PUBLIC ACKNOWLEDGMENT OF PRINCIPAL IF AN INDIVIDUAL STATE OF ) COUNTY OF }ss.. On this day of I before me personally appeared to me known and known to be to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same. NOTARY PUBLIC ACKNOWLEDGEMENT OF SURETY STATE OF New York} COUNTY OF Nassau }ss.: On November 15, 2004 before me personally came Diana P. Alesci to me known who, being by me duly sworn, did depose and say that he/she resides at 255 Executive Drive Plainview, New York 11803, that he/she is the Attorney in Fact of Westchester Fire Insurance Company the corporation described in and which executed the foregoing instrument; and that he/she signed his/her r thereto by order of the Board of Directors of said corporation. n „ "- �-�- 2006 No Text POLICYHOLDER DISCLOSURE NOTICE OF TERRORISM INSURANCE COVERAGE Named Insure Endorsement Number Policy Symbol Pol cy umber Policy Period Ef ective Date o E orsement To SG ssue y ame o n urance ompany . �eS�GV ►ti . sera G THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. You should be aware that under the Terrorism Risk Insurance Act of 2002. ("The Act") effective November 26, 2002, any losses caused by certified acts of terrorism under your existing coverage may be partially reimbursed by the United States under a formula established by federal law (applicability is subject to the terms and conditions of each individual policy). The Act was specifically designed to address the ability of businesses and individuals to obtain property and casualty insurance for terrorism and to protect consumers by addressing market disruptions and ensure the continued availability of terrorism coverage. Under the terms of The Act, you may now have the right to purchase insurance coverage for losses arising out of acts of terrorism- as defined in Section 102(1) of the Act: The term "act of terrorism" means any act that is certified by the Secretary of the Treasury, in concurrence with the Secretary of State, and the Attorney General of the United States -to be an act of terrorism; to be a violent act or an act that is dangerous to human life, property; or infrastructure; to have resulted in damage within the United States, or outside the United States in the case of an air carrier or vessel or the premises of a United States mission; and to have been committed by an individual or individuals acting on behalf of any foreign person or foreign interest, as part of an effort to coerce the civilian population of the United States or to influence the policy or affect the conduct of the United States Government by coercion. Responsibility for Compensation under The Act is shared between insurance companies covered by The Act and the United States. Under the formula set forth in The Act, the United States pays 90% of covered terrorism losses exceeding the statutorily'established deductible, which is paid by the insurance company providing the coverage. We are providing you with the terrorism coverage required by The Act. We have not established a separate price for this coverage; however the portion of your annual premium that is reasonably attributable to such coverage is: JQQ2. Authorized gent TRIA12 (5/03) WESTCHESTER FIRE INSURANCE COMPANY FINANCIAL STATEMENT DECEMBER 31, 2003 ADMITTED ASSETS BONDS $1,211,249,339 SHORT - TERM INVESTMENTS 32,096,506 STOCKS 2,499,900 REAL ESTATE 0 CASH ON HAND AND IN BANK 2,602,736 PREMIUM IN COURSE OF COLLECTION` 77,829,346 INTEREST ACCRUED 13,923,276 OTHER ASSETS 94,697,742 TOTAL ASSETS 1,434.698,845 LIABILITIES RESERVE FOR UNEARNED PREMIUMS $379,073,789 RESERVE FOR LOSSES 747,946,558 RESERVE FOR TAXES 8,300,884 FUNDS HELD UNDER REINSURANCE TREATIES 13.943 OTHER LIABILITIES (176,810,273) TOTAL LIABILITIES $958,524,901 CAPITAL: SPECIAL SURPLUS $117,300,000 CAPITAL: 928,592 SHARES, $4.85 PAR VALUE 4,503,671 CAPITAL: PAID IN 128,333,500 SURPLUS (UNASSIGNED) 226,036,772 SURPLUS TO POLICYHOLDERS 476,173,943 TOTAL $1,434,698,844 v, (*EXCLUDES PREMIUM MORE THAN 90 DAYS DUE.) STATE OF PENNSYLVANIA COUNTY OF PHILADELPHIA John P. Taylor, being duly swom, says that he is Vice President of Westchester Fire Insurance Company and that to the best of his knowledge and belief the foregoing is a true and correct statement of the said Company's financial condition as of the 31 st day of December, 2003. Swom before me this 16th day of April, 2004. Vice Pr sident r Notary P Elie' �/ My com issian expires /short forms 2003/wfict LJ� iN dig2;E ZA�?7YCKI, Nota Public ! �;�,r c: P�:riudzlphia. Phila. Ccunt� I My Commission Expire; Qct, g. 2C04 I Walsh Construction, Inc. 5828 N. St. Louis Ave. Loveland, CO 80538 CONTRACTOR T BY:�IA-1th'�1f�1iS ADDRESS: "pilewE,C AEn1T Walsh Construction, Inc. 8. BID SCHEDULE (Base Bid) Loveland, CO 80538 LAKE STABILIZATION AT FOSSIL CREEK PARK B SCHEDULE Bid ite are described in Section 01800 BID ESTIMATED UNIT ITEM ITEM # DES IPTION QUANTITY U PRICE TOTAL GENERAL REQ REMENTS 1 Mobilization 1 ---- Ls 2 General Conditi s LS 3 Traffic Control 1 LS FILL AREA - POND 1 AND 2 4 ewatering 1 LS 5 Earthwork - Fill 125 CY 6 Pipe Extension 10 LF STABILIZATION AN ITTING ROCKS - PO 2 7 Riprap 520 LF 8 Sitting ocks 40 TON STEPPING TONES -POND 2 9 ewatering 1 LS 10 Riprap 10 LF 1 Stepping Stones 20 TON 7/96 Section 00300 Pa e 2 9 IIL ZATION AT FOSSIL CREEK PARK BID SCHEDULE Bid items are described in Section 01800 BID ESTIMATED UNIT ITEM ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL GENERAL REQUIREMENTS 1 Mobilization 1 LS yd06, yppp,77 2 General Conditions 1 LS Ws-/., 3 Traffic Control 1 LS C2 poo , FILL AREA - POND 1 AND 2 4 Dewatering 1 LS J ppO, /Qpp,'l 4a Dewatering - Haul and Dispose 50 CY 5 Earthwork - Fill 125 CY 30, 6 Pipe Extension 10 LF STABILIZATION AND SITTING ROCKS - POND 2 7 Riprap 520 8 Sitting Rocks 40 STEPPING STONES - POND 2 9 Dewatering 1 9a Dewatering - Haul and Dispose 10 10 Riprap 10 11 Stepping Stones 20 TOTAL OF BASE BID Sv, � rk&-o a,&ot pLa v� (written) ADD ALTERNATE: 1 Rip Rap at Pond 1 2 Topsoil LF �39P, ?n,r TON LS- CY LF TON C/ &cvvL�(t d _ $ // Figure 270 LF / g, 9 to 50 CY7 ��j, FTOTA ASE BID written Figure ADD ALTERNATE: 1 Ri p at Pond 1 270 LF opsoil Rn I ICY 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profits insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. RESPECTFULLY SUBMITTED Si(�gnature Date Zc5c-t:"� Title 0-1- H 1 License Number (If Applicable) (Seal - jifid is by corporXiAttest:� Address a Ipy%- k5- Telephone / -6,2d Y0?o27 7/96 Section 00300 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 150 of the contract. ITEM 7/96 SUBCONTRACTOR Section 00430 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. Walsh Construction, Inc. 1. Name of Bidder: 5825 N. St. Louis Ave. to 2. Permanent main office address: 3. When organized: 11 J 1( 01 c c 4. If a corporation, where incorporated: (tolfA 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing the amount of each contract and theappropriateanticipated dates of completion.) 7. General character of Worko performed by your company: M. 0 Have you ever failed to complete any Work awarded to you? If so, where and why? Have your ever defaulted on a contract? Rio If so, where and why? 10. Are you debarred by any government agency? fVO If yes list agency name. 7/96 Section 00420 Page 1 WALSH CONSTRUCTION INC. JOBS IN PROGRESS 11/12/2004 #10304 Project: Reynolds Ranch Open Space House Rehabilitation 48,711 Owner: Boulder County Bid#4577-04 2045 13th St., PO Box 471 Start 11-1-14 Boulder, CO 80306 Completion Date 2-15-04 303-441-3505 #20204 Project: Glenda Rowe 303-441-4957 Landfill Gas Upgrade Fax 303-441-4594 Contract#IRRA-2003-1 $431,400 Owner: Islip Resource Recovery Agency 401 Main St. Completion Date 12- 55-04 Islip, NY 11751 #20503 (Project: (Reconstruction of Brooksite Horse Trail Bridge at Blyndenburg County Park Contract#CP 7009.316 $59,618.00 Owner: County of Suffolk William S. Shannon Dept. of Public Works Completion Date 11-04 335 Yaphank Ave. Yaphank, NY 11980 SUF-141 #20403 Project: 631 /852-4010 - Fax 631 /852-4150 Well Head Enclosures Contract#5674 $160,000.00 Owner: Suffolk County Water Authority Anthony Scrivano 3 building P.O. Box 37 Joe Vecchio 4060 Sunrise Hwy. Tony Mancusco Fx631-589-5268 Oakdale, Long Island, NY 11769 631-563-0348 SCW-138 #20303 Project: 516/589-5200 - Fax 516/218-1156 Two Chemical Treatment' Conti Bldg. Fax 589-5277 JIMM Contract#5628 Completion Date 01-05 M. Evergreen and Edison $297,060.00 Owner: Suffolk County Water Authority Anthony Scrivano P.O. Box 37 Oakdale, Long Island, NY 11769 516/589-5200 - Fax 516/218-1156 SCW-137 Completion Date 11-04 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. �i 1► # -3go Mc� aI cpz k)�:2 � kAA,5- (—i teCk Y"14Soe)C;' `J/ZGo4 WkeW'Nck �2 ►,u1�1�� V�G�KS lNlffl izC AAiA FZ,ertc VnL '1 11 � 4It r.,,M IJI. _A C>t�e- 12. L' t your major equipment available for this contract. AtK4 a __ Kic�s-rE��, VIt-2tous tt�c(�S U i�l�iouS -�A-+' 13 Experience in construction Work similar in importance to this X 14. Background and experience of the principal including officers: members of your organization, F "- --e�C Nt cJ 15. Credit available: $ j(DO,C)c(3 16. Bank reference:�NTgNN'�;fk 8WIK o� 11L \ -c /`--fk i PtOPE 970d 7 tc0j 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? 18. Are you licensed as a General CONTRACTOR? �� S If yes, in what city, county and state? N,Lr3r� il� What class, license and numbers? (SC - ;;Z P C.1-l1G 19. Do you anticipate subcontracting Work under this Contract? N,Q If yes, what percent of total contract? and to whom? 20. Are any lawsuits pending against you or your firm at this time? N� If DETAIL yes, 7/96 Section 00420 Page 2 Matthew Walsh 5M N. St. Louis Ave., Loveland, CO 80538 (970)635-1828 EDUCATION B.S. - Construction Management, Colorado State University, Fort Collins, CO 80521 Major GPA: 3.0/4.0 May 1997 Course Content: Construction Project Administration, Scheduling & Planning, Construction Contracts, Construction Estimating, Safety Management, Labor Relations, Elementary Structural Design WORK EXPERIENCE Walsh Construction, Inc. Loveland, CO. July 1998 -Present General Contractor • President/Owner R.D. Stewart, Inc. Loveland, CO. August 1997 - July 1998 General Contractor, Contact: Dave Hall (970) 669-1500 • Project Manager • Oversaw project operations for commercial and multi -family construction • Project estimating, budgeting, scheduling, cost control, general administration • Negotiated, wrote and organized all subcontracts • Performed on -site supervision • Reported to Divisional Operations Manager Amma Construction Corp. Huntington Station, N.Y. Summers/Winters 1988-1997 Civil Construction, Contact: Prescott Ammarell (516) 351-6124 • Supervised operations related to concrete, sitework and steel fabrication • Assisted in project estimating • Modified company's job cost control system • Diagnosed possible managerial problems in company • Assisted office engineer in everyday duties • Assisted in organizing and maintaining companies shops and yard • Operated wide range of heavy equipment • Drove tractor/trailer combinations to move equipment and materials to various jobs • Performed general labor duties Self - Employed, Walsh Contracting, Northport, N.Y. Summers 1993 -1995 Residential Landscape Construction • Initiated company's existence • Contracted work related to residential landscaping • Planned, organized and supervised everyday operations end Use Environmental Corp. baiting Hollow, N.Y. Summer 1993 • Performed general tasks in accordance with marsh and wetland renovation