HomeMy WebLinkAboutRESPONSE - BID - 5884 LAKE STABILIZATION AT FOSSIL CREEK PARK (9)SECTION 00300
BID FORM
PROJECT: LAKE STABILIZATION AT FOSSIL CREEK PARK; BID NO. 5884
Place (16 p-� roEl 0.11 ftAs
Date I1 I t. I Zooy (W— �3:co
1. In compliance with your Invitation to Bid dated ,�� oZ OO`I
�and subject to all conditions thereof, the undersigned
4t� - �otlSilZ11CT1ot 1T�1C� • a ** (CorporatiQ , Limited Liability Company,
Partnership, Joint Venture, or Sole Proprietor)** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid a certified or cashier's check or standard Bid
bond in the sum of �21D ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance ancJ, payment bonds is as
follows: NO bieoAaWAY
WE:gl )e5rcre t �'i 1n� v,�r+r.,C ��rv,p y _. /V N, N V i1, os
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through C�, E .
7/96 Section 00300 Page 1
RESUME
CHARLES P. WALSH
31 MAPLEWOOD DRIVE
NORTHPORT, NEW YORK 11768
BACKGROUND & QUALIFICATIONS
EDUCATION:
TWO YEAR MECHANICAL ENGINERS COURSE AT FARMINGDALE (1968-1969)
NORTHPORT HIGH SCHOOL GRAD CLASS OF 1968
HEAVY EQUIPMENT OPERATOR IN BUILDING, MECHANICAL AND ELECTRICAL
CONSTRUCTION
PIPELINE BRIDGE AND AIRPORT CONSTRUCTION
BULKHEAD WORK
LICENSES
CALIFORNIA STATE ENGINEERING CONTRACTORS LICENSE
NYS CLASS "A" DRIVERS LICENSE
NYS ADULT EDUCATION TEACHING CERTIFICATE
WORK EXPERIENCE
PRESENT 1997 WALSH CONSTRUCTION INC-GENERAL MANAGER
PREPARE BIDS ON MUNICIPAL WORK, SUPERVISE ALL NY PROJECTS,
COORDINATE MATERIALS, LABOR, LIASON BETWEEN ENGINEERS & MGT.
1984-1997-SUPERVISOR FOR AMMA CONSTRUCTION, HUNTINGTON STA, NY
ALL PHASES OF CONSTRUCTION, MUNICIPAL WORK, HEAVY HIGHWAY, AND
BULKHEAD WORK
21. What are the limits of your public liability? DETAIL
1 oco ��,\ Oeeu � c� cee�coo A e� c oocco Lln t1�
What company? E StIJ S ��Sts ey�ct , c� rcy
22. What are your company's bonding limitations?
C000
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
(� l
Dated at p-Oe�Q-1kc31 QS� this day of �oV�ry-� , 200
Name of Bi � ,r
By:
Title:
State of �du\cCA�L
County of FP \ ME ?,.
\�rTl'EW 6v s\ being duIv Sworn fIPYI(ICPC rro ...
_ t'Kr--S%CV4- JT oft,�\S-N LJemsl-q xo (t(K T-NC and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
scribed and swolrn to before me this
QA *. C
No y P lic -
Lo b& 1� � ko- 3 8 . J
My commission expires
7/96 Section 00420 Page 3
FROM (MON)NOV 15 2004 10:15/ST. 10:10/NO. 6365763904 P 3
SECTION 00410
BID BOND
T INSlli1VV[k (1Mmy $ we, the undersigna
KNOW ALL MEN BY THESE ?RES j QM'
NSTR(MON, INC. as Principal, and
surety, are hereby held and firmly��b�ound unto the City of Fore Collins, Colorado,
as OWNER, in ,the sum Of s FIVE P�'11 ff BID for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fort Collins Project, LAKE STABILIZATION AT FOSSIL CREEK PARK; BID NO. 5984.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) if said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and erfect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the. time. within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 2
FROM
(MON)NOV 15 2004 10:15/ST.10:10/NO.6365763904 P 4
IN WITNESS WHEREOF, the Principal and the Surety have. hereunto set their hand
and seals this 15 day of NUVOCER 2004 , and such of them as es
corporations have caused their corporate seals to be hereto affixed and then
presents to be signed by their proper officers, the day and year first set fora
above. . 11
PRINCIPAL SURETY
Name WSH ONSW OV INC. 4ESRMTER FIRE INUANCE COMPANY
Address: 5828 N. ST. LOUIS AVENLE 140 6$OAM 41SY SIPM
LpVEI�IPp;:' p0 01638,' NEW YOW M005 /
Y.
Title: AIS Nj Title: DLW P. ALESCI, ATTORU-IN-FACE
ATTEST:.`
By: C" � <�
(SEAL) (SEAL) ;.
' •'Ary'lA�INL•NY;•. •
7/96
'01240410 Page '3
•a'• ::r�; fir•.
•� • Fi4'i; N�
ACKNOWLEDGMENT OF PRINCIPAL IF A CORPORATION
STATE O� }
COUNTY O Cb A ss}•
On this / Aday of AIV/ Z00� before me personally came % /1A,-,
me known, who b in by duly sword did depose and say that he/she resides at .5��VS AJ • Sf- �cuis
4-0,10 �{, � �O "'td. go-5-3 and that he/she is the ;461d(�--ti"r
V'W-r-A NSt,EUje-fi%a nl f ar i(2,
the corporation described in and which executed the foregoing instrument] that he/she knows the 11
said corporation; that one of the seals affixed to said instruments such seal, that it was so affixec�3iX
of the directors of said corporation, and that he sinned his name theretdhv like order/G.•
-Z•�O
MYCOMMISSION
ACKNOWLEDGMENT OF PRINCIPAL IF A PARTNERSHF-&IF-t
STATE OF
COUNTY OF }ss.:
RY
P
G�
:C
On this day of I before me personally appeared
to me known and known to me to be one of the members of the firm of
described in and who executed the foregoing instrument and he acknowledged to me that he executed the
same and or the act and deed of said firm.
NOTARY PUBLIC
ACKNOWLEDGMENT OF PRINCIPAL IF AN INDIVIDUAL
STATE OF )
COUNTY OF }ss..
On this day of I before me personally appeared
to me known and known to be to be the person described in and who executed the foregoing instrument and
acknowledged that he/she executed the same.
NOTARY PUBLIC
ACKNOWLEDGEMENT OF SURETY
STATE OF New York}
COUNTY OF Nassau }ss.:
On November 15, 2004 before me personally came Diana P. Alesci
to me known who, being by me duly sworn, did depose and say that he/she resides at 255 Executive Drive
Plainview, New York 11803, that he/she is the Attorney in Fact of
Westchester Fire Insurance Company
the corporation described in and which executed the foregoing instrument; and that he/she signed his/her r
thereto by order of the Board of Directors of said corporation. n „ "- �-�-
2006
No Text
POLICYHOLDER DISCLOSURE NOTICE OF
TERRORISM INSURANCE COVERAGE
Named Insure
Endorsement Number
Policy Symbol
Pol cy umber
Policy Period
Ef ective Date o E orsement
To
SG
ssue y ame o n urance ompany
.
�eS�GV ►ti .
sera G
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
You should be aware that under the Terrorism Risk Insurance Act of 2002. ("The Act") effective November 26,
2002, any losses caused by certified acts of terrorism under your existing coverage may be partially
reimbursed by the United States under a formula established by federal law (applicability is subject to the
terms and conditions of each individual policy). The Act was specifically designed to address the ability of
businesses and individuals to obtain property and casualty insurance for terrorism and to protect consumers
by addressing market disruptions and ensure the continued availability of terrorism coverage.
Under the terms of The Act, you may now have the right to purchase insurance coverage for losses arising out
of acts of terrorism- as defined in Section 102(1) of the Act: The term "act of terrorism" means any act that is
certified by the Secretary of the Treasury, in concurrence with the Secretary of State, and the Attorney General
of the United States -to be an act of terrorism; to be a violent act or an act that is dangerous to human life,
property; or infrastructure; to have resulted in damage within the United States, or outside the United States in
the case of an air carrier or vessel or the premises of a United States mission; and to have been committed by
an individual or individuals acting on behalf of any foreign person or foreign interest, as part of an effort to
coerce the civilian population of the United States or to influence the policy or affect the conduct of the United
States Government by coercion.
Responsibility for Compensation under The Act is shared between insurance companies covered by The Act
and the United States. Under the formula set forth in The Act, the United States pays 90% of covered terrorism
losses exceeding the statutorily'established deductible, which is paid by the insurance company providing the
coverage.
We are providing you with the terrorism coverage required by The Act. We have not established a separate
price for this coverage; however the portion of your annual premium that is reasonably attributable to such
coverage is: JQQ2.
Authorized gent
TRIA12 (5/03)
WESTCHESTER FIRE INSURANCE COMPANY
FINANCIAL STATEMENT DECEMBER 31, 2003
ADMITTED ASSETS
BONDS
$1,211,249,339
SHORT - TERM INVESTMENTS
32,096,506
STOCKS
2,499,900
REAL ESTATE
0
CASH ON HAND AND IN BANK
2,602,736
PREMIUM IN COURSE OF COLLECTION`
77,829,346
INTEREST ACCRUED
13,923,276
OTHER ASSETS
94,697,742
TOTAL ASSETS
1,434.698,845
LIABILITIES
RESERVE FOR UNEARNED PREMIUMS $379,073,789
RESERVE FOR LOSSES 747,946,558
RESERVE FOR TAXES 8,300,884
FUNDS HELD UNDER REINSURANCE TREATIES 13.943
OTHER LIABILITIES (176,810,273)
TOTAL LIABILITIES $958,524,901
CAPITAL: SPECIAL SURPLUS $117,300,000
CAPITAL: 928,592 SHARES, $4.85 PAR VALUE 4,503,671
CAPITAL: PAID IN 128,333,500
SURPLUS (UNASSIGNED) 226,036,772
SURPLUS TO POLICYHOLDERS 476,173,943
TOTAL $1,434,698,844 v,
(*EXCLUDES PREMIUM MORE THAN 90 DAYS DUE.)
STATE OF PENNSYLVANIA
COUNTY OF PHILADELPHIA
John P. Taylor, being duly swom, says that he is Vice President of
Westchester Fire Insurance Company and that to the best of his knowledge and belief the
foregoing is a true and correct statement of the said Company's financial condition as of the
31 st day of December, 2003.
Swom before me this 16th day of April, 2004.
Vice Pr sident
r
Notary P Elie' �/ My com issian expires
/short forms 2003/wfict
LJ� iN dig2;E ZA�?7YCKI, Nota Public !
�;�,r c: P�:riudzlphia. Phila. Ccunt� I
My Commission Expire; Qct, g. 2C04
I
Walsh Construction, Inc.
5828 N. St. Louis Ave.
Loveland, CO 80538
CONTRACTOR
T
BY:�IA-1th'�1f�1iS
ADDRESS: "pilewE,C AEn1T
Walsh Construction, Inc.
8. BID SCHEDULE (Base Bid) Loveland, CO 80538
LAKE STABILIZATION AT FOSSIL CREEK PARK
B SCHEDULE
Bid ite are described in Section 01800
BID
ESTIMATED
UNIT
ITEM
ITEM #
DES IPTION
QUANTITY
U
PRICE
TOTAL
GENERAL REQ REMENTS
1
Mobilization
1
----
Ls
2
General Conditi s
LS
3
Traffic Control
1
LS
FILL AREA - POND 1 AND 2
4
ewatering
1
LS
5
Earthwork - Fill
125
CY
6
Pipe Extension
10
LF
STABILIZATION AN ITTING ROCKS - PO 2
7
Riprap
520
LF
8
Sitting ocks
40
TON
STEPPING
TONES -POND 2
9
ewatering
1
LS
10
Riprap
10
LF
1
Stepping Stones
20
TON
7/96
Section 00300 Pa e 2
9
IIL ZATION AT FOSSIL CREEK PARK
BID SCHEDULE
Bid items are described in Section 01800
BID
ESTIMATED
UNIT
ITEM
ITEM #
DESCRIPTION
QUANTITY
UNIT
PRICE
TOTAL
GENERAL REQUIREMENTS
1
Mobilization
1
LS
yd06,
yppp,77
2
General Conditions
1
LS
Ws-/.,
3
Traffic Control
1
LS
C2 poo ,
FILL AREA
- POND 1 AND 2
4
Dewatering
1
LS
J ppO,
/Qpp,'l
4a
Dewatering - Haul and Dispose
50
CY
5
Earthwork - Fill
125
CY
30,
6
Pipe Extension
10
LF
STABILIZATION AND SITTING ROCKS - POND 2
7 Riprap 520
8 Sitting Rocks 40
STEPPING STONES - POND 2
9 Dewatering 1
9a Dewatering - Haul and Dispose 10
10 Riprap 10
11 Stepping Stones 20
TOTAL OF BASE BID
Sv, � rk&-o a,&ot pLa v�
(written)
ADD ALTERNATE:
1 Rip Rap at Pond 1
2 Topsoil
LF �39P, ?n,r
TON
LS-
CY
LF
TON
C/ &cvvL�(t d
_ $ //
Figure
270 LF / g, 9 to
50 CY7 ��j,
FTOTA ASE BID
written
Figure
ADD ALTERNATE:
1
Ri p at Pond 1
270
LF
opsoil
Rn
I
ICY
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profits insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (250) of the total Agreement Price.
RESPECTFULLY SUBMITTED
Si(�gnature Date
Zc5c-t:"�
Title
0-1- H 1
License Number (If Applicable)
(Seal - jifid is by corporXiAttest:�
Address a Ipy%- k5-
Telephone / -6,2d Y0?o27
7/96 Section 00300 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 150 of the contract.
ITEM
7/96
SUBCONTRACTOR
Section 00430 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires. Walsh Construction, Inc.
1. Name of Bidder: 5825 N. St. Louis Ave.
to
2. Permanent main office address:
3. When organized: 11 J 1( 01 c c
4. If a corporation, where incorporated: (tolfA
5. How many years have you been engaged in the contracting business under your
present firm or trade name?
6. Contracts on hand: (Schedule these, showing the amount of each contract and
theappropriateanticipated dates of completion.)
7. General character of Worko performed by your company:
M.
0
Have you ever failed to complete any Work awarded to you?
If so, where and why?
Have your ever defaulted on a contract? Rio
If so, where and why?
10. Are you debarred by any government agency? fVO
If yes list agency name.
7/96 Section 00420 Page 1
WALSH CONSTRUCTION INC.
JOBS IN PROGRESS
11/12/2004
#10304
Project:
Reynolds Ranch Open Space House Rehabilitation
48,711
Owner:
Boulder County
Bid#4577-04
2045 13th St., PO Box 471
Start 11-1-14
Boulder, CO 80306
Completion Date 2-15-04
303-441-3505
#20204
Project:
Glenda Rowe 303-441-4957
Landfill Gas Upgrade
Fax 303-441-4594
Contract#IRRA-2003-1
$431,400
Owner:
Islip Resource Recovery Agency
401 Main St.
Completion Date 12- 55-04
Islip, NY 11751
#20503 (Project: (Reconstruction of Brooksite Horse Trail Bridge at Blyndenburg County Park
Contract#CP 7009.316
$59,618.00
Owner:
County of Suffolk
William S. Shannon
Dept. of Public Works
Completion Date 11-04
335 Yaphank Ave.
Yaphank, NY 11980
SUF-141
#20403
Project:
631 /852-4010 - Fax 631 /852-4150
Well Head Enclosures
Contract#5674
$160,000.00
Owner:
Suffolk County Water Authority
Anthony Scrivano
3 building
P.O. Box 37
Joe Vecchio
4060 Sunrise Hwy.
Tony Mancusco
Fx631-589-5268
Oakdale, Long Island, NY 11769
631-563-0348
SCW-138
#20303
Project:
516/589-5200 - Fax 516/218-1156
Two Chemical Treatment'
Conti Bldg.
Fax 589-5277
JIMM
Contract#5628
Completion Date 01-05
M.
Evergreen and Edison
$297,060.00
Owner:
Suffolk County Water Authority
Anthony Scrivano
P.O. Box 37
Oakdale, Long Island, NY 11769
516/589-5200 - Fax 516/218-1156
SCW-137
Completion Date 11-04
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
�i 1► # -3go Mc� aI cpz
k)�:2 � kAA,5- (—i teCk Y"14Soe)C;' `J/ZGo4 WkeW'Nck �2 ►,u1�1�� V�G�KS
lNlffl izC AAiA FZ,ertc VnL '1 11 � 4It r.,,M IJI. _A C>t�e-
12. L' t your major equipment available for this contract.
AtK4 a __ Kic�s-rE��, VIt-2tous tt�c(�S U i�l�iouS -�A-+'
13
Experience in construction Work similar in importance to this
X
14.
Background and experience of the principal
including officers:
members of
your organization,
F "- --e�C Nt cJ
15.
Credit available: $ j(DO,C)c(3
16.
Bank reference:�NTgNN'�;fk 8WIK o� 11L
\ -c /`--fk
i PtOPE 970d 7 tc0j
17.
Will you, upon request, fill out a detailed
financial statement and furnish
any other information that may be
required
by the OWNER?
18. Are you licensed as a General CONTRACTOR? �� S
If yes, in what city, county and state? N,Lr3r� il� What
class, license and numbers? (SC - ;;Z P C.1-l1G
19. Do you anticipate subcontracting Work under this Contract? N,Q
If yes, what percent of total contract?
and to whom?
20. Are any lawsuits pending against you or your firm at this time? N�
If
DETAIL yes,
7/96 Section 00420 Page 2
Matthew Walsh
5M N. St. Louis Ave., Loveland, CO 80538
(970)635-1828
EDUCATION
B.S. - Construction Management, Colorado State University, Fort Collins, CO 80521
Major GPA: 3.0/4.0 May 1997
Course Content: Construction Project Administration, Scheduling & Planning,
Construction Contracts, Construction Estimating, Safety
Management, Labor Relations, Elementary Structural Design
WORK EXPERIENCE
Walsh Construction, Inc. Loveland, CO. July 1998 -Present
General Contractor
• President/Owner
R.D. Stewart, Inc. Loveland, CO. August 1997 - July 1998
General Contractor, Contact: Dave Hall (970) 669-1500
• Project Manager
• Oversaw project operations for commercial and multi -family construction
• Project estimating, budgeting, scheduling, cost control, general administration
• Negotiated, wrote and organized all subcontracts
• Performed on -site supervision
• Reported to Divisional Operations Manager
Amma Construction Corp. Huntington Station, N.Y. Summers/Winters 1988-1997
Civil Construction, Contact: Prescott Ammarell (516) 351-6124
• Supervised operations related to concrete, sitework and steel fabrication
• Assisted in project estimating
• Modified company's job cost control system
• Diagnosed possible managerial problems in company
• Assisted office engineer in everyday duties
• Assisted in organizing and maintaining companies shops and yard
• Operated wide range of heavy equipment
• Drove tractor/trailer combinations to move equipment and materials to various jobs
• Performed general labor duties
Self - Employed, Walsh Contracting, Northport, N.Y. Summers 1993 -1995
Residential Landscape Construction
• Initiated company's existence
• Contracted work related to residential landscaping
• Planned, organized and supervised everyday operations
end Use Environmental Corp. baiting Hollow, N.Y. Summer 1993
• Performed general tasks in accordance with marsh and wetland renovation