Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5884 LAKE STABILIZATION AT FOSSIL CREEK PARK (5)ADDENDUM''#J LAKE STABILIZATION AT FOSSIL CREEK PARK BID SCHEDULE Bid items are described in Section 01800 BID ESTIMATED UNIT ITEM ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL GENERAL REQUIREMENTS 1 Mobilization 1 LS ! Ono ' 2 General Conditions 1 LS 3 Traffic Control 1 LS FILL AREA - POND 1 AND 2 4 Dewatering 1 LS_' 4a Dewatering - Haul and Dispose 50 CY 5 Earthwork - Fill 125 CY 6 Pipe Extension 10 LF 44!5� STABILIZATION AND SITTING ROCKS - POND 2 7 Riprap 520 LF 100 CX.YJ ' 8 Sitting Rocks 40 TON roo STEPPING STONES - POND 2 �`""� 9 Dewatering 1 LS 3 500 9a Dewatering - Haul and Dispose 10 CY l 190 10 Riprap 10 LF co � ' nw — -- 11 Stepping Stones 20 TON D%0 � 5& w TOTAL OF BASE BID 41kit tv AbrZ' $ 3ST Figure ADD ALTERNATE: 1 Rip Rap at Pond 1 270 LF 100 7.10' 2 Topsoil 50 CY 30 1 15CYJ OFFICERS AND PRINCIPALS I� MOUNTAIN CONSTRUCTORS, INC. 11 /16/2004 YEARS OF NAME TITLE EXPERIENCE Kuntz, Joe President 41 Johnson, Andrea Secretary, Treasurer 13 Kinion, Dave Gen. Superintendent 31 Tjardes, Bill Superintendent 14 Y 21. What are the limits of your public liability? DETAIL What company? p-g 1S 22. What are your company's bonding limitations? 7 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at PF this -,o44 — day of ��✓ 20C4 Title:-4---I1'esiota4ljr- State of O-C) CQC16 County of L&e (j bei dul sworn deposes and says that he is r of4 V) 01brZ, and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. ibed and swo n to before me this �(p�ay of 20 ary Public I-JOHNSON My commission expires I )-p(.0 7/96 Section 00420 Page 3 W SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 150 of the contract. 7/96 ITEM SUBCONTRACTOR Section 00430 Page 1 SECTSON 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned * _ as Principal, andloverc M, ,a1, ^Cll Cnmas Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER,,in.the sum of $ ** for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the Cit/ of Fort Collins, -Colorado the accompanying Baal and hereby made a part hereof tc enter into a Construction Agreement for the construction of Fort Collins Project -LAKE'STABILIZATION AT FOSSIL CREEK PARK; BID NO. 5884. NOW THEREFORE, (a) If said Bid shall, be rejected, or (b) if said Bid sha_1 be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance wits_ said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shal"1 remain in force and effe t, it being expressly understood and agreed that the liability of tl r= Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies exec-ating bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. * Mountain Constructors, Inc. ** Five Percent of Amount Bid (5%) 7/96 Section 00410 Page 2 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hanc and seals thiis -16th day of November 1 2004, and such of diem as ax corporations rave caused their corporate seals to be hereto affixed and the= presents to be signed by their proper offxcex-s, the day and year first set fort above. PRINCIPAL Name:Mountain Constructors, Inc. Address: P.O. Box 405 Platteville. CO 80651 ` By: 00Ll�jJ , Title: ATTSS . By: (SEAL) ;SURETY Employers Mutual Casualty Company P.O. Box 370010 enver, CO 8 23 By; D.N. Broyles Title: Attorney -in -Fact (SEAL) 7/96 Section 00410 Page'3 No Text TOTAL OF BASE BID written Fi ure ADD ALTERNATE: 1 Rip Rap at Pond 1 270 LF 2 Topsoil 50 CY Ll 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. RESPECTFULLY SUBMITTED: Srgnatifre Date Title License Number (If Applicable) (Seal - Bid is by corporation) Attest: r1 Ad MOUNTAIN CONSTRUCTORS INC. P.O. Box 405 Platteville, Cr) 80651 Telephone (970)785-6161 7/96 Section 00300 Page 3 SECTION 00300 BID FORM PROJECT: LAKE STABILIZATION AT FOSSIL CREEK PARK; BID NO. 5884 Place +k-L,il IIf (16 Date 1)_)LP_0C 1. In compliance with your Invitation to Bid dated I6 /a�n_d subject to all conditi thereof, the undersigned LCZufo&n CCA\<- M0-A0r% a ** orporatio Limited Liability Company, Partnership, Joint Venture, or Sole Proprre or)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid oi�s a c rtifi d or cashier's check or standard Bid bond in the sum of : I i� Q] �� X ($ in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through 7/96 Section 00300 Page 1 7/96 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410Bid Bond 00420Statement of Bidder's Qualifications 00430Schedule of Subcontractors Section 00410 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: 004 n�&O n 2. Permanent main office address: �_ 5f ( JI( v( `+� 00 3. When organized: )I-,;-29- 4. If a corporation, where incorporated:�� 5. How many years have you been engaged in the contracting business under your present firm or trade name? ,'g�^ 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) i- 155 38Sa / -IbAr-en S -)C-734 15-C O-L4u 1= i'C'2 1 1-F3 ��i 1- _Mud LA.U. Dap) 2) Olo`1 3 15 -C4 D5 7. General ch,acter of Work performed by your company: 8. Have you ever failed to complete any Work awarded to you? If so, where and why? 9. Have your ever defaulted on a contract? If so, where and why? 10. Are you debarred by any government agency?� If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12. List your ma or equipment available for this contract. SQk CAJ nAI)0 13. Experience in construction Work similar in importance to this project: �J� l ➢ A�� 14. Background and experience of the principal members of your organization, including offic rs• �DD � Ql0 d 15. Credit availabl 16. Bank reference: 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? i ^a 19 Are you licensed as a General CONTRACTOR? If yes, in what city, county and state5 class, license and numbers? Do you anticipate subcontracting Work under this Contract? If yes, what percent of total contract? and to whom? 20. Are any lawsuits pending against you or your firm at this If DETAIL What time? yes, 7/96 Section 00420 Page 2 ,4f-e* t t�-- t /, /3 MOUNTAIN CONSTRUCTORS, INC. COMPLETED PROJECTS AS OF 11/16/2004 OWNER PROJECT NAME CONTRACT AMOUNT DATE COMPLETE CDOT Hwy 287 & SH 1 Im vmts $984,000.00 5/1/1997 Larimer County Elkhorn Creek $120,999.99 8/5/1997 City of Loveland Hwy 34 Underpass & path $507,896.00 9/9/1997 Larimer County CR 42C Improvements $197,117.00 2/1/1998 City of Greeley 35th Ave & 10 St. $501,925.00 11/3/1997 CDOT CDOT Erosion Control $146,000.00 3/27/1998 Larimer County Pleasant Valley Bridge Re I $162,165.00 5/14/1998 Larimer County Parks Maint. Facility $206,689.00 6/1/1998 City of Loveland Eisenhower Blvd. Im t. $530,856.90 6/22/1998 CDOT Hwy 34 Im vmt - Wiggins $1,310,464.00 12/31/1998 Larimer County Horsetooth Boat Ram $379,192.00 5/31/1999 City of Greeley Hwv 34 & 35th Ave Im vmt $1,082,474.67 8/31/1999 Citv of Greelev Mosier Hill Grading $57,000.00 5/31/1999 City of Fort Collins Horsetooth & Mason Im vmt $191,704.00 11/26/1999 City of Greeley 4th St. Reconstruction $944,787.00 1/10/2000 Colorado Div. of Wildlife Watson Lake Spillway_ $49,840.00 3/1/2000 Log Lane Village Street reconstruction - Log Lane $231,941.00 8/21/2000 Boulder Countv Niwot Rd & 95th Ave. reconstr. $707,293.00 10/30/2000 Town of Hudson Street resurfacing $90,390.00 7/30/2000 Larimer County Intersection Im vmt CR17 &CR14 $196,356.00 11/30/2000 Larimer County Intersection Im vmt CR17 &CR28 $102,324.00 11/30/2000 Larimer County Pinewood Lake parking lot $103,058.00 10/30/2000 Weld County Weld County Bridge 47/68B $299,988.00 4/28/2001 Larimer County Replace Bridge #226 $341,633.00 5/31/2001 Larimer County Road Improvements CR 64 $1,347,989.00 10/15/2001 City of Greele Monfort Park - Parking Lot /Access Road $378,647.00 8/31/2001 Colorado State Univ Rodeo Demolition $29,950.00 7/31/2001 City of Greelev Highway 257 Spur Reconstruction $199,832.00 9/30/2001 City of Greeley Reconstr of Number 3 Ditch $69,308.00 9/30/2001 City of Greeley 4th St. Reconstruction $1,275,065.00 11/30/2001 City of Fort Collins SH 14 Ped/Bike Path $867,578.00 7/30/2002 Town of Erie Leon Wurl Park(ay Construction $378,222.00 5/28/2002 MOUNTAIN CONSTRUCTORS, INC. COMPLETED PROJECTS AS nF I I/I R/9nnA OWNER PROJECT NAME CONTRACT AMOUNT DATE COMPLETE Weld County WCR 65 and WCR 24 1/2 Im vmt $877,029.00 8/16/2002 Bureau of Reclamation Hu hes Stadium Parkin Lot $511,190.00 9/26/2002 FHWA Beaver Meadows Visitor Center $867,577.66 6/12/2002 Colorado State Parks Jackson Lake $91,870.00 11/26/2002 Larimer County Handy Ditch $116,874.33 5/7/2003 Weld County Greeley Weld Co Airport $1,693,129.73 4/25/2003 Estes Park Fall River Pedestrian trail $280,112.50 7/31/2003 Estes Park Fall River Pedestrian trail PH II $170,488.00 12/31/2003 Loveland 2003 Stormwater Improvements $85,439.97 12/15/2003 City of Greeley 11th Ave & 22nd St. Im rovments $134,651.50 10/31/2003 City of Greeley 59th Ave Reconstruction $1,663,073.69 12/31/2003 Colo Dept of Trans . Safety Pro'ect $250,364.14 1/15/2004 Larimer County CR 27 & CR 44H Realignment $108,415.90 10/13/2003 Larimer County Pleasant Valley Bike Trail $166,364.60 11/30/2003 Evans 31st St. Realignment $385,447.37 2/1/2004 City of Greeley Hwy 34 & 35th Ave Im vmt $102,642.20 11/30/2003 Division of Wildlife Watson Lake Spillway $29,028.70 1/15/2004 Weld County WCR 51 Dust control $129,959.00 12/31/2003 Fort Collins N. College/Jefferson Im vmts $3,751,768.00 6/21/2004 Colo Dept of Trans . SH 1 & CR 54 $61,333.25 5/24/2004 --it- iL MOUNTAIN CONSTRUCTORS, INC. CONSTRUCTION EQUIPMENT 11/16/2004 M DESCRIPTION 14 Pick ups 1/2 ton, 3/4 ton 7 Service Trucks/Mechanic Truck 2 Dump Trucks 1 Water Wagon 8000 gal. 3 Water Trucks 2500 gal, 3500 gal. (2) 4 Truck Tractors - 85,000 GVW 10 Trailers - End Dump, Bottom Dump, Low Bed 1 Crawler Dozer - CAT D7H 4 Motor Graders - CAT 130G, 140G (2), 140H 5 Rollers - CAT 815, Dynapac 2511, CAT 463B, Bomag, CAT 563C 4 Motor Scrapers - CAT 623B, CAT 623E, CAT 627B (2) 3 Rubber Tire Backhoes - JD 310D, JD 410D (2) 4 Track Backhoes - JD 892D, JD 892E, CAT 325L, CAT 235 3 Bobcat - 753, 763, 853 1 Air Compressor - 175CFM 4 Welders 200Amp (3), 300 Amp (1) 1 Water Pump - 6 inch 3 Storage Trailers 5 Wheel Loaders - CAT 966C (2), CAT 950, CAT 966E, CAT 980F 3 Demo Hammer