HomeMy WebLinkAboutRESPONSE - BID - 5884 LAKE STABILIZATION AT FOSSIL CREEK PARK (4)NOV-08-04 MON 01:49 PM CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P,02/04
ADDEIMUK fi1..
LAKE STABILIZATION AT FOSSIL CREEK PARK
BID SCHEDULE
Bid items are described in Section 01800
BID ESTIMATED UNIT ITEM
ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL
GENERAL REQUIREMENTS
1
Mobilization
2
General Conditions
3
Traffic Control
FILL AREA - POND 1 AND 2
4
Dewatering
4a
Dewatering - Haut and Dispose
5
Earthwork - Fill
6
Pipe Extension
1
LS
2,025.00
2,025.00
1
LS
/2,950-
1Q,45D`"
1
LS
694.00
694.00
1
LS
9.150.00_
9 ,1_50 00
50
CY
16.00
800.00
125
CY
16.35
2,043.75
10
LF
65.00
650.90
STABILIZATION AND SITTING ROCKS - POND 2
7
Riprap
620
8
Sitting Rocks
40
STEPPING STONES - POND 2
9
Dewatering
1
9a
Dewatering - Haul and Dispose
10
10
Riprap
10
11
Stepping Stones
20
TOTAL OF BASE BID
LF
78.00
40,560.00
TON
62.00
2,480.00
LS
4,088.00
4,088.00
CY
16.00
160.00
LF
90.00
900.00
TON
68.00
1,360.00
A
ADD ALTERNATE:
1 Rip Rep at Pond 1 270 LF 66.00 17,820.00
2 Topsoil 50 CY 22.50 1,125.00
G.L. Hoff Company
2004 Projects
CSU Transit Center
Construction of parking improvements at the Lory Student Center on
the Colorado State University campus. The scope of work includes
site excavation and demolition, grading, landscaping, irrigation
system, fencing, and electrical lighting.
Owner: City of Fort Collins
215 North Mason Street
Fort Collins, CO 80524
Contact: Steve White, Project Manager, 970-221-6273
Contract: $208,761,
Completion: 4-2004
Loveland Industries Remodel
This remodel is a design -build tenant finish project for United Agri
Products, Inc. The work involves the complete remodel of an existing
metal building warehouse space into a laboratory. The scope of work
includes carpentry, drywall, HVAC, plumbing, electrical and all finishes.
Owner: United Agri Products, Inc.
14520 WCR 64
Greeley, CO 80631
Contact: Robert Bath, 970-356-8920 ext.201
Contract: $1.42,817.00
Completion: 4-2004
UNC Apartments Playground
Removal of existing playground equipment, sitework, concrete, irrigation
and installation of new playground equipment.
Owner: University of Northern Colorado
Greeley, CO 80631
Contact: George Galida, UNC Project Manager, 970-351-1892
Contract: $125,008.00
Completion: 5 -2004
Rolland Moore Park Shelter Replacement
Remove four existing wood laminate picnic shelters and replace with
structural steel shelters for the City of Fort Collins Rolland Moore Park.
Owner: City of Fort Collins
215 North Mason, Fort Collins, CO 80521
Contact: Eileen School, Project Manager, 970-416-2062
Contract: $121,962.
Completion: 5-2004
Student Recreation Center Landscape Improvements
Removal of existing concrete sun deck and construction of a new patio
with landscaping, decorative paving, concrete, shade structures, site
lighting and access drive.
Owner: Colorado State University
365 Aylesworth Hall SE, Fort Collins, CO 80523
Contact: Greg Smith, CSU Project Manager, 970-491-0150
Contract: $332,606.00
Completion: 8-2004
West Elizabeth Bike Lane Improvements
Construction of curb, gutter and concrete bike lane on both sides of
Elizabeth between City Park Ave., and Shields St, while maintaining
business access. Scope includes site clearing, asphalt and concrete
removal, asphalt patching, curb & gutter, ramp, apron and crosspan
construction, inlet reconstruction, earthwork, manhole and valve box
adjustments, and traffic control.
Owner: City of Fort Collins
215 North Mason St., Fort Collins, CO 80524
Contact: Erika Keeton, Project Engineer, 970-221-6605
Contract: $413,379.00
Completion: 8-2004
West Elizabeth Streetscape Improvements
Removal of asphalt and concrete sidewalk and construction of new
concrete sidewalk on both sides of Elizabeth between City Park Ave. and
Shields St. Scope includes landscaping, irrigation, installation of site
furnishings, pavement markings, and traffic control.
Owner: City of Fort Collins
215 North Mason St., Fort Collins, CO 80524
Contact: Erika Keeton, Project Engineer, 970-221-6605
Contract: $232,550.57
Completion: 8-2004
G.L. Hoff Company
2003 Projects
East Riverside Drive Retaining Wall and Street Rehabilitation Project
Construction of approximately 200 feet of 10 foot high retaining wall with
associated brick trim and metal top railing along the Big Thompson River.
Removal of two city blocks of existing street asphalt. Installation of an 8
inch water line with two hydrants, new service connections to 10 buildings,
3 street inlets and piping. Installation of concrete curb & gutter, drives and
pans, sidewalk, and the roadway base course and asphalt pavement along a
two block section of East Riverside Drive in Estes Park. Phase One of the
project was completed in October and November of 2002 and Phase Two
was completed between March and May of 2003.
Owner: Town of Estes Park
PO Box 1200, Estes Park, CO 80517
Contact: John Spooner, Project Manager, 970-586-9388
Van Horn Engineering and Surveying
1043 Fish Creek Road
Estes Park, CO 80517
Contract: $373,388.00
Completion: June, 2003
Butch Butler Press Box and Bleachers Project
Construction of a single pre -cast concrete structure for use as a press box
at Butch Butler Field in Greeley. The scope of work also included new
stadium bleachers and a concrete slab.
Owner: City of Greeley
Contact: Ted Trujillo, Parks Program Manager, 970-350-9340
1000 10th Street, Greeley, CO 80631
Contract: $108,282.00
Completion: February 2004
Bellvue Hatchery French Drain
Installation of a perforated and solid wall drain pipe at the Bellvue
Research Hatchery for the Division of Wildlife. Scope of work included
sitework and pipeline work.
Owner: State of Colorado Division of Wildlife
6060 Broadway, Denver, CO 80216
Contact: Kay Sinclair, 970-472-4433, Fort Collins
Contract: $17,073.00
Completion: 10-2003
Routt/Spruce Hall Sewer Line Replacement
Completion of sitework and utility work to remove and replace 215 LF of
sanitary sewer from Routt Hall to manhole with 6 inch PVC pipe.
Owner: Colorado State University
365 Aylesworth SE, Fort Collins, CO 80523
Contact: Michael Davis, Project Manager, Facilities, 970-491-0075
Contract: $54,279.00
Completion: 1-2004
Edwards -Ellis Parking Lot
Construction of new parking lot on Colorado State University campus.
Scope of work included demolition, sitework, storm drainage, fire line and
hydrant, asphalt paving, concrete pavement, irrigation and landscape work.
Owner: Colorado State University
365 Aylesworth SE, Fort Collins, CO 80523
Contact: Steve Kiess, Project Manager, Facilities, 970-491-0017
Contract: $282,608.
Completion: 9-2003
Fish Creek Pedestrian Trail
Construction of a concrete pedestrian trail including sitework, erosion
control, culvert installation, rip rap, seeding, fencing, concrete bikeway,
curb & gutter and traffic control.
Owner: Town of Estes Park
170 MacGregor Ave., Estes Park, CO 80517
Contact: Mike Todd, 970-586-2458
Cornerstone Engineering, 437, S. St.Vrain, Estes Park, CO
Contract: $322,056.
Completion: 3-2004
G.L. Hoff Company
Projects in Progress
East Riverside Drive Retaining Wall and Street Rehabilitation
Construction of concrete wall, walkway, curb and gutter, asphalt paving,
utility work. Scope included clearing site, demolition of existing sidewalk,
retaining wall, extension on bridge, riprap and asphalt. Construction of
cofferdam and dewatering, footings, masonry wall, metal railing, and
riprap. Complete concrete flatwork including sidewalks, drives, curb &
gutter, handicap ramps, plaza, and installation of sandstone pavers.
Provide landscaping and irrigation.
Owner: Town of Estes Park
PO Box 1200, Estes Park, CO 80517
Contact: John Spooner, Project Manager, 970-586-9388
Van Horn engineering and Surveying
1043 Fish Creek Road
Estes Park, CO 80517
Contract: $362,576.00
Completion: May, 2003
CSU Annual Trial Gardens Shade Structure
Construction of a custom metal shade structure with brick veneer and
specialty molded concrete flatwork.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact: Cass Bietler, Project Manager, 491-0158
Contract: $118,973.00
Completion: December, 2002
Pool Deck and Outdoor Kitchen Project
Removal and replacement of concrete pool deck with patterned concrete,
and roof and outdoor kitchen addition. The scope of work includes
sitework, demolition, concrete foundations and flatwork, masonry, roof
addition, utilities, and exterior kitchen cabinets, painting, plumbing and gas
piping, HVAC, electrical.
Owner: Mr. and Mrs. Earl Sethre
3304 Bent Drive
Loveland, CO 80538
Contact: Earl Sethre, owner,
Contract: $51,266.00
Completion: January 2003
DeDecker Studio Remodel
Project delvelopment and construction for remodel of existing shop
building for artists studio. Scope of work includes sitework and site
concrete, utilities, concrete/stone fence, masonry, structural timbers,
carpentry, insulation, windows and doors, drywall, painting, plumbing and
gas piping, HVAC, and electrical.
Owner: DeDecker Sculpture Inc.
1503 West 8th Street
Loveland, CO 80537
Contact: Maggie DeDecker, 663-5727
Contract: $135,279.00
Completion: February 2003
Wash Pad Improvements at Estes Park Facility
Construction of a trench grate inside an existing shop, a tank to hold
washdown water (septic tank) a concrete wash pad and connection to
existing sanitary sewer.
Owner: Waste Management of Estes Park
8310 S. Valley highway, Suite 200
Englewood, CO 80112-5806
Contact: Cort Nickel. Project Engineer, 970-224-5999
RTW Professional Engineers and Consultants, Inc.
Contract: $51,252.00
Completion: April, 2003
G.L. Hoff Company
Construction Experience
Gregory L. Hoff, President and Construction Manager
For the past thirty years, Greg has been involved with all aspects of construction. Greg
established G.L. Hoff Company in 1984. Serving as president and project superintendent,
Greg is a driving force in the company.
Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering
Technology, his early work included surveying and architectural design and drafting. He
has held a Class B Commercial Contractor's License with the City of Fort Collins since
1976. Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, and
Boulder.
Prior to 1984, Greg worked with A] Hockett, Inc. initially as an architectural draftsman and
progressing to project superintendent. He was also a partner in H&M Builders from 1976
to 1980. This company specialized in custom homes, tenant finish and custom millwork.
Beginning in 1984, Greg established G.L. Hoff Company, a commercial general contracting
company which specializes in all types of commercial construction including sitework,
excavation, structural concrete, and commercial buildings. As president and construction
superintendent for G.L. Hoff Company, Greg supervises a wide variety of projects
including, schools, churches, city and government projects, city park developments, as well
as many light industrial and concrete construction jobs. Greg oversees project scheduling,
review of construction procedures and specifications, monitors quality control and safety
enforcement on job sites. As president and construction supervisor, Greg works closely
with project owners, architects and engineers throughout the project.
Greg is an active member of the Loveland construction community. He has volunteered his
time to the Loveland Construction Advisory Board for over 15 years. While serving as
Chairman, this Board, the city adopted licensing for contractors. He is currently serving on
a review committee to study the International Building Code prior to adoption by the City
of Loveland.
Joel S. Reger, Estimator and Project Manager
Joel has a Bachelor of Science Degree in Construction Management from Colorado State
University and seventeen years experience in the construction field. He has continued his
education with estimating seminars including training with American Building Company's
estimating Access workshop. He is also an active member of the Sigma Lambda Chi
honorary national construction fraternity.
During the past thirteen years, as the chief estimator with G.L. Hoff Company, Joel has
compiled bids and development estimates for projects valued at up to five million dollars.
As chief estimator, he directs the project bidding process as well as the review of
specifications. He also works directly with project management, coordinating proposal
requests and change orders with the architect or owner, overseeing material orders to insure
that the project is completed in a timely manner and according to specifications. Joel is an
important and effective member of every Design -Build project with G.L. Hoff Company.
He works closely with the owner and architect to understand project goals and provide
detailed project budgets and construction options to meet the owner's needs.
Patrick R. Norris, Estimator/Project Manager
Pat brings over twenty five years of construction experience to his position as estimator and
project manager. His background includes experience with residential, commercial and
industrial construction. Pat began his career as a carpenter, form setter and equipment
operator. With 18 years working as a field foreman, he has a broad understanding of
building methods and materials as well as site safety and personnel management. His
knowledge of construction has enabled Pat to be an effective estimator and project
manager. During the past 6 years, Pat has bid and managed projects valued up to $
1
SECTION 00410
BID BOND
I�NOG�1 Ho
1�jL MEN BY THESE PRESENTS: that we, the undersigned
C aas Principal, and Employers Mutual Casualty Company as
Su1�etyn� are hereby held and firmly bound unto the City of Fort Collins, Colorado,
as OWNER, in the sum of $ 5% of total bid for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted. to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part. hereof to enter into a Construction Agreement for the construction of
Fort Collins Project, LAKE STABILIZATION AT FOSSIL CREEK PARK; BID NO. 5884.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other. respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWiVER.
7/96
Section 00410 Page 2
IN WITNESS NHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 16th day of November , 2004, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL
Name: G. L. Hoff Company
Address: 1815 W. 12th St.
Loveland CO 80537
By:
Title:
ATTEST:
B21�d 1. —-
C A^"
(SEAL)
7/96
SURETY
Employers Mutual Casualty Company
P. 0. Box 370010
Denver, CO 80237
By: h mow. p
Title: -Attorney -in -Fact. Darlene Lings
(SEAL)
Section 00410 Page 3
TOTAL OF BASE BID
(written)Figure
ADD ALTERNATE:
1
Rip Rap at Pond 1
270
LF
2
Topsoil
50
CY
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
4RESPE�CTIUL/LYSUMI
Gregory L.President
Title
#B-6
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:
Address 1815 West 12th Street
Loveland, CO 80537
Telephone 970-669-3255
11-16-2004
Date
7/96 Section 00300 Page 3
No Text
SECTION 00300
BID FORM
PROJECT: LAKE STABILIZATION AT FOSSIL CREEK PARK; BID NO. 5884
Place Fort Collins
Date November 16, 2004
1. In compliance with your Invitation to Bid dated October 21, 2004
and subject to all conditions thereof, the undersigned
G.L. Hoff Company a ** (Corporation, �rinrreeF-B3akrii�ttlr �em}arry,
authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of 5% of bid amount ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
Employers Mutual Companies
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.1
through
7/96 Section 00300 Page 1
G.L. Hoff Company
CONTRACTOR
BY:
ADDRESS: 1815 West 12th Street
Loveland, CO 80537
8. BID SCHEDULE (Base Bid)
LAKE STABILIZATION AT FOSSIL CREEK PARK
BID SCHEDULE ** See attached Revised Bid Schedule Addendum #1
Bid items are described in Section 01800
BID
ITEM #
IDESCRIPTION
ESTIMATED
QUANTITY TUNIT
UNIT
PRICE
ITEM
TOTAL
GENERAL REQUIREMENTS
1
Mobilization
1
LS
2
General Conditions
1
LS
3
Traffic Control
1
LS
FILL AREA - POND 1 AND 2
4
Dewatering
1
LS
5
Earthwork - Fill
125
CY
6
Pipe Extension
10
LF
STABILIZATION AND SITTING ROCKS - POND 2
7
Riprap
520
LF
8
Sitting Rocks
40
TON
STEPPING STONES - POND 2
9
Dewatering
1
tLS
10
Riprap
10
LF
11
Stepping Stones
20
TON
7/96 Section 00300 Page 2
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 150 of the contract.
ITEM
SUBCONTRACTOR
A
7/96 Section 00430 Page 1
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1.
Name of Bidder:
G.L.
Hoff Company
2.
Permanent main
office
address: 1815 West 12th Street, Loveland, CO 80537
3. When organized: January 1984
4. If a corporation, where incorporated: Colorado, 1989
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 20 years
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
CSU Student Recreation Center Landscape Improvements: $332,606. 8-2004
City of Loveland G-L Canal at Taft Culvert Extention: $130,365.00 1?2005
7. General character of Work performed by your company:
Commercial eeneral contractor: we complete 91te'Qork, concrete, carpentry,
project management with our own forces.
8. Have you ever failed to complete any Work awarded to you? no
If so, where and why?
9. Have your ever defaulted on a contract? no
If so, where and why?
10. Are you debarred by any government agency? no
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
Please refer to the attached information
12. List your major equipment available for this contract.
dump truck. CAT 928 loader, CAT 320 Track excavator, backhoes, bobcats,
motor grader, grading tractor, concrete pump
13. Experience in construction Work similar in importance to this
project:
Please refer to the attached information
14. Background and experience of the principal members of your organization,
including officers:
Please refer to the attached information
15. Credit available: $ 100:9000.
16. Bank reference: Loran Emmons, Bank One Loveland
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? yes
If yes, in what city, county and state? Fort Collins, others What
class, license and numbers? 0-6
19. Do you anticipate subcontracting Work under this Contract? yes
If yes, what percent of total contract? refer to bid information
and to whom?
20. Are any lawsuits pending against you or your firm at this time? no
If yes,
DETAIL
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
2 million plus 2 million umbrella
What company? Travelers, agent: Flood & Peterson Insurance, Fort
�o Rins
22. What are your company's bonding limitations? 5 million aggregate
23. The undersigned
corporation to
verification of
Qualifications.
Dated at Loveland
G.L. Hoff
Name
By:_
hereby authorizes and requests any person, firm or
furnish any information requested by the OWNER in
the recital comprising this Statement of Bidder's
this //day of 200
Title: Miriam T. _Hoff, Secretary Treasurer
State of Colorado
County of
Larimer
Miriam T. Hoff
being duly sworn deposes and says that he is
secretary treasurer of G.L. Hoff Company and that name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this day of
✓1%///A77 /i 2 016
My commission expires
/-/-D7
7/96 Section 00420 Page 3