Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5884 LAKE STABILIZATION AT FOSSIL CREEK PARK (2)ADDENDUM: #).. LAKE STABILIZATION AT FOSSIL CREEK PARK BID SCHEDULE Bid items are described in Section 01800 BID ESTIMATED UNIT ITEM ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL GENERAL REQUIREMENTS 1 Mobilization 1 2 General Conditions 1 3 Traffic Control 1 FILL AREA - POND 1 AND 2 4 Dewatering 1 4a Dewatering - Haul and Dispose 50 5 Earthwork - Fill 125 6 Pipe Extension 10 LS # 10�I 16OM.Db LS %Z$O.L" .00 LS IP 0()0. uo �, ° by LS�pDp , ot� DD CY z4,56� Zz5° vo CY I g , oD dt_Zi 250 , co LF I (�®, oo I boo. 14 STABILIZATION AND SITTING ROCKS - POND 2 7 Riprap 520 LF ,ao 8 Sitting Rocks 40 TON (05 00 w ev STEPPING STONES POND #�(� 2 9 Dewatering 1 9a Dewatering - Haul and Dispose 10 10 Riprap 10 11 Stepping Stones 20 TOTAL OF BASE BID (written) LS :SIOW.00 4t S,Vp6. cb CY 24 ° 50 24500 0 LF TON I $1� , °O 3 (iXL w D#14$ 7-7) SSD . vo Figure ADD ALTERNATE: 1 Rip Rap at Pond 1 270 LF 5So , ab 2 Topsoil 50 CY too ATTACHMENT C COWEST ASSOCIATES PAGE 01 ACOBDrm CERTIFICATE OF LIABILITY INSURANCE ADUCER (720)S24-9344 FAX (720)524-9352 THIS CERTIFICATE ISIISSUEE Co West Insurance Group Co West Insurance Associates P.O. Box 101387 Denver, CO 90250-1387 INSURED E-21 Engineering, Inc. 269S S. Raritan St Englewood, CO 80110 INSURERS AFFORDING COVERAGE INSURERA'. Hudson Specialty Ins INSURERD: Pinnacol Assurance INSURER D: INSURER R DATE (MMIDDIYYYY) 07/12/2004 TER OF INFORMATION THE CERTIFICATE NAIC # GQVf: GtCS THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR DD' TYPE OF INSURANCE POLICY NUMBER POLICY EFF CTIVE POLICY EXPIRATION LIMITS I ToOENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY FEC5101041 03/01/2004 03/01/2O0S EACHOCCURRENCE S 1,000 000 ETO RENTED DAMAGV9 IF S 5000 MED EXP (Any one person) S 10,000 CLAIMS MADE O OCCUR PERSONAL SAD/ INJURY S 1,000,000 A X Contract. Pollut. X Professional Liab. CLAIMS MADE OENERALAGOREGATE S 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMPIOP AGO S 2,000,000 POLICY 7 JJER& Lac RETRO DATE: 1/19/99 AUTOMOBILE LIABILITY X ANY AUTO CPP054927001 03/01/2004 03/03-/'e:005 COMBINED SINGLE LIMIT (Es eeclderrl) S 1,000,000 BODILY INJURY (Per Penonl S ALL OWNED AUTOS S SCHEDULED AUTOS HIREDAUTOS NON.OWNED AUTOS BODILYINJURY (Per sccldang $ PROPERTYDAMAGE (Per aceidenq S LIABILITY AUTO ONLY -EA ACCIDENT S OTHER THAN EA ACC AUTO ONLY: AGG 5 0GARAUE ANY ALTO S EXCESSNMBRELLA LIABILITY FXS3101782 05/10/2004 03/02/2005 EACHOCCURRENCE S 2 000,00 AGGREGATE S 21000,000 X OCCUR D CLAIMS MADE s A S DEDUCTIBLE X RETENTION S 10.000S WORKERS COMPENSATION AND 4018191 03/01/2004 03/03./2005 wCSTATU- O1H- EL EACH ACCIDENT 3 500,000 C EMPLOYERS' LIABILITY ANYCER EMBER EJ(LRTNr E07ECUrVF , F..L DISEASE- EA EMPLOYE S SOD, OOO E.L. DISEASE - POLICY LIMITS 500OO If ync, desalbe under SPECIAL PROVISIONS below OTHER DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS V Gr\Ir IrV SHOULD ANY OF THE ABOVE DESCRIBED POLICIES 6E CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL _ DAYS WRITTEN NOTICE TO THE CERTIFICATE MOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AOEATS OR REPRESEN7ATWES. AUTHORED REPRESENTAT'VE For information purposes ACORD 25 (2001105) wm%lV1{U t vml-VMA 4 rVF1 1709 CITY OF FORT COLLINS PAYMENT AUTHORIZATION FROM: PREPARED BY: PAY TO:-.� / ��, DATE PREPARED: G'o DISTRIBUTION AMOUNT DEBIT CREDIT clvf o&., APPROVED BY: r;),. . M a0 G A 4416 11-24 - ORke AV # 1210(8) Operator I.D.: uden1960 uden6340 OFFICIAL CHECK 3T,Y OF FORT WN O cents*** F� -0481614813 November 16, 2004 **$3,877.50** `. VOID IF OVER US $ 3,877.60 7L tl�- CONTROLLER ))'048Ir. L48Lill' :L210002481:486i 505774))' City of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 1 BID #5884 LAKE STABILIZATION AT FOSSIL CREEK PARK SPECIFICATIONS AND CONTRACT DOCUMENTS Bid No. 5884 — Lake Stabilization at Fossil Creek Park OPENING DATE: November 16, 2004, 3:00 P.M. (Our Clock) To all prospective bidders under the specification and contract documents described above, the following changes are hereby made. 1. No questions regarding this bid will be accepted after November 9, 2004, 5:00 pm. 2. Please use the attached Bid Schedule when submitting your bid. 3. SPECIFICATIONS 1. Division 1, Section 01800, Definition of Bid Items: Bid Item 4a. — Earthwork - Haul and Dispose Contractor shall take unusable material from the pond and remove it from the site. Bid amount includes all labor, material and equipment for a complete item. Bid Item 9a. — Earthwork - Haul and Dispose Contractor shall take unusable material from the pond and remove it from the site. Bid amount includes all labor, material and equipment for a complete item. If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: �- t 1�N61 DJ�EL` f I IJ 6 ,NL A:r ITAN 2. Permanent main office address: 3. When organized: `ct-1 1, 4. If a corporation, where incorporated: Col 0rPr'bO 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion:) Art D6* e -smTl4 rr- 4Arx, <v iron tvv) oU JV�r . Znn 4 '7. General character of Work performed by your company,:. l'I fl 1 l K. c�JR-"Vj' NSA z' TrT1[ 09y'r- I Iy W � r- 8. Have you ever failed to complete any Work awarded to you?_ If so, where and why? 9. Have your ever defaulted on a contract? Q If so, where and why? 10. Are you debarred by any government agency? JV 0 If yes list agency.name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of_construction. 12. List your major equipment available for this contract. ::5ft 6� cil ME tj s A 13. Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: 5 A Tt 11um'1 T 15. Credit available: $ 4OQ, Dab. 16. Bank reference: �f. �r � �1fST �c9►nnmuN 1 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the. OWNER? 18. Are you licensed as a General CONTRACTOR? '5rnt i -,--"NvA*kyj T A,I.f yes, in what city, county and state? What class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract? J 0 If yes, what percent of total contract? and to whom? 20. Are any lawsuits pending against you or your firm at this time? 110 If yes, DETAIL 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL What company? 22. What are your company's bonding limitations? 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at this _1 day of i�p V�B - 20Q_j State of ( D104A!� () County of INAt being duly sworn deposes and says that he is of and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. ubscribed and sworn to before.me this , day of V2M , 20b4 Notary Public My commission expires 1 I 1 9I acx� (p •'' COLLEEN HOLLAR 7/96 Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM SUBCONTRACTOR NVk- Section 00430 Page 1 Attachment A Question: No 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Answer: 1. Spectacle Lake Dam Rehabilitation, National Forest Service. Completion date November 2004. Cost: $89,000.00 Location: Chonehos County,Colorado Project type: Design Build dam rehabilitation new inlet and out let works with beaver prevention devise and spillway, while maintaining wetlands. Placement of abutment fill soils and rip rap. 2. Brocker Overlook, Arapahoe Wildlife Refuge. Completion Date: August 2004. Cost $ 181,000.00 Location Walden, Colorado Project Type: General construction of parking lots, earthen berms with mason End walls. Round observation platform with radial flagstone seat wall. Question No. 12: List all equipment available for this project. Answer: 140 ton Excavator 1 5 ton mini hoe 1 back hoe 2 Skidsters Question No. 13: Experience in construction work similar in importance to this project. Answer: E-21 Engineering completed a similar project the City of Englewood in 2002. The project included the design of a gas mitigation system and installation of a clay cover over an abandon landfill located between the Platte River and centennial lake. Upon placement and compaction of over 80,000 cubic yard of fill soils we built a concrete and rip rap shore line on the lake. A field of Dreams was built on the site in conjunction with the Colorado Rockies. Question No. 18: Are you licensed as a General Contractor? If yes, in what City, County and State, license and numbers. Answer: E-21 Engineering currently hold licenses in the following: 1. City of Aurora Lie. # 2004-10394200c1 Type A 2. City of Black hawk Lie. # 04-45 Engineering and Construction 3. City of Englewood Lie.# 12310 Type A 4. City of Lakewood Lie. # 11337 Type Misc. 5. City of Littleton Lie. # D15021 Type D-15Misc. 6. City of Louisville Lie. # 03275 Type Other 7. City of Sheridan Lie. # B00986 Type Class C-Consruction 8. State of Colorado Pre -Qualification Type Dir.#1 General Dir#2 Site work ATTACHMENT B The many years of experience of E-21's professionals provide the resources for the cost effective and timely completion of client requested consulting services. Through the nine-year history of E- 21 over 300 environmental and engineering projects have been successfully completed. Project sizes have ranged from initial environmental site assessments to full-scale site remediation design and construction with costs exceeding $ 2 million. Clients have ranged from small landowners to large corporations and the State of Colorado. Professionals available through the E-21 Engineering, Inc. Englewood office include: Name S ecial Ex erience Sergius Hanson, P.E., P.G. Environmental, Soil, and Waste Engineering 29 years Paul Gottler, P.G. Hydrogeology and Phase I and Il ESAs 12 years Brian Woody, P.G. Geology, Hydrocarbon Remediation 14 years John Rinko Jr. Environmental and Chemical Engineer 15 years Keith Allis Environmental Sciences 7 years Greg Underwood Hydrogeology / Underground storage tanks 6 years John Ward Construction Supervisor 11 years Kevin Allis Field Operations Manager 10 years Additional field geologists, engineers and technicians are available for quick turnaround projects. Office and other support personnel are also available and round out the E-21 Engineering, Inc. staff. Earthwork Construction and Remediation E-21 Engineering also provides earthwork services including soil location, soil geotechnical and environmental analyses, transportation, placement, removal, grading, filling, excavation and soil remediation earthwork. E-21 recently completed site redevelopment earthwork services for the demolition and regrading of the Cinderella City Redevelopment Site now known as the Englewood CityCenter. This and other work is described below. • CityCenter Englewood — Demolition site clean-up, earthwork and redevelopment. E-21 provided interactive design -build services as an engineer, managed and directed the transportation of 250,000 cubic yards of structural fill and recycled crushed concrete fill, its placement, and grading for the redevelopment of the former Cinderella Shopping Mall site in Englewood, Colorado. This multi -million dollar project included inter -facing with the lead demolition contractor, environmental soil and groundwater investigations, removal and legal disposal of over 4,000 cubic yards of hydrocarbon contaminated waste soils, import of 125,000 cubic yards of structural fill from 11 miles away, removal of old asphalt, removal of 400 buried concrete caissons, and interactive design assistance for earthwork and grading. Incidental work included manhole construction, sewer repair, and site overlot grading Total site redevelopment work was approximately $2.2 million. • Centennial Park Landfill Site Redevelopment — E-21 served as consultant and and remediation contractor for a large design -build site remediation project including Phase I and II Environmental Site Assessments of three parcels of land which are former solid waste dumps, design investigations for remediation, development of a Corrective Action Plan under Colorado's Voluntary Cleanup and Redevelopment Act.