Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5884 LAKE STABILIZATION AT FOSSIL CREEK PARKRDIDElgOl� D►i.: T� `7 LAKE sTA6M.Q.ATiON AT FOSSIL CREEK PARK BID SCHEDULE Bid items are described in Sedan 01800 BID ESTIMATED LUT ITEM ITEM # DESCPJ TION QUANTITY UNT PRICE TOTAL� GENERAL 1 Mobillizalion 1 LS 125on oo 2S lUU-°G 2 C,enend conditions 1 Ls 3 S W09 3y Oo � 3 TANTIC Comral 1 LS % FILL AREA - POND 1 AND 2 4 Dew W*e 1 LS ,1 4a Dewalls&V - Had err! Dispose so CY iar�_ 2 000 m=° 5 Eardwwrk - FM 125 CY 0 PureEAWAion 10 LF 30 ,7—, 3007 STABILQATION AND SITTrWQ ROCKS -POND 2 7 FWW 520 a SWkv Rocks 40 STEPPWG STONES - POND 2 9 Dewaller ft 1 9a Dmmiwig - Had and Dispose 10 10 mixap 10 11 Steppirg Stones 20 i� LTWS ?=T4ff�] LF V •Z i Sao TON iC71l LS /S d 0 921" / 5-D o CY �iG ocl LF. ie� 7d6a" TON 1 -2-4 0 AP tie. a V4V ADD ALTERNATE- 1 lip Rap at Pond 1 270 LF S=. 2 V5 2 Topeoi so CY 4S 7� Q < b 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12 List your major equipment available for this contract. 13. Experience in construction Work similar in importance to this project: 51 eWr 6,y we i( es(( '4—i19 % All 'U'-901iff �4 C'4 14. Background and experience of the principal including officers: members of your organization, 15. Credit available: $ fps cl� 16. Bank reference: } 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? 18. Are you licensed as a General CONTRACTOR? If yes, in what city, county and state? class, license and numbers? What 19. Do you anticipate subcontracting Work under this Contract? p If yes, what percent of total contract? and to whom? 20. Are any lawsuits pending against you or your firm at this time? /' O If DETAIL yes, 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL U�, vv o / A 000 0670 What company- �4 ��r., �,r-c F>icbA, Ctt 22. What are your company's bonding limitations��S i 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at f.- Ig00, this 16fA day of 200q. State of �OlUlh �p County of being duly sworn deposes and says that he is of 56b. wt v A-u%i< %.r<f,r./;.�, and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. �Subscribed and sworn to before me this \�_ day of Notary Publ c My commission expires L--�� 7/96 VTR F COS �'PO My Commission Expires 4-23-07 Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM 7/96 SUBCONTRACTOR Section 00430 Page 1 CITY OF FORT COLLINS PAYMENT AUTHORIZATION FROM: PREPARED BY: ggg:�2- P TO:DATE PREPARED: �02�028� DISTRIBUTIO014;311- APPROVED BY: 0 SECTION 00300 BID FORM PROJECT: LAKE STABILIZATION AT FOSSIL CREEK PARK; BID NO. 5884 Place Date 1. In compliance with your Invitation to Bid dated tl[f .21,i d 0 and subject to all conditions thereof, the undersigned wWV APeAks �cAjj a��'en a **(Corporation, Limited Liability Company, <tgjffM�, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of a - Q ' ($ in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: U d /cl t Pry�il/it i1 �/ 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through L. 7/96 Section 00300 Page 1 ADDRESS: �[G'8US`I aL- BID SCHEDULE (Base Bid) LAKE STABILIZATION AT FOSSIL CREEK PARK BID SCHEDULE Bid items are described in Section 01800 BID ESTIMATED UNIT ITEM ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL GENERAL REQUIREMENTS 1 Mobilization 1 ----- LS 2 General Conditions 1 LS 3 Traffic Control 1 LS FILL AREA - POND 1 AND 2 4 Dewatering 1 LS 5 Earthwork - Fill 125 CY 6 Pipe Extension 10 LF STABILIZATION AND SITTING ROCKS - POND 2 7 Riprap 520 LF 8 Sitting Rocks 40 1 ITONI STEPPING STONES - POND 2 9 Dewatering 1 LS 10 Riprap 10 LF 11 Stepping Stones 20 TON 7/96 Section 00300 Page 2 TOTAL OF BASE BID written Fi ure ADD ALTERNATE: 1 Rip Rap at Pond 1 270 LF 2 Topsoil 50 CY 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. RESPEC F LY SUBM TTED: / Signature 1 Date_ �av L/ P`,-/- Title License Number (If Applicable) (Seal - if Bid is by corporation) Attest: Address 4/(0 S Fy,-t'1kz Telephone rCj-2 p) 7/96 Section 00300 Page 3 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410Bid Bond 00420Statement of Bidder's Qualifications 00430Schedule of Subcontractors 7/96 Section 00410 Page 1 SN oaeze 11=24 Office AVk 1210(8) OFFICIAL CHECK 0482617051 Operator I.D.: uden2708 ' PAY TO THE ORDER OF'' ***CITY OF FORT COLLINS' ***Two thousand two hundred thirty doNars and no -Oent$0'* Wells Fargo and Company Issuer 420 MONTGOMERY STREET SAN FRANCISCO, CA 94163 - PAYABLE AT WELLS FARGO BANK,N.A. FOR INQUIRIES CALL (480) 394-3122 11e04826It705il1a 1:1210002481:486L 50577411■ a 0 u November 16, 2004 **$29230.00** VOID IF OVER US $ 2,230.00 X Z` _ CONTROLLER KNOW ALL Surety, are as OWNER, i truly to be assigns. SECTION 00410 C � *-0 Wo MEN BY THESE PRESENTS: as Principal, and hereby held and firmly bound unto the n the sum of $ for made, we hereby jointly and severally that we, the undersigned as City of Fort Collins, Colorado, the payment of which, well and bind ourselves, successors, and THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, LAKE STABILIZATION AT FOSSIL CREEK PARK; BID NO. 5884. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 2 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of , 20 , and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Name: Address• By: Title: ATTEST: By: (SEAL) 7/96 By: Title: SURETY (SEAL) Section 00410 Page 3 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. / 1. Name of Bidder: ta-r{M 2. Permanent main office address:13C�ve� 3. When organized: 4. If a corporation, where incorporated: 5. How many years have you been engaged in the contracting business under -your present firm or trade name? 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) e g�^o^e� �� Scbr/r -5e wCI el ,_[yrr7 — /4en, - :3 201 =6�/�/ _4 2-GlQ-7 7. General character of Work performed by your company: n dkl� All 8. Have you ever failed to complete any Work awarded to you? P/l 6 If so, where and why? 9. Have your ever defaulted on a contract? 44 If so, where and why? 10. Are you debarred by any government agency? If yes list agency name. 7/96 M Section 00420 Page 1