HomeMy WebLinkAboutWORK ORDER - REQUISITION - 21461PAGE 02
11/23/2004 16:09 6049 PARKS No.3076 fP. 02
IINov, 23. 2004A 12:16PUB49 f
AWS
WORKOUNRFOAM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY or PORT COi.UM
AND
M
• v• 1
Purdw
Fmim
Comm,
, • � n11 1„ � • . l 1�7��1�* � .)' �l � .• �.. � it J �,� — v
Scope d Seavka.-
Serums Provider agrees to Pu met the mexvioea idaat W above and m the attached
ft= in ea,ot bm wish the to= and am►ditim e;oinw hmm mad ice tw Serwm
AVOMMaat bd v= the putea. In tk event of oonfliet bet►vm ofr=Wgdty in flee
tw a of the SerAm Ageemegt and this work order (inajvdWg the A#gd ed fomm) ttte
S�tvioea Aget r�11 ootdrod.
new,
.11 WWff
11/23/2004 16:09 6649 PARKS
PAGE 03
ALLER • LINGLE
ARCI-IITECI'S OL
P.C.
August 74, 2004
Eileen Scholl
Parks Division
413 S. Bryan Avenue
Fort Collins, CO 80521
RE: Proposal for Architectural/Engineering Services
Buckingham, Park Restroom
Fort Collins, Colorado
Dear Eileen:
Alter-Ungle Architects P.C. is pleased to provide you with this Proposal for architectural services for
the proposed Restroom Building at Buckingham Park in Fort Collins. We are happy to have been
selected for this project. In response to our meeting on August 10, 2004, we propose the following
scope of services and associated fees:
Project Description
The project is to include architectural construction documents and construction administration as
outlined below. The work will be based upon the "Professional Services Agreement" dated in 2004 as
contracted with the City of Fort Collins, Colorado.
1. Provide design, construction documents, and construction administration based upon approved
floor plans from conceptual designs of restrooms previously completed for the City of Fort
Collins.
2. As recorded changes to the drawings will be provided.
Scope of Basic Services
The Scope of Basic Services shall be as follows:
1. Conceptual Design Phase: Conceptual floor plans, elevations.
2. Design Development Phase: Floor plan and elevation revisions based upon City of Fort
Collins' comments and cost estimate.
3. Construction Documents Phase: Modify the Warren Park construction drawings and
specifications only for competitively bidding the project to Contractors.
Overall Floor Plan
Reflected Ceiling Plan
Roof Plan
Wall Sections and Details
712 WHALERS WAY • RLDG. B, SUITE 100 a FORT COLLINS • COLORADO • ROM
(970) 223-1820 phone (970) 223.1333 fox 0 affice0aller4ingle.com • www,aller-lingle.com ■
11/23/2004 16:09 6649 PARKS
PAGE 04
Proposal for Arch ltecturalffingineering Services
Page 2
Room Finish Schedule
Door and Window Schedules, Door Types and Details
Interior Elevations
Foundation and Roof Framing Plans
Mechanical and Electrical Drawings
4. Coordination and Project Management: Coordinate the efforts of the Owner, Architect, and
Engineers for a complete project.
5. Bidding/Negotiation Phase: Assistance to the Owner to acquire and review Contractor bids,
attendance at Pre -Bid Conference, responding to Contractor questions and issuing addenda as
necessary, and assistance in reviewing bids, negotiations and contract award.
6. Construction Administration Phase: Perform field inspections of the work in progress during
construction with written reports to the Owner, attendance at Pre -Construction Conference,
attend site meetings with the Contractor and Owner's representative, review of shop drawings
and submittals as necessary, issuance of change orders as necessary, review of Contractor's
pay requests, final "punch list" inspection and assistance with project close-out. For purpose
of this Proposal, the number of field visits during the Construction Administration phase shall
be limited to two (2) architectural and structural trips and one mechanical / plumbing trip.
All construction documents prepared for this project shall be generated with our in-house Computer -
Aided Design and Drafting (CAD) systems, using AutoCAD Version 2002 software.
Work Not Included
1. Site Design: Owner to provide for all landscaping, utilities, paving, and grading to within 5'-0"
of the building separately.
2. Representation of public meetings including neighborhood meetings, City Council, Planning
Commission.
3. Perspectives, renderings, models or other presentation documents. See Additional Services.
4. Energy calculations as may be required by the City of Fort Collins in support of the building
permit application.
5. Site visits or inspections beyond those identified in the Basic Scope of Services.
owner -Provided Information
1. Owner -developed sketches or programming documents.
2. Copies of all applicable standard documents, forms, specifications or other information from
the City to be a part of the bidding documents.
3. Copies of all standard specifications for materials, equipment, fixtures and systems to be
incorporated into the project design used by the City, including material cut sheets and
sources for sales and technical representatives, if available.
4. City application, development and building permit fees.
5. All site landscaping, utility, paving, and grading design and specifications to within 5'-0" of the
building.
6. Site plan locating building.
7. Soils report for area where building is located.
Fees
Aller. Lingle Architects P.C. proposes to complete the project through the Construction Administration
phase for a maximum not to exceed fee based upon the hourly rates established with the City of Fort
Collins for a cost of approximately $14,900.00. A breakdown of this fee by project phase is as
■
11/23/2004 16:09 6849
PARKS
PAGE 05
Proposal for Architectural/Engineering Services
follows:
Alter -Lingle Architects P.C.:
$10,200.00
Weeks and Associates:
$ 1,250.00
Abrahamson Engineering:
$ 1,850.00
Electrical Systems Consultants:
$ 1000.00
Reimbursable Expenses:
S 500.00
TOTAL
$140900.00
Page 3
Billing
Professional fees shall be billed at the end of each month. Payment is due within 30 days of the
statement date. Interest of 1.5% per month (18% per annum) will be charged on any outstanding
balance. Fees shall be based upon hours used per month.
Reimbursable Expenses
In addition to Basic Services, reimbursables will be billed per the City of Fort Collins Contract. We
expect this amount to be about $500.00. All printing of construction documents and specifications for
bidding will be by the City of Fort Collins.
1. Blueprinting
2. Copying
3. Long distance telephone/1=AX
4. Mileage
5. Postage
6. Federal Express/Express Mail and other delivery services
7. Photography or other miscellaneous expenses
8. Plotting of CAD -generated drawings for City reviews and presentations
Additional Services
If the Owner requests additional services beyond those set forth in this Proposal, or for additional
services as described elsewhere in this Proposal, such services shall be agreed to in writing between
the Owner and the Architect and the fees adjusted accordingly per the current hourly rates as
contracted with the City of Fort Collins.
AIIer.Lingle Architects P.C.
Principal/Project Manager:
$110/hour
Associate Architect:
$92/hour
Sr. Project Manager/Architect:
$85/hour
Project Architect:
$75/hour
Interior Designer:
$65/1hour
Architecturallntern/CAD Tech. 2:
$60/hour
Architecturallntern/CAD Tech.1:
$50/hour
Clerical/Administration:
$35/hour
Weeks & Associates, Inc. Structural Engineers
Principal Engineer: $100/hour
Staff Engineer: $65.75/hour
Administrative Staff: $35/hour
0
11/23/2004 16:09 6849
PARKS
PAGE 06
Proposal for Architectural/Engineering Services
Abrahamson Engineering Inc.
Principal: $90/hour
Professional Engineer: $75/hour
Engineer/Senior Designer: $65/hour
Draftsperson: $42/hour
Clerical: $42/hour
Electrical Systems Consultants Inc.
Principal:
$75/hour
Project Manager:
$72/hour
Electrical Engineer:
$68/hour
Senior Designer:
$62/hour
Designer:
$55/hour
CAD Tech:
$46/hour
Clerical:
$30/hour
Page 4
Contract Terms
All terms of this Proposal shall be in accordance with our master contract with the City of Fort
Collins.
Schedule
Scope of Basic Services for this project will be performed in accordance with the following schedule,
assuming notice to proceed from the Owner by October 15, 2004:
1. conceptual Design Phase: 4 weeks, complete by November 14, 2004.
2. Design Development Phase: 8 weeks, complete by January 14, 2005.
3. Construction Documents Phase: 8 weeks, complete by March 14, 2005.
4. Bidding/Negotiation Phase: As required by the proposed bidding/construction schedule.
5. Construction Administration Phase: As required by the proposed bidding/construction
schedule.
Duration of Contract
If the Basic Services covered by this Proposal have not been completed within six (6) months of the
date hereof, or if the project is suspended for more than six (6) months, through no fault of the
Architect, compensation for the Architect's services beyond the term of this Proposal shall be
renegotiated as Additional Services.
Delivery of CAD Files
At the conclusion of the Project, the Architect shall deliver to the Owner copies of all final
construction documents on computer disks upon payment in full of all monies due to the Architect. It
is agreed that all such drawings and data are instruments of service of the Architect, who shall be
named the author, and who shall retain all common law, statutory and other rights, Including
copyrights. The Owner agrees not to use these drawings and data, or permit any reuse or
modification to be made to them, without the prior written consent of the Architect, and then only
after the Architect has been properly compensated for any such reuse. The Owner further agrees to
waive all claims against the Architect resulting in any way from any unauthorized changes or reuse of
the drawings and data for any other project by anyone other than the Architect. The transfer of the
CAD files for use by the Owner shalt not be deemed a sale and the Architect makes no warranty,
■
11/23/2004 16:09 6949 PARKS
PAGE 07
Proposal for Architectural/Engineering Services
either express or implied, of merchantability or fitness for any particular purpose.
Page 5
The electronic files provided by the Architect to the Owner are submitted for an acceptance period of
30 days. Any defects the Owner discovers during this period will be reported to the Architect and
shalt be corrected as part of the Basic Scope of Services. Correction of defects detected and reported
after the acceptance period will be compensated for as Additional Services.
Cost Estimates
Since the Architect and Engineers have no control over the cost of labor, materials, equipment or
services furnished by others, the quality or level of finishes selected, the Contractors methods of
determining prices, or competitive bidding or market conditions, any estimate of project costs is
made on the basis of the Architect's and Engineers' experience and qualifications and represent our
best judgment as experienced and qualified professionals familiar with the construction industry. The
Architect and Engineers cannot and do not guarantee that proposals, bids or actual construction costs
will not vary from the estimate of probable cost. The selection of either the method of construction
or a particular Contractor shall not affect this limitation.
Hazardous Materials
The Architect and Consultants shall have no responsibility for the discovery, presence, handling,
removal or disposal of, or exposure of persons to hazardous materials in any form at the project site,
including but not limited to, asbestos, asbestos products, polychlorinated biphenyl (PCB) or other
toxic substances.
Aller•Lingle Architects P.C. is dedicated to providing quality professional service and creative design
solutions. We look forward to the opportunity of working with you on this project. Give us a call if
you have any questions concerning this Proposal.
This Proposal is valid for a period of 60 days. Thank you for your interest and consideration.
Sincerely,
ALLER.LINGLE HITECTS P.C.
Shaun J. Moscrip, Assoc. AIA
SJM:IIs
0