Loading...
HomeMy WebLinkAbout102130 COOVER-CLARK - CONTRACT - RFP - P806 COLORADO STATE UNIVERSITY TRANSIT CENTERPROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and Coover-Clark & Associates, P.C., hereinafter referred to as "Professional'. W ITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: Scope of Services. The Professional agrees to provide services in accordance with the scope of services attached hereto as Exhibit "A", consisting of five (5) pages, and incorporated herein by this reference. 2. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated upon execution of this Agreement. Services shall be completed no later than August 12, 2002. Time is of the essence. Any extensions of the time limit set forth above must be agreed upon in writing by the parties hereto. 3. Early Termination by City. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following addresses: PSA 05/01 Task 6: Design Development Task 6.1: Design Development Plans and Specifications provided regarding the following elements: • Structures (excluding Phase II buildings) • Utilities • Vehicle areas • Pedestrian plazas and walkways • Landscaping • Street Furniture • Lighting • Outline Specifications Detailed design documents will be Task 6.2: Cost Estimate. Cost estimates will be revised to current phase of design. Task 6.3: Plat Map. The Project Team will prepare a plat document describing the subject tract for compliance with the Fort Collins/CSU agreement. The plat map is not intended to be filed of record as a subdivision plat. Task 7: Construction Documents Task 7.1: Construction Plans and Technical Specifications. A complete set of documents ready for submittal for building permits will be developed for all elements detailed in the Design Development Phase. Task 7.2: Cost Estimate. The Cost Estimate will be revised to reflect the CD level of design. Task 7.3: Weather Station. Design documents regarding the weather station relocation, if necessary, will be provided. Task 8: Bidding and Negotiation Task 8.1: Bid Preparation. Bid documents, to be supplemented as necessary with procurement specifications provided by the City of Fort Collins, will be prepared. Task 8.2: Pre -Bid Meeting. The Project Team will attend and will be available for questions 455 Sherman .Street, Suite 205.4 Denver, Colorado 80203 ..Phone: (303) 783-0040 A Fax. (303) 783-0060 to potential contractors. Task 8.3: Advice on Bids Received/Contract Negotiation. Work with City of Fort Collins regarding negotiation of award to selected contractor. Task 9: Construction Administration Task 9.1: Site Visits and Meetings. Site visits will be scheduled to match construction schedule regarding various components of the project and will occur no less frequently than bi- weekly. Task 9.2: Administration. Construction administration services will include: • Site visits for each technical area • Submittal review • Pay application review • Contractor questions regarding design intent • Punch List and Closeout. Task 10: Meetings Task 10.1: Meeting Planning and Scheduling. The Project Team will schedule all planned meetings described herein. Task 10.2: Meeting Attendance and Recording. The following meetings will be attended by some or all of the Project Team. The Project Team will be responsible for minutes and records of these meetings. • Program Review and Preliminary Site Plan Review Meeting • Final Site Plan Meeting • Phasing Plan/Design Development Review/Final Plat Meeting • Construction Document Submittal Meeting • Pre -Bid Meeting • Contract Negotiation Meeting • Construction Administration Meetings (Bi-weekly or as needed) • Final Punch List 455 Sherman Street, Suite 205 4 Deaver, Colorado 80203 ..t Phone: (303) ; 834040 t Fax: (303) 78.1-0060 EXHIBIT B STATE OF COLORADO STATE BUILDINGS AND REAL ESTATE PROGRAMS ARCHITECT/ENGINEER AGREEMENT STANDARD FORMAT (STATE FORM SC-5.1) ARTICLE 8. INSURANCE 8.1 COMMERCIAL GENERAL LIABILITY 8.1.1 It is agreed and understood Architect/Engineer shall maintain in full force and effect adequate commercial general liability insurance and property damage insurance, as well as workmen's compensation and employer's liability insurance pursuant to the State insurance requirements as defined below: 1 The Architect/Engineer shall obtain, and maintain at all times during the term of this Agreement, insurance in the following kinds and amounts. .a Standard Workers' Compensation and Employer's Liability as required by State of Colorado statute, including occupational disease, covering all employees at the work site. b General Liability (minimum coverage) .1 Combined single limit of $600,000 written on an occurrence basis. .2 Any aggregate limit will not be less than $1 million. .3 The Architect/Engineer must purchase additional insurance if claims reduce the annual aggregate below $600,000. .c Automobile Liability (minimum coverage) in the amount of $600,000 combined single limit. .2 The State of Colorado, State Board of Agriculture, and/or Colorado State University and The City of Fort Collins shall be named as an additional insured on each commercial general liability policy. .3 The insurance shall include provisions preventing cancellation without 45 calendar days prior written notice, by certified mail to the Principal Representative. .4 Architect/Engineer shall be responsible for all claims, damages, losses or expenses, including attorney's fees, arising out of or resulting from the performance of the Services contemplated in this Agreement, provided that any such claim, damage, loss or expense is caused by any negligent act, error or omission of Architect/Engineer, any Consultant or associate thereof, or anyone directly or indirectly employed by Architect/Engineer. Architect/Engineer shall submit a Certificate of Insurance at the signing of this Agreement and also any notices of Renewal of said Policy as they occur. 8.2. PROFESSIONAL ERRORS AND OMISSIONS LIABILITY 8.2.1 The Architect/Engineer promises and agrees to maintain in full force and effect an Errors and Omissions Professional Liability Insurance Policy in the amounts (indicated in the following table) as minimum coverage or such other minimum coverage as determined by the Principal Representative and approved by the State Buildings and Real Estate Programs. The policy, including claims made forms, shall remain in effect for the duration of this Agreement and for at least three years beyond the completion and acceptance of the Work. The Architect/Engineer shall be responsible for all claims, damages, losses or expenses, including attorney's fees, arising out of or resulting from the performance of Professional Services contemplated in this Agreement, provided that any such claim, damage, loss or expense is caused by any negligent act, error or omission of the Architect/Engineer, any consultant or associate thereof, or anyone directly or indirectly employed by Architect/ Engineer. The Architect/Engineer shall submit a Certificate of Insurance verifying said coverage at the signing of this Agreement and also any notices of Renewals of the said policy as they occur. For a Fixed Limit of Construction Cost Minimum Coverage per Claim Minimum Coverage in the Aggregate $999,999 and under $250,000 $500,000 $1,000,000 to $4,999,999 $500,000 $1,000,000 $5,000,000 to $19,999,999 $1,000,000 $2,000,000 $20,000,000 and Above $2,000,000 $2,000,000 ARTICLE 9. INDEMNIFICATION 9.1 INDEMNIFYING THE STATE AND CITY 9.1.1 To the extent authorized by law, the Architect/Engineer shall indemnify, save and hold harmless the State of Colorado, State board of Agriculture, and/or Colorado State University, and The City of Fort Collins, its employees and agents, against any and all claims, damages, liability and court awards including costs, expenses and attorneys fees, to the extent such claims are caused by any negligent act or omission of, or breach of contract by, the Architect/Engineer, its employees, agents, subcontractors or assignees pursuant to the terms of this contract, but not to the extent such claims are caused by any act or omission of, or breach of contract by, the State, its employees, agents, other contractors or assignees, or other parties not under the control of or responsible to the Architect/Engineer. EXHIBIT C B. Fee Pro osal - Hourl Breakdown Hours Per Hour Total LILA Coover--Clark & Associates Principal Architect 4 125.00 500.00 Principal Planner 4 110.00 440.00 Project Designer 4 100.00 400.00 Associate Designer 4 80.00 320.00 Clerical 0 30.00 - KA Associates Senior Partner 4 100.00 400.00 Huitt-Zollars Project Principal 3 147.10 441.30 Project Manager 6 115.30 691.80 Clerical 2 44.71 89.42 Task u otal 3,282.52 Coover-Clark & Associates Principal Architect Principal Planner Project Designer 8 32 8 125.00 110.00 100.00 1,000.00 3,520.00 800.00 Associate Designer 8 80.00 640.00 Clerical 6 30.00 180.00 KA Associates Senior Partner 36 100.00 3,600.00 Huitt-Zollars Project Principal 1 2 1 147.10 294.20 ra-sk SubTotal 10,034.20 Coover-Clark & Associates Princi al Architect Princi a] Planner Project Designer Associate Desil4ner 56 32 72 12 125.00 110.00 100.00 80.00 7;000.00 3,520.00 7,200.00 960.00 CADD 80 50.00 4,000.00 KA Associates Senior Partner 16 100.00 1,600.00 Huitt-Zollars Project Principal 2 147.10 294.20 Project Manager 3 115.30 345.90 Engineer II 12 70.70 848.40 Desi ner Clerical 40 1 71.78 44.71 2,871.20 44.71 Survey (Lump Sum 1 17,000.00 17,000.00 as Sub Total45,684.41 JA2001 Jobs\0114 - Fort Collins Transit\Proposal\Fee Proposal.xls JA2001 Jobs\0114 - Fort Collins Transit\Proposal\Fee Proposal.xls JA2001 Jobs\0114 - Fort Collins Transit\Proposal\Fee Proposal.xls JA2001 Jobs\0114 -Fort Collins Transit\Proposal\Fee Proposal.xls JA2001 Jobs\0114 - Fort Collins Transit\Proposal\Fee Proposal.xls ACQRD CERTIFICATE OF LIABILITY INSUR 4NC�o OP ID B DATE(MM/DDNY) OVE-1 1 08/28/01 PRODUCER THIS CERTIFICATE IS . .SUED AS A MATTER OF INFORMATION Olson & Olson, Ltd. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Carolyn Gratrix Book HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 333 W. Hampden Ave., Suite 440 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Englewood, CO 80110 Phone:303-761-0085 Fax:303-788-1817 INSURED Coover-Clark & Associates P.C. 455 Sherman St., #205 Denver CO 80203 INSURERS AFFORDING COVERAGE INSURER A: Continental Casualty Co. INSURERS INSURER C: INSURER D: INSURER E: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE POLICY NUMBER P 1 EFF TIVE DATE MM/DD/YY PO 1 Y EXP RATION DATE 1MM/DD1YY1 LIMITS GENERAL LIABILITY - EACH OCCURRENCE $ COMMERCIAL GENERAL LIABILITY CLAIMS MADE OCCUR FIRE DAMAGE (Any one fire) $ MED EXP (Any one person) $ PERSONAL& ADV INJURY $ GENERAL AGGREGATE $ - GEN'L AGGREGATE LIMIT APPLIES PER: POLICY JECT PRO- LOG PRODUCTS - COMP/OP AGG $ AUTOMOBILE LIABILITY ANY AUTO COMBINED SINGLE LIMIT (Ea accident) - $ ALL OWNED AUTOS SCHEDULED AUTOS BODILY INJURY (Per person) $ HIRED AUTOS NON -OWNED AUTOS BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS LIABILITY OCCUR CLAIMS MADE - EACH OCCURRENCE $ AGGREGATE $ DEDUCTIBLE RETENTION $ $ WORKERS COMPENSATION AND EMPLOYERS' LIABILITY TORY LIMITS ER E.L. EACH ACCIDENT $ E.L. DISEASE -EA EMPLOYEE $ E.L. DISEASE - POLICY LIMIT $ OTHER A Professional AEA 11 374 75 39 08/15/01 08/15/02 Per Claim $1,00,0000 Liability CLAIMS -MADE Annl Aggr $1,000,000 DESCRIPTION OF OPERATIONSJLOCATIONSNEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Claim expenses are included in the limits of liability. Payment of claim and claim expense reduce the limits. *Except due to nonpayment of premium. CFRTICICATC ut11 11CD COOVCLA SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL *30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL Coover-Clark & Associates, PC 455 Sherman St., #2 O5 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR Denver CO 80203 REPRESENTATIVES. 25-S (7/97) TION Professional: City: With Copy to: Coover-Clark & Assoc., P.C. City of Fort Collins, City of Fort Collins, Facilities 455 Sherman Street Purchasing P.O. Box 580 Suite 205 P.O. Box 580 Ft. Collins, CO 80522 Denver, CO 80203 Ft. Collins, CO 80522 Attn: Steve White In the event of any such early termination by the City, the Professional shall be paid for services rendered prior to the date of termination, subject only to the satisfactory performance of the Professional's obligations under this Agreement. Such payment shall be the Professional's sole right and remedy for such termination. 4. Design, Project Indemnity and Insurance Responsibility. The Professional shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the Professional, including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold harmless the City, its officers and employees in accordance with Colorado law, from all damages whatsoever claimed by third parties against the City; and for the City's costs and reasonable attorneys fees, arising directly or indirectly out of the Professional's negligent performance of any of the services furnished under this Agreement. The Professional shall maintain commercial general liability insurance in the amount of $600,000 combined single limits, and errors and omissions insurance in the amount of $1,000,000. Please see Exhibit B for further insurance requirements. 5. Compensation. In consideration of the services to be performed pursuant to this Agreement, the City agrees to pay Professional a fixed fee in the amount of One Hundred Thirty- PSA 05/01 2 Attachment 4 Certification Regarding Lobbying Certification for Contracts, Grants, Loans, and Cooperative Agreements (To be submitted with each bid or offer exceeding $100,000) The undersigned [Contractor] certifies, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for making lobbying contacts to an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form—LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions [as amended by "Government wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2) herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of 1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601, et seq . )] (3) The undersigned shall require that the language of this certification be included in the award .documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.S.C.3 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. [Note: Pursuant to 31 U.S.C.1352(cx1)-(2)(A), any person who makes a prohibited expenditure or fails to file or amend a required certification or disclosure form shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure or failure.] The Contractor, c0010ea- e-c.a,QK- 4, A-Joae ttAXMes9 gyp, c. , certifies or affirms the Truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. A 3801, et seq., apply to this certificatioo9nd disclosure, if any. (. ttl ---- Signature of Contractor's Authorized Official C. tAkukm & )A,^7 Name and Title of Contractor's Authorized Official Date Page 6 �. .. Jim ON eill - RE CSU Transit Center pLL1 From: "Beckhouse, David (TRO-08)" <David.Beckhouse@fta.dot.gov> To: "'Tom Frazier"' <tfrazier@fcgov.com>, "Dolby, Chic... Date: Mon, Oct 29, 2001 11:13 AM Subject: RE: CSU Transit Center Nope, you've got a LONP for the whole project so you're good to go. Just keep doing all the procurements and contract clauses as if they'll be paid for with FTA funds and you'll keep them eligible. -----Original Message ----- From: Tom Frazier [mailto:tfrazier@fcgov.com] Sent: Monday, October 29, 2001 11:03 AM To: Chick. Dolby@fta.dot.gov; David. Beckhouse@fta.dot.gov Cc: MSITTNER@fcgov.com; SWHITE@fcgov.com Subject: CSU Transit Center Good Morning Gentlemen, The firm of Coover-Clark & Associates from Denver have been selected to be the A-E firm on the Colorado State Transit Center project... Dave Clark, a principal in the firm, is the project leader, and I gave him your names just in case they have any FTA type questions ... a few things on the project status, we are initiating another appraisal, there was an appraisal completed in 1997 of the property, but the project staff felt it was best to do another full appraisal along with the required Review Appraisal... due to the short construction period allowance (CSU is out of session mid -May and returns the 3rd week in August) the A-E staff is planning to bid the project in February 2002 with construction starting in mid -May ... the City of Fort Collins is not participating in the Colorado Coalition this year, and the City will be seeking a specific funding earmark for the balance of the CSU Transit Center Project (Approx $6M)... is there anything we need to do through your office on this 5309 process??? Thanks for all your help on the past projects, and we look forward forward to another transit center opening... Tom F CC: FC7.FACILITIES(SWHITE),FC3.Transfort(MSITTNER) 0 Coover-Clark & Associates, P.C. Architects A Planners A Landscape .Interiors October 26, 2001 Mr. James B. O'Neill, CPPO, FNIGP Director of Purchasing and Risk Management City of Fort Collins 215 North Mason Street P.O. Box 580 Fort Collins, CO 80522-0580 Re: P-806 Colorado State University Transit Center Dear Mr. O'Neill: OCT 3 0 2001 Enclosed please find the four signed copies of the documents relating to the Colorado State University Transit Center. Also enclosed is a copy of our Professional Liability Insurance policy. A certificate will be mailed to you in your name from our company next week. Thank you for the opportunity to provide services to the City of Fort Collins. Please advise if you have any questions or you need anything else. Enclosures 4i4.ChPrmnn Vrnot. Nuity 201 .4 nvuropr. Cn/nrndn 90207 i Phnnm MM 797-0040 i Far- 007) 787-1)061) Oct.24. 2001 91 7AM No.2953 P. 1/2 0 Architects .c Planners a Landscapes A Interiors 455 Sherman Street, Suite 205 .4 Denver, CO 80203 Phone: 303.783-0040 .4 Fax: 303-783-0060 webmail@coover-clark.com Fax Transmittal To: JB" `- -nze }-9uAjLgh From: C L- *—L).1 ! h Few- 97)4 - o-61 - is 7 Q 7 Date: 10 -• O"L C4+Q / Phone: Pages: Re: CC: ❑ Urgent ❑ For Review ❑ Please Comment R Please Reply El Please Reoyale •Comnranfs: .1J 8 IL Attachment 4 Certification Regarding Lobbying Certification for Contracts, Grants, Loans, and Cooperative Agreements (To be submitted with each bid or offer exceeding $100,000) The undersigned [Contractor] certifies, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, tc any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for making lobbying contacts to an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form--LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions [as amended by "Government wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2) herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of 1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601, et seq .)] (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.S.C.3 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. [Note: Pursuant to 31 U.S.C. 1352(c)(1)-(2)(A), any person who makes a prohibited expenditure or fails to file or amend a required certification or disclosure form shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure or failure.] The Contractor, Gomueti.- C-C-AA c- 4� A-fjoGIA.-V* 4?. c . , certifies or affirms the Truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. A 3801, et seq., apply to this certificatig8;and disclosure, if any. �� l� L. Lk L ILGE--- - Signature of Contractor's Authorized Official GNP¢--es♦'Drwr'� e-"AA�-, Name and Title of Contractor's Authorized Official 4 t 53 o ( Date Page 6 Nov• 8. '?001 3:46PM No.3177 P. 2/2 Attachment 4 Certification Regarding Lobbying Certification for Contracts, Grants, Loans, and Cooperative Agreements (To be submitted with each bid or offer exceeding $100, 000) The undersigned [Contractor] certifies, to the best of his or her knowledge and belief, that (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for making lobbying contacts to an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form—LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions [as amended by "Government wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2) herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of 1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601, at seq .}] (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.$.C.a 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. [Note: Pursuant to 31 U.S.C.1352(c)(1)-(2)(A), any person who makes a prohibited expenditure or fails to file or amend a required certification or disclosure form shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure or failure.] The Contractor, Goev"- c4-NL0L 4 h'S'3,W tArCe I r?. c- . , certifies or affirms the Truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. A 3801, et seq., apply to this certificatiq+-, nd dis ure, if a�ny. �-+� ��^•- �-�-� �-1Ll E-- Signature of Contractor's Authorized Official Ge�+t- 5,�"► •++7 cl-�I Name and Title of Contractor's Authorized Official I t 1 o i Date Page 6 Oct,24. 2001 9:38AM No.2953 P. 212 STATE OF COLORADO DEPARTMENT OF REGULATORY AGENCIES COLORADO OFFICE OF CERTIFICATION s ti Bernette L Collins, Director �3 1560 Broadway, Suite 1540 ♦ ,� Denver, CO 80202 + (303)894-2355 * 876 Bill Owens Governor January 28, 2000 M Michael Cooke Executive Director COOVER-CLARR &,ASSMATI S 333 W. Hampden Avenue, Suite 315 Englewood, CO 80110 Dear Ms.Coover-Clark, ANNUAL APPROVAL OF CERTMCATE #1159 The Colorado Office of Certification is pleased to inform you that COOVER-CLARK & ASSOCIATES has been reviewed and deemed eligible for continued participation in the United States Department of Transportation's (U.S. DOT) Disadvantaged Business Enterprise (DBE) Certification Program. This letter serves as your official certification. Your firm will be included on eligibility lists maintained by the entities seeing a programmatic need for your work specialty, and for whom this office performs contract certification services. In accordance with U.S. DOT Regulations found at 49 CFR Part 26, your firm is certified for a period of three years. However, you will be ttotifted by postcard each JANUARY, the month commensurate with your Wtial certification, that your certification status must be re-evaluated. The postcard provides instructions on how to obtain the necessary form and the other documents to submit to the Office of Certification, Submittal of this information is necessary to ensure that there is no interruption in your certified status. For the duration of your firm's continued eligibility, business development assistance is available from the Colorado Department of Transportation (CDOT), the Regional Transportation District (RTD) and the Denver Water Board (DWB). To inquire about particular programs available through these entities, please contact them directly. The Colorado Office of Certification, Department of Transportation, Regional Transportation District and Denver Water Department wish you continued success in your business endeavors. Sincerely, Berretta L. Collins, Director Supporting Big Results for Small .Business three Thousand Six Hundred Eighteen Dollars and Four cents ($133,618.04) plus reimbursable direct costs. All such fees and costs shall not exceed One Hundred Thirty-three Thousand Six Hundred Eighteen Dollars and Four cents ($133,618.04). The parties acknowledge that KA Associates, Huitt-Zollars, and BCER are not parties to this agreement. However, the rates listed for services to be provided by these subcontractors shall be the rate paid by the City to the Professional for these services. If the amount charged by these subcontractors exceed the rates listed in Exhibit "C" the excess amount shall not be paid or owed by the City. The limitation on increases in prices set forth in section 4 herein shall apply to all rates listed in Exhibit "C" including subcontractor rates. Monthly partial payments based upon the Professional's billings and itemized statements are permissible. The amounts of all such partial payments shall be based upon the Professional's City -verified progress in completing the services to be performed pursuant hereto and upon the City's approval of the Professional's actual reimbursable expenses. Final payment shall be made following acceptance of the work by the City. Upon final payment, all designs, plans, reports, specifications, drawings, and other services rendered by the Professional shall become the sole property of the City. 6. City Representative. The City will designate, prior to commencement of work, its project representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the project. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the City Representative. 7. Project Drawings. Upon conclusion of the project and before final payment, the Professional shall provide the City with reproducible drawings of the project containing accurate information on the project as constructed. Drawings shall be of archival quality, prepared on stable mylar base material using a non -fading process to prove for long storage and high quality reproduction. PSA 05/01 3 8. Monthly Report. Commencing thirty (30) days after the date of execution of this Agreement and every thirty (30) days thereafter, Professional is required to provide the City Representative with a written report of the status of the work with respect to the Scope of Services, Work Schedule, and other material information. Failure to provide any required monthly report may, at the option of the City, suspend the processing of any partial payment request. 9. Independent Contractor. The services to be performed by Professional are those of an independent contractor and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Professional's compensation hereunder for the payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose. 10. Personal Services. It is understood that the City enters into this Agreement based on the special abilities of the Professional and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. 11. Acceptance Not Waiver. The City's approval of drawings, designs, plans, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement. 12. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default. 13. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek PSA 05/01 4 damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting parry's reasonable attorney fees and costs incurred because of the default. 14. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 15. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. THE CITY OF FORT COLLINnnS,,, COLORADO By: 1. John . Fischbach Manager ig 0/�_ By: a es B. O'Neill II, CPPO, FNIGF3'-- DirectoLzIf Purchasing & Risk Management DATE: Ilk AT T: City Clerk APPROV D AS IRM: - .2 Assistant City Attorney PSA 05/01 5 If Me By: Title CORPORATE PRESIDENT OR VICE PRESIDENT Date: % 0/ ATTEST- CorporateSecretary W Commission 03hY1Z003 PSA 05/01 6 EXHIBIT A 9 Coover-Clark & Associates, P.C. Architects . Planners .i Landscape A Interiors A. SCOPE PROPOSAL Task 1: Orientation/Goals Meeting Task 1.1: Kick-off Meeting. The project will be initiated by a kick-off meeting attended by the Project Team and representatives for Fort Collins and Colorado State University. The intent of the meeting is to: • Establish reporting preferences, • Establish project management contacts, • Confirm the schedule and tasks, • Collect existing reports, studies, data, guidelines, and regulatory information affecting the project . The meeting will also include a Goals Session that is intended to discuss objectives and priorities for the project. Meeting minutes and a summary of goals will be provided by the Project Team. Task 1.2: Stakeholder Involvement (Optional/Supplemental to RFP description). The Project Team will work with University, community, and regional stakeholders in the identification of transportation projects for CSU, the City of Fort Collins, and Larimer County transportation groups that meet common goals. The Project Team will work to develop a consensus among these stakeholders regarding project priority. The Project Team is also available to meet with CSU Stakeholders regarding project development and specific impacts to the campus and to the Student Center. Status meetings scheduled monthly through the design phase is proposed. Task 2: Program Verification Task 2.1: Program Summary. The Project Team will review the existing project program and provide analysis for each component in relation to the project goals. At minimum, the written analysis will: • Verify program elements. • Validate area/space requirements. • Review operational requirements that affect programming, including the identification of 455 Sherman Sfree4 Suite 2054 Denver, Colorado 8020.3 .[ Phone: (303) 983-0040 4 F" qx: 003 78:3-0060 pedestrian, bicycle, and automobile routes that will access the Transit Center to insure "multimodal aspects." • Review operational aspects of the current Transfort system for application to the Transit Center and critique of operational aspects of the system relative to access and operational impacts. • Enumerate regulatory and/or design requirements that impact programming, including CSU guidelines, Code Issues, Fort Collins land use controls, and Federal Transit Administration (FTA) regulations. • Summarize each program element. Task 2.2: Off -Site FTA Regulation Compliance (Optional/Supplemental to RFP). Past experience dictates that the FTA will want to insure that campus and community circulation has been reviewed and documented as part of this project. Sub -tasks include: • Review internal campus circulation patterns and campus plans with focus on applicability of transit way development. • Review Mason Street Corridor plan for application and integration to the Transit Center proj ect. • Assist in client contact and coordination of the project with the FTA regional office. Task 3: Master Site Plan Task 3.1: Topographic Survey. Prepare a detailed boundary and topographic survey of the subject tract. The survey will extend 100 feet beyond the parcel and will be reported at a one (1) foot contour interval. Task 3.2: Site Inventory. Prepare a mapped inventory of all surfaces, structures, improvements, and landscaping currently on the subject tract. Task 3.3: Develop Base Maps. A project specific and a vicinity base map will be prepared for use through the project. Task 3.4: Preliminary Site Plans. Alternative preliminary site plans that accommodate the entire project program will be developed for internal review. A review meeting to present the opportunities and constraints of each approach will be scheduled. Task 3.5: Final Site Plan. Upon consensus regarding alternative approaches, a final site plan will be prepared. Task 3.6: Environmental Review Documents (Optional/Supplemental to RFP). FTA will require an environmental review, (probably best at the site plan phase) with the objective of 455 Sherman Street, Suite 205_t Denver, C"Werado 80203.4 Phone: (703) 783-0040.4 i ax. (303) 783-0060 obtaining a categorical exclusion from the Regional Office Engineer, that may impact the project schedule. Also, ADA and Title VI documentation may be required. Task 3.7: Enhanced Conceptual Plans for Phase II Transit Center Building (Supplemental to RFP/Included in Fee Proposal). The function and layout of the Transit Center Building is critical information relevant to site planning, especially regarding pedestrian movement and service provision to the building when constructed. The RFP suggests that Schematic Design for the building occur during Phase Il. An enhancement of the conceptual plan is regarded as key to a sustainable Master Site Plan. Task 3.8: Model (Optional/Supplemental to the RFP). A three dimension scaled model of the site and long range building plan would be valuable in the planning and scheduling of campus projects in close proximity to the subject tract. Task 4: Schematic Design Task 4.1: Schematic Plans. This task is proposed to supplement the Master Site Plan. Schematic Design for all project elements will be prepared, including: • All physical structures (excluding Phase II buildings) • Utilities • Grading/Drainage structures • Vehicle areas • Pedestrian plazas and walkways • Landscaping • Street Furniture • Lighting Task 4.2: Cost Estimate. Preliminary cost estimate will be prepared based on detail of design accomplished through this phase. Task 5: Phasing Plan Task 5.1: Technical Memorandum Regarding Project Phasing. General construction phasing recommendations will be enumerated. Specific phasing details regarding the CSU Weather Station and the Arthur Ditch will be provided. Task 5.2: Preliminary Plat. (Not requested in the RFP). A preliminary plat will be developed and submitted for review. 455 Sherman Slreey Suite 205 A Denver, Colorado 80203.4 Phone: (103) 783-0040 A Fax: (303) 783-0060