Loading...
HomeMy WebLinkAboutAddenda - RFP - P948 SOUTH TAFT HILL ROAD IMPROVEMENTSCity of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 1 P-948 SOUTH TAFT HILL ROAD IMPROVEMENTS HORSETOOTH TO HARMONY ROAD SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Proposal P-948 South Taft Hill Road Improvements Horsetooth to Harmony Road OPENING DATE: July 28, 2004, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Please include the attached Exhibits A & B with the RFP. If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 4:1 fill slope 10 ft shoulder 12 ft travel lane 5 ft sidewalk, 8 ft parkway 6 ft bikelane J 11 ft travel lane 11 ft travel lane Existing 60 ft to 80 ft ROW 58 ft Paved Section 14 ft turn lane 10 ft shoulder 12 ft travel lane Interim Cross Section 100 ft ROW 18 ft center median Ultimate 100 ft Cross Section 4:1 fill slope 5 ft sidewalk 8 ft parkway 6 ft bikelane 11 It travel lane 11 ft travel lane Potential S. Taft Hill Road Cross Sections Horsetooth Road to CR-38E (Harmony Road) Exhibit A PROJECT AREA W. Jlorsetooth Rd o+1 v L 0 z_ v Powe �Q/ £ 0 3 s DQXter L�xYY 1 Red Fox 0 Silver Trails Dr `� ronson 0 ThreR i aks� °' + sc �I� h s 0 0 v� - J T N se _ Ares t Ct so St nt Ct c' Ct Ur�hiu Y Ct l+�P 0 0 Westfield Dr d Dr Rd Looko� 1� q� S. Taft Hill Road Horsetooth Road to CR-38E (Harmony Road) (Located in SW Quadrant of City) Vicinity Map Exhibit B