Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5870 FOSSIL CREEK TRAIL SOUTH OF FOSSIL CRK PKWY (4)SECTION 00300 BID FORM PROJECT: FOSSIL CREEK TRAIL SOUTH OF FORT COLLINS PARKWAY; BID NO. 5870 Place F6h�Cb[ ULVIS.cc Date -1 $•Oy 1. In compliance with your Invitation to Bid dated , and subject to all conditions thereof, the undersigned LAM kscs,Zyy., a ** Corporation] Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5*�. 4> %}eQ bld ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to urnish the specified performance and payment bonds is as �ollows: �JF. T;r-ec►-�'1nrv��Z��9 u�e—Cp �i�: 2'1.5 nth g+.�oiD8 L.o►�yi��'.GD�LLSDI 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through 7/96 Section 00300 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: L403 �`,w+Pfipr�Ses Tv�c_ 2. Permanent main office address: 3. When organized: 19 1Lc 4. If a corporation, where incorporated: C olz>VaA a 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) e e Ak4o c_6. 7. Genera�character of Work performed by your company: .gec 8 Have you ever failed to complete any Work awarded to you?bp If so, where and why? 9. Have your ever defaulted on a contract?j'» If so, where and why? 10. Are you debarred by any government agency? �Q If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12. List your major equipment available for this contract. ,See- WacAte-d 13. Experience in construction Work similar in importance to this rojennct: . 14. Background and experience of the principal members of your organization, including officers: Sec 44� 15. Credit available: $ Mpyt�1fs�Cjf- ��&11k oy'Q- 16. Bank reference:Se-e Iy��tCfneri 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? V eS 18. Are you licensed as a General CONTRACTOR? 1 es If yes, in what city, county and state? e e-A+4.C, e- What class, license and numbers? 19. Do you anticipate subcontracting Work under this fi Contract? yes If yes, what percent of total contract? 3104/. and to whom? l,&4Xpu" ' d�iU(ec :gn ~ lJA4 kR Fence - C�G1ew�a._Se�d:h� _ , i 20. Are any lawsuits pending against you or your firm at this time? h o If DETAIL yes, 7/96 Section 00420 Page 2 n 21. What are the limits of your public liability? DETAIL wee Pam+ What company? 22. What are your company's bonding limitations? 23. The undersigned hereby authorizes and requests any person, corporation to furnish any information requested by the verification of the recital comprising this Statement of Qualifications. cc Dated at2r, C,D this o'i011- State of (polo County of L&rI day of firm or OWNER in Bidder's 2 0D y. Le �.� being duly sworn deposes and says that he is FIr tSi�u+ of q �i5pa` Z'hL and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. ubscribed and sworn to before me this O(O day of 2 00y . �a-A A. r, A A//1 C,� ,V/ J-i- c r, rr..• A n -expires i . �� D 7/96 D 513 klff.T.ITTVTN� IC is li 1. Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. 1� ITEM 7/96 FF `� SUBCONTRACTOR Section 00430 Page 1 CONTRACTOR'S QUALIFICATION STATEMENT L & M Enterprises, Inc. 735 East Colorado Hwy 56 P.O. Box W Berthoud, CO 80513 Phone: (303) 442-7401 or (970) 532-3706 Fax: (303) 442-2231 ORGANIZATION L & M Enterprises, Inc. is a Colorado corporation doing business since October of 1975 CORPORATE OFFICERS PRESIDENT: Lawrence L. Bebo VICE PRESIDENT: Ronald Propp, Steve Moritz, John Manes, Derek Helme, Iliaser Melendez SECRETARY/TREASURER: Janet M. DeMott BANK REFERENCES Bank One 200 East 7th Street Loveland, CO 80537 Contact: Ron Schneider (970) 622-7520 Community First National Bank 415 Mountain Ave Berthoud, Colorado 80513 Contact: Misha Maggi (970) 532-1000 BONDING SURETY: St. Paul Fire & Marine Insurance Company AGENT: Herbert Leavitt Insurance Agency, Inc. 275 S. Main, Suite 208 Longmont, CO 80501 Contact: Richard Herbert (303) 939-9921 INSURANCE AGENT: Herbert Leavitt Insurance Agency, Inc. 275 S. Main, Suite 208 Longmont, CO 80501 Contact: Richard Herbert (303) 939-9921 MISCELLANEOUS Dun & Bradstreet #040716359 -have been bonded up to six million dollars for a single job-$20,000,000.00 aggregate Liability Limits: $1,000,000.00 $1,000,000.00 $2,000,000.00 FIRM PREPARING FINANCIAL STATEMENT Bauerle and Company Contact: Bruce Gregory (303) 759-0089 LICENSING/PRE-QUALIFICATION • City & County of Denver Pre -qualification CE-1,3,4, and 7: Expires February 28, 2005 • City of Longmont License Classification D-16, No. D16000034: Expires June 30, 2005 • City & County of Denver RW-EXCVTR License: Expires December 31, 2004 • City of Thornton Landscaping License Number: 2163: Expires June 5, 2005 • City of Lakewood License No. 5937 Expires December 17, 2004 • City of Broomfield General Class A No. A2002-1041: Expires December 31, 2004 • Department of Agriculture Pesticide Applicator, License Categories 109, 206, 207: Expires August 3, 2005 • City of Louisville Contractor Pre -qualification: Expires April 1, 2005 • City of Aurora License No. 45168RTSL Expires December 25, 2005 • City of Black Hawk License No. 04-71 Expires January 1, 2005 • Town of Johnstown License No. 45 Expires December 31, 2005 • Colorado Department of Transportation • Vendor ID #167A Expires February 28, 2005 CONSTRUCTION CLIENT REFERENCES Urban Drainar & Flood Control District (303) 455-6277 2480 West 26 Avenue, Suite 156B Denver, Colorado 80211 Contacts: Dave Lloyd, Mark Hunter, Paul Hindman, Dave Bennetts, Mike Sarmento Icon Engineering, Inc. (303) 221-0802 7108-B South Alton Way Englewood, Colorado 80112 Contacts: Penn Gildersleeve, Doug Williams, Matt Ursetta City & County of Denver. (720) 913-4504 201 West Colfax Ave Denver, Colorado 80202 Contact: James Geist McLaughlin Water Engineers, Ltd. (303) 458-5550 2420 Alcott Street Denver, Colorado 80211 Contact: Mike Galuzzi, John Pflaum Sellards & Grigg, Inc. (303) 986-1444 143 Union Boulevard, Suite 280 Lakewood, Colorado 80228 Contact: Chuck McKnight South Suburban Park & Recreation District (303) 798-5131 6631 South University Boulevard Littleton, Colorado 80121 Contact: Bill Woodcock Muller Engineering Co, Inc. (303) 988-4939 777 South Wadsworth Blvd. Lakewood, Colorado 80226 Contact: Bruce Behrer EXPERIENCE Current list of work categories which L & M Enterprises, Inc. normally performs with it's own forces: EARTHWORK / SITE PREPARATION Excavation/embankment, backfill, compaction, rock excavation, clearing/grubbing, demolition WATER RESOURCES Soil cement, earthen/rip-rap dams and drop structures, erosion control, dewatering, rip -rap slope protection, wetland mitigation STRUCTURES Pipeline (concrete/metal), culverts, gabion walls, manholes, storm drainage, box culverts, etc. LANDSCAPE /REVEGETATION Soil preparation, planting (trees, shrubs, ground cover), seeding (native and bluegrass) and sod installation IRRIGATION Pump stations, drip systems, temporary and permanent (commercial) MAINTENANCE Native/Turf mowing and trimming, aeration, weed/insect control, tree/shrub pruning, snow removal and parking lot sweeping and striping WORK FORCES Construction: 1 Chief Estimator 2 Estimators 1 Superintendent 3 Foremen 15 Laborers/Operators Landscape, Irrigation & Maintenance: 5 Supervisors 8 Crew Leaders 40 Laborers Administrative: 1 Office Manager 3 Administrative Assistants PROJECTS IN PROGRESS PROJECT: LAKESHORE DRIVE IMPROVEMENTS: Remove asphalt paving, concrete paving, concrete curb and gutter, storm sewer inlet and storm sewer pipe; clearing and grubbing; earthwork; hot mix asphalt pavement; asphalt patch; concrete pavement; concrete curb & gutters; concrete inlets; reinforced concrete storm pipe; topsoil; seeding and planting. OWNER: City and County of Denver ENGINEER: DHM Design Corporation CONTRACT AMOUNT: $810,358.50 ESTIMATED COMPLETION DATE: September 1, 2004 Theresa Brashear 720-913-8528 START DATE: March 1, 2004 PROJECT: ACADEMY PARK: Bike path, rip rap, seeding, willow stakes, cottonwood stakes, tree planting, RCP, type 16 double inlet, fencing, traffic control, type 14 inlet, wingwall. OWNER: Urban Drainage & Flood Control District ENGINEER: Kiowa Engineering Corp. CONTRACT AMOUNT: $211,124.20 ESTIMATED COMPLETION: June 30, 2004 Ken MacKenzie Steve Brown START DATE: March 29, 2004 PROJECT: S. LAKEWOOD GULCH @ REED STREET: Remove structures, muck excavation, fencing, soil riprap, 5' grouted boulder channel edge, RCP, headwall, wingwalls, trash rack, handrail, repair and adjust irrigation system @ golf course. OWNER: Urban Drainage & Flood Control District ENGINEER: Icon Engineering, Inc. CONTRACT AMOUNT: $149,613.30 ESTIMATED COMPLETION: June 2, 2004 Ken MacKenzie Doug Williams START DATE: March 3, 2004 JUL-20-04 TUE 03:48 PM CITY/FT COLLINS, PURCHAS FAR NO, 970 2218707 P.02/02 Project: Fossil Creek Trail @ Fossil Crook Parkway BID SCHEDULE (BASE BID) - ADDENDUM #2 Bid Items are described in Section 01800 BID ESTIMATED UNIT ITEM ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL 1 Mobilization �_._...---- -- $ -_-. 9=51- 5---- ' D51.95 2 Traffic Control -1 LS _ Dq 1. 3, 0t,5(D _a ---------------- --- -- 1 — - LS- 3 yo. ah 37�to.a(� --4 - -- Excavation _ - 1,070 CY �, �p , 0 _5 Borrow - A.B.C. Class 6 136 TONS �Q, �- �,ga� 4 6 Fence - Western 3-Rail 1,990 LF 7 5" Colored Concrete Paving 24,350 — SF 8 _ ADA Accessible Ramps _ _ 2 _ _EA [CR RD 3g7W 9_ 12"Curb .read 850 LF C8.5a _ 10 18" Curb head _ - 190 LF 31.53 11 Adjust Valve Box �- 2 EA toglgq 1 $$ 12 Remove Concrete Sidewalk 675 SF 0144 ag1,DU 13 Remove Curb and Gutter 10 LF ail 7. !� 14 Relocate Barricade 3 EA- 1'-l3.7 `j3j.lto - 155 - Relocate Tree _ - - ---------.. - -1 - EA - a- 16 Drill Seeding 1� AC a/,a 214, 17 Metal Trail Gate - ,-1 _ - EA 3y 18 Silt Fence __ _ 2,400 _ LF 601 lb.og 6" Concrete Paving - Nan -Colored 19 Sidewalk 1,335 SF -fib g'53`I.Do Bid ArnountlS��r�il11V�11�V�Dip 1r1U, �2t7P,v���p�Q�,D TOTAL$ �a 037y� (Please write out am nt in words) �►. p�,, t RECENTLY COMPLETED PROJECTS PROJECT: WEST BANK STABILIZATION UPSTREAM OF 104T": Import topsoil, type "L" riprap, seeding, hydro mulching, cottonwood poles with beaver protection, willow bundles. OWNER: Urban Drainage & Flood Control District ENGINEER: Urban Drainage & Flood Control Dist. CONTRACT AMOUNT: $96,984.80 COMPLETED: June 1, 2004 Brian Kohlenberg Brian Kohlenberg START DATE: March 15, 2004 PROJECT: EAST BANK @ HAZELTINE PIT: Riprap, import topsoil, native seeding, willow bundles, cottonwood poles with beaver protection, water control, dewatering. OWNER: Urban Drainage & Flood Control District ENGINEER: Urban Drainage & Flood Control Dist. CONTRACT AMOUNT: $142,500.00 COMPLETED: June 1, 2004 Brian Kohlenberg Brian Kohlenberg START DATE: February 25, 2004 PROJECT: PROMONTORY POND: Pond restoration, excavation and repair. OWNER: City of Greeley ENGINEER: City of Greeley CONTRACT AMOUNT: $156,771.00 COMPLETED: June 1, 2004 Phil Carter START DATE: March 15, 2004 PROJECT: BEAR CREEK PARK/SIMMS ST. TRAIL CONNECTION: Removal and replacement of concrete pavement; removal of fence; clearing and grubbing; bollards; topsoil, seeding; excavation and traffic control. OWNER: City of Lakewood ENGINEER: City of Lakewood CONTRACT AMOUNT: $71,702.50 COMPLETED: April 15, 2004 Mary Barnard (303)987-7670 Ken Nyhoff (303) 987-7900 START DATE: January 30, 2004 PROJECT: NORTH MASSEY DRAW/DAKOTA POND IMPROVEMENTS: Drainageway demolition and earthwork, riprap, grouted boulders, asphalt path, sediment control, seeding, mulching and planting, pond excavation and liner, pond drain line, concrete pond spillway crossing. OWNER: Ken Caryl Ranch Master Association ENGINEER: McLaughlin Water Engineers John Pflaum CONTRACT AMOUNT: $224,844.50 START DATE: October 20, 2003 COMPLETED: April 6, 2004 PROJECT: BRANTNER DITCH: Riprap, grouted boulders, excavation, native seeding, water control and dewatering. OWNER: Urban Drainage & Flood Control District ENGINEER: Bryan W. Kohlenberg CONTRACT AMOUNT: $218,768.50 COMPLETED: January 1, 2004 START DATE: November 1, 2003 PROJECT: 16`' STREET GRADE CONTROL STURCTURE ON SOUTH PLATTE RIVER: Water control, install 3' boulders, grout, excavation, native seeding, hydro mulching. OWNER: Urban Drainage & Flood Control District Steve Materkowski (303) 455-6277 ENGINEER: McLaughlin Water Engineers CONTRACT AMOUNT: $125,000.00 Brian Kohlenberg (303) 458-5550 START DATE: March 10, 2003 COMPLETED: December 3, 2003 —Contract time extended by change orders. PROJECT: NORTH CLEAR CREEK IMPROVEMENTS: Water control, riprap, concrete flat work, extend existing wall, floodwall, type 13 inlet, pipe extension & drains, emergency stairs, excavation, structural fill, rock/stone veneer, asphalt parking lot. OWNER: Mardi Gras Casino Isle of Capri Casino ENGINEER: Parkhill Ivins CONTRACT AMOUNT: $1,014,598.00 COMPLETED: December 12, 2003 David Zornes Richard Meister Troy Leach 303)839-3422 START DATE: June 8, 2003 PROJECT: CLEAR CREEK CHANNEL IMPROVEMENTS: Excavation, water control, erosion and sediment control, muck excavation, landscape planting, hydro mulching, 18" and 24" concrete pipe, boulder edging. OWNER: Urban Drainage & Flood Control District ENGINEER: Icon Engineering, Inc. Douglas Williams CONTRACT AMOUNT: $285,900.00 START DATE: June 2, 2003 COMPLETED: December 16, 2003 PROJECT: BRATNER GULCH CROSSING: Sheet pile, riprap, grouted derrick stone, grouted boulders, concrete encasement, cutoff walls. OWNER: Shoshone South, LLC Allan Windmiller CONTRACT AMOUNT: $143,781.00 START DATE: July 17, 2003 COMPLETED: October 17, 2003 PROJECT: PINEY CREEK: Water control, erosion control, sheet pile, install riprap, grout, excavation, landscape plantings, seeding, hydro mulching, import clay fill. OWNER: Urban Drainage & Flood Control District ENGINEER: Icon Doug Williams CONTRACT AMOUNT: $187,000.00 COMPLETED: June 30, 2003 PROJECT: HUSTON LAKE RESTORATON edging, fine grading, seeding, sodding. OWNER: City & County of Denver ENGINEER: Wenk & Associates CONTRACT AMOUNT: $489,826.00 COMPLETED: April 30, 2003 Paul Hindman (303)221-0802 (303)455-6277 START DATE: February, 20, 2003 Muck excavation, shore line restoration, boulder Jim Geist (720) 913-4504 Nicole Horst START DATE: October 16, 2002 PROJECT: PLASTER RESERVOIR DAM IMPROVEMENTS: Clearing & grubbing riprap, construction of trail, storm sewer system, seeding & planting. OWNER: City & County of Broomfield ENGINEER: Love & Associates CONTRACT AMOUNT: $408,00.00 COMPLETED: March 30, 2003 Katie Alle (303) 438-6250 Nancy Love (303) 673-9795 START DATE: November 20, 2002 PROJECT: CHERRY CREEK TRAIL-SOUTHCREEK PORTION, PHASE I & 1B: Clearing, grubbing, grading, construction of pedestrian trail, box culvert, riprap, seeding and re -vegetation. OWNER: State of Colorado — Arapahoe County Lanae J. Raymond (720) 874-6504 ENGINEER: MDG, hic. Shaun Gordon (303) 571-5787 CONTRACT AMOUNT: $233,486.00 COMPLETED: March 30, 2003 START DATE: September 15, 2002 PROJECT: COTTONWOOD CREEK: Grouted boulders, mulching, seeding, earthwork, riprap OWNER: Rampart Range Metropolitan District No.1 Rich Shannon (303) 779-4525 ENGINEER: Carroll & Lange, Inc. Kennith L. Linhardt (303) 980-0200 CONTRACT AMOUNT: $258,259.00 START DATE: August 10, 2002 COMPLETED: April 15, 2003 PROJECT: HARVARD GULCH MINI, GARLAND & SARATOGA, AND WESTWOOD PLAYGROUNDS: Grading, concrete flatwork, irrigation and landscaping for 3 playgrounds. OWNER: City and County of Denver Richard Nystrom (720) 913-1700 ENGINEER: City & County of Denver City Engineer Lesley B. Thomas (720) 913-1700 CONTRACT AMOUNT: $92,553.00 START DATE: May 1, 2002 COMPLETED: November 1, 2002 PROJECT: BROADWAY MEDIAN LANDSCAPING: Clearing, grubbing, Irrigation installation, tree planting. OWNER & ENGINEER: City of Littleton David Flaig (303) 795-3766 CONTRACT AMOUNT: $29,500.00 START DATE: July 1, 2002 COMPLETED: September 1, 2002 PROJECT: REUNION METROPOLITAN DISTRICT-112" AVE RETENTION: Seeding, rip -rap, boulders, concrete, excavation, handrail. OWNER: Reunion Metropolitan District David Southard (303) 791-8180 ENGINEER: JR Engineering Aaron Clutter (303) 740-9393 CONTRACT AMOUNT: $435,645.00 START DATE: May 13, 2002 COMPLETED: July 31, 2002 PROJECT: LILLEY GULCH: Erosion and Sediment Control, riprap, grouting, concrete cut off wall at the drop structure, install concrete path, re -vegetation. OWNER: Urban Drainage & Flood Control District Dave Bennetts (303) 455-6277 ENGINEER: Icon Engineering, Inc. CONTRACT AMOUNT: $268,762.36 COMPLETED: May 1, 2002 Doug Williams (303) 221-0802 START DATE: January 1, 2002 PROJECT: LAKEWOOD GULCHISAND CREEK: Water Control and dewatering, rip -rap and stepped grouted boulders with cut-off wall, Erosion & Sediment Control OWNER: Metro Wastewater Reclamation District Bill Brennan (303) 286-3000 ENGINEER: Icon Engineering, Inc. Doug Williams (303) 221-0802 CONTRACT AMOUNT: $82,891.00 START DATE: June 5, 2001 COMPLETED: August 1, 2001 PROJECT: HARVARD GULCH: Removal of concrete channel lining, modification of existing concrete drop structure, excavation, grouted boulder channel edge, riprap, sodding, restoration of irrigation system OWNER: Urban Drainage & Flood Control Mark Hunter (303) 455-6277 ENGINEER: Kirkham Michael Consulting Engineers Billy A. Harris (303) 694-2300 CONTRACT AMOUNT: $268,389.00 START DATE: April 23, 2001 COMPLETED: July 22, 2001 PROJECT: PONDS 20 AND 21 DROP STRUCTURES: Furnished and installed grouted boulders, concrete cut off wall, dewatering, two pond drop structures, revegetation, and silt fence. OWNER: Highlands Ranch Metropolitan District No. 4 ENGINEER: Nolte & Associates/CMIS CONTRACT AMOUNT: 230,154.72 COMPLETED: June 20, 2001 Forrest Dykstra (303) 791-0430 Dave Lang (303) 257-5816 START DATE: March 15, 2001 PROJECT: LBO PONDS 1&3 REHABILITATION CONTRUCTION: Install trickle channel, grouted boulders, sod installation, irrigation repair. OWNER: Urban Drainage & Flood Control ENGINEER: Muller Engineering Company, Inc. CONTRACT AMOUNT: $102,446.91 COMPLETED: May 10, 2001 Jeff Fisher (303) 455-6277 Christopher Kroeger (303) 988-4939 START DATE: December 15, 2000 PROJECT: LOCUST STREET OUTFALL: Pond Spillway, Rock Berm, Seeding and Mulching. OWNER: Grimm Construction Company, Inc. Peter V. Grimm (303) 791-3600 ENGINEER: Sear -Brown, Inc. Don Silar (970) 482-5922 CONTRACT AMOUNT: 193,825.00 START DATE: March 16, 2001 COMPLETED: April 6, 2001 PROJECT: SOUTH PLATTE RIVER OWNER: Urban Drainage & Flood Control District Dave Lloyd (303) 455-6277 ENGINEER: Urban Drainage & Flood Control District Bryan Kohlenberg (303) 455-6277 CONTRACT AMOUNT: $84,828.00 START DATE: December 5, 2000 COMPLETED: January 24, 2001 PROJECT: SANDCREEK GREENWAY TRAIL OWNER: City of Aurora ENGINEER: City of Aurora CONTRACT AMOUNT: $1,328,734.00 COMPLETED: December 22, 2000 Tracy Young (303) 739-7160 START DATE: May 11, 2000 PROJECT: SAND CREEK GREENWAY TRAIL: Soil cement retaining wall, crushed recycled concrete trail, lighting and electrical service, fencing, seeding, tree planting, concrete ramps thickened edge and concrete curb wall, sprinkler system installation. OWNER: City of Aurora Greg Paulini (303) 739-7636 ENGINEER: City of Aurora Tracy Young (303) 739-7166 CONTRACT AMOUNT: $1,357,252.00 START DATE: June 1, 2000 COMPLETED: December 1, 2000 PROJECT: VALE VIEW IN THE MEADOW TRAIL CONSTRUCTION ENTRY LANDSCAPE AND IRRIGATION OWNER: Vale View ENGINEER: Architerra Group Dean Pierson (303) 948-0766 CONTRACT AMOUNT: $180,707.00 START DATE: September 1, 2000 COMPLETED: December 30, 2000 PROJECT: CHERRY CREEK DROPS #5: Clear & grub, wetlands plantings, buried soil riprap, grouted boulders, erosion control, sediment and water control. OWNER: Urban Drainage & Flood Control District Dave Lloyd (303) 455-6277 ENGINEER: Boyle Douglas Stewart (303) 987-3443 CONTRACT AMOUNT: $217,994.51 START DATE: March 6, 2000 COMPLETED: November 1, 2000 PROJECT: DAD CLARK DROP STRUCTURES: Erosion and sediment control, native seeding, steel sheet piling, grouted boulder, install box culvert, 48" RCP, concrete wing walls and cut off walls, concrete bike trail, steel railing, encasement of 8" PVC sanitary sewer. OWNER: Highlands Ranch Metropolitan District No. 3 Chris Seeley (303) 791-0430 ENGINEER: Ch2M Hill Kyle Hamilton (303) 771-0900 CONTRACT AMOUNT: $568,529.80 COMPLETED: September 1, 2000 START DATE: MAY 15, 2000 PROJECT: 1999 URBAN DRAINAGE RESTORATION ANNUAL MAINTENANCE & S. PLATTE RIVER PROGRAM: Rip rap erosion protection @ channel or outlets, silt removal from culverts and drainage - ways, construction and/or repair of concrete structures, rehabilitation of detention ponds and tree thinning in over -grown drainage -ways. OWNER: Urban Drainage & Flood Control District Dave Bennetts (303) 445-6277 CONTRACT AMOUNT: $ 50,000 - $ 200,000 START DATE: July 1, 1999 COMPLETED: June 30, 2000 PROJECT: MONACO WAY CULVERT CROSSING: 50' double 8'x6' RCB, new asphalt roadway, curb/gutter/sidewalk, grouted boulder drop structure, rip rap and boulder edging, erosion/sediment/water control OWNER: Urban Drainage & Flood Control District Paul Hindman (303) 455-6277 Arapahoe County Justin Bozich (303) 791-4640 ENGINEER: Icon Engineering CONTRACT AMOUNT: $ 325,643.00 COMPLETED: February 22, 2000 Matt Ursetta (303) 221-0802 START DATE: October 25, 1999 PROJECT: JAMISON TRIBUTARY CHANNEL IMPROVEMENTS: 50' type R inlets, 315' 24"/42"/48" RCP, three vertical rip rap drop structures w/ concrete cut-off walls, site restoration including: seeding, sodding and irrigation, erosion/sediment/water control OWNER: Urban Drainage & Flood Control District Cindy Thrush (303) 455-6277 Arapahoe County Justin Bozich (303) 791-4640 ENGINEER: Icon Engineering CONTRACT AMOUNT: $ 363,385.00 COMPLETED: January9, 2000 Matt Ursetta (303) 221-0802 START DATE: October 11, 1999 PROJECT: WEST DAD CLARK STORM DRAINAGE: Four grouted and sloping 18" boulder drop structure one concrete vertical drop structure, site grading, seeding, erosion/sediment/water control OWNER: Highland Ranch Metropolitan Dist. No. 2 ENGINEER: Nolte & Associates Greg Murphy CONTRACT AMOUNT: $ 202,260.00 COMPLETED: November 12, 1999 Forrest Dykstra (303) 791-0430 (303) 220-9001 START DATE: September 27, 1999 PROJECT: EAST FRONTAGE ROAD @ ST. VRAIN RIVER: Grouted 4' boulder drop structure (approx. 4500 tons), rip rap slope protection (approx.12,500 tons) and major river diversion OWNER: CDOT Gerry Padilla GENERAL CONTRACTOR: Reiman Corp. ENGINEER: Icon Engineering CONTRACT AMOUNT: $ 952,751.01 COMPLETED: November 12, 1999 (303)442-5640 Rich Bolkovatz (307) 632-8971 Doug Williams (303) 221-0802 START DATE: July 5, 1999 PROJECT: SAND CREEK INTERCEPTOR: Sheet pile with concrete, cap, grouted rip -rap & associated site work for protection of a utility crossing OWNER/ENGINEER: Metro Wastewater Reclamation District Bill Brenan (303) 286-3000 CONTRACT AMOUNT: $ 164,664.00 START DATE: August 2, 1999 COMPLETED: October 30, 1999 PROJECT: MASSEY DRAW @ CARR STREET: 2161f of double 10'x4'.6" RCB w/ headwall and wing walls, utility relocations, grouted Y boulder drop structure, 552' grouted stacked boulder channel edge, erosion/sediment/water control OWNER: Urban Drainage & Flood Control District/Jefferson County Paul Hindman (303) 455-6277 Jefferson County Paula Lundquist (303) 271-8480 ENGINEER: Icon Engineering Doug Williams (303) 221-0802 CONTRACT AMOUNT: $ 598,101 START DATE: June 21, 1999 COMPLETED: October 30, 1999 PROJECT: GRANGE HALL CREEK: Irrigation system installation, tree planting, soil prep, erosion control fabric install OWNER: City of Northglenn GENENAL CONTRACTOR: Hudick Excavating CONTRACT AMOUNT: $ 73,419.10 COMPLETED: September 29, 1999 Nestor Fedak (303) 450-8708 Brad Kreinbring (303) 688-5254 START DATE: August 16, 1999 PROJECT: NIWOT HIGH SCHOOL: Remove/Replace irrigation system, tree/shrub planting, soil prep OWNER: St. Vrain School District GENERAL CONTRACTOR: DeFalco-Poarch Ron Smith (303) 682-7268 Frank Lee (303) 655-2180 CONTRACT AMOUNT: $ 88,185.77 COMPLETED: September 7, 1999 START DATE: July 14, 1999 PROJECT: CHERRY CREEK RESTORATION: grouted boulder edge, bank stabilization, seeding/mulch OWNER: Urban Drainage & Flood Control District Jeff Fisher (303) 455-6277 ENGINEER: Urban Drainage CONTRACT AMOUNT: $ 103,933.75 COMPLETED: JULY 16, 1999 START DATE: June 5, 1999 PROJECT: GOLDSMITH GULCH @ COOK PARK: grouted boulder/rip rap drop structures, sheet pile cut- off walls, remove/replace pedestrian bridges, boulder edge tree/shrub planting, sod, bank restoration OWNER: Urban Drainage & Flood Control District Mark Hunter (303) 455-6277 ENGINEER: Icon Engineering Curt Neufeld (303) 221-4019 CONTRACT AMOUNT: $ 458,645.64 START DATE: February 2, 1999 COMPLETED: July 15, 1999 PROJECT: LAKEWOOD GULCH D/S HARLAN STREET: 24" RCP install, bank stabilization, concrete cut-off walls, irrigation system repair, sod, 24" drilled concrete piers, install 16" steel pipe OWNER: Urban Drainage & Flood Control District Mike Sarmento (303) 455-6277 ENGINEER: Urban Drainage CONTRACT AMOUNT: $ 174,387.13 START DATE: May 6, 1999 COMPLETED: July 1, 1999 PROJECT: TUSCANY SOUTH OWNER: Richmond Homes ENGINEER: JR Engineering CONTRACT AMOUNT: $ 54,904.89 COMPLETED: June 26, 1999 Tim Johnston (303)220-4404 (303) 740-9393 START DATE: May 7, 1999 PROJECT: BEAR CREEK REHABILITATION: grouted boulder drop structure, boat chute including sheet pile cut-off, bank restoration/stabilization, boulder edge, soil prep, re -vegetation (wetland) OWNER: Urban Drainage & Flood Control District Mark Hunter (303) 455-6277 ENGINEER: MK Centennial Carolyn Trayler (303) 948-4001 CONTRACT AMOUNT: $ 521,638.40 START DATE: January 1, 1998 COMPLETED: May 31, 1999 PROJECT: PUNT THE CREEK: boulder edge, remove/replace concrete trail, bank stabilization, cut- off walls, colored concrete work, shrub planting OWNER: The Greenway Foundation/City & County of Denver Jeff Shoemaker (303) 455-7109 ENGINEER: MDG, Inc. CONTRACT AMOUNT: $ 739,155.48 COMPLETED: May 24, 1999 Mark Taylor (303) 571-5787 START DATE: December 3, 1998 PROJECT: SOUTH GATE DETENTION: install 18"/24" RCP, concrete trickle channel, manhole, grouted boulders, pipe under drain system, tree planting OWNER: South Gate Corporation ENGINEER: Turner, Collie & Braden Rick Moser (303) 298-7117 CONTRACT AMOUNT: $63,696.00 START DATE: February 1, 1998 COMPLETED: March 25, 1999 PROJECT: BIG DRY CREEK @ PROGRESS PARK: concrete trail, bank stabilization, drop structures, seeding/mulch OWNER: Urban Drainage & Flood Control District Jeff Fisher (303) 455-6277 ENGINEER: Urban Drainage CONTRACT AMOUNT: 95,206.00 COMPLETED: March 26, 1999 START DATE: February 9, 1999 u CONTRACTO _ f1 ADDRESS: 2At � L 4 A e-a"�os 1 33 8. BID SCHEDULE (Base Bid) RT10ject: Fossil Creek Trail @ Fossil Creek Parkway BI SCHEDULE (BASE BID) Bid Ite are described in Section 01800 BID ESTIMATED UNIT ITEM ITEM # DESCRIPTION IQUANTITYIIUNITIJ PRIC TOTAL 1 Mobilization 1 LS 2 raffic Control 1 LS 3 S eying 1 LS 4 Excav 'on 1,070 CY 5 Borrow - .C. Class 6 136 , ' TONS 6 Fence - Weste 3-Rail j,990 LF 7 5" Colored Concre aving 26,000 SF 8 ADA Accessible Ramps-N.,, 2 EA 9 12" Curb head 850 LF 10 18" Curb head y' 190 LF 11 Adjust Valve Bqx EA 12 lRemove Concrete Sidewalk 675 SF 13 Remove Curb and Gutter 10 14 Relocate Barricade 3 EA 15 elocate Tree 1 EA 16 Drill Seeding 1 AC 17 Metal Trail Gate 1 EA 18 Silt Fence 2,400 LF TOTAL BASE BID $ tten) Figure 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid 7/96 Section 00300 Page 2 PROJECT: 17TH STREET HILLSIDE PROJECT: replacement, revegetation OWNER: University of Colorado ENGINEER: Love & Associates CONTRACT AMOUNT: 83,498.00 COMPLETED: January 31, 1999 stone drainage pipe install, manhole, curb/pavement Mike Barden (303) 492-5511 Nancy Love (303) 673-9795 START DATE: November 7, 1998 EXPERIENCE EDUCATION CHRIS FLICK 1997—Present L.&M ENTERPRISES, INC. Construction Management ■ Pre -qualification process for bidding ■ Obtains quotes for bidding proccess ■ Negotiates prices for bidding process ■ Develops and maintain relationships with owners ■ Supervises crews ■ Field work — project foreman ■ Contract administration ■ Contract compliance 1992 Skyview High School ■ High School Graduate 1993-1997 United States Navy ■ Construction Management ■ Osha Training ■ Heavy Equipment Operation ■ Hazmat coordination AREAS OF PROFICIENCY Extensive Field Experience Field Management Estimating Subcontractor Management Bidding Process Customer Relations BERTHOUD,CO Thornton, CO Heavy Equipment Operator Interperts Plans Obtaining competitive quotes Hazardous material identificaiton Hazmat cleanup / disposal EXPERIENCE EDUCATION ILIASER MELENDEZ 1991—Present L&M Enterprises, Inc. Berthoud, CO Maintenance Supervisor ■ Supervises crews for landscape maintenance, installation, tree and shrub pruning, parking lot sweeping, striping, snow removal, concrete and grout installation ■ Schedules crews, equipment and subcontractors for maintenance, snow removal, sweeping and parking lot striping ■ Assists with contract negotiations , bidding and customer relations ■ Assists Superintendent with organization and acquisition of major equipment required to efficiently complete projects 1982-1986 Longmont High School Longmont, CO ■ High School Diploma AREAS OF PROFICIENCY ■ Bilingual — Spanish and English ■ Forming and pouring concrete ■ Constructing block and rock walls ■ Operating equipment ■ Designing and installing irrigation systems EXPERIENCE EDUCATION JESSE BEBO 2001 - Present L&M Enterprises, Inc. Berthoud, CO Estimator ■ Estimates and bids construction projects for both private and public owners ■ Bids projects utilizing a digitizer ■ Assists in the field, operating equipment if needed ■ Maintains the corporations hardware systems ■ Project management duties include scheduling, coordinating materials, subcontractors, submittals and customer relations ■ Landscape maintenance crew leader supervising 8 individuals in regards to mowing, fertilizing and all other maintenance related items ■ Provided maintenance of equipment, scheduling, ordering materials and was responsible for customer satisfaction on his assigned route 1994 — Berthoud High School Berthoud, CO ■ High School Diploma 2000 — Mesa College Grand Junction, CO ■ Small Business and Construction Management Present — Colorado State University Fort Collins, CO ■ Construction Management Program AREAS OF PROFICIENCY ■ Estimating ■ Project Management ■ Scheduling ■ Landscaping ■ Irrigation Systems EXPERIENCE EDUCATION JUAN VALADEZ 1992—Present L&M Enterprises, Inc. Construction Foreamn • Supervises crews ■ Schedules crews ■ Heavy equipment operator ■ Reads and interpurts plans & specifications ■ Organizes equipment & crews for daily work Berthoud, CO 1985 Northglenn High School Northglenn, CO ■ High School Diploma AREAS OF PROFICIENCY ■ Bilingual — Spanish and English ■ Forming and pouring concrete ■ Constructing block and rock walls ■ Heavy equipment operator ■ Erosion Control & embankment ■ Riprap/boulder installation ■ Lazor operation ■ Customer Relations ■ Project scheduling & organization C EXPERIENCE EDUCATION RONALD S. PROPP 1983—Present L&M ENTERPRISES, INC. BERTHOUD, CO Construction Superintendent ■ Project manager for projects up to $6,000,000.00 ■ Over sees as many as 10 projects at the same time ■ Coordinates work with subcontractors ■ Develop and maintain relationships with owners ■ Supervises crews ■ Schedules work ■ Review job cost to ensure project is profitable ■ Supervises and controls repair an maintenance of heavy equipment 1980 Thompson Valley High School Loveland, CO ■ High School Graduate 1981-1982 . Mesa College ■ Construction Management ■ Osha Training 1994 City & Count of Denver Denver, CO ■ Drain Layers Certification AREAS OF PROFICIENCY Contract Management Field Management Estimating Scheduling Conflict Resolution Customer Relations Heavy Equipment Operator Change Order Negotiation Employee/Management Relations Subcontractor Management Bidding Process Extensive Field Experience EXPERIENCE EDUCATION STEVE MORITZ 1987—Present L&M Enterprises, Inc. Berthoud, CC Maintenance Superintendent ■ 13 years as Maintenance Superintendent ■ 16 years experience in landscape maintenance ■ Managed crew sizes of 20-35 members ■ Currently manages a crew of 28 ■ Establishes and maintains great customer relationships with over 40 individual customers ■ Oversee and ensures contracts are fulfilled to the customer's individual specifications and satisfaction ■ Passed Certified Landscape Technician test ■ Passed Qualified Supervisor Program offered by the Department of Agriculture ■ Obtained Certified Chemical Applicator's License AREAS OF PROFICIENCY ■ Contact Management ■ Field Management ■ Estimating ■ Scheduling ■ Conflict Resolution ■ Training ■ Landscaping ■ Irrigation Systems ■ Safety Issues ■ Chemical Application J EXPERIENCE EDUCATION TERRY REH 1992—Present L&M ENTERPRISES, INC. Project Foreman ■ Schedules crews daily work ■ Operates heavy equipment ■ Reads plans ■ Develops and maintain relationships with owners ■ Earthwork / drainage / erosion control ■ Field work — project foreman BERTHOUD, CO 1969 Pineview High School Durango, CO ■ High School Graduate AREAS OF PROFICIENCY Extensive Field Experience Field Management Earthwork Stabilization methods Crew Leader Riprap placement Water Diversion Heavy Equipment Operator Interperts Plans L&M ENTERPRISES, INC EQUIPMENT LIST Year I Qty I Make I VIN 2002 1 Komatsu PC200LC-7L A86038 2002 1 Komatsu PC200LC-7L A86117 2002 1 Komatsu PC228 USLC-3 21456 2003 1 Komatsu PC75R 200184 1999 1 Komatsu WA320 A31041 1988 1 Komatsu WA350 A11626 1992 1 Komatsu WA380 A45179 1997 1 Komatsu WA320 A30256 1998 1 Komatsu WA250 A70276 2003 1 John Deere Tractor 4600 LL460OH266685 2000 1 Cat Skidsteer 246 05SZO7578 2000 1 Cat Skidsteer 246 05SZO7577 2003 1 Cat Skidsteer 246 05SZO7575 2003 1 Cat Skidsteer 246 05SZO7673 2003 1 Cat Skidsteer 236 04YZ06659 2003 1 Cat Skidsteer 236 04YZ06741 2003 1 Cat Skidsteer 236 04YA06661 2000 1 Cat Skidsteer 246 05SZO4376 2000 1 Cat Skidsteer 246 05SZO2201 2003 1 Cat Skidsteer 236 4YZ06866 ENTERPRISES INC. July 28, 2004 City of Fort Collins 215 North Mason Street Fort Collins, CO 80522 RE: Fossil Creek Trail South of Fossil Creek Parkway Bid #5870 To Whom It May Concern: L&M Enterprises, Inc. recognizes three addendums for the above mentioned project. Addendum #1 July 15, 2004 Addendum #2 July 20, 2004 Addendum #3 July 26, 2004 Sincerely, Janet M. DeMott L&M Enterprises, Inc. P.O. Box W, Berthoud, CO 80513 • Phone: (303) 442-7401 (970) 532-3706 Fax: (303) 442-2231 or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. 7EN,IF ED: S,Onpture P _I_e. L, ebo Date w Title License Number (If Applicable) (Seal if Bid is by corporation) Attest: Address Po. -L�x L,-) Telephone Cr!4 L O a• T Q2_04 7/96 Section 00300 Page 3 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420Statement of Bidder's Qualifications 00430Schedule of Subcontractors 7/96 Section 00410 Page 1 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned L & M Enterpricas, In@s Principal, and St Paul Fire and Marine Insurance Company as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as,OWNER, in the sum of $ 5% of amount bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, FOSSIL CREEK TRAIL SOUTH OF FORT COLLINS PARKWAY; BID NO. 5870. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 2 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 28th day of July , 2004, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Name: L & M Enterprises, Inc. Address: 735 E. Colorado By: S "J'-SEAL ) f'a .as SURETY St. Paul Fire & Marine Insurance Company - - Richard D. Herbert Title• Attorney -in -Fact 7/96 Section 00.410 Page 3 7heStPaUl Power of Attorney No. POWER OF ATTORNEY Seaboard Surety Company St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company 23448 United States Fidelity and Guaranty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Certificate No. 1424934 KNOW ALL MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, and that St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, and that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland and that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies'), and that the Companies do hereby make, constitute and appoint Sally Herbert, Richard D. Herbert, Christine Jordan and Robert Bubnich Iongrnont Colorado of the City of ,State , [heir true and lawful Attorneys) -in -Fact, each in their separate capacity if more than one is named above, to sign its name as surety to, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and sealed this 25th day of July 2002 Seaboard Surety Company United States Fidelity and Guaranty Company St. Paul Fire and Marine Insurance Company Fidelity and Guaranty Insurance Company St. Paul Guardian Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. St. Paul Mercury Insurance Company 51rrY ` 1927 trCa9PoR47tD PETER W CARMAN, Vice President p.....�. State of Maryland City of Baltimore THOMAS E. HUIBREGTSE, Assistant Secretary On this 25th day of July 2002 before me, the undersigned officer, personally appeared Peter W Carman and Thomas E. Huibregtse, who acknowledged themselves to be the Vice President and Assistant Secretary, respectively, of Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, United States Fidelity and Guaranty Company, Fidelity and Guaranty Insurance Company, and Fidelity and Guaranty Insurance Underwriters, Inc.; and that the seals affixed to the foregoing instrument are the corporate seals of said Companies; and that they, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing the names of the corporations by themselves as duly authorized officers. 0k°en�s��n *""t"- AAA.etta - �/'4'l�- [n Witness Whereof, I hereunto set my hand and official seal e pOrARY 0 i Ue<lp My Commission expires the I st day of July, 2006. Lo9F C1v REBECCA EASLEY-ONOKALA, Notary Public ror an F. 86203 Rev. 7-2002 Printed in U.S.A. This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, United States Fidelity and Guaranty Company, Fidelity and Guaranty Insurance Company, and Fidelity and Guaranty Insurance Underwriters, Inc. on September 2, 1998, which resolutions are now in full force and effect, reading as follows: RESOLVED, that in connection with the fidelity and surety insurance business of the Company, all bonds, undertakings, contracts and other instruments relating to said business may be signed, executed, and acknowledged by persons or entities appointed as Attorney(s)-in-Fact pursuant to a Power of Attorney issued in accordance with these resolutions. Said Power(s) of Attorney for and on behalf of the Company may and shall be executed in the name and on behalf of the Company, either by the Chairman, or the President, or any Vice President, or an Assistant Vice President, jointly with the Secretary or an Assistant Secretary, under their respective designations. The signature of such officers may be engraved, printed or lithographed. The signature of each of the foregoing officers and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Attorney(s)-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and subject to any limitations set forth therein, any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company, and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is validly attached; and RESOLVED FURTHER, that Attorney(s)-in-Fact shall have the power and authority, and in any case, subject to the terms and limitations of the Power of Attorney issued them, to execute and deliver on behalf of the Company and to attach the seal of the Company to any and all bonds and undertakings, and other writings obligatory in the nature thereof, and any such instrument executed by such Attomey(s)-in-Fact shall be as binding upon the Company as if signed by an Executive Officer and sealed and attested to by the Secretary of the Company. 1, Thomas E. Huibregtse, Assistant Secretary of Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, United States Fidelity and Guaranty Company, Fidelity and Guaranty Insurance Company, and Fidelity and Guaranty Insurance Underwriters, Inc. do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I hereunto set my hand this 28th day of .Tit 1 y , 2004 1912 AN+,O�.ox��yr49 M,pyW,RX�// ?°j ' "is"":ix+° '•"'''"� WI,uNJ� Thomas E. Huibregtse, Assistant Secretary To verify the authenticity of this Power of Attorney, call 1-800-421-3880 and ask for the Power of Attorney clerk. Please refer to the Power of Attorney number, the above -named individuals and the details of the bond to which the power is attached.