Loading...
HomeMy WebLinkAboutPrebid - BID - 5866 SH 287 AND LAKE STREET MEDIAN IMPROVEMENTS (2)Pre -Bid Meeting Agenda State Highway 287 & Lake Street Median Improvements Bid No. 5866 June 22, 2004 10:00 a.m. 1) INTRODUCTIONS 2) ATTENDANCE Please sign attendance sheet 3) BID OPENING June 30, 2004 - 3:00 p.m. (our clock) Purchasing Division - 215 North Mason Street, 2"d Floor, Fort Collins 4) SUMMARY OF WORK Major components: • Removals o Asphalt pavement o Curb and gutter o Concrete median cover o Wood mulch and weed barrier fabric • Reconditioning under asphalt pavement patch and barrier curb • Installation of: o Barrier curb o Borrow o Trees o Topsoil o Weed barrier fabric o Wood mulch o Irrigation • Traffic Control 5) UTILITIES • Cable tv • Storm sewer • Water lines (City & CSU) • Duct banks (City electric, Qwest and CSU) • Electric supply to street lights • Median irrigation • Natural gas • CSU pedestrian tunnel 6) WORK BY CITY FORCES Light and Power — Remove and replace light standard, adjust electric boxes. Streets — Pavement milling, asphalt patching and paving, adjust manhole lid. Traffic Operations — Sign installation and pavement marking. 1 Pre -Bid Meeting Agenda State Highway 287 & Lake Street Median Improvements 7) COORDINATION Close coordination between the Contractor and City Forces is required to efficiently complete this project. 8) PRELIMINARY SCHEDULE • Award — July 2 • Pre -Construction Meeting — July 15 • Start construction — July 19 • Substantial Completion — August 17 (30 days from start of construction) (all work complete) • Final Completion — September 1 (45 days from start of construction) (punch list) 9) HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQUIREMENTS Federally Funded — Federal requirements apply including providing weekly payrolls Davis -Bacon Wages apply UDBE Goal (0%) Construction Surveying — Provided by City of Fort Collins Quality Assurance Testing — Provided by City of Fort Collins Quality Control Testing — Provided by Contractor Warranty — 2 years after final acceptance Construction Hours — 7 a.m. to 6 p.m. Monday through Friday 10)ADDENDA Addendum No. 2 will include: • Revised bid sheet • Irrigation plan and specifications • Deleted "Median Irrigation Force Account' item • CDOT Form 605 "Contractors Performance Capability Statement' to be submitted with bid 11)QUESTIONS 12)OPTIONAL PROJECT TOUR 2