No preview available
HomeMy WebLinkAboutRESPONSE - BID - 5865 FIBER OPTIC CABLE SINGLE MODE (12)Bid #5865 Addendum #2 BID SCHEDULE 100,000 Ft. of 48 strand fiber optic cable delivered to Fort1 Collins, Colorado. $—� --/Ft. X 100,000 Ft = $_v`_a� V . co Total Mfr.(2CN:Ql Mfr. #-QY,3 r_ IA) y ��1101 Delivery in weeks: — This bid meets or exceeds the specifications? YES X _ NO_ k _— (Se c Nokt5 kc FIRM Are you a orporatio ; Partgership, DBA, LLC, or PC SIGNATU ADDRESS PHONE/FAX #} 41 RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. ATTACHMENT 3 BUY AMERICA CERTIFICATE OF COMPLIANCE WITH FTA REQUIREMENTS FOR BUSES, OTHER ROLLING STOCK, OR ASSOCIATED EQUIPMENT (To be submitted with a bid or offer exceeding the small purchase threshold for Federal assistance programs, currently set at $100,000.) Certificate of Compliance The bidder hereby certifies that it will comply with the requirements of 49 U.S.C. Section 5323OX2XC), Section 165(bx3) of the Surface Transportation Assistance Act of 1982, as amended, and the regulations of 49 G.F.R. 661.11: Date Signature Company Name Title 10A Page 4 ATTACHMENT 3 BUY AMERICA CERTIFICATE OF COMPLIANCE WITH FTA REQUIREMENTS FOR BUSES, OTHER ROLLING STOCK, OR ASSOCIATED EQUIPMENT (To be submitted with a bid or offer exceeding the small purchase threshold for Federal assistance programs, currently set at $100,000.) CERTIFICATE OF NON-COMPLIANCE The bidder hereby certifies that it cannot comply with the requirements of 49 U.S.C. Section 53230X2)(C) and Section 165(b)(3) of the Surface Transportation Assistance Act of 1982, as amended, but may qualify for an exception to the requirements consistent with 49 U.S.C. Sections 5323Gx2)(B) or OX2XD), Sections 165(bx2) or (bx4) of the Surface Transportation Assistance Act, as amended, and regulations in 49 C.F.R. 661.7. Date Signature Company Name Title /J/)q Page 5 Attachment 4 Certification Regarding Lobbying Certification for Contracts, Grants, Loans, and Cooperative Agreements (To be submitted with each bid or offer exceeding $100,000) The undersigned [Contractor] certifies, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for making lobbying contacts to an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form—LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions [as amended by "Government wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2) herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of 1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601, et seq .)] (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that ail subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.S.C.0 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. [Note: Pursuant to 31 U.S.C.1352(cx1)-(2XA), any person who makes a prohibited expenditure or fails to file or amend a required certification or disclosure form shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure or failure.] The Contractor, , certifies or affirms the Truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. A 3601, at seq., apply to this certification and disclosure, if any. Date Signature of Contractor's Authorized Official Name and Title of Contractor's Authorized Official Page 6 Communication NOTES FOR BID# 5865 ADDENDUMS # 1 & 2 RECEIVED 1076 Florida Central Parkway Longwood, FL 32750 Toll: 800-423-2594 Local: 407-331-7779 Fax:407-332-9086 E-mail: jenniferCmumcominc.00m wwww.murdcominc.com BASED ON THE SPECS PROVIDED, THE P/N WOULD BE: 048EW4-T4101A20 WITH SPECIAL PRINT EVERY 5 FEET "CITY OF FORT COLLINS TRAFFIC" NOTE THE FOLLOWING REEL RQUIREMENTS: CABLE IS TO BE PROVIDED ON THE FEWEST # OF REELS FOR 100,000' OF CABLE MAX REEL DIAMETER IS 96" IN PREVIOUS SPEC, IT WAS SPECIFIED THAT CABLE SHOULD BE ON REELS IN 20,000' INCREMENTS EXCEPTIONS/COMMENTS: PAGE 2: EXCEPTION, THE THERMAL PROTECTIVE WRAP IS NOT LABELED "DO NOT REMOVE WRAP UNTIL CABLE IS PLACED" PAGE 2: EXCEPTION, ALL CABLED OPTICAL FIBERS > 1000 METERS IN LENGTH SHALL BE 100% ATTENUATION TESTED. THE ATTENUATION OF EACH FIBER SHALL BE PROVIDED WITH EACH CABLE REEL. THE OTDR TEST DATA WILL INCLUDE IDENTIFICATION OF EACH FIBER, WAVELENGTH TESTED, AND Db/km LOSS FOR EACH FIBER ONLY. PAGE 3: COMPLY WITH COMMENT, THE NOMINAL CABLE DIAMETER IS 11.5 MM; THE NOMINAL CABLE WEIGHT IS 91 KG.KM REQUIRED PAGE 3: COMPLY WITH COMMENT, SPECIAL PRINT "CITY OF FORT COLLINS TRAFFIC" IS PAGE 3: COMPLY WITH COMMENT, THE MAXIMUM PULLING TENSION SHALL BE 2700 N (608 LBF) DURING INSTALLATION (SHORT TERM) AND 890 N (200 LBF) LONG TERM INSTALLED. PAGE3: EXCEPTION, THE CABLE JACKET SHALL MEET THE JACKET TENSILE AND ELONGATION REQUIREMENTS OF ICEA S-87-640 PAGE 4: EXCEPTION, THE CORE DIAMETER WILL BE 8.2 UM, TYPICAL (CORE DIAMETER IS CHARACTERIZED PARAMETER) PAGE 4: EXCEPTION, THE REFRACTIVE INDEX DIFFERENCE WILL BE 0.36% TYPICAL (THIS IS A CHARACTERIZED PARAMETER) PAGE 4: COMPLY WITH COMMENT, FIBER CUTOFF WAVELENGTH IS NOT SPECIFIED FOR CABLED OPTICAL FIBER. THE CABLE CUTOFF WAVELENGTH IS SPECIFIED FOR OPTICAL FIBER CABLES AND SHALL BE LESS THAN 1260NM PAGE 4: EXCEPTION, <0,05 DB INDUCED ATTENUATION FOR I TURN AROUND A 32MM DIAMETER MANDREL PAGE 4: EXCEPTION, DISPERSION AT 1550 NM WILL BE < 18PS/NM-KM PAGE 4: COMPLY WITH COMMENT, THE FIBERS SHALL BE COLORED WITH ULTRAVIOLET (UV) CURABLE INKS THE COLORS SHALL BE STABLE ACROSS THE SPECIFIED STORAGE AND OPERATING TEMPERATURE RANGE AND NOT SUBJECT TO FADING OR SMEARING ONTO EACH OTHER OR INTO THE GEL FILLING MATERIAL. COLORS SHALL NOT CAUSE FIBERS TO STICK TOGETHER ALTOS° All -Dielectric Cables A LANscape SOILItiOnS Product Applications • Campus backbones in lashed aerial and duct installations Description Corning Cable Systems ALTOS® Cables are designed for outdoor and limited indoor use. The loose tube cable is waterblocked to prevent water penetration that could lead to fiber damage. Features / Benefits • Innovative Dry' Cable with waterblocking technology eliminates the need for traditional flooding compound • Available in 62.5 pm, 50 pm, single -mode and hybrid versions • Standard 3.0 mm buffer tube size reduces the number of access tools required by craftsperson • SZ-stranded, loose tube design isolates fibers from installa- tion, environmental rigors, and allows for easy mid -span access • Medium Density Polyethylene jacket is rugged, durable and easy to strip • Available with extended operating temperature to -60-C (-76°F) • All -dielectric cable construction requires no bonding or grounding • Available with Gigabit Ethernet and 10 Gigabit Ethernet performance ALTOS AN-Dlek ctrk Cable I Drawing CPC-220A/3 CORNING twmentrnma Mftrm. e Corning Cable Systems ALTOS AWDlelectrk Cable I Photo LAMM PE Jacket Ripand Dielectric Strength Members in regwredl water-Swelbbie Tape Filled BufrerTube Fibers (nflbenpertube) Water-Sweltable Yam 36-Fiber ALM Single-Jacket/No-Armor Cable I Drawing CPC-220A/1 PEJacket Ripwrd Dielectric Strength Members * required) Tape Buffer Tube (nnberspotube) Water-Swellable Yarn Central Member 288-Fiber ALTOS Siagke-Jacket/No-Armor high -Density Cable I Drawng CPC.220/1/2 Product Specifications ALTOS° All -Dielectric Cables A LANscape Solutions Product Corning Cable Systems Specifications Temperatures Storage- - 00 to +70oC (-4(i' to +1580F) Installation: -30'to +70'C (-22° to +158°F) Operation: -40o to +70oC (-40o to +1580F) Maximum Tensile toads Short -Term: 2700 N (600 lbb Lone -Term: R% N (2nA IhA Test Criteria Maximum Fiber Fibers per Count Tube Number of Tube Positions Nominal Cable Weight kg/km 0b/1000 it) Nominal Outer Diameter mm (in) Minimum Bend Radius Loaded Installed cm (in) cm (in) 2-30 6 5 91 (61) 11.5 (0.45) 17.5 (6.9) 11.7(4.6) 31-36 6 6 106 (71) 12.2 (0.48) 18.4 (7.2) 12.3 (4.8) 37-60 12 5 91 (61) 11.5 (0.45) 17.7 (7.0) 11.8(4.6) 61-72 12 6 106 (71) 12.2 (0.48) 18.8 (7.4) 12.5(4.9) 73-96 12 8 140 (94) 14.1 (0.56) 21.4 (8.4) 14.3 (5.6) 97-120 12 l0 181 (122) 16.0 (0.63) 24.3 (9.6) 16.2(6.4) 121-192 12 16 196 (132) 17.6 (0.69) 26.7 (10.5) 17.B (7.0) 193-216 12 18 219 (147) 18.4 (0.72) 27.8 (10.9) 18.5(7.3) 217-240 12 20 243 (163) 19.3 (0.76) 29.1 (11.5) 19.4 (7.6) 241-288 12 24 301 (202) 21.5 (0.85) 32.3 (12.7) 21.5(8.5) Transmission Performance Fiber Type 62.S/125 pm 62.S/125 pm (850/1300 rani) (850/1300 rim) 62.51125 pm (850/1300 rim) SO/12S Nm (850/1300 rim) Single -mode (1310/1550 mn) Performance Option Code 10 30 SO 31 01 Maximum Attenuation (de/km) 3.5/1.0 3.5/1.0 3.5/1.0 3.5/1.5 0.4/0 3 Minimum LED Bandwidth (MH2okm) 1601500 2001500 2001500 5001500 - / - Minimum Effective Modal Bandwidth (MHz -km) - / - 220/ - 385/ - * 5101-' - / - Serial Gigabit Ethernet Distance (m) 220/550 300/550 500/1000 600/600 5000/ - SeriallOGigabitEthernetDistance(m) 26/- 33/- 33/- 82/- 10000/40000 'EWB when deployed witb 850 tarn, 1 Gh/r VCSM, ar predieted by RML Bandwidth ruing FOTP-204 Orderine Information 1:10❑11W4-T41❑❑A20 o a r0Select fiber count. Select fiber type. Select performance option code. 02 to 288 K - 62.S/125 µm 10 - 62.5/125 pm C = 50/125 pm 30 - 62.5/125 pm R = Single -mode 50 = 62.5/125 pro 31 = 501125 pm Note: Use with Buffer Tube Fan -Our Kjrfir alien rm mamn, app/ioemm. 01 - Single -mode coming Cable systems LLC • PO Box 489 • Hkkwy, NC a86o;-o489 USA 1-8o*-?W2 h • BU(:+t•8a8-gm-p . Intematlonal:+1-828got S000 • bttp:/twvsav coming corn/cablesystans Caning Cable Systems reserves the right to impmw, enhance and modify the features and specifications of Coming Cable Systems'products without prim notification. ALTOS and LANsape are registered trademarks of Coming Cable Systems Brands, Inc. Dry is a trademark of Corning Cable Systems Brands, Inc. Discovering Beyond Imagination Is a trademark of Coning Incorporated. All other trademarks are the properties of their respective owners. Coming Cable Systems Is ISO Sort certlfled.0 moo; aoo3 Corning Cable Systems. All rights reserved. Published In the USA IAN-79-EN / February 2" / SM CORNING Ghae.e,lryapmie sntli^am raCCna'e5[inu,tlblreNW aebgl] Attachment 1 BUY AMERICA REQUIREMENTS 49 U.S.C. 53230) - 49 CFR Part 661 Certification requirement for procurement of steel, iron, or manufactured products. Certificate of Compliance with 49 U.S.C. 5323U)(1) The bidder or offeror hereby certifies that it will meet the requirements of 49 U.S.C. 53230)(1) and the applicable regulations in 49 CFR Part 661. Page 28 Attachment 1 BUY AMERICA REQUIREMENTS -49 U.S.C. 53230) - 49 CFR Part 661 A bidder or offeror must submit to the FTA recipient the appropriate Buy America certification with all Bids on FTA-funded contracts, except those subject to a general waiver. Bids or offers that are not accompanied by a completed Buy America certification must be rejected as nonresponsive. This requirement does not apply to lower tier subcontractors. Certification requirement for procurement of steel, iron, or manufactured products. Certificate of Non -Compliance with 49 U.S.C. 5323g)(f) The bidder or offeror hereby certifies that it cannot comply with the requirements of 49 U.S.C. 5323(j)(1), but it may qualify for an exception pursuant to 49 U.S.C. 5323UX2XB) or 0)(2XD) and the regulations in 49 CFR 661.7. Date Signature Company Name Title NI,q Page 29 Attachment 1 CERTIFICATION REQUIREMENT FOR PROCUREMENT OF BUSES, OTHER ROLLING STOCK AND ASSOCIATED EQUIPMENT CERTIFICATE OF COMPLIANCE WITH 49 U.S.C. 5323(J)(2)(C) The bidder or offeror hereby certifies that it will comply with the requirements of 49 U.S.C. 5323Qx2XC) and the regulations at 49 CFR Part 661. Date Signature Company Name Title Id/A Page i Attachment 1 CERTIFICATION REQUIREMENT FOR PROCUREMENT OF BUSES, OTHER ROLLING STOCK AND ASSOCIATED EQUIPMENT CERTIFICATE OF COMPLIANCE WITH 49 U.S.C. 5323(.9(2)(C) The bidder or offeror hereby certifies that it cannot comply with the requirements of 49 U.S.C. 53230)(2)(C), but may qualify for an exception pursuant to 49 U.S.C. 5323OX2XB) or 0)(2XD) and the regulations in 49 CFR 661.7. Date Signature Company Name Title N/� Page 2 Attachment 2 CERTIFICATION OF COMPLIANCE WITH FTXS BUS TESTING REQUIRMENT The undersigned [Contractor/Manufacturer] certifies that the vehicle offered in this procurement with 49 U.S.C. A 5323(c) and FTA's implementing regulation at 49 CFR Part 665. The undersigned understands that misrepresenting the testing status of a vehicle acquired with Federal financial assistance may subject the undersigned to civil penalties as outlined in the Department of Transportation's regulation on Program Fraud Civil Remedies, 49 CFR Part 31. In addition, the undersigned understands that FTA may suspend or debar a manufacturer under the procedures in 49 CFR Part 29. Date Signature Company Name Title jv/fl Page 3