Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
130163 EMPIRE CARPENTRY - CONTRACT - BID - 5787 RESTORATION OF FRANZ SMITH CABIN
�u:�-.amrma SPECIFICATIONS AND CONTRACT DOCUMENTS FOR RESTORATION OF FRANZ-SMITH CABIN BID N0.5787 BID OPENING: PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS MAY 13, 2003 - 3:00 P.M. (OUR CLOCK) SECTION 00020 INVITATION TO BID Date: April 18, 2003 Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on May 13, 2003 for the RESTORATION OF FRANZ-SMITH CABIN; Bid No. 5787. If delivered, they are to be delivered to 215 North Mason Street, 2"d Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. 0. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. The Contract Documents provide for final placement and restoration of the Franz - Smith cabin to be included in the museum exhibits of the Fort Collins Museum. The Fort Collins Museum plans to use the Franz -Smith cabin as part of its interpretive program involving three other relocated historic cabins. The Contractor must follow the Secretary of the Interior's Standards for Rehabilitation in all aspects of the restoration of the Franz -Smith cabin. Restoration work includes; exterior wall construction and structural systems; roof framing and roof systems; foundation systems; perimeter foundation drainage; exterior finishes; exterior windows, doors, hardware, and trim; interior doors, windows, hardware and trim; fire detection systems; stairs; electrical distribution, service, panels, and lights; interior finishes; exterior masonry. Qualifications: A minimum of five years experience with historic structure stabilization, rehabilitation, and restoration. A minimum of five projects of similar size and scope of work. All Bids must be in accordance with the Contract Documents on file with The City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Contract Documents will be available April 21, 2003. Copies of the Contract Documents, complete with Construction Specifications and Drawings, may be obtained from Purchasing Division at 215 North Mason St., 2nd floor, Fort Collins, Colorado, 80521 upon payment of a refundable fee of Fifty Dollars ($50.00) per set. No partial sets will be issued. The Contract Documents and Construction Drawings may be examined at: 1. City of Fort Collins, Purchasing Division. 2. The Daily Journal, 2000 S. Colorado Blvd. Suite 2000, Denver, Colorado. 3. CMD Denver Plan Room, 8878 Barrons Blvd., Highlands Ranch, Colorado 4. Builders Exchange, 223 South Link Lane, Fort Collins, Colorado. 5. The Plan Room, 2176 South Jasmine St. Door "E"/Suite 219, Denver, Colorado. A prebid conference and job walk with representatives of prospective Bidders will be held at 2:00 p.m. on Thursday, April 24, 2003 at the Fort Collins Museum, 200 07/2001 Section 00020 Page 1 for Payment or otherwise). ENGINEER's written decision thereon will be final and binding upon OWNER and CONTRACTOR, unless, within ten days after the date of any such decision, either OWNER or CONTRACTOR delivers to the other and to ENGINEER written notice of intention to appeal from ENGINEER's decision and: (i) an appeal from ENGINEER's decision is taken within the time limits and in accordance with the procedures set forth in Exhibit GC -A, "Dispute Resolution Agreement", entered into between OWNER and CONTRACTOR pursuant to Article 16, or (ii) if no such Dispute Resolution Agreement has been entered into, a formal proceeding is instituted by the appealing party in a forum of competent jurisdiction to exercise such rights or remedies as the appealing party may have with respect to ENGINEER's decision, unless otherwise agreed in writing by OWNER and CONTRACTOR. Such appeal will not be subject to the procedures of paragraph 9.11. Decisions on Disputes. 9.11. ENGINEER will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. Claims, disputes and other matters relating to the acceptability of the Work or the interpretation of the requirements of the Contract Documents pertaining to the performance and furnishing of the Work and claims under Articles 11 and 12 in respect of changes in the Contract Price or Contract Times will be referred initially to ENGINEER in writing with a request for a formal decision in accordance with this paragraph. Written notice of each such claim, dispute or other matter will be delivered by the claimant to ENGINEER and the other party to the Agreement promptly (but in no event later than thirty days) after the start of the occurrence or event giving rise thereto, and written supporting data will be submitted to ENGINEER and the other party within sixty days after the start of such occurrence or event unless ENGINEER allows an additional period of time for the submission of additional or more accurate data in support of such claim, dispute or other matter. The opposing party shall submit any response to ENGINEER and the claimant within thirty days after receipt of the claimant's last submittal (unless ENGINEER allows additional time). ENGINEER will render a formal decision in writing within thirty days after receipt of the opposing party's submittal, if any, in accordance with this paragraph. ENGINEER's written decision on such claim, dispute or other matter will be final and binding upon OWNER and CONTRACTOR unless: (i) an appeal from ENGINEER's decision is taken within the time limits and in accordance with the procedures set forth in EXHIBIT GC -A, "Dispute Resolution Agreement", entered into between OWNER and CONTRACTOR pursuant to Article 16, or (ii) if no such Dispute Resolution Agreement has been entered into, a written notice of intention to appeal from ENGINEER's written decision is delivered by OWNER or CONTRACTOR to the other and to ENGINEER within thirty days after the date of such decision and a formal proceeding is instituted by the appealing party in a forum of competent jurisdiction to exercise such rights or remedies as the appealing party may have with respect to such claim, dispute or other matter in accordance with applicable Laws and Regulations within sixty days of the date of such 22 E1CDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) decision, unless otherwise agreed in writing by OWNER and CONTRACTOR. 9.12. When functioning as interpreter and judge under paragraphs 9.10 and 9.11, ENGINEER will not show partiality to OWNER or CONTRACTOR and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. The rendering of a decision by ENGINEER pursuant to paragraphs 9.10 or 9.11 with respect to any such claim, dispute or other matter (except any which have been waived by the making or acceptance of final payment as provided in paragraph 14.15) will be a condition precedent to any exercise by OWNER or CONTRACTOR of such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any such claim, dispute or other matter . 9.13. Limitations on ENGINEER's Authority and Responsibilities. 9.13.1. Neither ENGINEER's authority or responsibility under this Article 9 or under any other provision of the Contract Documents nor any decision made by ENGINEER in good faith either to exercise or not exercise such authority or responsibility or the undertaking, exercise or performance of any authority or responsibility by ENGINEER shall create, impose or give rise to any duty owed by ENGINEER to CONTRACTOR, any Subcontractor, any Supplier, any other person or organization, or to any surety for or employee or agent of any of them. 9.13.2. ENGINEER will not supervise, direct, control or have authority over or be responsible for CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the furnishing or performance of the Work. ENGINEER will not be responsible for CONTRACTOR's failure to perform or famish the Work in accordance with the Contract Documents. 9.13.3. ENGINEER will not be responsible for the acts or omissions of CONTRACTOR or of any Subcontractor, any Supplier, or of any other person or organization performing or furnishing any of the Work. 9.13.4. ENGINEER's review of the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, Bonds and certificates of inspection, tests and approvals and other documentation required to be delivered by paragraph 14.12 will only be to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests and approvals that the results certified indicate compliance with, the Contract Documents. 9.13.5. The limitations upon authority and responsibility set forth in this paragraph 9.13 shall also apply to ENGINEER's Consultants, Resident Project Representative and assistants. ARTICLE 10—CHANGES IN THE WORK 10.1, Without invalidating the Agreement and without notice to any surety, OWNER may, at any time or from time to time, order additions, deletions or revisions in the Work. Such additions, deletions or revisions will be authorized by a Written Amendment, a Change Order, or a Work Change Directive. Upon receipt of any such document, CONTRACTOR shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). 10.2. If OWNER and CONTRACTOR are unable to agree as to the extent, if any, of an adjustment in the Contract Price or an adjustment of the Contract Times that should be allowed as a result of a Work Change Directive, a claim may be made therefor as provided in Article l I or Article 12. 10.3. CONTRACTOR shall not be entitled to an increase in the Contract Price or an extension of the Contract Times with respect to any Work performed that is not required by the Contract Documents as amended, modified and supplemented as provided in paragraphs 3.5 and 3.6, except in the case of an emergency as provided in paragraph 6.23 or in the case of uncovering Work as provided in paragraph 13.9. 10.4. OWNER and CONTRACTOR shall execute appropriate Change Orders recommended by ENGINEER (or Written Amendments) covering: 10.4.1. changes in the Work which are (i) ordered by OWNER pursuant to paragraph 10.1, (ii) required because of acceptance of defective Work under paragraph 13.13 or correcting defective Work under paragraph 13.14, or (iii) agreed to by the parties; 10.4.2. changes in the Contract Price or Contract Times which are agreed to by the parties; and 10.4.3. changes in the Contract Price or Contract Times which embody the substance of any written decision rendered by ENGINEER pursuant to paragraph 9.11; provided that, in lieu of executing any such Change Order, an appeal may be taken from any such decision in accordance with the provisions of the Contract Documents and applicable Laws and Regulations, but during any such appeal, CONTRACTOR shall carry on the Work and adhere to the progress schedule as provided in paragraph 6.29. 10.5. If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) (including, but not limited to, Contract Price or Contract Times) is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be CONTRACTOR's responsibility, and the amount of each applicable Bond will be adjusted accordingly. Written Agreement are not valid. ARTICLE 11—CHANGE OF CONTRACT PRICE 11.1. The Contract Price constitutes the total compensation (subject to authorized adjustments) payable to CONTRACTOR for performing the Work. All duties, responsibilities and obligations assigned to or undertaken by CONTRACTOR shall be at CONTRACTOR's expense without change in the Contract Price. 11.2. The Contract Price may only be changed by a Change Order or by a Written Amendment. Any claim for an adjustment in the Contract Price shall be based on written notice delivered by the party making the claim to the other party and to ENGINEER promptly (but in no event later than thirty days) after the start of the occurrence or event giving rise to the claim and stating the general nature of the claim. Notice of the amount of the claim with supporting data shall be delivered within sixty days after the start of such occurrence or event (unless ENGINEER allows additional time for claimant to submit additional or more accurate data in support of the claim) and shall be accompanied by claimant's written statement that the adjustment claimed covers all known amounts to which the claimant is entitled as a result of said occurrence or event. All claims for adjustment in the Contract Price shall be determined by ENGINEER in accordance with paragraph 9.11 if OWNER and CONTRACTOR cannot otherwise agree on the amount involved. No claim for an adjustment in the Contract Price will be valid if not submitted in accordance with this paragraph 11.2. 11.3. The value of any Work covered by a Change Order or of any claim for an adjustment in the Contract Price will be determined as follows: 11.3.1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of 23 paragraphs 11.9.1 through 11.9.3, inclusive); 11.3.2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed payment basis, including lump sum (which may include an allowance for overhead and profit not necessarily in accordance with paragraph 11.6.2); 11.3.3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum is not reached under paragraph 11.3.2, on the basis of the Cost of the Work (determined as provided in paragraphs 11.4 and 11.5) plus a CONTRACTOR's fee for overhead and profit (determined as provided in paragraph 11.6). Cost of the Work. 11.4. The term Cost of the Work means the sum of all costs necessarily incurred and paid by CONTRACTOR in the proper performance of the Work. Except as otherwise may be agreed to in writing by OWNER such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items and shall not include any of the costs itemized in paragraph 11.5: 11.4.1. Payroll costs for employees in the direct employ of CONTRACTOR in the performance of the Work under schedules of job classifications agreed upon by OWNER and CONTRACTOR. Such employees shall include without limitation superintendents, foremen and other personnel employed full-time at the site. Payroll costs for employees not employed full-time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall inelade, but net be limited to, salaries and wages plus the cost of fringe benefits which shall include social security contributions, unemployment, excise and payroll taxes, workers' compensation, health errd retimnm benefits; bonuses applicable thereto. The expenses of performing Work after regular working hours, on Saturday, Sunday or legal holidays, shall be included in the above to the extent authorized by OWNER 11.4.2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. All cash discounts shall accrue to CONTRACTOR unless OWNER deposits funds with CONTRACTOR with which to make payments, in which case the cash discounts shall accrue to OWNER. All trade discounts, rebates and refunds and returns from sale of surplus materials and equipment shall accrue to OWNER, and CONTRACTOR shall make provisions so that they may be obtained. 11.4.3. Payments made by CONTRACTOR to the Subcontractors for Work performed or furnished by Subcontractors. If required by OWNER, 24 EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) CONTRACTOR shall obtain competitive bids from Subcontractors acceptable to OWNER and CONTRACTOR and shall deliver such bids to OWNER who will then determine, with the advice of ENGINEER, which bids, if any, will be accepted. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as CONTRACTOR's Cost of the Work and fee as provided in paragraphs 11.4, 11.5, 11.6 and 11.7. All subcontracts shall be subject to the other provisions of the Contract Documents insofar as applicable. 11.4.4. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys and accountants) employed for services specifically related to the Work. 11.4.5. Supplemental costs including the following: 11.4.5.1. The ,_ proportion of necessary transportation, travel and subsistence expenses of CONTRACTOR's employees incurred in discharge of duties connected with the Work. 11.4.5.2. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office and temporary facilities at the site and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost less market value of such items used but not consumed which remain the property of CONTRACTOR. I I A.5.3. Rentals of all construction equipment and machinery and the parts thereof whether rented from CONTRACTOR or others in accordance with rental agreements approved by OWNER with the advice of ENGINEER, and the costs of transportation, loading, unloading, installation, dismantling and removal thereof —all in accordance with terms of said rental agreements. The rental of any such equipment, machinery or parts shall cease when the use thereof is no longer necessary for the Work. 11.4.5.4. Sales, consumer, use or similar taxes related to the Work, and for which CONTRACTOR is liable, imposed by Laws and Regulations. 11.4.5.5. Deposits lost for causes other than negligence of CONTRACTOR, any Subcontractor or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. 11.4.5.6. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by CONTRACTOR in connection with the I performance and fumishing of the Work (except losses and damages within the deductible amounts of property insurance established by OWNER in accordance with paragraph 5.9), provided they have resulted from causes other than the negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of OWNER. No such losses, damages and expenses shall be included in the Cost of the Work for the purpose of determining CONTRACTOR's fee. If, however, any such loss or damage requires reconstruction and CONTRACTOR is placed in charge thereof, CONTRACTOR shall be paid for services a fee proportionate to that stated in paragraph 11.6.2. 11.4.5.7. The cost of utilities, fuel and sanitary facilities at the site. 11.4.5.8. Minor expenses such as telegrams, long distance telephone calls, telephone service at the site, expressage and similar petty cash items in connection with the Work. 11.4.5.9. Cost of premiums for additional Bonds and insurance required because of changes in the Work. 11.5. The term Cost of the Work shall not include any of the following: 11.5.1. Payroll costs and other compensation of CONTRACTOR's officers, executives, principals (of partnership and sole proprietorships), general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks and other personnel employed by CONTRACTOR whether at the site or in CONTRACTOR's principal or a branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in paragraph 11.4.1 or specifically covered by paragraph 11.4.4—ail of which are to be considered administrative costs covered by the CONTRACTOR' fee. 11.5.2. Expenses of CONTRACTOR's principal and branch offices other than CONTRACTOR's office at the site. 11.5.3. Any part of CONTRACTOR's capital expenses, including interest on CONTRACTOR'S capital employed for the Work and charges against CONTRACTOR for delinquent payments. 11.5.4. Cost of premiums for all Bonds and for all insurance whether or not CONTRACTOR is required by the Contract Documents to purchase and maintain the same (except for the cost of premiums covered by subparagraph 11.4.5.9 above). EJCDC GENERAL. CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) 11.5.5. Costs due to the negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied and making good any damage to property. 11.5.6. Other overhead or general expense costs of any kind and the costs of any item not specifically and expressly included in paragraph 11.4. 11.6. The CONTRACTOR's fee allowed to CONTRACTOR for overhead and profit shall be determined as follows: 11.6.1. a mutually acceptable fixed fee; or 11.6.2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: 11.6.2.1. for costs incurred under paragraphs 11.4.1 and 11.4.2, the CONTRACTOR's fee shall be fifteen percent; 11.6.2.2. for costs incurred under paragraph 11.4.3, the CONTRACTOR's fee shall be five percent; 11.6.2.3. where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of paragraphs 11.4.1, 11.4.2, 11.4.3 and 11.6.2 is that the Subcontractor who actually performs or furnishes the Work, at whatever tier, will be paid a fee of fifteen percent of the costs incurred by such Subcontractor under paragraphs 11.4.1 and 11.4.2 and that any higher tier Subcontractor and CONTRACTOR will each be paid a fee of five _e ent of the . ..t paid to to be negotiated in good faith with the OWNER but not to exceed five percent of the amount paid to the next lower tier Subcontractor. 11.6.2.4. no fee shall be payable on the basis of costs itemized under paragraphs 11.4.4, 11.4.5 and 11.5; 11.6.2.5. the amount of credit to be allowed by CONTRACTOR to OWNER for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in CONTRACTOR's fee by an amount equal to five percent of such net decrease; and 11.6.2.6. when both additions and credits are involved in any one change, the adjustment in CONTRACTOR's fee shall be computed on the basis of the net change in accordance with paragraphs 11.6.2.1 through 11.6.2.5, inclusive. 11.7. Whenever the cost of any Work is to be 25 determined pursuant to paragraphs 11.4 and 11.5, CONTRACTOR will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in form acceptable to ENGINEER an itemized cost breakdown together with supporting data. Cash Allowances: 11.8. It is understood that CONTRACTOR has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be furnished and performed for such sums as may be acceptable to OWNER and ENGINEER CONTRACTOR agrees that: 11.8.1. the allowances include the cost to CONTRACTOR (less any applicable trade discounts) of materials and equipment required by the allowances to be delivered at the site, and all applicable taxes; and 11.8.2. CONTRACTOR's costs for unloading and handling on the site, labor, installation costs, overhead, profit and other expenses contemplated for the allowances have been included in the Contract Price and not in the allowances and no demand for additional payment on account of any of the foregoing will be valid. Prior to final payment, an appropriate Change Order will be issued as recommended by ENGINEER to reflect actual amounts due CONTRACTOR on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.9. Unit Price Work: 11.9.1. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the established unit prices for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by CONTRACTOR will be made by ENGINEER in accordance with paragraph 9.10. 11.9.2. Each unit price will be deemed to include an amount considered by CONTRACTOR to be adequate to cover CONTRACTOR's overhead and profit for each separately identified item. 11.9.3.OWNER or CONTRACTOR may make a claim for an adjustment in the Contract Price in accordance with Article I t if. 11.9.3.1. the quantity of any item of Unit Price Work performed by CONTRACTOR differs materially and significantly from the estimated quantity of such item indicated in the Agreement; 26 EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) and 11.9.3.2. there is no corresponding adjustment with respect to any other item of Work; and 11.9.3.3. if CONTRACTOR believes that CONTRACTOR is entitled to an increase in Contract Price as a result of having incurred additional expense or OWNER believes that OWNER is entitled to a decrease in Contract Price and the parties are unable to agree as to the amount of any such increase or decrease. 11.9.3.4. CONTRACTOR acknowledges that the OWNER has the right to add or delete items in the Bid or change quantities at OWNER'S sole discretion without affecting the Contract Price of any remaining item so long as the deletion or addition does not exceed twenty-five percent of the original total Contract Price. ARTICLE 12—CHANGE OF CONTRACT TMIES 12.1. The Contract Times (or Milestones) may only be changed by a Change Order or a Written Amendment. Any claim for an adjustment of the Contract Times (or Milestones) shall be based on written notice delivered by the party making the claim to the other party and to ENGINEER promptly (but in no event later than thirty days) after the occurrence of the event giving rise to the claim and stating the general nature of the claim. Notice of the extent of the claim with supporting data shall be delivered within sixty days after such occurrence (unless ENGINEER allows additional time to ascertain more accurate data in support of the claim) and shall be accompanied by the claimant's written statement that the adjustment claimed is the entire adjustment to which the claimant has reason to believe it is entitled as a result of the occurrence of said event. All claims for adjustment in the Contract Times (or Milestones) shall be determined by ENGINEER in accordance with paragraph 9.11 if OWNER and CONTRACTOR cannot otherwise agree. No claim for an adjustment in the Contract Times (or Milestones) will be valid if not submitted in accordance with the requirements of this paragraph 12.1. 12.2. All time limits stated in the Contract Documents are of the essence of the Agreement 12.3. Where CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of CONTRACTOR, the Contract Times (or Milestones) will be extended in an amount equal to time lost due to such delay if a claim is made therefor as provided in paragraph 12.1. Delays beyond the control of CONTRACTOR shall include, but not be limited to, acts or neglect by OWNER, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions or acts of God. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of CONTRACTOR. 12.4. Where CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of both OWNER and CONTRACTOR, an extension of the Contract Times (or Milestones) in an amount equal to the time lost due to such delay shall be CONTRACTOR's sole and exclusive remedy for such delay. In no event shall OWNER be liable to CONTRACTOR, any Subcontractor, any Supplier, any other person or organization, or to any surety for or employee or agent of any of them, for damages arising out of or resulting from (i) delays caused by or within the control of the CONTRACTOR, or (ii) delays beyond the control of both parties including, but not limited to, fires, floods, epidemics, abnormal weather conditions, acts of God or acts or neglect by utility owners or other contractors performing other work as contemplated by Article 7. ARTICLE 13—TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.1. Notice of Defects: Prompt notice of all defective Work of which OWNER or ENGINEER have actual knowledge will be given to CONTRACTOR. All defective Work may be rejected, corrected or accepted as provided in this Article 13. Access to Work: 13.2. OWNER, ENGINEER, ENGINEER's Consultants, other representatives and personnel of OWNER, independent testing laboratories and governmental agencies with jurisdictional interests will have access to the Work at reesemble times for their observation, inspecting and testing. CONTRACTOR shall provide them proper and safe conditions for such access and advise them of CONTRACTOR's site safety procedures and programs so that they may comply therewith as applicable. Tests and Inspections: 13.3. CONTRACTOR shall give ENGINEER timely notice of readiness of the Work for all required inspections, tests or approvals, and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. 13.4. OWNER shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents except: 13.4.1. for inspections, tests or approvals covered by paragraph 13.5 below; 13.4.2. that costs incurred in connection with tests or inspections conducted pursuant to paragraph 13.9 EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) below shall be paid as provided in said paragraph 13.9; and 13.4.3. as otherwise specifically provided in the Contract Documents. 13.5. If Laws or Regulations of any public body having jurisdiction require any Work (or part thereof) specifically to be inspected, tested or approved by an employee or other representative of such public body, CONTRACTOR shall assume full responsibility for arranging and obtaining such inspections, tests or approvals, pay all costs in connection therewith, and furnish ENGINEER the required certificates of inspection, or approval. CONTRACTOR shall also be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests or approvals required for OWNER's and ENGINEER's acceptance of materials or equipment to be incorporated in the Work, or of materials, mix designs, or equipment submitted for approval prior to CONTRACTOR's purchase thereof for incorporation in the Work. 13.6. If any Work (or the work of others) that is to be inspected, tested or approved is covered by CONTRACTOR without written concurrence of ENGINEER, it must, if requested by ENGINEER, be uncovered for observation. 13.7. Uncovering Work as provided in paragraph 13.6 shall be at CONTRACTOR's expense unless CONTRACTOR has given ENGINEER timely notice of CONTRACTORs intention to cover the same and ENGINEER has not acted with reasonable promptness in response to such notice. Uncovering Work: 13.8. If any Work is covered contrary to the written request of ENGINEER, it must, if requested by ENGINEER, be uncovered for ENGINEER's observation and replaced at CONTRACTOR's expense. 13.9. If ENGINEER considers it necessary or advisable that covered Work be observed by ENGINEER or inspected or tested by others, CONTRACTOR, at ENGINEER's request, shall uncover, expose or otherwise make available for observation, inspection or testing as ENGINEER may require, that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective, CONTRACTOR shall pay all claims, costs, losses and damages caused by, arising out of or resulting from such uncovering, exposure, observation, inspection and testing and of satisfactory replacement or reconstruction, (including but not limited to all costs of repair or replacement of work of others); and OWNER shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof, may make a claim therefor as provided in Article It. If, however, such Work is not found to be defective, CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Times (or Milestones), or both, directly attributable to such 27 uncovering, exposure, observation, inspection, testing, replacement and reconstruction; and, if the parties are unable to agree as to the amount or extent -thereof, CONTRACTOR may make a claim therefor as provided in Articles 11 and 12. OWNER May Stop the Work: 13.10. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment, or fails to fiunish or perform the Work in such a way that the completed Work will conform to the Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of OWNER to stop the Work shall not give rise to any duty on the part of OWNER to exercise this right for the benefit of CONTRACTOR or any surety or other party. Correction or Removal of Defective Work. 13.11. If required by ENGINEER, CONTRACTOR shall promptly, as directed, either correct all defective Work, whether or not fabricated, installed or completed, or, if the Work has been rejected by ENGINEER, remove it from the site and replace it with Work that is not defective. CONTRACTOR shall pay all claims, costs, losses and damages caused by or resulting from such correction or removal (including but not limited to all costs of repair or replacement of work of others). 13.12. Correction Period. 13.12.1. If within one year two years after the date of Substantial Completion or such longer period of time as may be prescribed by Laws or Regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defective, CONTRACTOR shall promptly, without cost to OWNER and in accordance with OWNER's written instructions: (i) correct such defective Work, or, if it has been rejected by OWNER, remove it from the site and replace it with Work that is not defective, and (ii) satisfactorily correct or remove and replace any damage to other Work or the work of others resulting therefrom. If CONTRACTOR does not promptly comply with the terns of such instructions, or in an emergency where delay would cause serious risk of loss or damage, OWNER may have the defective Work corrected or the rejected Work removed and replaced, and all claims, costs, losses and damages caused by or resulting from such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by CONTRACTOR. 13.12.2.In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Specifications or by Written Amendment. 13.12.3. Where defective Work (and damage to other E1CDC GENERAL CONDITIONS 1910-8 (1990 Edition) 28 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) Work resulting therefrom) has been corrected, removed or replaced under this paragraph 13.12, the correction period hereunder with respect to such Work will be extended for an additional period of one-year two years after such correction or removal and replacement has been satisfactorily completed. Acceptance of Defective Work: 13.13. If, instead of requiring correction or removal and replacement of defective Work, OWNER (and, prior to ENGINEER's recommendation of final payment, also ENGINEER) prefers to accept it, OWNER may do so. CONTRACTOR shall pay all claims, costs, losses and damages attributable to OWNER's evaluation of and determination to accept such defective Work (such costs to be approved by ENGINEER as to reasonableness). If any such acceptance occurs prior to ENGINEER's recommendation of final payment, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and OWNER shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof, OWNER may make a claim therefor as provided in Article 11. If the acceptance occurs after such recommendation, an appropriate amount will be paid by CONTRACTOR to OWNER. OWNER May Correct Defective Work: 13.14. If CONTRACTOR fails within a reasonable time after written notice from ENGINEER to correct defective Work or to remove and replace rejected Work as required by ENGINEER in accordance with paragraph 13.11, or if CONTRACTOR fails to perform the Work in accordance with the Contract Documents, or if CONTRACTOR fails to comply with any other provision of the Contract Documents, OWNER may, after seven days' written notice to CONTRACTOR, correct and remedy any such deficiency. In exercising the rights and remedies under this paragraph OWNER shall proceed expeditiously. In connection with such corrective and remedial action, OWNER may exclude CONTRACTOR from all or part of the site, take possession of all or part of the Work, and suspend CONTRACTOR's services related thereto, take possession of CONTRACTOR's tools, appliances, construction equipment and machinery at the site and incorporate in the Work all materials and equipment stored at the site or for which OWNER has paid CONTRACTOR but which are stored elsewhere. CONTRACTOR shall allow OWNER, OWNER's representatives, agents and employees, OWNER's other contractors and ENGINEER and ENGINEER's Consultants access to the site to enable OWNER to exercise the rights and remedies under this paragraph. All claims, costs, losses and damages incurred or sustained by OWNER in exercising such rights and remedies will be charged against CONTRACTOR and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and OWNER shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof, OWNER may make a claim therefor as provided in Article 11. Such claims, costs, losses and damages will include but not be limited to all costs of repair or replacement of work of others destroyed or damaged by correction, removal or replacement of CONTRACTOR's defective Work. CONTRACTOR shall not be allowed an extension of the Contract Times (or Milestones) because of any delay in performance of the Work attributable to the exercise by OWNER of OWNER's rights and remedies hereunder. ARTICLE 14—PAYMENTS TO CONTRACTOR AND COMPLETION Schedule of Values: 14.1. The schedule of values established as provided in paragraph 2.9 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to ENGINEER. Progress payments on account of Unit Price Work will be based on the number of units completed. Application for Progress Payment. 14.2. At least twenty days before the date established for each progress payment (but not more often than once a month), CONTRACTOR shall submit to ENGINEER for review an Application for Payment filled out and signed by CONTRACTOR covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice or other documentation warranting that OWNER has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate property insurance and other arrangements to protect OWNER's interest therein, all of which will be satisfactory to OWNER. The amount of retainage with respect to progress payments will be as stipulated in the Agreement. Any funds that are withheld by the OWNER shall not be subject to substitution by the CONTRACTOR with securities or any arrangements involving an escrow or custodianship. By executing the application for payment form the CONTRACTOR expressly waives his right to the benefits of Colorado Revised Statutes, Section 24-91-101, et sea. COIVTRACTOR's Warranty of Title: 14.3. CONTRACTOR warrants and guarantees that title to all Work, materials and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to OWNER no later than the time of payment free and clear of all Liens. Review of Applicationsfor Progress Payment. 14.4. ENGINEER will, within ten days after receipt of each Application for Payment, either indicate in writing a EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) recommendation of payment and present the Application to OWNER, or return the Application to CONTRACTOR indicating in writing ENGINEER's reasons for refusing to recommend payment. In the latter case, CONTRACTOR may make the necessary corrections and resubmit the Application. Ten days after presentation of the Application for Payment to OWNER with ENGINEER's recommendation, the amount recommended will (subject to the provisions of the last sentence of paragraph 14.7) become due and when due will be paid by OWNER to CONTRACTOR 14.5. ENGINEER's recommendation of any payment requested in an Application for Payment will constitute a representation by ENGINEER to OWNER, based on ENGINEER's on -site observations of the executed Work as an experienced and qualified design professional and on ENGINEER's review of the Application for Payment and the accompanying data and schedules, that to the best of ENGINEER's knowledge, information and belief 14.5.1. the Work has progressed to the point indicated, 14.5.2. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents, to a final determination of quantities and classifications for Unit Price Work under paragraph 9.10, and to any other qualifications stated in the recommendation), and 14.5.3. the conditions precedent to CONTRACTOR's being entitled to such payment appear to have been fulfilled insofar as it is ENGINEER's responsibility to observe the Work. However, by recommending any such payment ENGINEER will not thereby be deemed to have represented that: (i) exhaustive or continuous on -site inspections have been made to check the quality or the quantity of the Work beyond the responsibilities specifically assigned to ENGINEER in the Contract Documents or (ii) that there may not be other matters or issues between the parties that might entitle CONTRACTOR to be paid additionally by OWNER or entitle OWNER to withhold payment to CONTRACTOR. 14.6. ENGINEER's recommendation of any payment, including final payment, shall not mean that ENGINEER is responsible for CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the furnishing or performance of Work, or for any failure of CONTRACTOR to perform or furnish Work in accordance with the Contract Documents. 14.7. ENGINEER may refuse to recommend the whole or any part of any payment if, in ENGINEER's opinion, it would be incorrect to make the representations to 29 OWNER referred to in paragraph 14.5. ENGINEER may also refuse to recommend any such payment, or, because of subsequently discovered evidence or the results of subsequent inspections or tests, nullify any such payment previously recommended, to such extent as may be necessary in ENGINEER's opinion to protect OWNER from loss because: 14.7.1. the Work is defective, or completed Work has been damaged requiring correction or replacement, 14.7.2. the Contract Price has been reduced by Written Amendment or Change Order, 14.7.3. OWNER has been required to correct defective Work or complete Work in accordance with paragraph 13.14,or 14.7.4. ENGINEER has actual knowledge of the occurrence of any of the events enumerated in paragraphs 15.2.1 through 15.2.4 inclusive. OWNER may refuse to make payment of the full amount recommended by ENGINEER because: 14.7.5. claims have been made against OWNER on account of CONTRACTOR's performance or furnishing of the Work, 14.7.6. Liens have been filed in connection with the Work, except where CONTRACTOR has delivered a specific Bond satisfactory to OWNER to secure the satisfaction and discharge of such Liens, 14.7.7. there are other items entitling OWNER to a set- off against the amount recommended, or 14.7.8. OWNER has actual knowledge of the occurrence of any of the events enumerated in paragraphs 14.7.1 through 14.7.3 or paragraphs 15.2.1 through 15.2.4 inclusive; but OWNER must give CONTRACTOR immediate written notice (with a copy to ENGINEER) stating the reasons for such action and promptly pay CONTRACTOR the amount so withheld, or any adjustment thereto agreed to by OWNER and CONTRACTOR, when CONTRACTOR corrects to OWNER's satisfaction the reasons for such action. Substantial Completion: 14.8. When CONTRACTOR considers the entire Work ready for its intended use CONTRACTOR shall notify OWNER and ENGINEER in writing that the entire Work is substantially complete (except for items specifically listed by CONTRACTOR as incomplete) and request that ENGINEER issue a certificate of Substantial Completion. Within a reasonable time thereafter, OWNER, CONTRACTOR and ENGINEER shall make an inspection of the Work to determine the status of completion. If ENGINEER does not consider the Work substantially complete, ENGINEER will notify CONTRACTOR in writing giving the reasons therefor. If ENGINEER 30 EICDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) considers the Work substantially complete, ENGINEER will prepare and deliver to OWNER a tentative certificate of Substantial Completion which shall fix the date of Substantial Completion. There shall be attached to the certificate a tentative list of items to be completed or corrected before final payment OWNER shall have seven days after receipt of the tentative certificate during which to make written objection to ENGINEER as to any provisions of the certificate or attached list. If, after considering such objections, ENGINEER concludes that the Work is not substantially complete, ENGINEER will within fourteen days after submission of the tentative certificate to OWNER notify CONTRACTOR in writing, stating the reasons therefor. If, after consideration of OWNER's objections, ENGINEER considers the Work substantially complete, ENGINEER will within said fourteen days execute and deliver to OWNER and CONTRACTOR a definitive certificate of Substantial Completion (with a revised tentative list of items to be completed or corrected) reflecting such changes from the tentative certificate as ENGINEER believes justified after consideration of any objections from OWNER. At the time of delivery of the tentative certificate of Substantial Completion ENGINEER will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities pending final payment between OWNER and CONTRACTOR with respect to security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees. Unless OWNER and CONTRACTOR agree otherwise in writing and so inform ENGINEER in writing prior to ENGINEER's issuing the definitive certificate of Substantial Completion, ENGINEER's aforesaid recommendation will be binding on OWNER and CONTRACTOR until final payment 14.9. OWNER shall have the right to exclude CONTRACTOR from the Work after the date of Substantial Completion, but OWNER shall allow CONTRACTOR reasonable access to complete or correct items on the tentative list. Partial Utilization: 14.10. Use by OWNER at OWNER's option of any substantially completed part of the Work, which: (i) has specifically been identified in the Contract Documents, or (ii) OWNER, ENGINEER and CONTRACTOR agree constitutes a separately functioning and usable part of the Work that can be used by OWNER for its intended purpose without significant interference with, CONTRACTOR's performance of the remainder of the Work, may be accomplished prior to Substantial Completion of all the Work subject to the following: 14.10.1.OWNER at any time may request CONTRACTOR in writing to permit OWNER to use any such part of the Work which OWNER believes to be ready for its intended use and substantially complete. If CONTRACTOR agrees that such part of the Work is substantially complete, CONTRACTOR will certify to OWNER and ENGINEER that such part of the Work is substantially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. M CONTRACTOR at any time may notify OWNER and ENGINEER in writing that CONTRACTOR considers any such part of the Work ready for its intended use and substantially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. Within a reasonable time after either such request, OWNER, CONTRACTOR and ENGINEER shall make an inspection of that part of the Work to determine its status of completion. If ENGINEER does not consider that part of the Work to be substantially complete, ENGINEER will notify OWNER and CONTRACTOR in writing giving the reasons therefor. If ENGINEER considers that part of the Work to be substantially complete, the provisions of paragraphs 14.8 and 14.9 will apply with respect to certification of Substantial Completion of that part of the Work and the division of responsibility in respect thereof and access thereto. 14.10.2. No occupancy or separate operation of part of the Work will be accomplished prior to compliance with the requirements of paragraph 5.15 in respect of property insurance. Final Inspection: 14.11. Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is complete, ENGINEER will make a final inspection with OWNER and CONTRACTOR and will notify CONTRACTOR in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. CONTRACTOR shall immediately take such measures as are necessary to complete such work or remedy such deficiencies. Final Application for Payment. 14.12. After CONTRACTOR has completed all such corrections to the satisfaction of ENGINEER and delivered in accordance with the Contract Documents all maintenance and operating instructions, schedules, guarantees, Bonds, certificates or other evidence of insurance required by paragraph 5.4, certificates of inspection, marked -up record documents (as provided in paragraph 6.19) and other documents, CONTRACTOR may make application for final payment following the procedure for progress payments. The final Application for Payment shall be accompanied (except as previously delivered) by: (i) all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by subparagraph 5.4.13, (ii) consent of the surety, if any, to final payment, and (iii) complete and legally effective releases or waivers (satisfactory to OWNER) of all Liens arising out of or filed in connection with the Work. In lieu of such releases or waivers of Liens and as approved by OWNER, CONTRACTOR may furnish receipts or releases in full and affidavit of CONTRACTOR that: (i) the releases and receipts include all labor, services, material and equipment for which a Lien could be filed, and (ii) all payrolls, material and equipment bills, and other indebtedness connected with the Work for which OWNER or OWNERSs property might in any way be responsible have been paid or otherwise satisfied. If any Subcontractor or Supplier fails EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) to furnish such a release or receipt in full, CONTRACTOR may furnish a Bond or other collateral satisfactory to OWNER to indemnify OWNER against any Lien. Releases or waivers of liens and the consent of the surety to finalize payment are to be submitted on forms conforming to the format of the OWNER'S standard forms bound in the Proiect manual. Final Payment and Acceptance: 14.13. If, on the basis of ENGINEER's observation of the Work during construction and final inspection, and ENGINEER's review of the final Application for Payment and accompanying documentation as required by the Contract Documents, ENGINEER is satisfied that the Work has been completed and CONTRACTOR's other obligations under the Contract Documents have been fulfilled, ENGINEER will, within ten days after receipt of the final Application for Payment, indicate in writing ENGINEER's recommendation of payment and present the Application to OWNER for payment. At the same time ENGINEER will also give written notice to OWNER and CONTRACTOR that the Work is acceptable subject to the provisions of paragraph 14.15. Otherwise, ENGINEER will return the Application to CONTRACTOR, indicating in writing the reasons for refusing to recommend final payment, in which case CONTRACTOR shall make the necessary corrections and resubmit the Application. Thirty days after presentation to OWNER of the Application and accompanying documentation, in appropriate form and substance and with ENGINEER's recommendation and notice of acceptability, the amount recommended by ENGINEER will become due and will be paid by OWNER to CONTRACTOR subiect to paragraph 17.6.2 of these General Conditions. 14.14. If, through no fault of CONTRACTOR, final completion of the Work is significantly delayed and if ENGINEER so confirms, OWNER shall, upon receipt of CONTRACTOR's final Application for Payment and recommendation of ENGINEER, and without terminating the Agreement, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by OWNER for Work not fully completed or connected is less than the retainage stipulated in the Agreement, and if Bonds have been furnished as required in paragraph 5.1, the written consent of the surety to the payment of the balance due for that portion of the Work fully completed and accepted shall be submitted by CONTRACTOR to ENGINEER with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims, Waiver of Claims: 14.15. The making and acceptance of final payment will constitute: 14.15.1. a waiver of all claims by OWNER against CONTRACTOR, except claims arising from unsettled Liens, from defective Work appearing after 31 Mathews Street, Fort Collins. Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. Bids will be received as set forth in the Bidding Documents. The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or _ personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision -making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or -- accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited City of Fort Collins By am s B. O' eill, II, CPPO, FNIGP ur hasing/Risk Management Director O W 2001 Section 00020 Page 2 final inspection pursuant to paragraph 14.11, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from CONTRACTOR's continuing obligations under the Contract Documents; and 14.15.2. A waiver of all claims by CONTRACTOR against OWNER other than those previously made in writing and still unsettled. ARTICLE 15—SUSPENSION OF WORK AND TERMINATION OWNER May Suspend Work: 15.1. At any time and without cause, OWNER may suspend the Work or any portion thereof for a period of not more than ninety days by notice in writing to CONTRACTOR and ENGINEER which will fix the date on which Work will be resumed. CONTRACTOR shall resume the Work on the date so fixed. CONTRACTOR shall be allowed an adjustment in the Contract Price or an extension of the Contract Times, or both, directly attributable to any such suspension if CONTRACTOR makes an approved claim therefor as provided in Articles 11 and 12. OWNER May Terminate: 15.2. Upon the occurrence of any one or more of the following events: 15.2.1. if CONTRACTOR persistently fails to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to the progress schedule established under paragraph 2.9 as adjusted from time to time pursuant to paragraph 6.6); 15.2.2. if CONTRACTOR disregards Laws or Regulations of any public body having jurisdiction; 15.2.3. if CONTRACTOR disregards the authority of ENGINEER; or 15.2.4. if CONTRACTOR otherwise violates in any substantial way any provisions of the Contract Documents; OWNER may, after giving CONTRACTOR (and the surety, if any) seven days' written notice and to the extent permitted by Laws and Regulations, terminate the services of CONTRACTOR, exclude CONTRACTOR from the site and take possession of the Work and of all CONTRACTOR's tools, appliances, construction equipment and machinery at the site and use the same to the full extent they could be used by CONTRACTOR (without liability to CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the site or for which OWNER has paid EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) 32 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) CONTRACTOR but which are stored elsewhere, and finish the Work as OWNER may deem expedient. In such case CONTRACTOR shall not be entitled to receive any further payment until the Work is finished If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by OWNER arising out of or resulting from completing the Work such excess will be paid to CONTRACTOR. If such claims, costs, losses and damages exceed such unpaid balance, CONTRACTOR shall pay the difference to OWNER. Such claims, costs, losses and damages incurred by OWNER will be reviewed by ENGINEER as to their reasonableness and when so approved by ENGINEER incorporated in a Change Order, provided that when exercising any rights or remedies under this paragraph OWNER shall not be required to obtain the lowest price for the Work performed. 15.3. Where CONTRACTOR's services have been so terminated by OWNER, the termination will not affect any rights or remedies of OWNER against CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of moneys due CONTRACTOR by OWNER will not release CONTRACTOR from liability. 15.4. Upon seven days' written notice to CONTRACTOR and ENGINEER, OWNER may, without cause and without prejudice to any other right or remedy of OWNER, elect to terminate the Agreement. In such case, CONTRACTOR shall be paid (without duplication of any items): 1SA L for completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 15.4.2. for expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; 15.4.3. for all claims, costs, losses and damages incurred in settlement of terminated contracts with Subcontractors, Suppliers and others; and 15.4.4. for reasonable expenses directly attributable to termination. CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. CONTRACTOR May Stop Work or Terminate: 15.5. If, through no act or fault of CONTRACTOR, the Work is suspended for a period of more than ninety days by OWNER or under an order of court or other public authority, or ENGINEER fails to act on any Application for Payment within thirty days after it is submitted or OWNER fails for thirty days to pay CONTRACTOR any sum finally determined to be due, then CONTRACTOR may, upon seven days' written notice to OWNER and ENGINEER, and provided OWNER or ENGINEER do not remedy such suspension or failure within that time, terminate the Agreement and recover from OWNER payment on the same terms as provided in paragraph 15.4. In lieu of terminating the Agreement and without prejudice to any other right or remedy, if ENGINEER has failed to act on an Application for Payment within thirty days after it is submitted, or OWNER has failed for thirty days to pay CONTRACTOR any sum finally determined to be due, CONTRACTOR may upon seven days' written notice to OWNER and ENGINEER stop the Work until payment of all such amounts due CONTRACTOR, including interest thereon. The provisions of this paragraph 15.5 are not intended to preclude CONTRACTOR from making claim under Articles 11 and 12 for an increase in Contract Price or Contract Times or otherwise for expenses or damage directly attributable to CONTRACTOR's stopping Work as permitted by this paragraph. ARTICLE 16—DISPUTE RESOLUTION If and to the extent that OWNER and CONTRACTOR have agreed on the method and procedure for resolving disputes between them that may arise under this Agreement, such dispute resolution method and procedure, if any, shall be as set forth in Exhibit GC -A, "Dispute Resolution Agreement", to be attached hereto and made a part hereof. If no such agreement on the method and procedure for resolving such disputes has been reached, and subject to the provisions of paragraphs 9.10, 9.11 and 9.12, OWNER and CONTRACTOR may exercise such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any dispute. ARTICLE 17—MISCELLANEOUS Giving Notice. 17.1. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if delivered in person to the individual or to a member of the firm, or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. 17.2. Computation of Time: 17.2.1. When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day will be omitted from the computation. EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) 17.2.2. A calendar day of twenty-four hours measured from midnight to the next midnight will constitute a day. Notice of Claim: 17.3. Should OWNER or CONTRACTOR suffer injury or damage to person or property because of any error, omission or act of the other party or of any of the other parry's employees or agents or others for whose acts the other party is legally liable, claim will be made in writing to the other party within a reasonable time of the first observance of such injury or damage. The provisions of this paragraph 17.3 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations or repose.Cumulative Remedies: 17.4. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto, and, in particular but without limitation, the warranties, guarantees and obligations imposed upon CONTRACTOR by paragraphs 6.12, 6.16, 6.30, 6.31, 6.32, 13.1, 13.12, 13.14, 14.3 and 15.2 and all of the rights and remedies available to OWNER and ENGINEER thereunder, are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations by special warranty or guarantee or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply. Professional Fees and Court Costs Included: 17.5. Whenever reference is made to "claims, costs, losses and damages", it shall include in each case, but not be limited to, all fees and charges of engineers, architects, attorneys and other professionals and all court or arbitration or other dispute resolution costs. 17.6. The laws of the State of Colorado apply to this Agreement. Reference to two pertinent Colorado statutes are as follows; 17.6.2. If a claim is filed, OWNER is required by law (CRS 38-26-107) to withhold from all payments to CONTRACTOR sufficient funds to insure the payment of all claims for labor, materials team hire, sustenance provisions provender, or other supplies used or consumed by CONTRACTOR or his 33 34 E1CDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) (This page left blank intentionally.) EICDC GENERAL CONDITIONS 1910-8(1990 Edition) 35 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) 36 EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) EXHIBIT GC -A to General Conditions of the Construction Contract Between OWNER and CONTRACTOR DISPUTE RESOLUTION AGREEMENT OWNER and CONTRACTOR hereby agree that Article 16 of the General Conditions of the Construction Contract between OWNER and CONTRACTOR is amended to include the following agreement of the parties: 16.1. All claims, disputes and other matters in question between OWNER and CONTRACTOR arising out of or relating to the Contract Documents or the breach thereof (except for claims which have been waived by the making or acceptance of final payment as provided by paragraph 14.15) will be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association then obtaining, subject to the limitations of the Article 16. This agreement so to arbitrate and any other agreement or consent to arbitrate entered into in accordance herewith as provided in this Article 16 will be specifically enforceable under the prevailing law of any court having jurisdiction. 16.2. No demand for arbitration of any claim, dispute or other matter that is required to be referred to ENGINEER initially for decision in accordance with paragraph 9.11 will be made until the earlier of (a) the date on which ENGINEER has rendered a written decision or (b) the thirty-first day after the parties have presented their evidence to ENGINEER if a written decision has not been rendered by ENGINEER before that date. No demand for arbitration of any such claim, dispute or other matter will be made later than thirty days after the date on which ENGINEER has rendered a written decision in respect thereof in accordance with paragraph 9.11; and the failure to demand arbitration within said thirty days' period will result in ENGINEER's decision being final and binding upon OWNER and CONTRACTOR. If ENGINEER renders a decision after arbitration proceedings have been initiated, such decision may be entered as evidence but will not supersede the arbitration proceedings, except where the decision is acceptable to the parties concerned. No demand for arbitration of any written decision of ENGINEER rendered in accordance with paragraph 9.10 will be made later than ten days after the party making such demand has delivered written notice of intention to appeal as provided in paragraph 9.10. 16.3. Notice of the demand for arbitration will be filed in writing with the other party to the Agreement and with the American Arbitration Association, and a copy will be sent to ENGINEER for information. The demand for arbitration will be made within the thirty -day or ten-day period specified in paragraph 16.2 as applicable, and in all other cases within a reasonable time after the claim, dispute or other matter in question has arisen, and in no event shall any such demand be made after the date when institution of legal or equitable proceedings based on such claim, dispute or other matter in question would be barred by the applicable statute of limitations. EJCDC GENERAL. CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) 16.4. Except as provided in paragraph 16.5 below, no arbitration arising out of or relating to the Contract Documents shall include by consolidation, joinder or in any other manner any other person or entity (including ENGINEER, ENGINEER's Consultant and the officers, directors, agents, employees or consultants of any of them) who is not a party to this contract unless: 16.4.1. the inclusion of such other person or entity is necessary if complete relief is to be afforded among those who are already parties to the arbitration, and 16.4.2. such other person or entity is substantially involved in a question of law or fact which is common to those who are already parties to the arbitration and which will arise in such proceedings, and 16.4.3. the written consent of the other person or entity sought to be included and of OWNER and CONTRACTOR has been obtained for such inclusion, which consent shall make specific reference to this paragraph; but no such consent shall constitute consent to arbitration of any dispute not specifically described in such consent or to arbitration with any party not specifically identified in such consent. 16.5. Notwithstanding paragraph 16.4, if a claim, dispute or other matter in question between OWNER and CONTRACTOR involves the Work of a Subcontractor, either OWNER or CONTRACTOR may join such Subcontractor as a party to the arbitration between OWNER and CONTRACTOR hereunder. CONTRACTOR shall include in all subcontracts required by paragraph 6.11 a specific provision whereby the Subcontractor consents to being joined in an arbitration between OWNER and CONTRACTOR involving the Work of such Subcontractor. Nothing in this paragraph 16.5 nor in the provision of such subcontract consenting to joinder shall create any claim, right or cause of action in favor of Subcontractor and against OWNER, ENGINEER or ENGINEER's Consultants that does not otherwise exist. 16.6. The award rendered by the arbitrators will be final, judgment may be entered upon it in any court having jurisdiction thereof, and it will not be subject to modification or appeal. 16.7. OWNER and CONTRACTOR agree that they shall first submit any and all unsettled claims, counterclaims, disputes and other matters in question between them arising out of or relating to the Contract Documents or the breach thereof ("disputes"), to mediation by the American Arbitration Association under the Construction Industry Mediation Rules of the American Arbitration Association prior to either of them initiating against the other a demand for arbitration pursuant to paragraphs 16.1 through 16.6, unless delay in initiating arbitration would irrevocably prejudice one of the parties. The respective thirty and ten day time limits within which to file a demand for arbitration as provided in paragraphs 16.2 and 16.3 above shall be suspended with respect to a dispute submitted to mediation within those same applicable time limits and shall remain suspended until ten days after the termination of the mediation. The mediator of any dispute submitted to mediation under this Agreement shall not serve as arbitrator of such dispute unless otherwise agreed. GC -AI EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) GC -Al w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/94) F..+a SECTION 00800 SUPPLEMENTARY CONDITIONS No Text SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the Contract Documents as indicated below. SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: 5.4.1 and 5.4.2 Coverage A - Statutory Limits Coverage B - $100,000/$100,000/$500,000 5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,0.00 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. 5.4.6The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). 5.4.9This policy will include completed operations coverage/product liability coverage with limits of $1,000,000 combined single limits (CSL). SECTION 00100 INSTRUCTIONS TO BIDDERS No Text I, I M b n Ix SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950Contract Change Order 00960Application for Payment 9/99 No Text SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: Restoration of Franz -Smith Cabin; Bid No. 5787 CONTRACTOR: PROJECT NUMBER: DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost 4. Change in Contract Time: ORIGINAL CONTRACT COST $ .00 TOTAL APPROVED CHANGE ORDER 0.00 TOTAL PENDING CHANGE ORDER 0.00 TOTAL THIS CHANGE ORDER 0.00 TOTAL o OF THIS CHANGE ORDER TOTAL C.O.a OF ORIGNINAL CONTRACT ADJUSTED CONTRACT COST $ 0.00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purcha: cc: City Clerk Project File Engineer ng Agent over $30,000 Contractor Architect Purchasing DATE: DATE: DATE: DATE: 9/99 Section 00950 Page 1 No Text Section 00960 Application for Payment Insert pages 1 - 4 No Text ± e £ E f]} 7 r CD2am ` i 3 w*§§ ) fCD m 2 ° } ( } j ? z CD CD CD @ CD z \ £ / z A ( ( } (Do . m m (D < < ) ;2 2 e x } 0 \ ( 2 0 > 0 ) . / \ \ \ > 0 n \ \ \ � CD13 ( } \ / > (D / ~} - - @- z o w \ . .. ) f , . 7 01 . i I a Q ¢0 CL 3 7 k z £ \#\2 r I9 \ \ ) ° §w $ ® ° % \g ° \ W�-0\ !_§< z ) w 0 / \ Q ]\ } o z § \7 § §f /\ g 3 m }; ))>E k \E \ ) $ � ) }�° f s( \ \ \ }� > ./\ : go o § $G ƒn, & 0 / z ( } } R 5 D &\ § } . / y CD % } [ - ° & >CD ( \ \ o t > 3 >§ o $ . } q-a 2�3r-> mono ° _ ]bmt2 z22§z � oz mlo /(§ % m 88 s 0 0 D r- N C 7 'O y� D 6969"fA fA 4A6A to O o OOOO OO OOOOOO O o O O O O O O O O O O O O O O O 0 0 0 0 c o000000000000000000g0000�00000000 o 0 m fA 0 69 fA fA 69 rnvi469 0 0 0 o O o 0 0 0 0 0 0 o O o. o O o O o O o. o. 0 o 0 ..... 6 0 0 0 0 0 0 5.RL c A N O 30 D N M. m m fA O 69 fA 69 69 fA fA di fA 69 69 fA fA fA 69 EA EA (A V: 69 fA 69 fA fA EA 69 69,68 69 EA 69 69 69 fA O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O j O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000000000000000000000000000000 0 fD o 3 v D 3 � 0 a 69 0 fA 49,59 to 69 69 69 fA fA fA 69 69 fA 69 fA fA fA di fA 69 EA 6% fA 69 fA 69 69 V3 fA 69 fA fA 69 0006O00000'0000000'oo'000000 j 0 0 00 0000000000000000000'a00'000 0000000 0000000000000000000000000�0000000 m N 69 0 69 H) 69 69 fA 69 69 fA 69 fA fA 69 Hi fA fA 69 69 fA [A fA Vi fA fA 69 69169 fA 69 fA 69469 69 69 ... .. ......00000000000000000000o O N 039 m� O 0 0 0 0 0 o o 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000000000000000000000000000000 93 �(D i3 z ti 3 3 Cl. 0- 0 o v m N z m = O -i z p 4 D O m m N m 0)i O A v m c 3 U) &C c 3 0 m 3 en vi vi vi ce en En vi to En 69 fA 4A (a 4»9 69 6 'A V) (0 69 fA 6e 69,69 69,69 sv e9 1W 69 V, Fn vi 0 0 0 000000000000000000000000000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p -{ 0 7 ? N 00 3 �'a 3 " v 0 0 v. 0 fn 0 v+ vi En fn fA 69 En Fn en 6� en v+ ce <,e to fn to cn v+ ce to en t» en ce fA 69 0 0 0 0 0 0 0 0 0 r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 b o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (J z m 0 m 5. x O c 0 x 0 v m- D D M. m iz 0 3 m m m z Fn 0 en 0 en En Fn w cn ee to to cn cewvi to ce Fn Fn f» En vi en fn sn v+ ce vi 69 to di w to to to to 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000000000000000000000000a00000 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v go 0 3 v D D 3 a 0 ee en viviEnEnenFnen(AFA69 In69w(Avi01enfne)6.IU4 nvieeenee696r69 61En c 0 0 a 00000000000000000000000000000000 0 0 000000000000000000000000000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD 2 N O 7., n a N O N O 69 0 fA 0 69en6e6e<A�n4n,5n696n160 �fefn�n�n�n�nVe6,6,�,�69w�'A6s�,6n�6nfn 0 0 0 0 0 0 0 0 0 0 0 00 0 0 00 0 0 0 0 0 0 0 00 0 0 0 0 00 0 o;-w m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m 0. w 0 0 00000000000000000000000000000000o O co-0 ry A 0-0 CDm I z� 3 Z� 3 0 v Q 0 m v . a-00 D a < yf o o' o=i y r. o. D � o � C m _? to fA O (D O- o n O 7 CD O N Er fo a m o a 0 D N 2 69 0 fA 6A fA fo fA fA fA fA fo tii 69 EA fA Vi Vi fA EA 69 69 69 fA fA fo fo fo to (n in fo fA fA fA fA 000000000000000000000000000000000 m m O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - D A 0 000000000000000000000000000000000 oCL O � T A No Text No Text i SECTION 00010 TABLE OF CONTENTS DIVISION 00 -INTRODUCTORY INFORMATION 00010 — Table of Contents 00100 — Bid Solicitation — By Fort Collins Purchasing 00200 — Instructions to Bidders — By Fort Collins Purchasing 00201 — Supplementary Instructions to Bidders — By Fort Collins Purchasing 00300 — Information Available to all Bidders — By Fort Collins Purchasing 00400 — Bid Forms and Supplements — By Fort Collins Purchasing 00500 — Construction Agreement - By Fort Collins Purchasing 00600 — Bonds and Certificates — By Fort Collins Purchasing 00700 — General Conditions - By Fort Collins Purchasing 00800 — Supplementary Conditions — By Fort Collins Purchasing DIVISION 01 — GENERAL REQUIREMENTS 01100 — Summary 01200 — Payment Procedures 0 13 00 — Administrative Requirements 01330 — Submittal Procedures 01420 — References 01500 — Temporary Facilities and Controls 01600 — Product Requirements 01701 — Execution and Closeout Requirements DIVISION 02 — SITE WORK — Not Used DIVISION 03 — CONCRETE 03300 — Cast -In -Place Concrete DIVISION 04 — MASONRY 04810 — Unit Masonry Assemblies 04860 — Stone Veneer Assemblies DIVISION 05 — METALS 05210 — Steel Joists DIVISION 06 — WOOD AND PLASTICS 06100 — Rough Carpentry 06105 — Miscellaneous Carpentry 06200 — Finish Carpentry 06401 — Exterior Architectural Woodwork TABLE OF CONTENTS 00010-1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 06402 — Interior Architectural Woodwork DIVISION 07 — THERMAL AND MOUSTURE PROTECTION 07610 — Sheet Metal Roofing DIVISION 08 — DOORS AND WINDOWS 08212 — Stile and Rail Wood Doors 08550 — Wood Windows 08710 — Door Hardware 08800 — Glazing DIVISION 09 — FINISHES 09210 — Gypsum Plaster 09640 — Wood Flooring 09910 — Painting DIVISION 10 — SPECIALTIES- Not Used DIVISION 11— EQUIPMENT — Not Used DIVISION 12 — FURNISHINGS — Not Used DIVISION 13 — SPECIAL CONSTRUCTION 13851 —Fire Alarm DIVISION 14 — CONVEYING SYSTEMS — Not Used DIVISION 15 — MECHANICAL — Not Used DIVISION 16 — ELECTRICAL 16050 — Basic Electrical Materials and Methods 16140 — Wiring Devices 16410 — Enclosed Switches and Circuit Breakers 16442 — Panelboards 16500 — Lighting Historic Structure Assessment Report Preservation Brief #9 Preservation Brief #21 Preservation Brief #26 END OF SECTION 00010 TABLE OF CONTENTS 00010-2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM T SECTION 01100 - SUMMARY PART 1-GENERAL C 1.1 SUMMARY OF WORK A. Project: Franz -Smith Cabin/Building Restoration, Fort Collins Museum, 200 Mathews Street, Fort Collins, Colorado 80524. B. Owner: City of Fort Collins, 215 North Mason Street, Fort Collins, CO 80524. C. Architect: Gerou & Associates Civic Architecture, Ltd., 3064 Whitman Drive, Evergreen, Colorado 80439, Attn: Cheri R. Gerou, AIA. D. The Work consists of final placement and restoration of the Franz -Smith Cabin to be included in the museum exhibits of the Fort Collins Museum, as described in the Contract Documents. E. Owner -Furnished Items: The following products will be furnished by Owner and shall be installed by Contractor as part of the Work: 1. Existing cabin structure and materials on site. F. Work Not Included: The following will be provided by others: 1. Electrical utility extension. 2. Patterned concrete sidewalk 1.2 WORK RESTRICTIONS A. Contractor's Use of Premises: During construction, Contractor will have limited use of site indicated. Contractor's use of premises is limited only by Owner's right to perform work or employ other contractors on portions of Project and as follows: 1. Owner will occupy Museum during construction. Perform construction only during normal working hours (8 AM to 5 PM Monday thru Friday, other than holidays), unless otherwise agreed to in advance by Owner. Construction to be performed in cooperation with Owner's personnel and with noninterference with the Museum's operations. Clean up work areas and return to a useable condition at the end of each work period. PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION (Not Applicable) END OF SECTION 01100 SUMMARY FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 01100-1 SECTION 01200 - PAYMENT PROCEDURES PART1-GENERAL 1.1 ALLOWANCES — Not Applicable 1.2 ALTERNATES — Not Applicable 1.3 UNIT PRICES — Not Applicable 1.4 CONTRACT MODIFICATION PROCEDURES — Not Applicable 1.5 PAYMENT PROCEDURES A. Submit a Schedule of Values at least 10 days before the fast Application for Payment. In Schedule of Values, break down the Contract Sum into at least one line item for each Specification Section. Correlate the Schedule of Values with Contractor's Construction Schedule. B. Submit 3 copies of each application for payment[ on AIA Document G702m], according to the schedule established in Owner/Contractor Agreement. 1. For the second Application for Payment through the Application for Payment submitted at Substantial Completion, submit partial releases of liens from each subcontractor or supplier for whom amounts were included in the previous Application for Payment. 2. Submit final Application for Payment after completion of Project closeout procedures with release of liens and supporting documentation. Include consent of surety to final payment and insurance certificates. a. Submit final meter readings for utilities, a record of stored fuel, and similar data as of the date of Substantial Completion. PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION (Not Applicable) END OF SECTION 01200 PAYMENT PROCEDURES FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 01200 - 1 4 Y F SECTION 01300 - ADMINISTRATIVE REQUIREMENTS PART1-GENERAL 1.1 PROJECT MANAGEMENT AND COORDINATION A. Coordinate construction to ensure efficient and orderly installation of each part of the Work. B. Conduct progress meetings at Project site on a regular basis. Notify Owner and Architect of meeting dates and times. Require attendance of each subcontractor or other entity concerned with current progress or involved with planning or coordination of future activities. 1. Record minutes and distribute to parties involved, including Owner and Architect. 1.2 SUBMITTAL PROCEDURES A. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. 1. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing. 2. Architect will not accept submittals from sources other than Contractor. 3. Identify deviations from the Contract Documents. 4. Submit three copies of each submittal. B. Place a permanent label or title block on each submittal for identification. Provide a 4- by 5- inch space on the label or beside title block to record review and approval markings and action taken. Include the following information on the label: 1. Project name. 2. Date. 3. Name and address of Contractor. 4. Name and address of subcontractor or supplier. 5. Number and title of appropriate Specification Section. C. Architect will review each action submittal, mark as appropriate to indicate action taken, and return copies less those retained. Compliance with specified requirements remains Contractor's responsibility. D. Construction Schedule Submittal Procedure: 1. Submit schedule within five days after date established for Commencement of the Work. Distribute copies to Owner, Architect, subcontractors, and parties required to comply with dates. 2. Revise the schedule after each meeting or activity where revisions have been made. As Work progresses, mark each bar to indicate actual completion. Distribute revised copies to Owner, Architect, subcontractors, and parties required to comply with dates. ADMINISTRATIVE REQUIREMENTS FRANZ-SMITH CABIN / FORT COLLINS MUSEM 01300 - 1 PART 2-PRODUCTS 2.1 ACTION SUBMITTALS A. Product Data: Mark each copy to show applicable choices and options. Include the following: 1. Data indicating compliance with specified standards and requirements. 2. Notation of coordination requirements. 3. For equipment data, include rated capacities, dimensions, weights, required clearances, and furnished specialties and accessories. B. Shop Drawings: Submit Project -specific information drawn to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. Submit 1 reproducible print and 1 blue- or black -line print on sheets at least 8-1/2 by 11 inches but no larger than 30 by 42 inches. Architect will return the reproducible print. Include the following: 1. Dimensions, profiles, methods of attachment, large scale details, and other information, as appropriate for the Work. 2. Identification of products and materials. 3. Notation of coordination requirements. 4. Notation of dimensions established by field measurement. C. C. Samples: Submit Samples finished as specified and identical with the material proposed. Where variations are inherent in the material, submit sufficient units to show full range of the variations. Include name of manufacturer and product name on label. 2.2 INFORMATION SUBMITTALS A. Construction Schedule: Prepare a horizontal bar -chart Contractor's construction schedule. 1. Provide a separate time bar for each activity, using same breakdown of Work indicated in the Schedule of Values, and a vertical line to identify the first workday of each week. 2. Coordinate each element with other activities. Show each activity in proper sequence. Indicate sequences necessary for completion of related Work. 3. Indicate Substantial Completion and allow time for Architect's procedures necessary for certifying Substantial Completion. B. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements. PART 3 - EXECUTION (Not Applicable) END OF SECTION d1300 ADMINISTRATIVE REQUIREMENTS FRANZ-SMITH CABIN / FORT COLLINS MUSEM 01300 - 2 F x • x SECTION 01420 - REFERENCES PART1-GENERAL 1.1 GENRAL REQUIREMENTS A. Publication Dates: Comply with standards in effect as of date of the Contract Documents, unless otherwise indicated. B. Abbreviations and Acronyms: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web site addresses are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents. AA Aluminum Association, Inc. (The) (202) 862-5100 www.aluminum.org AABC Associated Air Balance Council (202) 737-0202 www.aabchq.com AAMA American Architectural Manufacturers Association (847) 303-5664 www.aamanet.org AASHTO American Association of State Highway and (202) 624-5800 Transportation Officials www.aashto.org ACI American Concrete Institute/ACI International (248) 848-3700 www.aci-int.org b AFPA American Forest & Paper Association (See AF&PA) AF&PA American Forest & Paper Association (800) 878-8878 www.afandpa.org (202) 463-2700 AGA American Gas Association y (202) 824-7000 www.aga.org AHA American Hardboard Association (847) 934-8800 www.ahardbd.org Al Asphalt Institute (859) 288-4960 www.asphaltinstitute.org AIA American Institute of Architects (The) (202) 626-7300 www.e-architect.com REFERENCES 01420 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM Y, 1.,.1 16 SECTION 00100 INSTRUCTIONS TO BIDDERS 1.0 DEFINED TERMS Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract (No. 1910-8, 1990 ed.) have the meanings assigned to them in the General Conditions. The term "Bidder" means one who submits a Bid to OWNER, as distinct from a sub - bidder, who submits a Bid to Bidder. The terms "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to whom OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 2.0 COPIES OF BIDDING DOCUMENTS 2.1. Complete sets of Bidding Documents may be obtained as stated in the Invitation to Bid. No partial sets will be issued. The Bidding Documents may be examined at the locations identified in the Invitation to Bid. 2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither OWNER nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.3. The submitted Bid proposal shall include Sections 00300, 00410, 00420, and 00430 fully executed. 2.4. OWNER and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. 3.0 QUALIFICATION OF BIDDERS 3.1 To demonstrate qualifications to perform the Work, each Bidder must submit at the time of the Bid opening, a written statement of qualifications including financial data, a summary of previous experience, previous commitments and evidence of authority to conduct business in the jurisdiction where the Project is located. Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract. The Statement of Qualifications shall be prepared on the form provided in Section 00420. 3.2. In accordance with Section 8-159 of the Code of the City of Fort Collins in determining whether a bidder is responsible, the following shall be considered: (1) The ability, capacity and skill of the bidder to perform 7/96 Section 00100 Page 1 i AISC American Institute of Steel Construction, Inc. (800) 644-2400 www.aisc.org (312) 670-2400 AISI American Iron and Steel Institute (202) 452-7100 www.steel.org ATTC American Institute of Timber Construction (303) 792-9559 www.aitc-glulam org ALSC American Lumber Standard Committee (301) 972-1700 AMCA Air Movement and Control Association International, Inc. (847) 394-0150 www.amca.org ANSI American National Standards Institute (202) 293-8020 www.ansi.org APA APA-The Engineered Wood Association (253) 565-6600 www.apawood.org APA Architectural Precast Association (941) 454-6989 www.archprecast.org ARI Air -Conditioning & Refrigeration Institute (703) 524-8800 www.ari.org ASCE American Society of Civil Engineers (800) 548-2723 www.asce.org (703) 295-6300 ASHRAE American Society of Heating, Refrigerating and (800) 5274723 Air -Conditioning Engineers (404) 636-8400 www.ashrae.org ASME ASME International (800) 843-2763 (The American Society of Mechanical Engineers (212) 591-7722 International) www.asme.org ASSE American Society of Sanitary Engineering (440) 835-3040 www.asse-plumbing.org ASTM American Society for Testing and Materials (610) 832-9585 www.astm.org AWCI AWCI International (703) 534-8300 y (Association of the Wall and Ceiling Industries International) www.awci.org AWI Architectural Woodwork Institute (800) 449-8811 www.awinet.org (703) 733-0600 REFERENCES 01420 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM N Iq AWPA American Wood -Preservers' Association (817) 326-6300 www.awpa.com AWS American Welding Society (800) 443-9353 www.awi.org (305) 443-9353 AWWA American Water Works Association (800) 926-7337 www.awwa.org (303) 794-7711 BHMA Builders Hardware Manufacturers Association (212) 297-2122 www.buildershardware.com BOCA BOCA International, Inc. (708) 799-2300 www.bocai.org CABO Council of American Building Officials (See ICC) CCC Carpet Cushion Council (203) 637-1312 www.carpetcushion.org CDA Copper Development Association Inc. (800) 232-3282 www.copper.org (212) 251-7200 CFFA Chemical Fabrics & Film Association, Inc. (216) 241-7333 www.chemicalfabricsandfilm.com CFR Code of Federal Regulations (888) 293-6498 www.access.gpo.gov/nara/cfr (202) 512-1530 CISCA Ceilings & Interior Systems Construction Association (630) 584-1919 www.cisca.org CISPI Cast Iron Soil Pipe Institute (423) 892-0137 www.cispi.org CRD Army Corps of Engineers (601) 634-2355 CRD Standards www.wes.army.mil CRI Carpet and Rug Institute (The) (800) 882-8846 www.carpet-rug.com (706) 278-3176 CRSI Concrete Reinforcing Steel Institute (847) 517-1200 www.crsi.org CSA CSA International (800) 463-6727 (Formerly: IAS - International Approval Services) (416) 747-4000 www.iasapprovals.org REFERENCES 01420 - 3 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM CSSB Cedar Shake & Shingle Bureau www.cedarbureau.org DHI Door and Hardware Institute www.dhi.org DOC Department of Commerce www.doc.gov DOD Department of Defense DOD Specifications and Standards http://astimage.daps.dla.mil/online/ EIA/TIA Electronic Industries Alliance/Telecommunications Industry Association www.eia.org EIMA EIFS Industry Members Association www.eifsfacts.com EPA Environmental Protection Agency www.epa.gov FDA Food and Drug Administration www.fda.gov FMG FM Global (Formerly: FM - Factory Mutual System) www.fmglobal.com FS Federal Specification Available from Defense Automated Printing Service //astimage.daps.dla.miVonline Available from General Services Administration www.fss.gsa.gov/pub/fed-specs.cfm Available from National Institute of Building Sciences www.nibs.org GA Gypsum Association www.gypsum.org GANA Glass Association of North America (Formerly: FGMA - Flat Glass Marketing Association) www.glasswebsite.com/gana HI Hydraulic Institute www.pumps.org HPVA Hardwood Plywood & Veneer Association REFERENCES FRANZ-SMITH CABIN / FORT COLLINS MUSEUM (604)820-7700 (703)222-2010 (202)482-2000 (215) 697-6257 (703)907-7500 (800)294-3462 (770)968-7945 (202)260-2090 (888)463-6332 (401)275-3000 (215)697-6257 (202)619-8925 (202)289-7800 (202) 289-5440 (785) 271-0208 (888)786-7744 (973)267-9700 (703)435-2900 01420 - 4 Y • 4 www.hpva.org HUD Department of Housing and Urban Development (202) 708-1112 www.hud.gov IAS International Approval Services (See CSA International) ICC International Code Council (703) 931-4533 (Formerly: CABO - Council of American Building Officials) www.inticode.org ICBO International Conference of Building Officials (800) 284-4406 www.icbo.org (562) 699-0541 ICEA Insulated Cable Engineers Association, Inc. (508) 394-4424 www.icea.net IEEE Institute of Electrical and Electronics Engineers, Inc. (The) (212) 419-7900 www.ieee.org IESNA Illuminating Engineering Society of North America (The) (212) 248-5000 www.iesna.org IGCC Insulating Glass Certification Council (315) 646-2234 www.igcc.org ITS Intertek Testing Services (800) 345-3851 www.itsglobal.com (607) 753-6711 KCMA Kitchen Cabinet Manufacturers Association (703) 264-1690 www.kcma.org LMA Laminating Materials Association (201) 664-2700 (Formerly: ALA - American Laminators Association) www.Ima.org LPI Lightning Protection Institute (800) 488-6864 www.lightning.org (847) 577-7200 MBMA Metal Building Manufacturers Association (216) 241-7333 www.mbma.com MFMA Maple Flooring Manufacturers Association (847) 480-9138 www.maplefloor.org ML/SFA Metal Lath/Steel Framing Association (See SSMA) MSS Manufacturers Standardization Society of The Valve and (703) 281-6613 REFERENCES 01420 - 5 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM w Fittings Industry, Inc. ' www.mss-hq.com NEBB National Environmental Balancing Bureau (301) 977-3698 www.nebb.org NECA National Electrical Contractors Association (301) 657-3110 1 www.necanct.org NeLMA Northeastern Lumber Manufacturers' Association (207) 829-6901 www.nelma.org NEMA National Electrical Manufacturers Association (703) 841-3200 www.nema.org NETA InterNational Electrical Testing Association (303) 697-8441 www.netaworld.org NFPA National Fire Protection Association (800) 344-3555 www.nfpa.org (617) 770-3000 NFRC National Fenestration Rating Council (301) 589-6372 www.nfrc.org NLGA National Lumber Grades Authority (604) 524-2393 �1 www.nlga.org NOFMA National Oak Flooring Manufacturers Association (901) 526-5016 www.nofma.org NRCA National Roofing Contractors Association (800) 323-9545 www.nrca.net (847) 299-9070 NSF NSF International (800) 673-6275 (National Sanitation Foundation International) (734) 769-8010 www.nsf.org NWWDA National Wood Window and Door Association (See WDMA) PCI Precast/Prestressed Concrete Institute (312) 786-0300 ., www.pci.org PDCA Painting and Decorating Contractors of America (800) 332-7322 www.pdca.com (703) 359-0826 RCSC Research Council on Structural Connections (800) 644-2400 c/o AISC (312)670-2400 www.boltcouncil.org - RMA Rubber Manufacturers Association (800) 220-7620 -" REFERENCES 01420 - 6 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM R.. I www.rma.org (202) 6824800 SDI Steel Deck Institute (847) 462-1930 www.sdi.org SDI Steel Door Institute (440) 899-0010 www.steeldoor.org SIGMA Sealed Insulating Glass Manufacturers Association (312) 644-6610 www.sigmaonline.org/sigma SJI Steel Joist Institute (843) 626-1995 www.steeljoist.org SMACNA Sheet Metal and Air Conditioning Contractors' National (703) 803-2980 Association www.smacna.org SPIB Southern Pine Inspection Bureau (The) (850) 434-2611 www.spib.org SPRI SPRI (781) 444-0242 (Single Ply Roofing Institute) www.spri.org SBCCI Southern Building Code Congress International, Inc. (205) 591-1853 www.sbeci.org SSMA Steel Stud Manufacturers Association (312) 456-5590 (Formerly: ML/SFA - Metal Lath/Steel Framing Association) www.ssma.com SSPC SSPC: The Society for Protective Coatings (800) 837-8303 www.sspc.org (412) 281-2331 STI Steel Tank Institute (847) 438-8265 www.steeltank.com TCA Tile Council of America, Inc. (864) 646-8453 www.tileusa.com TFS Texas Forest Service (409) 639-8180 Forest Products Laboratory //txforestservice.tamu.edu TPI Truss Plate Institute (608) 833-5900 UBC Uniform Building Code (See: International Conference of Building Officials) UL Underwriters Laboratories Inc. (800) 704-4050 REFERENCES FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 01420 - 7 www.ul.com WCLIB West Coast Lumber Inspection Bureau www.wclib.org WCMA Window Covering Manufacturers Association (Formerly: AWCMA - American Window Covering Manufacturers Association) www.windowcoverings.org WDMA Window & Door Manufacturers Association (Formerly: NWWDA - National Wood Window and Door Association) www.wdma.com WIC Woodwork Institute of California www.wicnet.org WMMPA Wood Moulding & Millwork Producers Association www.wmmpa.com WWPA Western Wood Products Association www.wwpa.org PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION (Not Applicable) END OF SECTION 01420 REFERENCES FRANZ-SMITH CABIN / FORT COLLINS MUSEUM (847)272-8800 (800)283-1486 (503) 639-0651 (212) 6614261 (800)223-2301 (847) 299-5200 (916)372-9943 (800)550-7889 (530) 661-9591 (503)224-3930 01420 - 8 y. , e SECTION 01500 -TEMPORARY FACILITIES AND CONTROLS PARTI- GENERAL 1.1 SECTION REQUIREMENTS A. Use Charges: Owner will pay use charges for temporary utilities. B. Use water and electric power from Owner's existing system without metering and without payment of use charges. C. Standards: Comply with ANSI A10.6, NECA's "Temporary Electrical Facilities," and NFPA 241. 1. Electrical Service: Comply with NEMA, NECA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70. D. Temporary Utilities: At earliest feasible time, when acceptable to Owner, changeover from use of temporary service to use of permanent service. PART2-PRODUCTS 2.1 EQUIPMENT A. Heating Equipment: Unless Owner authorizes use of permanent heating system, provide vented, self-contained heaters with thermostatic control. 1. Use of gasoline-buming space heaters, open -flame heaters, or salamander -type heating units is prohibited. 2. Heating Units: Listed and labeled, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use for type of fuel being consumed. PART 3 - EXECUTION 3.1 TEMPORARY UTILITIES A. General: Engage appropriate local utility company to install temporary service or connect, to existing service. Where utility company provides only part of the service, provide the remainder. B. Sanitary Facilities: Use of Owner's existing facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to Owner. TEMPORARY FACILITIES AND CONTROLS 01500 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM C. Heating and Cooling: Provide temporary heating and cooling required for curing materials or for protecting installed construction from adverse weather. Use equipment that will not have a harmful effect on completed installations or elements being installed. 3.2 TEMPORARY FACILITIES A. Provide field offices, storage trailers, and other support facilities as necessary for the Work. B. Collect waste daily and, when containers are full, legally dispose of waste off -site. 1. Handle hazardous, dangerous, or unsanitary waste materials in separate closed waste containers. Dispose of material according to applicable laws and regulations. C. Install project identification and other signs in locations approved by Owner to inform the public and persons seeking entrance to Project. 3.3 TEMPORARY CONTROLS A. Provide temporary environmental controls as required by authorities having jurisdiction including, but not limited to, erosion and sediment control, dust control, noise control, and pollution control. B. Provide temporary barricades, warning signs, and lights to protect the public and construction personnel from construction hazards. 1. Enclose construction areas with fences with lockable entrance gates, to prevent unauthorized access. C. Provide temporary fire protection until permanent systems supply fire -protection needs. Comply with NFPA 241. 3.4 TERMINATION AND REMOVAL A. Remove temporary facilities and controls before Substantial Completion. Personnel remaining after Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to Owner. END OF SECTION 01500 TEMPORARY FACILITIES AND CONTROLS 01500 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM „„ d.. 14 III SECTION 01600 - PRODUCT REQUIREMENTS PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. Provide products of same kind from a single source. The term "product” includes the terms "material," "equipment," "system," and similar terms. B. Product Substitutions: Substitutions include products and methods of construction differing from that required by the Contract Documents and proposed by Contractor after award of the Contract. 1. Submit four copies of each request for product substitution. 2. Submit requests within 10 days after signing the Contract. 3. Submit requests in time to permit processing of request and subsequent submittals, if any, sufficiently in advance of when materials are required in the Work. Do not submit unapproved substitutions on Shop Drawings or other submittals. 4. Identify product to be replaced and provide complete documentation showing compliance of proposed substitution with applicable requirements. Include a full comparison with the specified product, a list of changes to other Work required to accommodate the substitution, and any proposed changes in the Contract Sum or the Contract Time should the substitution be accepted. 5. Architect will review the proposed substitution and notify Contractor of its acceptance or rejection. C. Comparable Product Submittal: 1. Submit four copies of each request for approval of products as comparable to basis -of - design products. Submit requests in time to permit processing of request and subsequent submittals, if any, sufficiently in advance of when materials are required in the Work. Do not submit unapproved products on Shop Drawings or other submittals. 2. Identify product to be replaced and provide complete documentation showing compliance of proposed product with applicable requirements. Include a full comparison with the specified product. 3. Architect will review the proposed product and notify Contractor of its acceptance or rejection. D. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions. 1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces. 2. Deliver products to Project site in manufacturer's original sealed container or packaging, complete with labels and instructions for handling, storing, unpacking, protecting, and installing. 3. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected. PRODUCT REQUIREMENTS 01600 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM the contract or provide the services required, (2) whether the bidder can _ perform the contract or provide the service promptly and within the time specified without delay or interference, (3) the character, integrity, reputation, judgment, experience and efficiency of the bidder, (4) the quality of the bidder's performance of previous contracts or services, (5) the previous and existing compliance by the bidder with laws and ordinances relating to the contract or service, (6) the sufficiency of the financial resources and ability of the bidder to perform the contract or provide the _ service, (7) the quality, availability and adaptability of the materials and services to the particular use required, (8) the ability of the bidder to provide future maintenance and service for the use of the subject of the contract, and (9) any other circumstances which will affect the bidder's -' performance of the contract. 3.3. Each Bidder may be required to show that he has handled former Work so that no just claims are pending against such Work. No Bid will be accepted from a Bidder who is engaged on any other Work which would impair his ability to perform or finance this Work. _ 3.4 No Bidder shall be in default on the performance of any other contract with the City or in the payment of any taxes, licenses or other monies due to the City. -- 4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE 4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize himself with local conditions that may in any manner affect cost, progress or performance of the Work, (c) familiarize himself with — federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. 4.2. Reference is made to the Supplementary Conditions for identification of: Subsurface and Physical Conditions SC-4.2. 4.3. The submission of a Bid will constitute an incontrovertible _ representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of -, the Work. 5.0 INTERPRETATIONS AND ADDENDA. _ 5.1. All questions about the meaning or intent of the Bidding Documents are to 7/96 Section 00100 Page 2 4. Store materials in a manner that will not endanger Project structure. 5. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation. PART2-PRODUCTS 2.1 u A. PRODUCT OPTIONS Provide products that comply with the Contract Documents, are undamaged, and are new or approved for historic application at the time of installation. 1. Provide products complete with accessories, trim, finish, and other devices and components needed for a complete installation and the intended use and effect. B. Select products to comply with all of the following that are applicable: 1. Where only a single product or manufacturer is named, provide the item indicated. No r substitutions will be permitted. 2. Where two or more products or manufacturers are named, provide one of the items indicated. No substitutions will be permitted. 3. Where products or manufacturers are specified by name, accompanied by the term "available products" or "available manufacturers," provide one of the named items or comply with provisions for 'comparable product" to obtain approval for use of an unnamed product or manufacturer. y 4. Where a single product is named as the "basis -of -design" together with the names of other manufacturers, provide the named product or comply with provisions for 'comparable product submittal' to obtain approval for use of a product of one of the other named manufacturers. 5. Where a single product is named as the "basis -of -design" and no other manufacturers are named, provide the named product or comply with provisions for "comparable product submittal' to obtain approval for use of a product of another manufacturer. 6. Where a product is described with required characteristics, provide a product that R complies with those characteristics. 7. Where compliance with performance requirements is specified, provide products that comply and are recommended in writing by the manufacturer for the application. 8. Where compliance with codes, regulations, or standards, is specified, select a product that complies with the codes, regulations, or standards referenced. Y C. Unless otherwise indicated, Architect will select color, pattern, and texture of each product from manufacturer's full range of options that includes both standard and premium items. PART 3 - EXECUTION (Not Applicable) END OF SECTION 01600 PRODUCT REQUIREMENTS FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 01600 - 2 A k SECTION 01701 - EXECUTION AND CLOSEOUT REQUIREMENTS PART 1-GENERAL 1.1 CLOSEOUT SUBMITTALS A. Record Drawings: Maintain a set of the Contract Drawings as Record Drawings. Mark to show installation that varies from the Work originally shown. B. Operation and Maintenance Data: Organize data into three-ring binders with identification on front and spine of each binder and pocket folders for folded sheet information.. Include the following: 1. Manufacturer's operation and maintenance brochures. 2. Emergency instructions. 3. Spare parts list. 4. Wiring diagrams. 5. Copies of warranties. PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION 3.1 EXAMINATION AND PREPARATION A. Examine substrates and conditions for compliance with manufacturer's written requirements including, but not limited to, surfaces that are sound, level, plumb, smooth, clean, and free of deleterious substances; substrates within installation tolerances; and application conditions within environmental limits. Proceed with installation only after unsatisfactory conditions have been corrected. B. Verify layout information shown on Drawings, in relation to property survey and existing benchmarks, before laying out the Work. C. Prepare substrates and adjoining surfaces according to manufacturer's written instructions, including, but not limited to, filler and primer application. D. Take field measurements as required to fit the Work properly. Where fabricated products are to be fitted to other construction,'ve'n"ry` dimensions by field measurement before fabricating and, when possible, allow for fitting and trimming during installation. 3.2 CUTTING AND PATCHING A. Do not cut structural members without prior written approval of Architect. EXECUTION AND CLOSEOUT REQUIREMENTS 01701 - 1 FRANS-SMITH CABIN / FORT COLLINS MUSEUM B. For patching, provide materials whose installed performance will equal or surpass that of existing materials. For exposed surfaces, provide or finish materials to visually match existing adjacent surfaces to the fullest extent possible. 3.3 INSTALLATION A. Comply with manufacturer's written instructions for installation. Anchor each product securely in place, accurately located and aligned. Clean exposed surfaces and protect from damage. If applicable, prepare surfaces for field finishing. B. Clean Project site and work areas daily, including common areas. . . 3.4 FINAL CLEANING A. Clean each surface or item as follows before requesting inspection for certification of Substantial Completion: 1. Remove labels that are not permanent. 2. Clean transparent materials, including mirrors. Remove excess glazing compounds. Replace chipped or broken glass. 3. Clean exposed finishes to a dust -free condition, free of stains, films, and foreign substances. Leave concrete floors broom clean. 4. Wipe surfaces of electrical equipment. Clean light fixtures and lamps. -. 5. Clean the site. Sweep paved areas; remove stains, spills, and foreign deposits. Rake grounds to a smooth, even -textured surface. 3.5 CLOSEOUT PROCEDURES - A. Substantial Completion: Before requesting Substantial Completion inspection, complete the following: 1. Advise Owner of pending insurance changeover requirements. 2. Submit specific warranties, maintenance agreements, and similar documents. 3. Obtain and submit releases permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases. 4. Submit Record Drawings and Specifications, operation and maintenance manuals, and ` similar final record information. 5. Deliver tools, spare parts, extra materials, and similar items. 6. Changeover locks and transmit keys to Owner. 7. Complete startup testing of systems and instruction of operation and maintenance personnel 8. Remove temporary facilities and controls. 9. Advise Owner of changeover information related to Owner's occupancy, operation, and maintenance. 10. Complete final cleaning requirements, including touchup painting. 11. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects. EXECUTION AND CLOSEOUT REQUIREMENTS FRANS-SMITH CABIN / FORT COLLINS MUSEUM 01701 -2 ,., II � ., 14 11�, l B. On receipt of a request for inspection, Architect will proceed with inspection or advise Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or advise Contractor of items that must be completed or corrected before the certificate will be issued. C. Request inspection for certification of Final Completion, once the following are complete: ` 1. Submit a copy of Substantial Completion inspection list stating that each item has been completed or otherwise resolved for acceptance. 2. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and systems. D. Architect will reinspect the Work on receipt of notice that the Work has been completed. 1 1. On completion of reinspection, Architect will prepare a final Certificate for Payment. If the Work is incomplete, Architect will advise Contractor of the Work that is incomplete or obligations that have not yet been fulfilled. 3.6 DEMONSTRATION AND TRAR41NG A. Provide experienced instructors for each piece of equipment that requires operation and maintenance to provide instruction to Owner's personnel. Include a detailed review of the following: 1. Include instruction for system design and operational philosophy, review of documentation, operations, adjustments, troubleshooting, maintenance, and repair. END OF SECTION 01700 EXECUTION AND CLOSEOUT REQUIREMENTS 01701 - 3 FRANS-SMITH CABIN / FORT COLLINS MUSEUM SECTION 03300 CAST -IN -PLACE CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section specifies cast -in -place concrete, including reinforcement, concrete materials, mix design, placement producers, and finishes. Concrete ramp and walkway to match existing pattern concrete in color, style and finish. 1.3 SUBMITTALS A. General: In addition to the following, comply with submittal requirements in ACI 301. B. Product Data: For each type of manufactured material and product indicated. C. Design Mixes: For each concrete mix. D. Steel Reinforcement Shop Drawings: Details of fabrication, bending, and placement, prepared according to ACI 315, "Details and Detailing of Concrete Reinforcement'. Include material, grade, bar schedules, stirrup spacing, bent bar diagrams, arrangement, and supports of concrete reinforcement. Include special reinforcement required for openings through concrete structures. 1. General requirements, including submittals, quality assurance, acceptance of structure, and protection of in -place concrete. 2. Formwork and form accessories. 3. Steel reinforcement and supports. 4. Concrete mixtures. 5. Handling, placing, and constructing concrete. 2.1 FORMWORK A. Furnish formwork and form accessories according to ACI 301. 03300-1 CAST -IN -PLACE CONCRETE ",I M. • x 16 2.2 STEEL REINFORCEMENT A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed. B. Plain -Steel Wire: ASTM A 82, as drawn. C. Plain -Steel Welded Wire Fabric: ASTM A 185, fabricated from as -drawn steel i wire into flat sheets. r 2.3 CONCRETE MATERIALS A. Portland Cement: ASTM C 150, Types I or 11 or Type VII. B. Normal -Weight Aggregate: ASTM C 33, uniformly graded, not exceeding 1-1/2- inch nominal size. C. Water: Portable and complying with ASTM C,94. D. Synthetic Fiber at Exterior Flatwork: Fibrillated or monofilament polypropylene fibers engineered and designed for use in concrete, complying with ASTM C 1116, Type III,''/2 to 1-1/2 inches long. 2.4 ADMIXTURES A. General: Admixtures certified by manufacturer to contain not more than 0.1 percent water-soluble chloride ions by mass of cement and to be compatible with other admixtures. Do not use admixtures containing calcium chloride. B. Air -Entraining Admixture: ASTM C 260 C. Water -Reducing Admixture: ASTM C 494, Type A. D. High -Range, Water -Reducing Admixture: ASTM C 494, Type F. E. Water -Reducing and Accelerating Admixture: ASTM C 494, Type E. F. Water -Reducing and Retarding Admixture: ASTM C 494, Type D. 2.5 RELATED MATERIALS A. Joint -Filler Strips: ASTM D 1751, asphalt -saturated cellulosic fiber. 2.6 CURING MATERIALS A. Evaporating Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete. CAST-M-PLACE CONCRETE 03300-2 B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. Dry. C. Moisture -Retaining Cover: ASTM C 171, polyethylene film or white burlap - polyethylene sheet. D. Water: Potable. E. Clear, Waterborne, Membrane -Forming Curing and Sealing Compound: ASTM C 1315, Type 1, Class A. _ 2.7 CONCRETE MIXES A. Comply with ACI 301 requirements for concrete mixtures. B. Prepare design mixes, proportioned according to ACI 301, for normal -weight concrete determined by either laboratory trial mix or field test data bases, as = follows: 1. Exterior Flatwork: 3500 psi 2. Exterior Curbs, Gutters, and Pans: 3500 psi 3. Slump Limit for Concrete Containing High -Range Water -Reducing Admixture: No more than 8 inches after adding admixture to plant- or site - verified, 2- to 3- inch slump. C. Add air -entraining admixture at manufacturer's prescribed rate to result in concrete at point of placement having an air content of 2.5 to 4.5 percent. D. Add air -entraining admixture at manufacturer's prescribed rate to result in concrete at point of placement having air content of 6.0 percent within a tolerance of plus 1.0 or minus 1.5 percent. 1. Air content of trowel -finished interior concrete floors shall not exceed 3.0 percent. E. Synthetic Fiber in Exterior Flatwork: Uniformly disperse in concrete mix at manufacturer's recommended rate, but not less than 1.0 lb/cu. yd. 2.8 CONCRETE MIXING A. Ready -Mixed Concrete: Comply with ASTM C 94 and ASTM C 1116. 1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes. CAST -IN -PLACE CONCRETE 03300-3 PART 3 — EXECUTION 3.1 FORMWORK A. Design, construct, erect, shore, brace, and maintain framework according to ACI 301. 3.2 STEEL REINFORCEMENT A. Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement. 3.3 JOINTS A. General: Construction joints true to line with faces perpendicular to surface plane of concrete. B. Construction Joints: Locate and install so as not to impair strength or appearance of concrete, at locations indicated or as approved by Architect. C. Isolation (Expansion) Joints: Install joint -filler strips at junctions with slabs -on - grade and vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated. 1. Extend joint filters full width and depth of joint, terminating flush with finished concrete surface. unless otherwise indicated. D. Contraction (Control) Joints in Slabs -on -Grade: Form weakened -plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of the concrete thickness, as follows: 1. Grooved Joints: Form contraction joints after initial floating by grooving and finishing each edge of joint with groover tool to a radius of 1/8 inch. Repeat grooving of contraction joints after applying surface finishes. Eliminate groover marks on concrete surfaces. 2. Sawed Joints: Sawed joints are not allowed. 3.4 CONCRETE PLACEMENT A. Comply with recommendations in ACI 304R for measuring, mixing, transporting, and placing concrete. B. Do not add water to concrete during delivery, at Project site, or during placement. C. Consolidate concrete with mechanical vibrating equipment. CAST -IN -PLACE CONCRETE 03300-4 3.5 FINISHING FORMED SURFACES A. General: Comply with ACI 302.1R for screeding, restraightening, and fishing operations for concrete surfaces. Do not wet concrete surfaces. B. Screed surfaces with a straightedge and strike off. Begin initial floating using bull floats or darbies to form a uniform and open -textured surface plane before excess moisture or bleedwater appears on the surface. 1. Do not further disturb surfaces before starting finishing operations. C. Trowel and Fine -Broom Finish: Apply a partial trowel finish. Immediately after second troweling, and when concrete is still plastic, slightly scarify surface with a fine broom. D. Nonslip Broom Finish: Apply a nonslip broom finish to surfaces indicated and to _ exterior concrete flat- work, steps, and ramps. Immediately after float finishing, s slightly roughen trafficked surface by brooming with fiber -bristle broom perpendicular to main traffic route. _ E. At infill work, match adjacent concrete surfaces in finish and texture as approved by the Architect. ' 3.6 TOLERANCES r A. Comply with ACI 117, "Specifications for Tolerances for Concrete Construction and Materials." 3.7 CONCRETE PROTECTION AND CURING A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold -weather protection, and follow recommendations in ACI 30SR for hot- weather protection during curing. B. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing. C. Begin curing after finishing concrete, but not before free water had disappeared from concrete surface. CAST -IN -PLACE CONCRETE 03300-5 .i r �Ii1r 14 1. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial y application. Maintain continuity of coating and repair damage during curing period. 3.8 FIELD QUALITY CONTROL 1. Contractor to provide methods and materials in keeping with manufacturer's requirements and recommendations. 3.9 REPAIRS A. Remove and replace concrete that does not comply with requirements in this Section or that is otherwise rejected by the Architect. J END OF SECTION 03300 CAST-W-PLACE CONCRETE 03300-6 be submitted in writing to the Engineer and the OWNER. Interpretation or clarifications considered necessary in response to such questions will be issued only by Addenda. Questions received less than seven days prior to the date for opening of the Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 5.2. All questions concerning the scope of this project should be directed to the Engineer. Questions regarding submittal of bids should be directed to the City of Fort Collins' Purchasing Division. 5.3. Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or Engineer. 5.4. Addenda will be mailed or delivered to all parties recorded by the OWNER as having received the Bidding documents. 6.0 BID SECURITY 6.1. Each Bid must be accompanied by Bid Security made payable to OWNER in the amount stated in the Invitation to Bid. The required security must be in the form of a certified or bank cashier's check payable to OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be executed by a surety meeting the requirements of the General Conditions for surety bonds. 6.2. The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required contract security, whereupon Bid Security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within 15 days of the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom OWNER believes to have reasonable chance receiving the award may be retained by OWNER until the earlier of the seventh day after the effective date of the Agreement or the thirty- first day after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security with Bids which are not competitive will be returned within seven days after the Bid opening. 7.0 CONTRACT TIME. The number of days within which, or the date by which the Work is to be substantially complete and also completed and ready for Final Payment (the Contract Times) are set forth in the Agreement. 8.0 LIQUIDATED DAMAGES. Provisions for liquidated damages are set forth in the Agreement. 9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT The Contract, if awarded, will be on the basis of material and equipment 7/96 Section 00100 Page 3 r SECTION 04810 - UNIT MASONRY ASSEMBLIES PART1-GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Samples for face brick. B. Comply with ACI 530.1/ASCE 6/TMS 602. C. Mockups: Construct a sample wall panel approximately 48 inches long by 48 inches high to demonstrate aesthetic effects and set quality standards for materials and execution. PART2-PRODUCTS 2.1 MASONRY UNITS A. Face Brick: UBC Standard 21-1, Grade SW, Type FBS. 1. Products: a. Robinson Brick, 1845 W. Dartmouth Avenue, Denver, Colorado 80110, 800.477.9002 or equal. Color to be common red, tumbled. 2. Size: Standard. 3. Solid brick with exposed surfaces finished for ends of sills and caps. 4. Special shapes for applications where shapes produced by sawing would result in sawed surfaces being exposed to view. B. Firebox Brick: Not required. Chimney assembly to be representative only, not for actual use. C. Clay Flue Lining Units: Not required. 2.2 MORTAR AND GROUT A. Mortar: UBC Standard 21-15, proportion specification. Ready -mixed mortar, ASTM C 1142, may be used at Contractor's option. 1. Masonry Cement: Do not use masonry cement or plastic cement 2. Do not use calcium chloride in mortar. 3. For exterior, above -grade, load -bearing and non -load -bearing walls and parapet walls; for interior load -bearing walls; for interior non -load -bearing partitions, and for other applications where another type is not indicated, use Type N or RN. B. Grout: UBC Standard 21-19 with a slump of 8 to 11 inches. UNIT MASONRY ASSEMBLIES FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 04810 - 1 2.3 REINFORCEMENT, TIES, AND ANCHORS A. Steel Reinforcing Bars: ASTM A 615/A 615M, Grade 60. B. Joint Reinforcement: UBC Standard 21-10. 1. Coating: Hot -dip galvanized at both interior and exterior walls. 2. Wire Diameter for Side Rods: W 1.7 or 0.148 inch W2.8 or 0.188 inch. 3. Wire Diameter for Cross Rods: W 1.7 or 0.148 inch W2.8 or 0.188 inch. 4. For multiwythe masonry, provide tab design with single pair of side rods. C. Veneer Anchors: Two-piece adjustable masonry veneer anchors that allow vertical or horizontal adjustment but resist tension and compression forces perpendicular to plane of wall, for attachment over sheathing to studs, and acceptable to authorities having jurisdiction. 2.4 EMBEDDED FLASHING MATERIALS A. Sheet Metal Flashing: Stainless steel, 0.0156 inch thick. 2.5 MISCELLANEOUS MASONRY ACCESSORIES A. Compressible Filler: Premolded strips complying with ASTM D 1056, Grade 2A1. B. Preformed Control -Joint Gaskets: Designed to fit standard sash block and to maintain lateral stability in masonry wall; made from styrene-butadiene rubber or PVC. C. Weep Holes: Round polyethylene tubing, 3/8-inch OD, 24 inches long. D. Acidic Masonry Cleaner to be applied to brickwork upon completion. PART 3 - EXECUTION d 3.1 INSTALLATION, GENERAL A. Masonry construction to resemble chimney, construction is to be blocked at opening to room and at chimney. This masonry unit is not to be built to be operated. Chimney is to represent the original chimney in appearance only. B. Cut masonry units with saw. Install with cut surfaces and, where possible, cut edges concealed. C. Mix units for exposed unit masonry from several pallets or cubes as they are placed to produce uniform blend of colors and textures. D. Build non -load -bearing interior partitions full height and install compressible filler in joint between top of partition and underside of structure above. E. Tool exposed joints slightly concave when thumbprint hard, unless otherwise indicated. UNIT MASONRY ASSEMBLIES 04810 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM F. Keep cavities clean of mortar droppings and other materials during construction. Strike joints facing cavities flush. 3.2 FLASHING AND WEEP HOLES A. Install embedded flashing and weep holes in masonry at shelf angles, lintels, ledges, other obstructions to the downward flow of water in the wall, and where indicated. B. Place through -wall flashing on sloping bed of mortar and cover with mortar. Seal penetrations in flashing before covering with mortar. 1. Extend flashing 4 inches ( 100 mm) into masonry at each end and turn up 2 inches (50 rmn) to form a pan. C. Trim wicking material used in weep holes flush with outside face of wall after mortar has set. 3.3 FIELD QUALITY CONTROL A. Construction to comply with the following standards: 1. Mortar: UBC Standard 21-16. 2. Grout: UBC Standard 21-18. 3. Brick: ASTM C 67. 4. 3.4 PARGING A. Parge predampened masonry walls, where indicated, with Type S or Type N mortar applied in two uniform coats with a steel -trowel finish. Form a wash at top of parging and a cove at bottom. Damp cure parging for at least 24 hours. 3.5 CLEANING A. Clean masonry as work progresses. Remove mortar fins and smears before tooling joints. B. Final Cleaning: After mortar is thoroughly cured, remove large mortar particles, scrub, and rinse unit masonry. 1. Wet wall surfaces with water before applying acidic cleaner, then remove cleaner promptly by rinsing thoroughly with clear water. END OF SECTION 04810 UNIT MASONRY ASSEMBLIES 04810 - 3 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM T r 1 t SECTION 04860 - STONE VENEER ASSEMBLIES PARTI- GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Samples for stone. B. Submit qualification data for masonry contractor, including a list of completed projects. C. Construct a sample wall panel approximately 48 inches long by 48 inches high to demonstrate aesthetic effects and set quality standards for materials and execution. D. Do not use frozen materials or materials mixed or coated with ice or frost. Do not build on frozen subgrade or setting beds. Comply with cold -weather construction requirements contained in Section 2104.3 of the Uniform Building Code. PART 2-PRODUCTS 2.1 STONE — Final Selection to be approved by Owner. A. Granite: ASTM C 615.OR B. Quartz -Based Dimension Stone: ASTM C 616, Classification I Sandstone. 2.2 MORTAR A. Mortar for Stone Masonry Veneer: specifications to be provided by subcontractor and approved by Architect. 2.3 STONE MASONRY -VENEER ANCHORS A. Adjustable Veneer Anchors: Two-piece adjustable masonry veneer anchors that allow vertical y or horizontal adjustment but resist tension and compression forces perpendicular to plane of wall, for attachment over sheathing to studs, and acceptable to authorities having jurisdiction. v 2.4 EMBEDDED FLASHING MATERIALS A. Sheet Metal Flashing: Stainless steel, 0.0156 inch thick, 10 oz./sq.ft. or 0.0135 inch thick for t fully concealed flashing, 16-oz./sq. ft. weight or 0.0216 inch thick elsewhere. 2.5 MISCELLANEOUS MATERIALS — Not Applicable STONE VENEER ASSEMBLIES 04860 - 1 FRANZ-SMITH CABN / FORT COLLINS MUSEUM 2.6 STONE FABRICATION A. Gage backs of stones more than 81 sq. in. in area. B. Thickness of Stone Masonry Veneer: 4 inches plus or minus 1/2 inch. C. Type of Masonry (Pattern): Uncoursed rubble (fieldstone). D. Finish: Natural cleft. PART 3 - EXECUTION 3.1 SETTING STONE MASONRY VENEER, GENERAL A. Accurately mark stud centerlines on face of building paper or building wrap before beginning stone installation. B. Execute stone masonry veneer by skilled masons experienced with the kind and form of stone and installation method indicated. Arrange stones for good fit, in pattern indicated. C. Maintain uniform joint widths in accordance with stone type. Joints should be recessed to give "drystack" appearance of stone work. Install concealed flashing and weep holes at shelf angles, lintels, ledges, and similar obstructions to downward flow of water. 1. Extend flashing 4 inches into masonry at each end and turn up 2 inches to form a pan. 3.2 INSTALLING ANCHORED STONE MASONRY VENEER A. Set stone in full bed of mortar. Build veneer -anchors into mortar joints as stone is set. 3.3 INSTALLING ADHERED STONE MASONRY VENEER A. Install lath over sheathing and asphalt -saturated felt by fastening through sheathing into framing to comply with ASTM C 1063. 3.4 POINTING A. Point stone joints by placing and compacting mortar in layers not greater than 3/8 inch (10 mm). Compact each layer thoroughly and allow to become thumbprint hard before applying next layer. B. Tool joints, when pointing mortar is thumbprint hard, with a smooth jointing tool to produce joint profile indicated. 3.5 CLEANING STONE VENEER ASSEMBLIES 04860 - 2 FRANZ-SMITH CABN / FORT COLLINS MUSEUM A. Clean masonry as work progresses. Remove mortar fins and smears before tooling joints. B. Final Cleaning: After mortar is thoroughly cured, remove large mortar particles, scrub, and rinse stone masonry veneer. 1. Wet wall surfaces with water before applying acidic cleaner, then remove cleaner promptly by rinsing thoroughly with clear water. END OF SECTION 04860 y STONE VENEER ASSEMBLIES 04860 - 3 FRANZ-SMITH CABN / FORT COLLINS MUSEUM SECTION 05210 - STEEL JOISTS PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. Use existing steel frame support under structure. B. Comply with recommendations of SJI's "Standard Specifications Load Tables and Weight Tables for Steel Joists and Joist Girders" and AWS D1.1, "Structural Welding Code --Steel." PART2-PRODUCTS 2.1 ON -SITE MATERIALS TO BE USED. 2.2 JOISTS AND ACCESSORIES A. Remove all steel extending beyond the face of the structural frame upon final placement of steel frame on foundation. PART 3 - EXECUTION 3.1 INSTALLATION A. Structure to be secured and elevated on existing steel frame. B. Following installation of treated wood sillplates and treated 2x4's, structure to be lowered in place. C. Bolt joists to supporting steel framework using high -strength structural bolts, unless otherwise indicated. Install and tighten high -strength structural bolts according to RCSC's "Specification for Structural Joints Using ASTM A 325 or ASTM A 490 Bolts." END OF SECTION 05210 STEEL JOISTS 05210-1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM SECTION 06100 - ROUGH CARPENTRY PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. See information listed in this section and supplemental directions for rough carpentry requirements per historical architect's recommendations and Preservation Brief #26. PART 2-PRODUCTS 2.1 2.2 Y y 2.3 y y WOOD PRODUCTS, GENERAL A. Lumber: Provide dressed lumber, S4S, 19 percent maximum moisture content for 2-inch nominal thickness or less, marked with grade stamp of inspection agency. TREATED MATERIALS A. Preservative -Treated Materials: AWPA C2 lumber and AWPA C9 plywood, labeled by an inspection agency approved by ALSC's Board of Review. After treatment, kiln -dry lumber and plywood to 19 and 15 percent moisture content, respectively. Treat indicated items and the following: 1. Wood members in connection with roofing, flashing, vapor barriers, and waterproofing. 2. Concealed members in contact with masonry or concrete. 3. Wood framing members less than 18 inches above grade. 4. Wood floor plates installed over concrete slabs directly in contact with earth. LUMBER A. Dimension Lumber: The following grades are per inspection agency indicated: 1. Non -Load -Bearing Interior Partitions: Western woods: WCLB or WWPA. 2. Framing Other Than Non -Load -Bearing Partitions: Douglas fir -larch: NLGA, WCLB, or WWPA; B. Concealed Boards: 19 percent maximum moisture content: Western woods: Standard per WCLB rules or No. 3 Common per WWPA rules. C. Miscellaneous Lumber: Construction, Stud, or No. 3 grade of any species for nailers, blocking, and similar members. 2.4 LOGS ROUGH CARPENTRY FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 06100 - 1 A. Logs to be repaired or replaced as shown on the drawings. See attached description of methods and materials as described in Historic Structure Assessment Report dated September 2001 and Preservation Brief #26. 2.5 MISCELLANEOUS PRODUCTS A. Fasteners: Size and type indicated. Where rough carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with hot -dip zinc coating complying with ASTM A 153/A 153M. 1. Power -Driven Fasteners: CABO NER-272. 2. Bolts: Steel bolts complying with ASTM A 307, Grade A with ASTM A 563 hex nuts and, where indicated, flat washers. B. Metal Framing Anchors: Hot -dip galvanized steel of structural capacity, type, and size indicated. C. Building Paper: Asphalt -saturated organic felt complying with ASTM D 226, Type I (No. 15 asphalt felt), unperforated. D. Sill -Sealer: Glass -fiber insulation, 1-inch thick, compressible to 1/32 inch. PART 3 - EXECUTION 3.1 INSTALLATION A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction. Consult Needs Assessment for treatment of existing conditions of log structure. n B. Securely attach rough carpentry to substrates, complying with the following: r 1. CABO NER-272 for power -driven fasteners. 2. Published requirements of metal framing anchor manufacturer. C. Fastening Methods: Comply with recommendationsin APA Form No. E30K and the following: - 1. Combination Subflooring-Underlayment;.ndciro-Tramirtg— -._..- -- 2. Subfloorin Crlue and nail to fram ..eau! ,awl► .. -r°� _:-- - -..:_ .:.:.__ END OF SECTION 06100 ROUGH CARPENTRY 06100 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM I -11 1 Y .+ 4 SECTION 06105 - MISCELLANEOUS CARPENTRY PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Model code evaluation reports for treated wood. PART2-PRODUCTS 2.1 WOOD PRODUCTS, GENERAL A. Lumber: Provide dressed lumber, S4S, 19 percent maximum moisture content for 2-inch nominal thickness or less, marked with grade stamp of inspection agency. 2.2 TREATED MATERIALS A. Preservative -Treated Materials: AWPA C2 lumber and AWPA C9 plywood, labeled by an inspection agency approved by ALSC's Board of Review. After treatment, kiln -dry lumber and plywood to 19 and 15 percent moisture content, respectively. Treat indicated items and the following: 1. Wood members in connection with roofing, flashing, vapor barriers, and waterproofing. 2. Concealed members in contact with masonry or concrete. 3. Wood framing members less than 18 inches above grade. 4. Wood floor plates installed over concrete slabs directly in contact with earth. 2.3 LUMBER A. Interior Partition Framing: Standard, Stud, or No.3 grade: Western woods: WCLIB or WWPA. B. Other Framing: Construction or No. 2 grade: Douglas fir -larch: NLGA, WCLIB, or WWPA. C"'Exposed Boards: Eastern white, Idaho white, lodgepute, ponderosa, or sugar pine, D Select (Quality). D. Concealed Boards: Western woods: Standard per WCLIB rules or No. 3 Common per WWPA rules. E. Miscellaneous Lumber: Construction, Stud, or No. 3 grade of any species for nailers, blocking, and similar members. 2.4 INTERIOR WOOD TRIM i MISCELLANEOUS CARPENTRY 06105 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM described on the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items. Whenever it is indicated on the Drawings or specified in the Specifications that a substitute or "or equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the "effective date of the Agreement". The procedure for submittal of any such application by CONTRACTOR and consideration by Engineer is set forth in the .- General Conditions which may be supplemented in the General Requirements. 10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS 10.1. Each Bidder shall submit at the Bid opening to OWNER a list of principal subcontractors he proposes to use in the Work. Refer to Section 00430 contained within these Documents. 10.2. If OWNER or Engineer after due investigation has reasonable objection to any proposed Subcontractor, either may, before the Notice of Award is given, request the apparent successful Bidder to submit an -' acceptable substitute without an increase in Bid price. If the apparent successful Bidder declines to make any substitution, OWNER may award the contract to the next lowest responsive and responsible Bidder that proposes to use acceptable subcontractors. Subcontractors, suppliers, other persons or organization listed and to whom OWNER or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the effective date of the Agreement as provided in the General Conditions. 10.3. CONTRACTOR shall not be required to employ any subcontractor, supplier or other persons or organizations against whom he has reasonable objection. The use of subcontractors listed by the Bidder and accepted by OWNER prior to the Notice of Award will be required in the performance of the Work. 11.0 BID FORM. 11.1. A copy of the Bid Form is bound in the Contract Documents which may be retained by the Bidder. A separate unbound copy is enclosed for submission with the Bid. 11.2. Bid Forms must be complete in ink or typed. All lump sum prices on the form must be stated in words and numerals; in case of conflict, words will take precedence. Unit prices shall govern over extensions of sums. 11.3. Bids by corporations must be executed in the corporate name by the -. president or a vice-president (or other appropriate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address _ and state of incorporation shall be shown below the corporate name. 7/96 Section 00100 Page 4 w A. Softwood Lumber Trim: Eastern white, Idaho white, lodgepole, ponderosa, or sugar pine; Grade D Select (Quality). 2.5 FASTENERS A. Fasteners of size and type indicated. Where carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with hot -dip zinc coating complying with ASTM A 153/A 153M. 1. Power -Driven Fasteners: CABO NER-272. PART 3 - EXECUTION 3.1 INSTALLATION A. Set carpentry to required levels and lines, with members plumb and true to line. Fit carpentry to other construction; scribe and cope for accurate fit. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction. B. Securely attach carpentry work as indicated and according to applicable codes and recognized standards. C. Countersink nail heads on exposed carpentry work and fill holes with wood filler. D. Install wood trim with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Cope at returns and miter at comers to produce tight- fitting joints with full -surface contact throughout length of joint. Use scarf joints for end -to -end joints. 1. Install trim after wall and ceiling plastering operations are completed. 2. Install to tolerance of 1/8 inch in 96 inches (as existing conditions allow) for level and plumb. As existing conditions allow, install adjoining trim with 1/32-inch maximum offset for flush installation and 1/16-inch maximum offset for reveal installation. END OF SECTION 06105 MISCELLANEOUS CARPENTRY 06105 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM A 1 . SECTION 06200 - FINISH CARPENTRY PART 1 - GENERAL (Not Applicable) PART2-PRODUCTS 2.1 MATERIALS, GENERAL A. Lumber: DOC PS 20 and grading rules of inspection agencies certified by American Lumber Standards Committee Board of Review. B. Softwood Plywood: DOC PS 1. C. Hardwood Plywood: HPVA HP-1. 2.2 EXTERIOR FINISH CARPENTRY A. Exterior Lumber Trim: Smooth, D select (Quality) eastern white, Idaho white, lodgepole, ponderosa, or sugar pine. 2.3 INTERIOR STANDING AND RUNNING TRIM A. Interior Softwood Lumber Trim: C Select (Choice), eastern white, Idaho white, lodgepole, ponderosa, or sugar pine. B. Board Paneling: Clear No. 1; southern pine in existing tongue and groove to match existing material. Y 2.4 SHELVING A. Shelving: 3/.-inch finish boards as specified for interior softwood trim. 2.5 STAIRS AND RAILINGS A. Interior Treads: 1-1/16-inch, clear, kiln -dried, edge -glued, pine stepping with nosing to match existing stairs. B. Interior Risers: 13/16-inch, clear, kiln -dried, stock matching treads 3/4-inch. l C. Interior Railings: Clear, kiln -dried, hard -maple railing stock. 2.6 MISCELLANEOUS MATERIALS FINISH CARPENTRY 06200 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM A. Fasteners for Exterior Finish Carpentry: hot -dip galvanized steel nails. PART 3 - EXECUTION 3.1 INSTALLATION A. Condition finish carpentry in installation areas for 24 hours before installing. B. Prime and backprime lumber for painted finish exposed on the exterior. C. Install finish carpentry level, plumb, true, and aligned with adjacent materials. Scribe and cut to fit adjoining work. Refinish and seal cuts. D. Install standing and running trim with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Stagger joints in adjacent and related trim. Cope at returns and miter at corners. END OF SECTION 06200 r FINISH CARPENTRY 06200 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM M 1, SECTION 06401 - EXTERIOR ARCHITECTURAL WOODWORK PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Shop Drawings. B. Quality Standard: to match existing trim in style and application. PART2-PRODUCTS 2.1 MATERIALS A. Hardboard: AHAA135.4. B. Softwood Plywood: DOC PS 1. C. Preservative Treatment: Comply with NWWDA I.S.4 for items indicated to receive water- repellent preservative treatment. D. Fasteners for Exterior Woodwork: hot -dip galvanized steel nails. 2.2 EXTERIOR WOODWORK A. See requirements as listed in Historic Needs Assessment (document attached). Each architectural element is listed citing location and required treatment. B. Backout or groove backs of flat trim members, and kerf backs of other wide, flat members, except for members with ends exposed in finished Work. C. Exterior Standing and Running Trim: Custom grade, made from eastern white pine, sugar pine, or Idaho white pine. D. Exterior Ornamental Work: Custom grade, made from eastern white pine, sugar pine, or Idaho white pine. E. Exterior Frames and Jambs: Custom grade, made from eastern white pine, sugar pine, or Idaho white pine. F. Exterior Shutters: Custom grade, made from eastern white pine, sugar pine, or Idaho white pine. PART 3 - EXECUTION EXTERIOR ARCHITECTURAL WOODWORK 06401 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 0 3.1 INSTALLATION A. Install woodwork to comply with AWI Section 1700 for grade specified. B. Install woodwork level, plumb, true, and straight. Shim as required with concealed shims. Install to a tolerance of 1/8 inch in 96 inches (or as allowed by existing conditions) for level and plumb. C. Scribe and cut woodwork to fit adjoining work, seal cut surfaces, and repair damaged finish at cuts. D. Install trim with minimum number of joints possible, using full-length pieces to greatest extent possible. Stagger joints in adjacent and related members. END OF SECTION 06401 EXTERIOR ARCHITECTURAL WOODWORK . FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 06401 - 2 i ,I Y In IN SECTION 06402 - INTERIOR ARCHITECTURAL WOODWORK PART1-GENERAL 1.1 SECTION REQUIREMENTS A. Quality Standard: Architectural Woodwork Institute's "Architectural Woodwork Quality Standards." B. Environmental Limitations: Do not deliver or install woodwork until building is enclosed and wet work is completed. PART 2-PRODUCTS 2.1 MATERIALS A. Wood to match existing materials. 2.2 CABINET HARDWARE AND ACCESSORY MATERIALS A. Hardware Standards: Hardware to match existing in style and operation. B. Exposed Hardware Finishes: 1. Finish: to matching existing in style and operation. Any missing hardware may be obtained from Grandpa Snazzy's Hardware, 1832 South Broadway, Denver, Colorado 80210, 303.778.6508. C. Furring, Blocking, Shims, and Hanging Strips: Softwood lumber, kiln dried to 15 percent moisture content. 2.3 INTERIOR WOODWORK A. Installation of woodwork to match dimension and style to existing materials, as closely as possible. B. Backout or groove backs of flat trim members, kerf backs of other wide, flat members, except for members with ends exposed in finished Work END OF SECTION 06402 INTERIOR ARCHITECTURAL WOODWORK 06402-1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM SECTION 07610 - SHEET METAL ROOFING PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Product Data, Shop Drawings, and color Samples. B. Comply with SMACNA's "Architectural Sheet Metal Manual," unless otherwise indicated. PART 2-PRODUCTS 2.1 ROOFING SHEET METALS A. Corrugated Galvanized Steel Roofing: Strongbam corrugated galvanized steel roofing as available from Hutchison Western, 7460 Highway 85, Commerce City, Colorado. 2.2 ACCESSORIES A. Underlayment: Asphalt -saturated organic felt ASTM D 226, Type II (No. 30). B. Metal Accessories: Matching sheet metal roofing in finish and material required for a complete weathertight roofing system with ridge cap. PART 3 - EXECUTION 3.1 INSTALLATION A. Install underlayment on roof sheathing under sheet metal roofing, unless otherwise recommended by metal roofing manufacturer. B. Anchor roofing securely in place, with provisions for thermal and structural movement. Install with screws and rubber washers, unless otherwise indicated. C. Install work with lines and corners of exposed units true and accurate. Form exposed faces flat and free of buckles, excessive waves, and avoidable tool marks, considering temper and reflectivity of metal. Provide uniform, neat seams. D. Seal joints as shown and as required for leakproof construction. Provide low -slope transverse seams using cleats where backup of moisture may occur. END OF SECTION 07610 SHEET METAL ROOFING FRANZ-SMITH CABIN / FROT COLLINS MUSEUM 07610 - 1 t SECTION 07920 - JOINT SEALANTS PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Product Data and color Samples. B. Environmental Limitations: Do not proceed with installation of joint sealants when ambient and substrate temperature conditions are outside limits permitted by joint sealant manufacturer or are below 40 deg F . PART2-PRODUCTS 2.1 JOINT SEALANTS A. Compatibility: Provide joint sealants, joint fillers, and other related materials that are compatible with one another and with joint substrates under service and application conditions. B. Sealant for Use in Building Expansion Joints: 1. Single -component, neutral -curing silicone sealant, ASTM C 920, Type S; Grade NS; Class 25; Uses T, M, and O, with the additional capability to withstand 50 percent movement in both extension and compression for a total of 100 percent movement. C. Sealant for Exterior Traffic -Bearing Joints, Where Slope Precludes Use of Pourable Sealant: 1. Single -component, nonsag urethane sealant, ASTM C 920, Type S; Grade NS; Class 25; b Uses T, NT, M, G, A, and O. D. Sealant for Exterior Traffic -Bearing Joints, Where Slope Allows Use of Pourable Sealant: 1. Single -component, pourable urethane sealant, ASTM C 920, Type S; Grade P; Class 25; Uses T, M, G, A, and O. y 2.2 JOINT -SEALANT BACKING A. General: Provide sealant backings of material and type that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer. B. Cylindrical Sealant Backings: ASTM C 1330, of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance. JOINT SEALANTS 07920 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM C. Bond -Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint -filler materials or joint surfaces at back of joint. PART 3 - EXECUTION 3.1 INSTALLATION A. Comply with ASTM C 1193. B. Comply with ASTM C 919 for use of joint sealants in acoustical applications. END OF SECTION 07920 JOINT SEALANTS 07920 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM M♦xN SECTION 08212 - STILE AND RAIL WOOD DOORS PART 1 - GENERAL 1.1 SECTION REQUIREMENTS — See Historical Architect's recommendations listed IN Historical Assessment as attached. END OF SECTION 08212 STILE AND RAIL WOOD DOORS 08212-1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 11.4. Bids by partnerships must be executed in the partnership name and signed by a partner, his title must appear under his signature and the official address of the partnership must be shown below the signature. 11.5. Bids by joint venture shall be signed by each participant in the joint venture or by an authorized agent of each participant. The full name of each person or company interested in the Bid shall be listed on the Bid Form. 11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form). 11.7. No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder; if initialed, OWNER may require the Bidder to identify any alteration so initialed. 11.8. The address and telephone number for communications regarding the Bid shall be shown. 12.0 BID PRICING. Bids must be priced as set forth in the Bid Schedule or Schedules. 13.0 SUBMISSION OF BIDS. 13.1. Bids shall be submitted at the time and place indicated in the Invitation to Bid and shall be enclosed in an opaque sealed envelope marked with the Project title, Bid No., and name and address of the Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule of Subcontractors as required in Section 00430. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 13.2. Bids shall be deposited at the designated location prior to the time and date for receipt of Bids indicated in the Invitation to Bid, or any extension thereof made by addendum. Bids received after the time and date for receipt of Bids will be returned unopened. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids. 13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not receive consideration. 13.4. No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association. 14.0 MODIFICATION AND WITHDRAWAL OF BIDS. 7/96 Section 00100 Page 5 No _r SECTION 08550 - WOOD WINDOWS e s PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. See Historical Architect's recommendations as listed in Historical Assessment and Preservation Brief #9 attached. WOOD WINDOWS 08550 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM PART 2 - EXECUTION 2.1 INSTALLATION A. Set units level, plumb, and true to line, without warp or rack of frames ( as existing conditions allow) and panels and anchor securely in place. B. Set sill members in bed of sealant or with gaskets, as indicated, to provide weathertight construction. C. Adjust operating panels, screens, and hardware for smooth operation and weathertight closure. Lubricate hardware and moving parts. END OF SECTION 08550 A WOOD WINDOWS 08550 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM SECTION 08710 - DOOR HARDWARE PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. All door hardware not currently on site to be replaced with antique hardware. PART2-PRODUCTS 2.1 HARDWARE A. Suppliers: 1. Grandpa Snazzy's Hardware, 1832 South Broadway, Denver Colorado, 80210, 303.778.6508. B. Hinges: Replace missing historic hardware in size and shape as indicated by hardware cuts in existing doors. C. Locksets and Latchsets: Historic surface mount "rimlock" style locksets in black or white knobs. D. Provide hardware finishes as follows: 1. Hinges: Matching finish of lockset/latchset or matching existing hardware if available. 2. Locksets, Latchsets, and Exit Devices: Black. 3. Other Hardware: Matching finish of lockset/latchset. PART 3 - EXECUTION 3.1 INSTALLATION A. Mount hardware in locations recommended by the Door and Hardware Institute, unless otherwise indicated. END OF SECTION 08710 DOOR HARDWARE 08710 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEM SECTION 08800 - GLAZING PARTI- GENERAL 1.1 SECTION REQUIREMENTS A. See Historical Architect's recommendations for location or glazing replacement and repair. PART2-PRODUCTS — 2.1 GLASS A. The existing glazing on site should be reused as needed prior to introducing new glazing to the project. _ z PART 3 - EXECUTION 3.1 INSTALLATION - A. Comply with combined recommendations of manufacturers of glass, sealants, gaskets, and other glazing materials, unless more stringent requirements are contained in GANA's "Glazing Manual." B. Set glass lites in each series as indicated by drawings and existing window frames on site. END OF SECTION 08800 GLAZING 08800-1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM "" M.h.. rx ... y SECTION 09210 - GYPSUM PLASTER PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. See Historical Architect's recommendation for interior walls finishes. PART 2-PRODUCTS 2.1 LATH AND PLASTER A. See attached Preservation Brief #21 for method and material direction. END OF SECTION 09210 GYPSUM PLASTER 09210 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM SECTION 09640 - WOOD FLOORING PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Product Data and material Samples. B. Hardwood Flooring Comply with NOFMA grading rules for species, grade, and cut. 1. Certification: Provide flooring that carries NOFMA grade stamp on each bundle or piece. C. Maple Flooring: Comply with MFMA grading rules for species, grade, and cut. 1. Certification: Provide flooring that carries MFMA mark on each bundle or piece. D. Southern Pine Flooring: Comply with SPIB grading rules for species, grade, and cut. E. Softwood Flooring: Comply with WCLIB No. 17 grading rules for species, grade, and cut. PART2-PRODUCTS 2.1 WOOD FLOORING A. Solid -Wood Strip and Plank Flooring: Kiln dried and as follows: 1. Species and Grade: pine to match existing material. 2. Cut: Plain sawn. 3. Thickness: 1" think on first floor, 2" thick on second floor. 4. Face Width: 4 inches. 5. Matching: Tongue and groove, and end matched. 6. Backs: Channeled (kerfed) for stress relief. 7. Lengths: Lengths to conform to existing pattern. 8. Finish: Unfinished. 2.2 FINISHING MATERIALS A. Tongue Oil: Three coats, to be applied by brush. B. Wood Filler: Not to be used. PART 3 - EXECUTION WOOD FLOORING 09640 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 3.1 INSTALLATION A. Comply with flooring manufacturer's written instructions, but not less than recommendations in NOFMA's "Installing Hardwood Flooring." B. Provide expansion space at walls and other obstructions and terminations of flooring of not less than 3/4 inch. C. Solid -Wood Strip and Plank Flooring: Blind nail or staple flooring to substrate according to NOFMA's written recommendations. 1. Plank Flooring: For flooring of face width more than 3 inches , install countersunk screws at each end of each piece in addition to blind nailing. Cover screw heads with wood plugs glued flush with flooring] [install not less than 2 countersunk nails at each end of each piece, spaced not more than 16 inches along length of each piece, in addition to blind nailing. Fill holes with matching wood filler]. 3.2 SANDING AND FINISHING A. Do not sand or fill floor following installation. B. Apply floor finish components in number of coats recommended by finish manufacturer for application indicated, but not less than three finish coats. END OF SECTION 09640 WOOD FLOORING 09640 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM SECTION 09910 - PAINTING PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. Summary: Paint exposed surfaces, new and existing, unless otherwise indicated. B. Lead paint has been identified on existing exterior trim, interior trim and interior paneling. C. Submittals: Product Data and Samples. D. Obtain block fillers and primers for each coating system from same manufacturer as finish coats. E. Extra Materials: Deliver to Owner 1 gallon of each color and type of finish coat paint used on Project, in containers, properly labeled and sealed. PART2-PRODUCTS 2.1 PAINT A. Products: 1. Benjamin Moore. 2. Colors: As selected in attached Needs Assessment. Exterior trim color to be matched to existing and submitted for approval. B. Material Compatibility: Provide materials that are compatible with one another and with substrates. C. Material Quality: Manufacturer's best -quality paint material of coating types specified that are formulated and recommended by manufacturer for application indicated. PART 3 - EXECUTION 3.1 PREPARATION A. Remove hardware lighting fixtures and similar items that are not to be painted. Mask items that cannot be removed. Reinstall items in each area after painting is complete. B. Comply with local guidelines on the preparation and treatment of surfaces where existing lead paint is present. PAINTING 09910 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 1 0 ♦ 11 ill C. Clean and prepare all surfaces in an area before beginning painting in that area. Schedule painting so cleaning operations will not damage newly painted surfaces. 3.2 APPLICATION A. Apply coatings by brush, roller, spray or other applicators according to coating manufacturer's written instructions. 1. Use brushes only for exterior painting and where the use of other applicators is not practical. 2. Use rollers for finish coat on interior walls and ceilings. B. Pigmented (Opaque) Finishes: Completely cover surfaces to provide a smooth, opaque surface of uniform appearance. Provide a finish free of cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections. 3.3 EXTERIOR PAINT APPLICATION SCHEDULE A. Wood Trim: 1. Flat, Acrylic Enamel: Two coats over primer. 3.4 INTERIOR PAINT APPLICATION SCHEDULE A. Gypsum Plastering: 1. Flat Acrylic: Two coats primer. B. Woodwork and Hardboard: 1. Low -Luster, Acrylic Enamel: Two coats primer. END OF SECTION 09910 PAINTING 09910 - 2 FRANZ-SMITH CABIN I FORT COLLINS MUSEUM 14.1. Bids may be modified or withdrawn by an appropriate document duly _ executed (in a manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 14.2. Bids may also be modified or withdrawn in person by the Bidder or an authorized representative provided he can prove his identity and authority at any time prior to the opening of Bids. 14.3. Withdrawn Bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders. 15.0 OPENINGS OF BIDS. Bids will be opened and (unless obviously publicly as indicated in the Invitation to Bid of the Base Bids and major alternates (if any) the opening of Bids. 16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE. non -responsive) read aloud An abstract of the amounts will be made available after All Bids shall remain open for forty-five (45) days after the day of the Bid Opening, but OWNER may, in his sole discretion, release any Bid and return the Bid Security prior to that date. 17.0 AWARD OF CONTRACT. 17.1. OWNER reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work, to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 17.2. In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the -" Bid Form or prior to the Notice of Award. 17.3. OWNER may consider the qualification and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations is submitted as requested by _ OWNER. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials 7/96 Section 00100 Page 6 SECTION 13851 - FIRE ALARM PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. Summary: Noncoded system with manual and automatic alarm initiation.. Alarms include bells, horns, and xenon -strobe. units. Class A wiring. B. Submittals: System operating description to be as installed in existing buildings in Museum Courtyard. C. Submit system plans, connection diagrams, and component descriptions to authorities having jurisdiction. D. Comply with NFPA 70. E. Comply with NFPA 72. F. UL listed and labeled. PART 2-PRODUCTS 2.1 ALARM -INITIATING DEVICES A. See existing system for specifications. 2.2 ALARM -INDICATING DEVICE A. See existing system for specifications. PART 3 - EXECUTION 3.1 INSTALLATION A. Install and test systems according to NFPA 72. Comply with existing system specifications. B. Ground cable shields and equipment. END OF SECTION 13851 FIRE ALARM 13851 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM SECTION 16050 - BASIC ELECTRICAL MATERIALS AND METHODS PART 1 - GENERAL (Not Applicable) PART2-PRODUCTS 2.1 SUPPORTING DEVICES A. Material: Cold -formed steel, with corrosion -resistant coating acceptable to authorities having jurisdiction. B. Metal Items for Use Outdoors or in Damp Locations: Hot -dip galvanized steel. C. Slotted -Steel Channel Supports: Flange edges turned toward web, and 9/16-inch- diameter slotted holes at a maximum of 2 inches o.c., in webs. D. Raceway and Cable Supports: Manufactured clevis hangers, riser clamps, straps, threaded C- clamps with retainers, ceiling trapeze hangers, wall brackets, and spring -steel clamps or click - type hangers. E. Pipe Sleeves: Schedule 40, galvanized steel, plain ends. F. Cable Supports for Vertical Conduit: Factory -fabricated assembly consisting of threaded body and insulating wedging plug for nonarmored electrical cables in riser conduits. Plugs have number and size of conductor gripping holes as required to suit individual risers. Body constructed of malleable -iron casting with hot -dip galvanized finish. G. Toggle Bolts: All -steel springhead type. PART 3 - EXECUTION 3.1 ELECTRICAL EQUIPMENT INSTALLATION A. Extreme care to be taken to provide non-invasive installation of all electrical devices and equipment. Coordination with Contractor is required to maintain historic standards. B. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide maximum possible headroom. C. Materials and Components: Install level, plumb, and parallel and perpendicular to other building systems and components, unless otherwise indicated. D. Equipment: Install to facilitate service, maintenance, and repair or replacement of components. Connect for ease of disconnecting, with minimum interference with other installations. E. Right of Way: Give to raceways and piping systems installed at a required slope. BASIC ELECTRICAL MATERIALS AND METHODS 16050 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 3.2 SUPPORT INSTALLATION A. Secure electrical items and their supports to building structure, using the following methods unless other fastening methods are indicated: 1. Wood: Wood screws or screw -type nails. — 2. Gypsum Board: Toggle bolts. Seal around sleeves with joint compound, both sides of wall. 3. Masonry: Toggle bolts on hollow block and expansion bolts on solid block. Seal around — sleeves with mortar, both sides of wall. 4. Existing Concrete: Expansion bolts. 5. Fasteners for Damp, Wet, or Weather -Exposed Locations: Stainless steel. B. Fasteners: Select so load applied to each fastener does not exceed 25 percent of its proof -test load. 3.3 FIRESTOPPING A. Apply firestopping to cable and raceway sleeves and other penetrations of fire -rated floor and wall assemblies to restore original undisturbed fire -resistance ratings of assemblies. Firestopping installation is specified in Division 7 Section "Through -Penetration Firestop — Systems." 3.4 DEMOLITION A. Protect existing electrical equipment and installations indicated to remain, fi not in finished area. — B. Accessible Work: Remove exposed electrical equipment and installations, indicated to be demolished, in their entirety. C. Abandoned Work: Cut and remove buried raceway and wiring, indicated to be abandoned in place, 2 inches below the surface of adjacent construction. Cap raceways and patch surface to — match existing finish. 3.5 CUTTING AND PATCHING A. Cut, channel, chase, and drill floors, walls, partitions, ceilings, and other surfaces required to permit electrical installations. Perform cutting by skilled mechanics of trades involved. — B. Repair, refinish and touch up disturbed finish materials and other surfaces to match adjacent undisturbed surfaces. _ END OF SECTION 16050 BASIC ELECTRICAL MATERIALS AND METHODS 16050 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM M M n SECTION 16140 - WRUNG DEVICES PART 1-GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Product Data. B. Comply with NEMA WI) 1. C. Comply with NFPA 70. PART2-PRODUCTS 2.1 DEVICES A. General: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. B. Color: Paintable plates, device color to be approved by Owner. C. Receptacles: General -Duty grade, NEMA WI) 1, NEMA WD 6, and UL 498. D. Ground -Fault Circuit Interrupter Receptacles: Non -feed -through type,] with integral duplex receptacle; for installation in a 2-3/4-inch- deep outlet box without an adapter. E. TVSS Receptacles: Duplex type, with integral TVSS in line to ground, line to neutral, and neutral to ground. F. Snap Switches: General -duty, quiet type. G. Wall Plates, Finished Areas: Paintable fastened with metal screws having heads matching plate color. H. Wall Plates, Unfinished Areas: Galvanized steel with metal screws. PART 3 - EXECUTION 3.1 INSTALLATION A. Care to be taken in the installation of electrical distribution in existing structure. Electrician to work with Contractor to protect existing building materials. B. Install devices and assemblies plumb and secure. Electrical devices to be installed in quantity and location per drawing. WIRING DEVICES 16140 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM C. Mount devices flush, with long dimension vertical, and grounding terminal of receptacles on top, unless otherwise indicated. Group adjacent devices under single, multigang wall plates. D. Protect devices and assemblies during painting. E. Install wall plates when painting is complete. END OF SECTION 16140 WIRING DEVICES 16140 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM N 4 x SECTION 16410 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL (Not Applicable) PART2-PRODUCTS 2.1 SWITCHES A. Enclosed, Nonfusible Switch: NEMA KS 1, Type HD, with lockable handle. B. Enclosed, Fusible Switch, 800 A and Smaller: NEMA KS 1, Type HD, clips to accommodate specified fuses, enclosure consistent with environment where located, handle lockable with 2 padlocks, and interlocked with cover in closed position. 2.2 CIRCUIT BREAKERS A. Enclosed, Molded -Case Circuit Breaker: NEMA AB 1, with lockable handle, standard frame sizes, trip ratings, and number of poles and thermal -magnetic trip, unless otherwise indicated. 1. Lugs: Mechanical style suitable for number, size, trip ratings, and material of conductors. 2. Application Listing: Appropriate for application; Type SWD for switching fluorescent lighting loads; Type HACR for heating, air-conditioning, and refrigerating equipment. 3. Ground -Fault Protection: Integrally mounted relay and trip unit with adjustable pickup and time -delay settings, push -to -test feature, and ground -fault indicator. 4. Communication Capability: Circuit -breaker -mounted communication module with functions and features compatible with power monitoring and control system. 5. Shunt Trip: 120-V trip coil energized from separate circuit, set to trip at 55 percent of rated voltage. 6. Undervoltage Trip: Set to operate at 35 to 75 percent of rated voltage without intentional time delay. 7. Auxiliary Switch: One SPDT switch with "a" and "b" contacts; "a" contacts mimic circuit -breaker contacts, "b"contacts operate in reverse of circuit -breaker contacts. PART 3 - EXECUTION 3.1 TESTING A. Perform visual and mechanical inspections and electrical tests stated in NETA ATS. END OF SECTION 16410 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 16410-1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM r SECTION 16442 - PANELBOARDS PARTI- GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Product Data. B. Comply with NEMA PB 1. C. Comply with NFPA 70. PART2-PRODUCTS 2.1 PANELBOARDS AND LOAD CENTERS A. Surface mounted, NEMA PB 1, Type 1. 1. Front: Hinged to box with standard door within hinged cover. 2. Doors: With concealed hinges, flush catches, and tumbler locks, all keyed alike. 3. Bus: Hard -drawn copper, 98 percent conductivity. 4. Main and Neutral Lugs: Mechanical type suitable for use with conductor material. 5. Equipment Ground Bus: Adequate for feeder and branch -circuit equipment ground conductors; bonded to box. 6. Feed -through Lugs: Mechanical type suitable for use with conductor material. Locate at opposite end of bus from incoming lugs or main device. B. Panelboard Short -Circuit Rating: UL label indicating series -connected rating with integral or remote upstream devices. Include size and type of upstream device allowable, branch devices allowable, and UL series -connected short-circuit rating. C. Load Centers: 1. Overcurrent Protective Devices: Plug-in, full -module circuit breaker. 2. Conductor Connectors: Mechanical type for main, neutral, and ground lugs and buses. D. Lighting and Appliance Branch -Circuit Panelboards: 1. Branch Overcurrent Protective Devices: Plug-in circuit breakers, replaceable without disturbing adjacent units. 2. Doors: Front mounted with concealed hinges; secured with flush latch with tumbler lock; keyed alike. E. Molded -Case Circuit Breakers: NEMA AB 1, plug-in type. Single handle for multipole circuit breakers. Appropriate for application, including Type SWD for repetitive switching lighting loads and Type HACR for heating, air-conditioning, and refrigerating equipment. PANELBOARDS FRANZ-SMITH CABIN / FORT COLLINS MUSEUM 16442 - 1 PART 3 - EXECUTION 3.1 INSTALLATION A. Install panelboards and accessory items according to NEMA PB 1.1. Indicate installed circuit loads on a typed circuit directory after balancing panelboard loads. Exterior mounting may be preferable if panel cannot be mounted in attic space of cabin. B. Mounting Heights: Top of trim as allowable. C. Tighten electrical connectors and terminals, including grounding connections, according to manufacturer's published torque -tightening values. Where manufacturer's torque values are not indicated, use those specified in UL 486A and UL 486B. D. Perform visual and mechanical inspections and electrical tests stated in NETA ATS. END OF SECTION 16442 PANELBOARDS 16442 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM SECTION 16500 - LIGHTING PARTI-GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Product Data for each luminaire, including lamps. B. Fixtures, Emergency Lighting Units, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. C. Coordinate ceiling -mounted luminaires with ceiling construction, mechanical work, and security and fire -prevention features mounted in ceiling space and on ceiling. PART 2-PRODUCTS 2.1 LUMINAIRES A. Fixtures on first floor: Cloth -Covered Cord Pendant 1. Products: a. Burnside: Classic Cloth -Covered Cord Pendant, Item C100C. Rejuvenation Lamp and Fixture Co., 2550 N. NW Nicolai Street, Portland, OR 97210, 888.401.1900. 2. Mounting: Pendant, final mounting heigh to be determined by Owner. 3. Nominal Dimensions: Diameter, 4", Length; 36", Ceiling Canopy; 4.5". 4. Lamps: Edison 1890 carbon -filament bulb, Rejuvenation Lamp and Fixture Co., 2550 N. NW Nicolai Street, Portland OR 97210, 888.401.1900. 5. External Finish: unlacquered brass finish with black cloth cord. B. Fixtures on second floor: Cloth -Covered Cord Pendant. 1. Products: a. Burnside: Classic Cloth -Covered Cord Pendant, Item C100C. Rejuvenation Lamp and Fixture Co., 2550 N. NW Nicolai Street, Portland, OR 97210, 888.401.1900. 2. Mounting: Pendant, final mounting heigh to be determined by Owner. 3. Nominal Dimensions: Diameter; 4", Length; 36", Ceiling Canopy; 4.5". 4. Lamps: Edison 1890 carbon -filament bulb, Rejuvenation Lamp and Fixture Co., 2550 N. NW Nicolai Street, Portland OR 97210, 888.401.1900. 5. External Finish: unlacquered brass finish with black cloth cord. LIGHTING 16500 - 1 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM c PART 3-EXECUTION 3.1 INSTALLATION A. Set units level, plumb, and square with ceiling and walls, and secure. B. Lamping: Where specific lamp designations are not indicated, lamp units according to manufacturer's written instructions. END OF SECTION 16500 LIGHTING 16500 - 2 FRANZ-SMITH CABIN / FORT COLLINS MUSEUM i. , City of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 3 BID #5787 RESTORATION OF FRANZ-SMITH CABIN SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5787 Restoration of Franz -Smith Cabin OPENING DATE: May 29, 2003, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. The following are responses to questions raised: General: 1/ The work contained in these plans and specifications are to be done in compliance with the Secretary of Interior's Standards for the Treatment of Historic Properties. Architectural: 1/ Sheet A-3 — Please see drawing and note in clarification for Log 9 on drawings. The identified log as been noted as containing measurable moisture content, there is concern that the moisture has decayed the log to be point of requiring repair or replacement. This log section will be evaluated during construction to determine if repair or replacement is required. 2/ Sheet A-4, Detail #1 — Please see attached drawing and note in clarification of Detail #1. Electrical: 1/ The electrical supply for the building will be fed underground and supplied by the City of Fort Collins. 2/ The existing panel board, currently in the building, will be abandoned. It will be left in its current form as part of the exhibit of the building. The new panel board in the attic, will provide the electrical distribution for the building. 3/ Smoke detectors shown on the plans are to be "stand alone" and not tied into an existing fire detection system. The project will not require horns or strobes as specified in the contract documents. 4/ Electrical power through the building will be provided under the rock facing at the foundation, under the floor structure (above the slab) and through the chase located in the chimney. This chase is accessible because the wood stove / chimney will be inoperable. If there any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. 215 North Mason Street - 2nd Floor - P.O. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6775 - FAX (970) 221-6707 and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.4. OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidder's proposed Subcontractors, Suppliers and other persons and organizations to do the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time. 17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interest of the OWNER. Award shall be made on the evaluated lowest base bid excluding alternates. The basis for award shall be the lowest Bid total for the Schedule or, in the case of more than one schedule, for sum of all schedules. Only one contract will be awarded. 17.6. If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice of Award within forty-five (45) days after the date of the Bid opening. 18.0 CONTRACT SECURITY. The General Conditions and the Supplementary Conditions set forth OWNER's requirements as to performance and other Bonds. When the Successful Bidder delivers the executed Agreement to the OWNER, it shall be accompanied by the required Contract Security. 19.0 SIGNING OF AGREEMENT. When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER with the required Bonds. Within ten (10) days thereafter, OWNER shall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification. 20.0 TAXES. OWNER is exempt from Colorado State Sales and Use Taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Contract Price. Reference is made to the General and Supplementary Conditions. 21.0 RETAINAGE. Provisions concerning retainage are set forth in the Agreement. 7/96 Section 00100 Page 7 Historic Structure Assessment Report Project #2001-HA-058 Franz -Smith Cabin Fort Collins Museum Courtyard Fort Collins, CO September 2001 By: Anthony & Associates 8 Colorado State University's Architectural Preservation Institute This assessment is made possible In part by funding from the Colorado Historical Society/State Historical Fund Franz -Smith Cabin Historic Structure Assessment Report 1. Introduction 1.1 Research Background/participants Research Background The Fort Collins Museum (Museum) acquired the Franz -Smith Cabin from the Larimer County Historic Alliance in June 2000 and relocated It to the courtyard outside the Museum's building in Fort Collins, CO. The cabin, originally located in southwest Fort Collins, had been located on county land north of Fort Collins near Livermore for more than ten years. During that time the roof had been removed, and most of the windows had been removed or were broken, leaving it open to the elements. Much of the funding for the relocation by the Fort Collins Museum was provided for by the Don and May Wilkins Charitable Trust, with the balance being provided by the City of Fort Collins, the Downtown Development Authority, community donations and in -kind support The cost for moving the cabin, providing steel reinforcing, a new concrete pad, and a fence around the structure has been estimated at $35,000.00. The Museum's decision to relocate the cabin in order to save it was based on a number of reasons. First, Fort Collins City officials and Fort Collins Museum staff saw an opportunity to incorporate the Franz Smith cabin into plans for the Museum's expansion and revitalization. Second, the fact that it had already been moved from it's original location provided justification for another relocation with the Museum noting that they, as preservationists, "... refrain from moving things from their original relocation whenever we can." Third, the cabin, representing the agricultural history of the community, fit a gap in the Museum's historic cabin courtyard Interpretive program. In developing a Rlan for the restoration of the cabin, the Museum determined they needed a thorough assessment of the cabin's existing conditions and recommendations for repair and restoration. The Museum applied for, and received, a State Historical Fund Historic Structure Assessment Grant for the development of this report in the Summer of 2001. Director of Collections, Cheryl Donaldson, sought out the services of Ron Anthony, wood scientist, and Colorado State university's Architectural Preservation Institute to study the building and write the report. A key concern for the Franz -Smith cabin is the condition of the wood. There is evidence of moisture damage resulting in decayed wood throughout the structure. A detailed investigation of the wood members was conducted during August 2001. The purpose was to identify wood species used, assess the structural integrity of the logs and other wood members, determine the sources of moisture intrusion causing the deterioration and identify construction details which may aid in establishing original fabric and subsequent repairs. 1. Species Identification: The cabin makes use of logs for the exterior walls and dimension lumber for joists and boards for flooring. By determining the wood species of the logs, joists, boards and trim it may be possible to determine which materials are of local wood species and which may have been constructed of non - local species. For example, logs of Ponderosa pine would likely be of local origin while window trim identified as white pine would likely have been brought in to the area or represent replacement material. Wood species were identified by removing several small samples throughout the cabin from which the species or species group were identified by microscopic examination. I 2. Decay Quantification: The inspection of the wood members consisted of a combination of visual observations,_ moisture measurements and resistance drilling to determine loss of material due to wood decay. Resistance drilling is a quasi- " nondestructive technique for determining the relative density of wood. It is best suited for detemining Internal problems in timber which do not show obvious signs of deterioration, such as surface decay. Any internal void or early stage of decay at the location drilled can be detected by determining the relative density of the wood. The relative density is printed on a strip of paper as a small diameter needle penetrated the wood, as seen below for (a) a solid section and (b) a void. The technique is very reliable for quantifying the extent of voids when used in combination with other techniques fo rapidly locate areas of probable deterioration. . . . . . ra' @'. Figure 1. Results from resistance drilling showing (a) solid wood and _ (b) wood with internal decay. ti Resistance drilling was conducted on the exterior logs to determine the extent of deterioration and repair needs. Floor joists and roof Umbers were probed with an awl and moisture. measurements taken to locate areas with deterioration. 3. Moisture Determination: The effect of prolonged exposure to moisture is an — undesirable condition and results in long-term maintenance issues for wood in a structure. Excessive shrinkage or swelling, checking, loose connections and decay are typical problems. Moisture content measurements identify wood with favorable moisture levels for + the growth of wood -decay fungi. Generally. If moisture content is less than 20 percent wood -decay fungi are unable to grow. While fungi may be present at lower moisture contents they are unable to continue to deteriorate the wood without sufficient moisture. Moisture contents from 20 - 30 percent indicate areas of concern where sufficient moisture Is present for fungi to grow but generally not quite high enough to indicate advanced decay. A moisture content above 30 percent is often an indication of active decay with internal voids and / or surface deterioration. Moisture measurements were taken on dimension lumber and boards using a — capacitance -type meter, which provides moisture information to a depth of approximately 3/4 of an inch. Moisture measurements on the logs were taken with a resistance -type meter so that the internal moisture content of the wood can be determined. This information is useful, along with visual observations and 2 — M 1 r resistance drilling data, to establish patterns of moisture intrusion and deterioration and, therefore, determine priorities for repair. During the wood assessment of the cabin, observations on use of materials were made to aid in historic interpretation of the construction of the cabin. Observations included saw marks on dimension lumber and boards, notches on exterior log walls, types of nails and milling patterns on wood. Samples were also taken such as daubing, paint, and wallpaper for analysis at the Architectural Preservation Institute lab. Such information may make it possible to distinguish original fabric from material added at a later date, including replacement material. Participants Property Owner. Fort Collins Museum 200 Mathews Street Fort Collins, CO 80524 The Fort Collins Museum is a non-profit, (170, C-1) educational institution operated for the benefit of the community, open to the public and fully accessible. The inspiration for the Fort Collins Museum came with the Hobby and Historical Club in 1937. In 1941 the Museum opened in Library Park as the Pioneer Museum under the Parks and. Recreation Department of the City of Fort Collins. In 1976, the Museum was relocated to the 1904 Camegie Library building also in Library Park and renamed the Fort Collins Museum. The Museum houses over 25,000 artifacts and interprets five'historic structures including the Camegie building. The Fort Collins Museum has a professional staff of five full-time employees and six part-time employees. Consultants: Ron Anthony Anthony & Associates P.O. Box 271400 Fort Collins, CO 80527-1400 Chris Koziol and Alyson McGee Colorado State University Architectural Preservation Institute Fort Collins, CO 80523 Kevin Murray Empire Carpentry P.O. Box 245 Belivue, CO 80512 Ron Anthony received a Master of Science degree In Wood Science and a B.S. in Wood Science and Technology from Colorado State University. Mr. Anthony is active in research and development of nondestructive evaluation and inspection technology for assessment of timber structures. His efforts have led to application of stress wave methods, resistance drilling and digital radioscopy for conducting moisture diagnostics in building systems, quantifying decay in structural timbers and investigating hidden conditions. His recent consulting activities have focused on application of these innovative inspection technologies for assessment of wood in historic structures, such as Benjamin Latrobe's Basilica of the Assumption in Baltimore. Chris Koziol is a licensed architect and certified city planner with a diverse background in historic preservation projects of a variety of scales. He has worked on restoration projects ranging from the Hatch Band Shell on the Esplanade in Boston, to Victorian era houses. As an urban designer, his project credits include several in -fill housing development in historic neighborhoods, and the design integration. of the Denver light rail transit system in the existing building fabric of downtown Denver. Alyson McGee has completed coursework toward her Master of Science degree in Construction Management with an empasis In Historic Preservation. She has been with the Architectural Preservation Insmute since it's Inception In the fail of t997. She has participated In the testing and analysis for both masonry and wood deterioration " case studies, assists in the instruction of graduate level preservation courses in CSU's Construction Management Department, coordinates workshops on historic building materials, and oversees the day4o-day operations of the Architectural Preservation Institute. Alyson is currently serving as the owner's representative/construction manager for the Preston Farmhouse rehabilitation and Dearlield stabilization projects. Kevin Murrary is the owner of Empire CarPentry. Mr. Murray oversaw the stabilization of the Virginia Dale Overland Trail Stage Station; a hand-hewn log structure with a stone foundation. Other historic buildings In the Fort Collins area he has performed work on include: Old Fort Collins Post Office, Nelson Milkhouse, Earnest Waycott House, Stove House and Sherwood House. Mr. Murray provided assistance in estimating some of the costs of treatments for this report. A 4 I 1.2 Building Location/Site Plan or Vicinity Map The Franz -Smith cabin is located in the courtyard of the Fort Collins Museum at 200 Mathews Street, Fort Collins, CO. The building was originally located adjacent to Shields Street near Harmony Road in Fort Collins. It was moved to county land near Livermore, CO in 1988 then to the Fort Collins Museum in June 2000. Map of northern Colorado Cabin's original location In Fnrt rnllins Cabin's current location at F. C. Museum 5 e 2. History and Use 2.1 Architectural Significance and Construction History The Franz -Smith Cabin was built c. 1882 in Fort Collins by German immigrant Henry Franz whose family farmed alfalfa as well as participated in the sugar beet and Iamb Industries. The cabin was rented to the Smith family for a period of time and then purchasgd by them in 1936. The cabin continued to serve as a residence until 1987. r -^ The Franz -Smith cabin resembles a Continental Plan which is defined by NPS Preservation Brief 26 as, '... a single -pen of three rooms organized around a central hearth.' The Franz -Smith cabin, however, has only two rooms separated by a central , staircase. The east room has two entrances, one on the long end (south) and one on the gable and (east). The location of the door at the gable end is typical of what is known as the &Rodry Mountain' cabin form. This We evolved, In the West in the mid-19th century (NPS, Preservation Brief 26). The cabin has four windows on the first story placed symmetrically, with two on each north and south side, and a window in each gable. The cabin Is an example of the use of hand-hewn square and round logs, with wood chinking and a mortar -like daubing. The second story attic room is believed to have been -' added in 1909 and has a half wall upon which a gabled roof was placed. The roof of the building was removed when the cabin was transported to Uvemrore, CO in 1988. The gable ends remain intact, but are not attached to the building, and the rafters may be located within the cabin's first floor east room. When restoration is completed, the period of interpretation will be the 1920's and the restored version will include a reconstruction of the roof system. See Fig. 1-Cabin at original location and Fig. 2-Cabin at Uvennore location. 2.2 Proposed Program The Fort Collins Museum plans to use the Franz -Smith cabin as part of its interpretive program involving three (3) other relocated historic cabins. The Franz -Smith cabin is unique to the Museum's collection of historic cabins as it represents the agricultural history of the area rather than the frontier history represented by the other cabins. As with the other cabins, the Franz -Smith cabin will be used for educational programming, and will be accessible to the public, Including individuals and groups, wishing to learn about the history of the Fort Collins area. The Museum also wishes to use the cabin to provide interpretative information on cabin construction, historic preservation treatments, and material deterioration mechanisms. 2.3 Existing Sketch Plan See site and floor plans in Section 7.0. C 3.0 Structure Condition Assessment 3.1 Site • Associated Landscape Features: The cabin is not currently located In its historic setting. The cabin was relocated from It's original site near Shields Street and Harmony Road, Fort Collins, CO to land owned by Ladmer County near Livermore, CO In 1988. It was then moved in June 2000 to its current location within the Fort Collins Museum courtyard. The courtyard contains four (4) other structures, the historic Auntle Stone cabin, Box Elder School cabin, and Janis cabin, and a non -historic workshop. Landscaping within the courtyard consists of grass, trees, paved walking paths, potted planters, and a historic stone well. The entire area was recently enclosed within a wrought - iron fence, with the Franz -Smith cabin -located in the southwest comer of the courtyard. See Fig. 3-View of courtyard with Franz-Smlth cabin in background and site plan In section 7.0. • Parking: Parking Is provided on adjacent streets. • Archaeology: There is no archeology is associated with this project as the cabin is not in Its original location. 3.2 Foundations • Perimeter Foundation Drainage Existing Conditions: Poor There has been no formal grading of the site to provide drainage away from the foundation slab. Treatment Recommendation: Slab edges should be ground to allow for water to drain away from building and soil should also be graded for drainage. Cost of Repairs Grading Slab grinding • Foundation System Existing Conditions: Poor Originally the cabin may have sat on a shallow stone foundation or have had the sill logs In direct contact with the soil. This is difficult to determine based on the available black and white photos (o. 1988). Currently the structure is raised on steel girders above a 160 deep mete slab. Treatment Recommendation: The cabin could be placed upon the existing slab. However, this could lead to accelerated deterioration of the sill logs as It increases the possibility of the logs being exposed to high moisture levels. Placing preservative treated lumber between the slab and the sill logs would deter possible future deterioration of the sill logs. If desired, stones could then be applied as a facing to simulate a stone foundation, which would be consistent with buildings of the cabin's era. The pressure -treated lumber should be 2x12 member(s). Metal flashing should be placed between the treated lumber and the sill logs to stop moisture wicked up by the lumber from coming in contact with the sill logs. There should also be ventilation, such as screen covered notches or holes in the lumber to allow any moisture which does get underneath the structure to dissipate easily. White this is only one possible solution, final design and detailing will require the input of a structural engineer, and appropriate reviewing agencies. Cost of Repairs: Pressure -treated lumber Stone facing Flashing • Backfill: Any necessary could be provided as part of the site grading. 3.3 Building Structural System • General Structural System Description Existing Conditions: Poor --i Fair a Good The cabin is a load -bearing log structure with hand-hewn (squared) logs making up the first floor walls, rounded, smaller logs creating a 1/2 story wail above, and a i dimension lumber, truss roofing system. The first floor joists consist of 2x6's spaced 240 apart, currently supported by the steel frame system used to move the structure. ^ T The second story floor joists consist of 2x6's supported at the ends by the log walls with the joist ends exposed through the exterior walls. The square hewn logs are original to the structure, with the rounded logs having been added in 1909 to form the 1/2 wall for the second story. The round logs have vertical wooden pegs joining them together for added structural stability. The first story flooring Is mainly being supported at this time by the steel frame system put in place to provide support for the structure during relocation. There is a central stairwell incorporating two closets providing access to the second story. A number of existing logs are either deteriorated due to fungal decay, or have 'shifted' causing 'bowing' of certain walls. It can be assumed that mucb of the fungal activity was caused by the structure being open to the elements (10. moisture) and unoccupied at the Livermore, CO location for more than ten years. Shifting of the logs and wall planes is most likely caused by deterioration of the logs, twice moving the structure, and lack of a roof truss system. Conditions drawings in section 6.0 indicate the location of fungal decay, and other conditions. • First Floor Structural System Existing Conditions: Poor The first floor is supported by wood joists spaced approximately 24' on ,center, although the spacing is not uniform. The joists span approximately 16' across the cabin with no intermediate supports and are, generally, in poor condition. Several joists are broken at the west.side of the cabin (Fig. 4). Others are decayed and warped. The joists are of circular sawn Douglas -fir with approximate dimensions of 1 7/6' by 5 3/40. The joists support a wood subfloor consisting of.10 thick boards. Prior to allowing public access to the first floor, an engineering assessment should be conducted to determine the amount of load that the first floor can support The wearing surface of the floor in the east room is 314" thick tongue -and -groove flooring, 34 wide (Fig. 5). Flooring (which may have been subfloodng) in the west room varies in width. Much of the flooring was inaccessible due to storage of lumber 7 W from the cabin on the first, but what was visible showed signs of weathering and minor splitting due to exposure to the elements over time. Moisture content readings on the wood joists and flooring were less than 20 percent. A variety of nails are visible securing the structural framing and millwork, including steel cut nails and common wire nails. The cut nails are probably original fabric Treatment Recommendation: Although a structural engineering assessment is necessary to determine the adequacy of the existing first floor system, for the purposes of this assessment it will be assumed that the majority of (possibly all) the floor joists require replacement. This can be accomplished by sistering new members to existing or replacing the existing joists. Cost of Repairs: Remove flooring Notch and install pressure -treated joists Reinstall floor (replacing decayed as needed) Remove and reinstall Interior walls and fixtures (Ind. stairs) Second Floor Structural System Existing Conditions: Poor The second floor is supported by wood joists spaced approximately 24" on center. The joists span approximately 15 across the cabin with no Intermediate supports. The joists are of circular sawn Douglas -fir with approximate dimensions of 1 7/8" by 5 3/4" (Fig. 6). The joists have considerable sag, most likely due to the long span and shallow depth of the beams. Prior to allowing public access to the second floor, an engineering assessment should be conducted to determine the amount of bad that the second floor can support The wearing surface consists of nominal 1" thick lumber laid perpendicular to the joists. There is currently no subfloor. The floorboards exhibit considerable warp due to prolonged exposure to the elements and will need replacement should the second floor be made accessible to the public. Treatment Recommendation: Although a thorough structural engineering assessment is necessary to determine the appropriate design for repair/replacement of the existing second floor system, for the purposes of this assessment it will be assumed that the all the floor joists and subfloor require replacement. Cost of Repairs: Replace existing I flooring and joists Replace joists with similar douglas fir joists Replace subfloor with similar Roof Framing System Existing Conditions: None The structure currently has no roof Installed. The two gable ends exist but are not attached to the cabin (Fig. 7). The gable ends are constructed of 2x4dimension lumber framing with 1" thick boards of various widths (9-128) for cladding. The lumber Is poor quality with numerous large knots. There is termite damage at one end of the one of the gable frames (Fig. 8). Most of the boards are it fair condition, showing signs of weathering, minor surface deterioration and warping. 22.0 PURCHASING RESTRICTIONS. Purchasing restrictions: The Bidder's authorized signature of this Bid assures the Bidder's compliance with the City's purchasing restrictions. A _ copy of the resolutions are available for review in the Purchasing and Risk Management Division or the City Clerk's office. A. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that burn hazardous waste as a fuel. 23.0 COLLUSIVE OR SHAM BIDS. Any Bid deemed by the City in its sole discretion to be a collusive or sham ^ Bid will be rejected and reported to authorities as such. Your authorized signature of this Bid assures that such Bid is genuine and is not a collusive or sham Bid. 24.0 BID RESULTS. For information regarding results for individual Bids send a self- addressed, self -stamped envelope and a Bid tally will be mailed to you. Bid results will be posted in the Purchasing office seven (7) days after the Bid Opening. END OF SECTION 7/96 Section 00100 Page 8 C. 1988 Photos taken prior to the structure's first relocation (Fig. 9) show that the roof framing system consisted of dimensioh lumber 2x4 rafters with collar beams. The _ lumber stacked within the cabin Interior may be the historic rafters and collar beams. The roof pitch is approximately 6:12. Treatment Recommendation: If the stacked lumber In the cabin Is determined by the designer and/or contractor to Indeed be the original rafter and collar beam material, and is in sound condition, that material could be reused in the reconstruction of the roof framing, system per the available photo documentation. If new material is needed, material of similar species and dimensions should be used. it is unclear in the photo documentation how the rafters connected to the top of the wails. There is some existing evidence that layers of 1 x wood material were placed on top of the last round log course, providing a top plate -like surface on which the rafters, with "bird's mouth' notches may have sat A similar system could be utilized using existing lumber or new. Cost of Repairs: Roof framing Use existing lumber as possible and new where needed Includes gales, ridge, rafters, top plate and decking -r 3.4 Building Envelope -Exterior Walls • Exterior Wail Construction Existing Conditions: Poor-r.Good The exterior wall of the cabin is constructed of western yellow pine logs. Existing bark on some of the logs confirms that some of them are Ponderosa pine. The logs making up the first floor are hand4wwn and use a combination of half -dovetail, steeple and square notches to connect,the walls (Flgs.10-14). Although photographic evidence is unclear whether all of the logs are present that existed when the structure was In use, the current sill logs on the north and south elevations are above the level of the iloor)oists. This would suggest that additional logs had been present to support the floor Joists and door frame. However, no evidence of r additional logs has yet been found. The hewn logs were identified as one of the: westem yellow pines. Ponderosa pine (Pins ponderosa). Both the microscopic structure of the wood and remnants of bark were used to Identify the wood spades. tip 1 �• �� l�,hall FIj. 30. FMMMPW a/&mWV. jmw CagW. Example of notching styles from NPS Preservation Brief No. 26 The logs constituting the second story appear to have been added after the Initial construction. They are round and of Irregular taper as opposed to the hand-hewn logs below. These logs were identified as a westem yellow pine. There are various forms of chinking used on the exterior walls. Microscopic examination of wood wedge chinking showed the species to be a westem yellow pine. Wooden pegs penetrate the upper logs at various locations, providing some stability to the second story logs (Fig. 15). 10 1 Moisture content measurements were taken on the logs using a resistance -type meter. Readings were taken near the ends of the logs where moisture could easily move along the end -grain of the log and where deterioration was observed. With the exception of the west wall, no moisture content readings exceeded 20 percent logs on the west elevation near the south wall were found to have moisture contents from 12 to greater than 30 percent. Moisture contents from 20-30 percent indicate areas of concern where sufficient moisture is,present for fungi to be active. Moisture contents above 30 percent are often an indication of advanced decay with internal voids and/or surface deterioration. Based on the moisture readings, the deterioration in the logs and other wood members is the result of past moisture intrusion. With the exception noted on the west elevation, there is insufficient moisture to support active wood decay. Voids in logs, and surface deterioration are the result of past exposure to the elements, a condition exacerbated by the lack of roof covering for several years. Both gable ends located at the site, but not installed on the building, will require some repair to their support structure and to specific wood members making up their construction. East Elevation The logs on the east elevation are, generally, in good condition. They exhibit minor surface deterioration from the combined effects of decay and weathering (Fig. 16), a condition most visible near the north end of logs 1 and 2. The logs have been numbered with one being the lowest log on each elevation. Logs 1-9 are hewn while logs 10 and 11 at the top of the wall are round. Resistance drilling of log 1 revealed that although minor surface deterioration is present, there are no internal voids. Logs 2-9 are weathered but no evidence of decay was found. Logs 10 and 11 have evidence of bark beetle activity, probably present prior to being used in construction of the cabin. Log 11 has significant deterioration due to internal decay extending from the south end to approximately 5' from the north end. The decay has left only approximately 20 percent, remaining cross section. A fruiting body from the wood decay is visible on the exterior of the log (Fig.17). Replacement of this log is recommended. South Elevation The logs on the south elevation are, generally, in good condition. They exhibit minor surface deterioration from the combined effects of decay and weathering. Logs 1-8 . are hewn while logs 9-11 are round. Resistance drilling of log 1 revealed that although minor surface deterioration is present near the east end of the log, there are no internal voids. Logs 2-9 are weathered but no evidence of decay was found. Log 9 as significant deterioration along its length due to decay (Fig. 18). The internal decay has left only approximately 20 percent remaining cross section. Replacement of this log is recommended. l0-11 ? West Elevation The logs on the west elevation are, generally, in good condition. They exhibit minor surface deterioration from the combined effects of decay and weathering, a condition most visible near the north end of logs 1 and 3. Logs 1-8 are hewn while logs 9-11 are round. Log 2 has internal voids near the north end of the log with approximately 50 -70 percent remaining cross-section. The log is in good condition near the south end. Log 2 has a v-notch on the exterior face that does not correspond to any current structural assembly. The reason for the notches is unknown. 11 IF Resistance drilling from the exposed interior wan of the cabin revealed that the interior face of log 2 has decayed, probably due to moisture penetration between the logs and the plaster and lath. Much of the Interior cabin wens are covered with oriented strandboard or plaster and lath (Fig.19). The presence of deterioration on the Interior face of exposed loge on the west and north elevations suggests that other logs have deteriorated on their Interior QxA not visible) faces. This condition likely evolved from lack of roof covering for several years, allowing for moisture intrusion " Into the wan cavity. Log 9 exhibits the initial stages of decay near the south notch. This was the only area of the cabin where the moisture content was sufficient to support active wood decay (Fig. 20). This condition is nkely recent (since the cabin was placed In the courtyard) and the deterioration can be arrested by allowing the wood to dry. North Elevation The logs on the north elevation are, generally, in fair condition. As with the other _ elevations, they exhibit minor surface deterioration from the combined effects of decay and weathering. Logs 1-7 are hand-hewn. Log 8 is hewn but has been placed with the round face exposed. Logs 9 and 10 are round. The second floor Joists are visible between the hewn and round logs and are in fair to good condition. Log 1 exhibits a range of deterkuation and Is a candidate for repair. There is minor Internal deterioration approximately 511Z from the east end of the log. There is decay, both Internal and surface on the log between the location of the windows and extending to the west end of the log. The deterioration. Is most severe below the west window with only 10 percent remaining cross section. The surface deterioration is visible along the length of the log with loss of several Inches of material from the face In several locations. '— Log 2 is severely decayed around the west window. Moving may from the window on either side revealed approximately 75 percent remaining section. Logs 2 and 7 have v-notches on the exterior faces that do not correspond to any current structural assembly. The reason for the notches Is unknown. Log 3 has an Internal void at the west notch but approximately 90 percent of the cross section remains. Similarly, log 4 has a small void 33" east of the west window with approximately 80 percent remaining cross section. Log 5 has internal deterioration between the windows with a minimum section of approximately 20 percent remaining. Log 6 has considerable twist on the section between the windows. Treatment Recommendation: Repair with epoxy or replace deteriorated logs or sections of logs as needed per assessment Replacement logs should match existing in size, species and tooling. Elevation Log Dimensions Re aldRe lace East 1 12-140 x 7'3" hewn Epoxy repair of 3'6" East 2 12-14" x 713" hewn Epoxy repair of 3'6" East 5 12-140 x 3' Epoxy reit East 6 12-14' x 3' Epoxy repair East 11 10" x 16'9" round Replace entire log South 1 14" x 8'6" hewn E xy repair of 2' South 9 10" x 25' round - Replace entire log r 12 West 1 11" x 25' (hewn) Replace with lap joint or epoxy repair of 4' West 2 12" x 25' hewn Re lace T6' of log West 3 120 x 25' (hewn) Replace with lap joint or epoxy repair of 4' North 1 14" x 25' hewn Replace entire log North 2 12' x 25' (hewn) Replace with lap joints 4' of 109 North 3 120 x 4' (hewn) Replace with lap joints or epoxy repair of 1'6" North 4 12" x 4' (hewn) Replace entire 4' of log or epoxy repair of 3' North 5 17 x 13' hewn Re lace entire109 NIS Sill Logs I x 26 (hewn) Replace missing sill logs on south and north elevation Subtotal Cost of Repairs: Per above table Penetrating Epoxy Sealer and Laminating Epoxy Replace gable end support and repair both gables Subtotal Exterior Finishes Existing Conditions: Poor The gaps between the logs are generally filled with various wood chinking', which is then covered with various daubing mixes (Fig. 21). A majority of the chinking remains and consists of strips and blocks of wood material. The daubing has obviously been repaired a number of times as numerous mixes were found, most of which were of a mortar like appearance (ie. lime and send), but very $mail amounts of mud daubing were also present This variation In daubing material Is consistent with historic maintenance techniques in which the daubing would require periodic repair and/or replacement A number of daubing samples were taken from the building for analysis and replication at the Architectural Preservation Institute labs. Treatment Recommendation: After repair and replacement of deteriorated logs and straightening of walls Is complete, chinking and daubing should be repaired and replaced as necessary. Loose daubing should be removed, and missing chinking should be replaced with similar material of same shape and wood species. After gaps are filled with oinking, new daubing mix, based on the recipe provided below, should be applied. Examination of the building Indicates that the majority, if not all, daubing will require replacement to ensure all the material has good adhesion to the logs. The daubing "recipe" is based on information obtained by the Architectural Preservation Institute by conducting a gravimetric mortar mix. The samples were crushed then subjected to an approximately 12% solution of hydrochloric acid in order to dissolve any lime (calcium carbonate) binder. After the binder (lime) was ' Chinking - wood strips, planks, or other material placed between logs. 2 Daubing - mortar or plaster -like material placed over chinking. Provides a protection from air and moisture infiltration between logs. 13 I M dissolved by the add the fines were filtered out through a paper fitter. The remaining aggregate materials was then dded,and weighed. Daubing Recipe: 6 parts sand (LaFarge Ridge Pit, East Fort Collins) 4 parts lime 1 part federal cement Daubing to be applied based on information provided In the National Park Service's Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Included in this report. Examples of chinking and daubing techniques from NPS Preservation Brief No. 26 Cost of Repairs: Replace missing chinking Replace missing daubing • Exterior Masonry Existing Conditions: None Historic photographs, c.1988, (Fig. 22 &.9) indicate that the cabin had a brick chimney extending from the roof through the second story floor (Fig. 9), but none show the area on the first story where the chimney would have penetrated from the second story. The chimney may have extended through the first floor to some kind of stone foundation below the cabin, or have sat on a wooden shelf, current evidence is unclear. As there is no indication in the interior that there was a fireplace, this chimney most likely provided venting for a wood stove. Inspection of the floor at this location was not possible due to debris. None of the original brick material remains. Treatment Recommendation: The historic photos dearly show the design of the original chimney and that it extended through the second story space and floor. This element should be reconstructed as It provides a significant detail to both the exterior and Interior of the structure. 14 M 1...1 lo The second story floor has a square cutout indicating that the chimney penetrated down to the first floor. As stated before, the chimney either extended through the first floor to a stone foundation orwas supported by a wooden shelf. Since there is not adequate evidence of either detail, a decision will need to be made as to which detail to use. A stove appropriate to the period of interpretation (1920's) could be installed, with venting provided by the reconstructed chimney. Cost of Repairs: Reconstruct 29 h, 18• x 180 brick chimney with flue Install new wood burning stove • Exterior Windows, Doors, Hardware, and Trim Existing Conditions & Treatment Recommendations: All the windows appear to have been four -paned (four over four), double -hung, sash windows. There are six (6) window openings in all, two on both the north and south . elevations and one In either gable end, and two exterior doors, one on each of the east and south elevations. The door And window trim consists of 10 thick boards, generally In fair to poor condition. Most of the trim is weathered and warped. Some material is missing. A sample of the window trim was Identified as white pine. There are a number of window sashes located inside the building which are more than likely the original window material (Fig. 31). What little evidence of paint exists indicates that the exterior trim was painted white at one time. The door on the east elevation has warped trim on the south side (Figure 29 a & b). The trim on the north side of the Jamb has minor deterioration. The sill has deteriorated and needs replacement. The windows on the south elevation have broken and warped sills with minor deterioration due to decay. Some of the side trim is missing. The left hand window #1 (Fig. 23) on the south elevation has been covered on the interior with lath and plaster. The right hand window on the north elevation has a decayed sill and supporting log (Fig. 26). The top plate is missing. The east window on the north elevation is out of plumb. Window1nonr Cnndifinns and Tranfmanf rnr,ie. Element Cond Comments Treatment Window #1 Poor • opening has been . Remove lath and (Fig. 23) covered from the Interior plaster. with lath and plaster. • Reglaze, repair, paint • no remaining window and reinstall window material or trim. sashes located In east • trim on Both sides is room. missing • Replace missing trim • sill Is deteriorated due to and sill. funual deca Window #2 Poor • upper and lower sashes • re -glaze and paint (Fig. 24) are in place existing sashes • glazing and paint are In • repair window stops, poor condition eta as needed. • sill and upper framing • replace missing trim trim Is missing. and sill. 15 _ 1 4 , Window #3 Poor a upper sash In place. • strelghten opening and (Fig. 25) • glazing, glass and paint hams as part of are missing or in poor sbueWrd work. condition. • Instal new glass, re- • frame and operiirp are gins and paint existing skewed. sash. • trim In ptaoe, but Vw NN • wgius, mW a Is somewhat decayed. needed, and reInslaN existing sash In east - room. • repair decayed area of all with epoxy. • replace any trim damaged during stralghtenina Process. Window #4 Poor . upper and lower sashes a roylaze, repair as (�9• 26) missing. needed, and reinstall • upper trim and A missing. existing sash in east • lower ends of skis trim memo • replace upper trim and show signs of decay. $10 • repair iowaf ends of side trim with Window #6 Poor . upper and lower sashes • re glaze, repair as (Fig. 27) are not currently Installed needed, and reinstall In either gable and. existing sash in east room Window #6 Poor . upper and lower sashes • re -glaze, repair as (Fig. 27) are not currently installed needed. and reinstall In either9" end existing sash In east room Door #1 Good Door is in good condkkxn, Sand, prime, and paint S. Elev. but has No paint door white (based on (Fig. 28 remaining and Is missing all samples removed f om a & b) hardware except one set of dmo Replace missing hinges. Jamb and trim Is In hardware Including hinge, place, but some pieces are deadbolt, and riniock. warped. Replace warped jamb and Ulm pieces and paint Door #2 Good Door Is in good condition, Sand, prime, and paint E. Elev. but has little paint door white (based on (Fig. 29 remaining and Is missing samples removed from a & b) deadbok hardware and door. Replace missing requires reinstallation of deadbok hardware. dmiock. Left side trim Is Replace warped and damaged and warped. The missing trim and threshold Is missing and threshold. Paint all trim elements of the upper trim white. Refurbish existing are damaned or missing. wood frame screen door. Screen Poor Screen missing, and wood Repair broken elements Door frame In very poor and rescreen. (Fig. 30) condition including broken elements. Miser Trim Remove, number, store existing trim during repairs Subtotal 16 Hardware: Included in door and window descriptions Trim: Included in door and window descriptions • Exterior Appendages -Porch, Stoop, Portico, Etc. - There are no exterior appendages on the structure. 3.5 Building Envelope -Roofing and Waterproofing • Roofing Systems Existing Conditions: None As stated above, the roof, except for the gable ends is no longer Installed. However, according to available photos (c. 1988), the roof framing system consisted of milled 2x4 rafters with collar beams. Other photos (Fig. 32a) show sheathing consisting of wood planks of various widths with random width gaps between. The roofing material was corrugated galvanized steel similar to the Strongbam material available today (Fig. 32b). The roof pitch is approximateiy 6:12. Treatment Recommendation: Reconstruct the roof framing system using salvaged lumber located in the east room, if possible. Provide new wood 1" thick plank sheathing and roofing material. Replacement sheathing should resemble the plank sheathing shown In photo documentation. Strongbam corrugated galvanized steel roofing with a metal ridge cap can be used to replicate the roofing shown In the photo documentation. This material Is available from Hutchison Western located at 7460 Highway 85, Commerce City, CO. An alternate roofing material would be treated cedar shingle. Although the photo documentation available does not Indicate the structure had cedar shingles, other Information such as oral histories may be able to provide that information. Cost of Repairs: Install plank sheathing Install Strongbam roofing (1 1/4", 29 ga, 26" wide) Install ridge cap or Install cedar shingles Install ridge cap • Sheet Metal Flashing Existing Conditions: None There is not remaining roofing system and historic photos do not show any metal flashing. Treatment Recommendation: Flashing should be applied at masonry chimney penetration. Cost of Repairs: Install flashing at chimney penetration Drainage System, Gutters and Downspouts Existing Conditions: None According to the available photos (c. 1988) the building did not have a gutter system. 17 Treatment Recommendation: As the building probably did not have a gutter system, one should not be installed. If at a later date the Fort Collins Museum finds that one is necessary due to excessive water run -Off from the roof accelerating decay of the building. a rounded. galvanized steel gutter system would be most appropriate. -- Cost of Repairs: $0 3.6 Interior Finishes • Wall Finish Material -1st Floor Existing Conditions: Poor The Interior walls are finished in lath and plaster, with the stair well wails being _ constructed of tongue & groove wood planking. The plaster waft are in serious disrepair due to exposure to moisture and the moving of the cabin (Na. 33-39). The wood plank wails are in fair condition. These walls have remains of multiple layers of wallpaper with paint below, of of which Is In poor condition (Fig. 40-52). Historic Photos (o. 1988) (Fig. 53 & 54) iodic ate that the plaster wells also had wallpaper applied. Samples were taken of the plaster material for analysis in the Architectural Preservation Institute lab. -- Treatment Recommendation: Due to the extensive damage to the lath and plaster, new lath and plaster is required. Plaster should consist of a gypsum plaster with horsehair in the mixture, df.possibie, r to replicate existing. Wallpaper should be. reapplied throughout the first floor that either replicates the paper determined to coincide with the 1920's era, or be one chosen which closely resembles it. Some existing wallpaper shouid,remakr In place (possibly with a glass cover), to show visitors the many layers of paper applied to the interior over the years. Install new wood base board throughout 1st floor. Wall Finish Material - 2nd Floor Existing Conditions: None The c.1988 photos do not indicate any Interior wall finishes on the 2nd floor (Fig. 55) Treatment Recommendation: None, leave second story with no interior finishes. Cost of Repairs: Apply new wood lath Apply new gypsum plaster Replication wallpaper (east room) Replication wallpaper (west room) .- Install new wood base board 18 • Calling Finish Materials -1 at floor Existing Conditions: None There are currently no finish materials on the ceiling, only the exposed second floor Joists and second floor wood subfloodng material. Historic photos (c. 1988) show, that at that time, the ceiling consisted pf a finished ceiling (most likely lath and plaster), painted or papered in a light color (Fig. 56). Treatment Recommendation: Reinstall lath and plaster ceiling per the historic photos and apply paint or wall paper of a light color or one matching paint samples removed from other interior elements. Cost of Repairs: Apply new wood lath Apply new gypsum plaster Paint ceiling Paper ceiling Flooring Material Existing Conditions: Poor First Floor. The wearing surface of the floor in the east room is 314- thick tongue -and -groove flooring, 3" wide (Fig. 57). Flooring (which may have been subfloodng) in the west room varies in width. Much of the flooring was inaccessible due to storage of lumber from the cabin on the first floor but what was visible showed signs of weathering and minor splitting due to exposure to the elements over time. Moisture content readings on the wood joists and flooring were less than 20 percent. A small amount of jute backed linoleum was found at the 1st floor stalr landing. This linoleum may have covered the west room also, yet none of the material currently remains (Fig. 58). Second Floor. The wearing surface consists of nominal V thick lumber laid perpendicular to the Joists (Fig. 59). The wearing surface also serves as the sub -floor. There Is currently no subfloor. The floorboards exhibit considerable warp due to prolonged exposure to the elements and will need replacement should the second floor be made accessible to the public. Treatment Recommendation: Repair flooring in east room as needed. Reinstall wood flooring in west room, similar to east room flooring, or install linoleum (pricing is based on installing new wood floor as costs for replicating linoleum were not available and extent of original linoleum Installation unknown). Install new wood subfloor and wearing surface flooring on second story. W61 SECTION 00300 BID FORM �P • Interior Doors, Windows, Hardware and Trim Existing Conditions & Treatment Recommendations: Efsment Cond Comments Treatment Cost Window #1 Poor • No trim • Remove lath & plater. Included • Covered In lath & piaster . Install trim. In exterior • Paint. window costs Window #2 Good . Trim in good condition. . Paint. Window #3 Good • Trim in good condition. . Paint. Window #4 Poor . Missing aide and bottom • Replace missing trim trim & sit and sill. • Paint. WUxlow #5 Poor • AN trim In very poor, . Replace trim. warped condition. • Paint. Window #6 Poor • An trim In very poor, • Replace trim. warped condition. • Paint. Door #3 Good . Door Is no longer • Repair and paint (Fig. 60) Installed. However, existing doors. there are two doors . Replace and paint lying on the it= of the missing jambs and trim. let floor west room . Paint door and trim - which may be the paint should match original doors. Benjamin Moore • Jambs and trim casing Sherwood green (HC- are missing or severely i 18) per samples damaged } removed from Interior trim. Door #4 Poor . Door Is no longer • Repair and paint (Fig. 60) ' Installed. However, existing doors. there are two doors • Replace and paint lying on the floor of the . missing jambs and trim. 1st floor west room • Paint door and trim - which may be the should match original re. aoo gamin Moore • Jambs and trim casing Sherwood green (HC- are missing or severely 118) per samples damaged. removed from Interior trim. • Stairs Existing Conditions: Poor The existing box stairs are in very poor condition with broken or damaged risers; treads and strings (Fig. 61). Photos (c. 1988) show a railing at the top of stairs on 2nd story which is now missing (Fig. 62). Treatment Recommendation: Reconstruct stairs and railing using like material. Paint stairs and stairwell walls Benjamin Moore Sherwood green (HC-118) per samples removed from Interior trim. 20 V Cost of Repairs: Reconstruct stair (box stair, 1 flight) Paint stairs and walls Reconstruct railing 3.7 Mechanical Systems • Heating - None existing, none to be Installed., • Ventilation - None existing, none to be installed. • Water Service and Sewer Utilities - None existing, none to be installed. • Fire SuppressionSprinklers Existing Conditions: None There is not an existing fire suppression or alarm system. Treatment Recommendation: None planned. Cost of Repairs: $0 3.8 Electrical Systems • Electrical Service and Panels Existing Conditions: None Porcelain knobs and cloth -covered wiring on the exterior of the cabin, wiring for overhead lighting In both the east and west 1st floor rooms, and an electric fuse switch Just inside the east exterior door Indicate that the cabin had electricity before being relocated in 1988. Historic (c. 1988) photos also show bare bulb ceiling fixtures (Fig. 53. 54 & 56). Treatment Recommendation: Provide underground electrical service to the cabin following current life -safety electrical codes. Assume existing electrical panel will service the cabin. Maintain the historic electrical elements on the exterior of the cabin for Interpretive purposes. Cost of Repairs: Underground electrical line to cabin (based on cost of previous work at F.C: Museum) • Electrical Distribution System Existing Conditions: Poor There is no visible sign of electrical outlets In the cabin, however, overhead lighting was available in the west and east rooms. Treatment Recommendation: Provide upgraded electrical wiring to meet life -safety needs. Provide one outlet in each room in order to facilitate maintenance of the cabin. Cost of Repairs: Wiring for outlets and lighting 21 • Ughting Existing Conditions: Existing wiring and a 1988 photos indicate the west and east rooms had single, bare - Treatment fixtures hanging from cloth covered wire in the center of each room, Treatment Recommendation: Replace existing fixtures with new replication fixtures using ell wiring meeting current life -safety code requirements. Cloth cord, single, bare -bulb fixtures are available from Rejuvenation Lamp anC Fixture Co. (Burnside model available at rejuvenation.com)----___-.-- -- Cost of Repair. Two replication fixtures Fire Detection System Existing Conditions: None -- There Is no existing fire suppression or alarm system. Treatment Recommendation: s Install a fire alarm system based on systems installed in other cabins on the site. Cost of Repairs: Install fire alarm system (cost based on previously installed systems) — • Security Alarm System Existing Conditions: None Currently the F.C. Museum does not have a security alarm system on any of the cabin structures in the courtyard. The only security used are locks. The entire courthard, however, is surrounded by a tall, wrought Iron fence with locked gates, Treatment Recommendation: No security alarm system to be installed. Lock hardware Is planned for in the doortwindow, section. Cost of Repairs: $0 4.0 Analysis and Compliance 4.1 Hazardous Materials Existing Conditions: Three samples of paint removed from the cabin (exterior trim, Interior trim, and interior paneling) all tested positive for lead using the Lead Check Household Lead Test Kit manufactured by Homax.Products, Inc. y y The cabin also has sheets of oriented strand board, lumber which may be the original rafters, and other Treatment Recommendation: Collect paint chips removed from trim and dispose of per local guidelines. '- 4.2 Building Code Compliance ` The City of Fort Collins considers the cabins maintained by the F.C. Museum to be 'artifacts' and does not require compliancewith the Universal Building Code. However, ^ life -safety measures for structural stability, electrical system, etc. should be met. 22 4.3 Zoning Code Compliance -WA 4.4 Accessibility Compliance Provide concrete ramp to east entrance for H/C accessibility. This ramp can also be used as the general path to cabin. Provkllng access to second floor is not possible without extensive changes to the historic layout of the cabin. Cost of Repairs: Install concrete ramp (3' wide) 4.5 Existing Materials Analysis Analysis of existing materials is discussed as needed in previous sections. 5.0 Preservation Plan 5.1 Prioritized Work (Critical -Minor) 1. Exterior wall Construction & Structural System 2. Roof Framing & Rooflng Systems 3. Foundation System 4. Perimeter Foundation Drainage 5. Exterior Finishes 6. Exterior Windows, Doors, Hardware, and Trim 7. Interior Doors, Windows, Hardware and Trim 8. Fire Detection System 9. Stairs 10. Electrical Service and Panels 11. Electrical Distribution System 12. Lighting 13. Flooring Material 14. Wall Finish Material -1 st Floor 15. Ceiling Finish Materials -1st floor 16. Exterior Masonry (Chimney) 5.2 Phasing Plan The Fort Collins Museum plans to conduct all work in one phase. Preliminary sequence of events: • Remove floor system from 1 st floor. • Grind concrete. • Set cabin on slab. Support east and west walls on two pressure treated 2x8's and flashing. Crib south and north walls. - Manufacture and install two new sill logs on north and south wall on pressure' treated 2 x 12 with flashing. Notch for floor system. • Install 1 at floor joists. • Replace and repair logs as needed per table on pages 12 & 13. • Remove round logs as needed. Remove upper floor system. • Install new 2nd floor joists and subfloor. • Install new S9 & E11 logs, reinstall sound logs. • Install gables. • install ridge, rafters and skip deck. • - install roofing material. • Install 1 st floor subfloor. Stabilize interior wails, stairs, etc. • Repair windows and doors. • Reinstall finish floor on 1st floor. • Reinstall trim and apply finishes. 23 No Text Preservation Brief 9: The Repair of Historic Wooden Windows Page 1 of 11 Preservation Brills Technical Preservation Services The Repair of Historic Wooden Windows John H. Myers >>Architectural or Historical Si nificance »Physical Evaluation *Repair Class I: Routine Maintenance »Repair Class II: Stabilization »Repair Class III: Splices and Parts Replacement »Weatherization >>Window Replacement >>Conclusion >>Additional Readies National Park Service The windows on many historic buildings are an important aspect of the architectural character of those buildings. Their design, craftsmanship, or other qualities may make them worthy of preservation. This is self-evident for ornamental windows, but it can be equally true for warehouses or factories where the windows may be the most dominant visual element of an otherwise plain building. Evaluating the significance of these windows and planning for their repair or replacement can be a complex process involving both objective and subjective considerations. The Secretary of the Interior's Standards for Rehabilitation and the accompanying guidelines, call for respecting the significance of original materials and features, repairing and retaining them wherever possible, and when necessary, replacing them in kind. This Brief is based on the issues of significance and repair which are implicit in the standards, but the primary emphasis is on the technical issues of planning for the repair of windows including evaluation of their physical condition, techniques of repair, and design considerations when replacement is necessary. Much of the technical section presents repair techniques as an instructional guide for the do-it-yourselfer. The information will be useful, however, for the architect, contractor, or developer on large-scale projects. It presents a methodology for approaching the evaluation and repair of existing windows, and considerations for replacement, from which the professional can develop alternatives and specify appropriate materials and procedures. Architectural or Historical Significance Evaluating the architectural or historical significance of windows is the first step in planning for window treatments, and a general understanding of the function and history of windows is vital to making a proper evaluation. As a part of this evaluation, one must httn-Hwww2_cr nns onv/tn.c/hriefc/hriefll9 him ................. zran/Inm Preservation Brief 9: The Repair of Historic Wooden Windows Page 2 of 11 consider four basic window. functions: admitting light to the interior spaces, providing fresh air and ventilation to the interior, providing a visual link to the outside world, and enhancing the appearance of a building. No single factor can be disregarded when planning window treatments; for example, attempting to conserve energy by closing up or reducing the size of window openings may result in the use of more energy by increasing electric lighting loads and decreasing passive solar heat -gains. especially on simple facades such as this mill building. Replacement of the multi -pane windows with larger panes could dramatically alter the appearance of the building. Photo: NPS files. element. Historically, the first windows in early American houses were casement windows; that is, they were hinged at the side and opened outward. In the beginning of the eighteenth century single - and double -hung windows were introduced. Subsequently many styles of these vertical sliding sash windows have come to be associated with specific building periods or architectural styles, and this is an important - consideration in determining the significance of windows, especially on a local or regional basis. Site -specific, regionally oriented architectural comparisons should be made to determine the significance of windows in question. Although such comparisons may focus on specific window types and their details, the ultimate determination of significance should be made within the context of the whole building, wherein the windows are one architectural After all of the factors have been evaluated, windows should be considered significant to a building if they: 1) are original, 2) reflect the original design intent , for the building, 3) reflect period or regional styles or building practices, 4) reflect changes to the building resulting from major periods or events, or 5) are examples of exceptional craftsmanship or design. Once this evaluation of significance has been completed, it is possible to proceed with planning appropriate treatments, beginning with an investigation of the physical condition of the windows. Physical Evaluation The key to successful planning for window treatments is a careful evaluation of existing physical conditions on a unit -by -unit basis. A graphic or photographic system may be devised to record existing conditions and illustrate the scope of any necessary repairs. Another effective tool is a window schedule which lists all of the parts of each window unit. Spaces by each part allow notes on existing conditions and repair instructions. When such a schedule is completed, it indicates the precise tasks to be performed in the repair of each unit and becomes a part of the specifications. In any evaluation, one should note at a minimum: e 1) window location e 2) condition of the paint e 3) condition of the frame and sill e 4) condition of the sash (rails, stiles and muntins) 5) glazing problems ht.trr//www? cr nns.lsnv/tn-/hrief.�/hriefll9.htm 3/10/2003 Preservation Brief 9: The Repair of Historic Wooden Windows Page 3 of I I e 6) hardware, and 7) the overall condition of the window (excellent, fair, poor, and so forth) Many factors such as poor design, moisture, vandalism, insect attack, and lack of maintenance can contribute to window deterioration, but moisture is the primary contributing factor in wooden window decay. All window units should be inspected to see if water is entering around the edges of the fr�:me and, if so, the joints or seams should be caulked to eliminate this danger. The glazing putty should be checked for cracked, loose, or missing sections which allow water to saturate the wood, especially at the joints. The back putty on the interior side of the pane should also be inspected, because it creates a seal which prevents condensation from running down into the joinery. The sill should be examined to insure that it slopes downward away from the building and allows water to drain off. In addition, it may be advisable to cut a dripline along the underside of the sill. This almost invisible treatment will insure proper water runoff, particularly if the bottom of the sill is flat. Any conditions, including poor original design, which permit water to come in contact wit'i the wood or to puddle on the sill must be corrected as they contribute to deteriorat on of the window. One clue to the location of areas of excessive moisture is the condition of the paint; therefore, each window should be examined for areas of paint failure. Since excessive moisture is detrimental to the paint bond, areas of paint blistering, cracking, flaking, and peeling usually identify points of water penetration, moisture saturation, and potential deterioration. Failure of the paint should not, however, be mistakenly interpreted as a sign that the wood is in poor condition and hence, irreparable. Wood is frequently in sound physical condition beneath unsightly paint. After noting areas of paint failure, the next step is to inspect the condition of the wood, particularly at the points identified during the paint examination. ,eterioration of poorly maintained windows usually f ;ins on horizontal surfaces and at Joints, where %- er can collect and saturate the wood. Photo: t ?S files. Each window should be examined for operational soundness beginning with the lower portions of the frame and sash. Exterior rainwater and interior condensation can flow downward along the window, entering and collectii,e at points where the flow is blocked. The sill, joints between the sill and jamb, orners of the bottom rails and muntin joints are typical points where water collect; and deterioration begins. The operation of the window (continuous opening and c:osing over the years and seasonal temperature changes) weakens the joints, causing , iovement and slight separation. This process makes the joints more vulnerable to rater which is readily absorbed into the endgrain of the wood. If severe deterioration ex!sts in these areas, it will usually be apparent on visual inspection, but other less severely deteriorated areas of the wood may be tested by two traditional methods using a call ice pick. An ice pick or an awl may be used to test wood for soundness. The technique is simply to jab the pick into a wetted wood surface at an arg!e and pry up a small section of the wood. Sound wood will separate in long fibrous sp' .ters, but decayed wood will lift up in short irregular pieces due to the breakdown of f'l er strength. Another method of testing for soundness consists of pushing a sharp object into the wood, perpendicular to the surface. If deterioration : as begun from the hidden side of a http://www2.cr.nps.gov/tpsibriefs/briefO9.htm 3/30/2003 Preservation Brief 9: The Repair of Historic Wooden Windows i i Page 4 of 11 member and the core is badly decayed, the visible surface may appear to be sound wood. Pressure on the probe can force it through an apparently sound skin to penetrate deeply into decayed wood. This technique is especially useful for checking sills where visual access to the underside is restricted. Following the inspection and analysis of the results, the scope of the necessary repairs will be evident and a plan for the rehabilitation can be formulated. Generally the actions necessary to return a window to "like new" condition will fall into three broad categories: 1) routine maintenance procedures, 2) structural stabilization, and 3) parts replacement. These categories will be discussed in the following sections and will be referred to respectively as Repair Class I, Repair Class II, and Repair Class III. Each successive repair class represents an increasing level of difficulty, expense, and work time. Note that most of the points mentioned in Repair Class I are routine 2 maintenance items and should be provided in a regular maintenance program for any building. The neglect of these routine items can contribute to many common window problems. Before undertaking any of the repairs mentioned in the following sections all sources of moisture penetration should be identified and eliminated, and all existing decay fungi destroyed in order to arrest the deterioration process. Many commercially available fungicides and wood preservatives are toxic, so it is extremely important to follow the manufacturer's recommendations for application, and store all chemical materials away from children and animals: After fungicidal and preservative treatment the windows may be stabilized, retained, and restored with every expectation for a long service life. Repair Class I: Routine Maintenance Repairs to wooden windows are usually labor intensive and relatively uncomplicated. On small scale projects this allows the do-it-yourselfer to save money by repairing all or part of the windows. On larger projects it presents the opportunity for time and money which might otherwise be spent on the removal and replacement of existing windows, to be spent on repairs, subsequently saving all or part of the material cost of new window units. Regardless of the actual costs, or who performs the work, the evaluation process described earlier will provide the knowledge from which to specify an appropriate work program, establish the work element priorities, and identify the level of skill needed by the labor force. The routine maintenance required has many layers of paint, soma to upgrade a window to "like new" cracked and missing putty, slight separation at the Joints, broken sash condition normally includes the cords, and one cracked pane. Photo: following steps: 1) some degree NPS files. of interior and exterior paint removal, 2) removal and repair of sash (including reglazing where necessary), 3) repairs to the frame, 4) weatherstripping and reinstallation of the sash, and S) repainting. These operations are illustrated for a typical double -hung wooden window, but they may be adapted to other window types and styles as applicable. httn'//www7 (-.r nns.vnv/tn.q/hriefs/hriefT)9.htm 3/30/2003 Preservation brief 9: '1 he Repair of Historic Wooden Windows Page ) of i t Historic windows have usually acquired many layers of paint over time. Removal of excess layers or peeling and flaking paint will facilitate operation of the window and restore the clarity of the original detailing. Some degree of paint removal is also necessary as a first step in the proper surface preparation for subsequent refinishing (if paint color analysis is desired, it should be conducted prior to the onset of the paint removal). There are several safe and effective techniques for removing paint from wood, depending on the amount of paint to be removed. r Paint removal should I begin on the interior „- y frames, being careful After removing paint from the to remove the paint seam between the interior stop from the interior stop and the jamb, the stop can be pried out and gradually worked and the parting bead, loose using a pair of putty particularly althe knives as shown. Photo: NPS p yon g files. seam where these stops meet the jamb. This can be accomplished by running a utility knife along the length of the seam, breaking Sash can be removed and repaired in a convenient the paint bond. It will then be much easier to work area. Paint is being removed from this sash with remove the stop, the parting bead and the a hot air gun. Photo: NPS files. sash. The interior stop may be initially loosened from the sash side to avoid visible scarring of the wood and then gradually pried loose using a pair of putty knives, working up and down the stop in small increments. With the stop removed, the lower or interior sash may be withdrawn. The sash cords should be detached from the sides of the sash and their ends may be pinned with a nail or tied in a knot to prevent them from falling into the weight pocket. Removal of the upper sash on double -hung units is similar but the parting bead which holds it in place is set into a groove in the center of the stile and is thinner and more delicate than the interior stop. After removing any paint along the seam, the parting bead should be carefully pried out and worked free in the same manner as the interior stop. The upper sash can be removed in the same manner as the lower one and both sash taken to a convenient work area (in order to remove the sash the interior stop and parting bead need only be removed from one side of the window). Window openings can be covered with polyethylene sheets or plywood sheathing while the sash are out for repair. The sash can be stripped of paint using appropriate techniques, but if any heat treatment is used, the glass should be removed or protected from the sudden temperature change which can cause breakage. An overlay of aluminum foil on gypsum board or asbestos can protect the glass from such rapid temperature change. It is important to protect the glass because it may be historic and often adds character to the window. Deteriorated putty should be removed manually, taking care not to damage the wood along the rabbet. If the glass is to be removed, the glazing points which hold the glass in place can be extracted and the panes numbered and removed for cleaning and reuse in the same openings. With the glass panes out, the remaining putty can be removed and the sash can be sanded, patched, and primed with a preservative primer. Hardened putty in the rabbets may be softened by heating with a soldering iron at the point of removal. Putty remaining on the glass may be softened by soaking the panes in linseed oil, and then removed with less risk of breaking the glass. Before reinstalling the glass, a bead of glazing compound or linseed oil putty should be laid around the rabbet http://www2.cr.nps.gov/tps/briefs/br-ief09.htm 3/30/2003 SECTION 00300 PROJECT: RESTORATION OF FRANZ-SMITH CABIN; Bid No. 5787 Place Date: May 29th 2003 In compliance with your Invitation to Bid dated April 18'b 2003 and subject to all conditions thereof, the undersigned Empire Carnentry a Limited Liability Company authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of $90,000.00 in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Western Surety Company, South Dakota 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. The undersigned Bidder hereby acknowledges receipt of Addenda No. I through 3. CONTRACTOR: Empire Carpentry LLC BY: Kevin Murray Signature Tito Manager ADDRESS: PO Box 245 Bellvue, Colorado 80512 7l96 Section 00300 Page 1 Preservation Brief 9: The Repair of Historic Wooden Windows Page 6 of 11 f to cushion and seal the glass. Glazing compound should only be used on wood which has been brushed with linseed oil and primed with an oil based primer or paint. The pane is then pressed into place and the glazing points are pushed into the wood around the perimeter of the pane. The final glazing compound or putty is applied and beveled to complete the seal. The sash can be refinished as desired on the inside and painted on the outside as soon as a "skin" has formed on the putty, usually in 2 or 3 days. Exterior paint should cover the beveled glazing compound or putty and lap over onto the glass slightly to complete a weather -tight seal. After the proper curing times have elapsed for paint and putty, the sash will be ready for reinstallation. While the sash are out of the frame, the condition of the wood -in the jamb and sill can be evaluated. Repair and refinishing of the frame may proceed concurrently with repairs to the sash, taking advantage of the curing times for the paints and putty used on the sash. One of the most common work items is the replacement of the sash cords with new rope cords or with chains. The weight pocket is frequently accessible through a door on the face of the frame near the sill, but if no door exists, the trim on the interior face may be removed for access. Sash weights may be increased for easier window operation by elderly or handicapped persons. Additional repairs to the frame and sash may include consolidation or replacement of deteriorated wood. Techniques for these repairs are discussed in the following sections. The operations just discussed summarize the efforts necessary to restore a window with minor deterioration to "like new" condition. The techniques can be applied by an unskilled person with minimal training and experience. To demonstrate the practicality of this approach, and photograph it, a Technical Preservation Services staff member repaired a wooden double -hung, two over two window which had been in service over ninety years. The wood was structurally sound but the window had one broken pane, many layers of paint, broken sash cords and inadequate, worn-out weatherstripping. The staff member found that the frame could be stripped of paint and the sash removed quite easily. Paint, putty and glass removal required about one hour for each sash, and the reglazing of both sash was accomplished in about one hour. Weatherstripping of the sash and frame, Following the relatively replacement of the sash cords and reinstallation of the sash, rertightthe simpleIs likeno in is weatheKight, like new in parting bead, and stop required an hour and a half. These times appearance, and refer only to individual operations; the entire process took several serviceable for many years days due to the drying and curing times for putty, primer, and to come.Photo: NPS files. paint, however, work on other window units could have been in progress during these lag times. i 0 Repair Class II: Stabilization The preceding description of a window repair job focused on a unit which was operationally sound. Many windows will show some additional degree of physical deterioration, especially in the vulnerable areas mentioned earlier, but even badly damaged windows can be repaired using simple processes. Partially decayed wood can _ be waterproofed, patched, built-up, or consolidated and then painted to achieve a sound condition, good appearance, and greatly extended life. Three techniques for repairing http://www2.cr.nps.gov/tpsibriefs/briefO9.htm 3/30/2003 `� Preservation Brief 9: The Repair of Historic Wooden Windows Page / of 11 partially decayed or weathered wood are discussed in this section, and all three can be accomplished using products available at most hardware stores. One established technique for repairing wood which is split, checked or shows signs of rot, is to: 1) dry the wood, 2) treat decayed areas with a fungicide, 3) waterproof with two or three applications of boiled linseed oil (applications every 24 hours), 4) fill cracks and holes with putty, and 5) after a "skin" forms on the putty, paint the surface. Care should be taken with the use of fungicide which is toxic. Follow the manufacturers' directions and use only on areas which will be painted. When using any technique of building up or patching a flat surface, the finished surface should be sloped slightly to carry water away from the window and not allow it to puddle. Caulking of the joints between the sill and the jamb will help reduce further water penetration. When sills or other members exhibit surface weathering they may also be built-up using wood putties or homemade mixtures such as sawdust and resorcinol glue, or whiting and varnish. These mixtures can be built up in successive layers, then sanded, primed, and painted. The same caution about proper slope for flat surfaces applies to this technique. v z - Wood may also be strengthened and stabilized by consolidation, using semirigid epoxies which This illustrates a two-part expoxy patching saturate the porous decayed wood and then compound used fill the surface of a weathered sill andd rebuild the missing edge. harden. The surface of the consolidated wood can When the epoxy cures, it can be sanded smooth then be filled with a semirigid epoxy patching and painted to achieve a durable and waterproof compound, sanded and painted. Epoxy patching repair. Photo: NPS files. compounds can be used to build up missing sections or decayed ends of members. Profiles can be duplicated using hand molds, which are created by pressing a ball of patching compound over a sound section of the profile which has been rubbed with butcher's wax. This can be a very efficient technique where there are many typical repairs to be done. The process has been widely used and proven in marine applications; and proprietary products are available at hardware and marine supply stores. Although epoxy materials may be comparatively expensive, they hold the promise of being among the most durable and long lasting materials available for wood repair. More information on epoxies can be found in the publication "Epoxies for Wood Repairs in Historic Buildings," cited in the bibliography. Any of the three techniques discussed can stabilize and restore the appearance of the window unit. There are times, however, when the degree of deterioration is so advanced that stabilization is impractical, and the only way to retain some of the original fabric is to replace damaged parts. Repair Class III: Splices and Parts Replacement When parts of the frame or sash are so badly deteriorated that they cannot be stabilized there are methods which permit the retention of some of the existing or original fabric. These methods involve replacing the deteriorated parts with new matching pieces, or splicing new wood into existing members. The techniques require more skill and are more expensive than any of the previously discussed alternatives. It is necessary to remove the sash and/or the affected parts of the frame and have a carpenter or http://www2.cr.nps.gov/tps/briefs/briefD9.htm 3/30/2003 Preservation Brief 9: The Repair of Historic Wooden Windows Page 8 of 11 E woodworking mill reproduce the damaged or missing parts. Most millwork firms can '- duplicate parts, such as muntins, bottom rails, or sills, which can then be incorporated into the existing window, but it may be necessary to shop around because there are T several factors controlling the practicality of this approach. Some woodworking mills do not like to repair old sash because nails or other foreign objects in the sash can damage expensive knives (which cost far more than their profits on small repair jobs); others do not have cutting knives to duplicate muntin profiles. Some firms prefer to concentrate _ r on larger jobs with more profit potential, and some may not have a craftsman who can duplicate the parts. A little searching should locate a firm which will do the job, and at a reasonable price. If such a firm does not exist locally, there are firms which undertake this kind of repair and ship nationwide. It is possible, however, for the advanced do-it- yourselfer or craftsman with a table saw to duplicate moulding profiles using techniques discussed by Gordie Whittington in "Simplified Methods for Reproducing Wood Mouldings," Bulletin of the Association for Preservation Technology, Vol. III, No. 4, 1971, or illustrated more recently in The Old House, Time -Life Books, Alexandria, Virginia, 1979. The repairs discussed in this section involve window frames which may be in very deteriorated condition, possibly requiring removal; therefore, caution is in order. The actual construction of wooden -window frames and sash is not complicated. Pegged mortise and tenon units can be disassembled easily, if the units are out of the building. The installation or connection of some frames to the surrounding structure, especially masonry walls, can complicate the work immeasurably, and may even require dismantling of the wall. It may be useful, therefore, to take the following approach to frame repair: 1) conduct regular maintenance of sound frames to achieve the longest life possible, 2) make necessary repairs in place, wherever possible, using stabilization and splicing techniques, and 3) if removal is necessary, thoroughly investigate the -- structural detailing and seek appropriate professional consultation. Another alternative may be considered if parts replacement is required, and that is sash — replacement. If extensive replacement of parts is necessary and the job becomes prohibitively expensive it may be more practical to purchase new sash which can be installed into the existing frames. Such sash are available as exact custom reproductions, reasonable facsimiles (custom windows with similar profiles), and contemporary wooden sash which are similar in appearance. There are companies which still manufacture high quality wooden sash which would duplicate most historic sash. A few calls to local building suppliers may provide a source of appropriate replacement — sash, but if not, check with local historical associations, the state historic preservation office, or preservation related magazines and supply catalogs for information. If a rehabilitation project has a large number of windows such as a commercial building or an industrial complex, there may be less of a problem arriving at a solution. Once the evaluation of the windows is completed and the scope of the work is known, there may be a potential economy of scale. Woodworking mills may 'be interested in the work from a large project; new sash in volume may be considerably less expensive per unit; crews can be assembled and trained on site to perform all of the window repairs; and a few .. extensive repairs can be absorbed (without undue burden) into the total budget for a large number of sound windows. While it may be expensive for the average historic home owner to pay seventy dollars or more for a mill to grind a custom knife to duplicate four or five bad muntins, that cost becomes negligible on large commercial projects which may have several hundred windows. Most windows should not require the extensive repairs discussed in this section. The ones which do are usually in buildings which have been abandoned for long periods or have totally lacked maintenance for years. It is necessary to thoroughly investigate the http://www2.cr.nps.gov/tps/briefs/brief09.htm 3/30/2003 ri cJA;L V d .lull 011Gi, Y. i ilC NIZpall V i rllsturlu VV UVUGii VV IIIUU W J r ase 7 UL 1 1 alternatives for windows which do require extensive repairs to arrive at a solution which retains historic significance and is also economically feasible. Even for projects requiring repairs identified in this section, if the percentage of parts replacement per window is low, or the number of windows requiring repair is small, repair can still be a cost effective solution. Weatherization A window which is repaired should be made as energy efficient as possible by the use of appropriate weatherstripping to reduce air infiltration. A wide variety of products are available to assist in this task. Felt may be fastened to the top, bottom, and meeting rails, but may have the disadvantage of absorbing and holding moisture, particularly at the bottom rail. Rolled vinyl strips may also be tacked into place in appropriate locations to reduce infiltration. Metal strips or new plastic spring strips may be used on the rails and, if space permits, in the channels between the sash and jamb. Weatherstripping is a historic treatment, but old weatherstripping (felt) is not likely to perform very satisfactorily. Appropriate contemporary weatherstripping should be considered an integral part of the repair process for windows. The use of sash locks installed on the meeting rail will insure that the sash are kept tightly closed so that the weatherstripping will function more effectively to reduce infiltration. Although such locks will not always be historically accurate, they will usually be viewed as an acceptable contemporary modification in the interest of improved thermal performance. Many styles of storm windows are available to improve the thermal performance of existing windows. The use of exterior storm windows should be investigated whenever feasible because they are thermally efficient, cost-effective, reversible, and allow the retention of original windows (see "Preservation Briefs: 3"). Storm window frames may be made of wood, aluminum, vinyl, or plastic; however, the use of unfinished aluminum storms should be avoided. The visual impact of storms may be minimized by selecting colors which match existing trim color. Arched top storms are available for windows with special shapes. Although interior storm windows appear to offer an attractive option for achieving double glazing with minimal visual impact, the potential for damaging condensation problems must be addressed. Moisture which becomes trapped between the layers of glazing can condense on the colder, outer prime window, potentially leading to deterioration. The correct approach to using interior storms is to create a seal on the interior storm while allowing some ventilation around the prime window. In actual practice, the creation of such a durable, airtight seal is difficult. Window Replacement Although the retention of original or existing windows is always desirable and this Brief is intended to encourage that goal, there is a point when the condition of a window may clearly indicate replacement. The decision process for selecting replacement windows should not begin with a survey of contemporary window products which are available as replacements, but should begin with a look at the windows which are being replaced. Attempt to understand the contribution of the window(s) to the appearance of the facade including: 1) the pattern of the openings and their size; 2) proportions of the frame and sash; 3) configuration of window panes; 4) muntin profiles; 5) type of wood; 6) paint color; 7) characteristics of the glass; and 8) associated details such as arched tops, hoods, or other decorative elements. Develop an understanding of how the window http://www2.cr.nps.gov/tps/briefsfbriefO9.htm 3/30/2003 F(a Preservation Brief 9: The Repair of Historic Wooden Windows Page 10 of 11 L P reflects the period, style, or regional characteristics of the building, or represents technological development. Armed with an awareness of the significance of the existing window, begin to search for r a replacement which retains as much of the character of the historic window as possible. There are many sources of suitable new windows. Continue looking until an acceptable replacement can be found. Check building supply firms, local woodworking mills, carpenters, preservation oriented magazines, or catalogs or suppliers of old building materials, for product information. Local historical associations and state historic preservation offices may be good sources of information on products which have been used successfully in preservation projects. p Consider energy efficiency as one of the factors for replacements, but do not let it -- dominate the issue. Energy conservation is no excuse for the wholesale destruction of historic windows which can be made thermally efficient by historically and aesthetically acceptable means. In fact, a historic wooden window with a high quality storm window .. added should thermally outperform a new double -glazed metal window which does not have thermal breaks (insulation between the inner and outer frames intended to break the path of heat flow). This occurs because the wood has far better insulating value than the metal, and in addition many historic windows have high ratios of wood to glass, thus reducing the area of highest heat transfer. One measure of heat transfer is the U-value, the number of Btu's per hour transferred through a square foot of material. When comparing thermal performance, the lower the U-value the better the performance. According to ASHRAE 1977 Fundamentals, the U-values for single glazed wooden windows range from 0.88 to 0.99. The addition of a storm window should reduce these figures to a range of 0.44 to 0.49. A non -thermal break, double -glazed metal window _ has a U-value of about 0.6. Conclusion Technical Preservation Services recommends the retention and repair of original 1 windows whenever possible. We believe that the repair and weatherization of existing wooden windows is more practical than most people realize, and that many windows are _ unfortunately replaced because of a lack of awareness of techniques for evaluation, repair, and weatherization. Wooden windows which are repaired and properly maintained will have greatly extended service lives while contributing to the historic character of the building. Thus, an important element of a building's significance will have been preserved for the future. Additional Reading ASHRAE Handbook 1977 Fundamentals. New York: American Society of Heating, Refrigerating and Air-conditioning Engineers, 1978 (chapter 26). Ferro, Maximillian. Preservation: Present Pathway to Fall River's Future. Fall River, Massachusetts: City of Fall River, 1979 (chapter 7). "Fixing Double -hung Windows." Old House Journal (no. 12, 1979): 135. http://www2.cr.nps.gov/tps/briefs/briefD9.htm 3/30/2003 Preservation Brief 9: The Repair of Historic Wooden Windows Page I I of 11 Morrison, Hugh. Early American Architecture. New York: Oxford University Press, 1952. Phillips, Morgan, and Selwyn, Judith. Epoxies for Wood Repairs in Historic Buildings. Washington, DC: Technical Preservation Services, U.S. Department of the Interior (Government Printing Office, Stock No. 024016000951), 1978. Rehab Right, Oakland, California: City of Oakland Planning Department, 1978 (pp. 7883). "Sealing Leaky Windows." Old House Journal (no. 1, 1973): S. Smith, Baird M. "Preservation Briefs: 3 Conserving Energy in Historic Buildings." Washington, DC: Technical Preservation Services, U.S. Department of the Interior, 1978, Weeks, Kay D. and David W. Look, "Preservation Briefs: 10 Exterior Paint Problems on Historic Woodwork." Washington, DC: Technical Preservation Services, U.S. Department of the Interior, 1982. Washington, D.C. 1981 Home page logo: Historic six -over -six windows --preserved. Photo: NPS files. This publication has been prepared pursuant to the National Historic Preservation Act of 1966, as amended, which directs the Secretary of the Interior to develop and make available information concerning historic properties. Technical Preservation Services (TPS), Heritage Preservation Services Division, National Park Service prepares standards, guidelines, and other educational materials on responsible historic preservation treatments for a broad public. Order Brief I Technical Preservation Services I Preservation Briefs I Search I QuestionsLnsmers KDW P0get Naliona r Service Privacy &Disclaimer http://www2.cr.nps,gov/tps/briefs/br-ief'09.htm 3/30/2003 Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings t Page 1 of 15 21 Preservation Briefs Technical Preservation Services Repairing Historic Flat Plaster Walls and Ceilings Mary Lee MacDonald >>Historical Background *Common Plaster Problems >>Repairing Historic Plaster When Damaged Plaster Cannot be Repaired >>Patching Materials »Summer IV National Park Service Plaster in a historic building is like a family album. The handwriting of the artisans, the taste of the original occupants, and the evolving styles of decoration are embodied in the fabric of the building. From modest farmhouses to great buildings, regardless of the ethnic origins of the occupants, plaster has traditionally been used to finish interior walls. A versatile material, plaster could be applied over brick, stone, half-timber, or frame construction. It provided a durable surface that was easy to clean and that could be. applied to flat or curved walls and ceilings. Plaster could be treated in any number of ways: it could receive stenciling, decorative painting, wallpaper, or whitewash. This variety and the adaptability of the material to nearly any building size, shape, or configuration meant that plaster was the wall surface chosen for nearly all buildings until the 1930s or 40s. Plaster was used as the Interior surface coating of this elegant 1911 church located in Eugene, Oregon. Photo: NPS files. Historic plaster may first appear so fraught with problems that its total removal seems the only alternative. But there are practical and historical reasons for saving it. First, three - coat plaster is unmatched in strength and durability. It resists fire and reduces sound transmission. Next, replacing plaster is expensive. A building owner needs to think carefully about the condition of the plaster that remains; plaster is often not as badly damaged as it first appears. Of more concern to preservationists, however, original lime and gypsum plaster is part of the building's historic fabric --its smooth troweled or textured surfaces and subtle contours evoke the presence of America's earlier craftsmen. Plaster can also serve as a plain surface for http://www2.cr.nps.gov/tps/briefs/brief2 I.htm 3/30/2003 Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 2 of 15 irreplaceable decorative finishes. For both reasons, plaster walls and ceilings contribute to the historic character of the interior and should be left in place and repaired if at all possible. The approaches described in this Brief stress repairs using wet plaster, and traditional materials and techniques that will best assist the preservation of historic plaster walls and ceilings --and their appearance. Dry wall repairs are not included here, but have been written about extensively in other contexts. Finally, this Brief describes a replacement option when historic plaster cannot be repaired. Thus, a veneer plaster system is discussed rather than dry wall. Veneer systems include a coat or coats of wet plaster --although thinly applied --which can, to a greater extent, simulate traditional hand -troweled or textured finish coats. This system is generally better suited to historic preservation projects than dry wall. To repair plaster, a building owner must often enlist the help of a plasterer. Plastering is a skilled craft, requiring years of training and special tools. While minor repairs can be undertaken by building owners, most repairs will require the assistance of a plasterer. Historical Background Plasterers in North America have relied on two materials to create their handiwork --lime and gypsum. Until the end of the 19th century, plasterers used lime plaster. Lime plaster was made from four ingredients: lime, aggregate, fiber, and water. The lime came from ground -and -heated limestone or oyster shells; the aggregate from sand; and the fiber from cattle or hog hair. Manufacturing changes at the end of the 19th century made it possible to use gypsum as a plastering material. Gypsum and lime plasters were used in combination for the base and finish coats during the early part of the 20th century; gypsum was eventually favored because it set more rapidly and, initially, had a harder finish. The builders of this mid-18th century house installed the baseboard molding first then applied a mud and horse hair plaster. Lime was used for the finish plaster. Photo: NPS files. Not only did the basic plastering material change, but the method of application changed also. In early America, the windows, doors, and all other trim were installed before the plaster was applied to the wall. Generally the woodwork was prime -painted before plastering. Obtaining a plumb, level wall, while working against built-up moldings, must have been difficult. But sometime in the first half of the 19th century, builders began installing wooden plaster "grounds" around windows and doors and at the base of the wall. Installing these grounds so that they were level and plumb made the job much easier because the plasterer could work from a level, plumb, straight surface. Woodwork was then nailed to the "grounds" after the walls were plastered. Evidence of plaster behind trim is often an aid to dating historic houses, or to discerning their physical evolution. Lime Plaster When building a house, plasterers traditionally mixed bags of quick lime with water to "hydrate" or "slake" the lime. As the lime absorbed the water, heat was given off. When the heat diminished, and the lime and water were thoroughly mixed, the lime putty that resulted was used to make plaster. http://www2.cr.nps.gov/tpsibriefs/brief2 Lhtm 3/30/2003 Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 3 of 15 When lime putty, sand, water, and animal hair were mixed, the mixture provided the plasterer with "coarse stuff." This mixture was applied in one or two layers to build up the wall thickness. But the best plaster was done with three coats. The first two coats made up the coarse stuff; they were the scratch coat and the brown coat. The finish plaster, called "setting stuff," contained a much higher proportion of lime putty, little aggregate, and no fiber, and gave the wall a smooth white surface finish. Compared to the 3/8-inch-thick layers of the scratch and brown coats, the finish coat was a mere 1/8-inch thick. Additives were used for various finish qualities. For example, fine white sand was mixed in for a "float finish." This finish was popular in the early 1900s. (If the plasterer raked the sand with a broom, the plaster wall would retain swirl marks or stipples.) Or marble dust was added to create a hard -finish white coat which could be smoothed and polished with a steel trowel. Finally, a little plaster of Paris, or "gauged stuff," was often added to the finish plaster to accelerate the setting time. Although lime plaster was used in this country until the early 1900s, it had certain disadvantages. A plastered wall could take more than a year to dry; this delayed painting or papering. In addition, bagged quick lime had to be carefully protected from contact with air, or it became inert because it reacted with ambient moisture and carbon dioxide. Around 1900, gypsum began to be used as a plastering material. Gypsum Plaster Schiflerstadt, a simple house of German origin that dates to 1756, utilized plaster for both flat and curved walls. The building is located In Frederick, Maryland Photo: NPS flies. Gypsum begins to cure as soon as it is mixed with water. It sets in minutes and completely dries in two to three weeks. Historically, gypsum made a more rigid plaster and did not require a fibrous binder. However it is difficult to tell the difference between lime and gypsum plaster once the plaster has cured. Despite these desirable working characteristics, gypsum plaster was more vulnerable to water damage than lime. Lime plasters had often been applied directly to masonry walls (without lathing), forming a suction bond. They could survive occasional wind -driven moisture or water winking up from the ground. Gypsum plaster needed protection from water. Furring strips had to be used against masonry walls to create a dead air space. This prevented moisture transfer. Many of these traditional plastering tools are still used today. In rehabilitation and restoration projects, Drawing: NPS files. one should rely on the plasterer's judgment about whether to use lime or gypsum plaster. In general, gypsum plaster is the material plasterers use today. Different types of aggregate may be specified by the architect such as clean river sand, perlite, pumice, or vermiculite; however, if historic finishes and textures are being replicated, sand should be used as the base -coat http://www2.cr.nps.gov/tps/briefs/brief2l.htm 3/30/2003 -� Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 4 of 15 aggregate. Today, if fiber is required in a base coat, a special gypsum is available which includes wood fibers. Lime putty, mixed with about 35% gypsum (gauging plaster) to help it harden, is still used as the finish coat. Lath Lath provided a means of holding the plaster in place. Wooden lath was nailed at right angles directly to the structural members of the buildings (the joists and studs), or it was fastened to nonstructural spaced strips known as furring strips. Three types of lath can be found on historic buildings. Wood Lath. Wood lath is usually made up of narrow, thin strips of wood with spaces in between. The plasterer applies a slight pressure to push the wet plaster through the spaces. The plaster slumps down on the inside of the wall, forming plaster "keys." These keys hold the plaster in place. Metal Lath. Metal lath, patented in England in 1797, began to be used in parts of the United States toward the end of the 19th century. The steel making up the metal lath contained many more spaces than wood lath had contained. These spaces increased the number of keys; metal lath was better able to hold plaster than wood lath had been. Rock Lath. A third lath system commonly used was rock lath (also called plaster board or gypsum -board lath). In use as early as 1900, rock lath was made up of compressed gypsum covered by a paper facing. Some rock lath was textured or perforated to provide a key for wet plaster. A special paper with gypsum crystals in it provides the key for rock lath used today; when wet plaster is applied to the surface, a crystalline bond is achieved. Rock lath was the most economical of the three lathing systems. Lathers or carpenters could prepare a room more quickly. By the late 1930s, rock lath was used almost exclusively in residential plastering. Common Plaster Problems When plaster dries, it is a relatively rigid material which should last almost indefinitely. However, there are conditions that cause plaster to crack, effloresce, separate, or become detached from its lath framewor. These include: • Structural Problems • Poor Workmanship • Improper Curing • Moisture Structural Problems Overloading. Stresses within a wall, or acting on the house as a whole, can create stress cracks. Appearing as diagonal lines in a wall, stress cracks usually start at a door or window frame, but they can appear anywhere in the wall, with seemingly random starting points . htti)://www2.cr.nvs.2ov/tos/briefs/brieP-I.htm 3/30/2003 8. Ga BID SCHEDULE (Base Bid) Lump Sum : One Hundred Seventeen Thousand and no/100's Dollars ($117,000.00) PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty—five percent (251/o) of the total Agreement Price. SPECTFULLY SUBMITTED: Signature Date: 2� J K vin Murray Title: Manager License Number: C1- 2 (Seal _if Bid is by corporation) Attest: Address: Empire Carpentry, LLC PO Box 245 Bellvue, CO 80512 Phone: 970493-3499 Fax: 970493-2088 7/96 Section 00300 Page 2 Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 5 of 15 Builders of now -historic houses had no codes to help them size the structural members of buildings. The weight of the roof, the second and third stories, the furniture, and the occupants could impose a heavy burden on beams, joists, and studs. Even when houses were built properly, later remodeling efforts may have cut in a doorway or window without adding a structural beam or "header" across the top of the opening. Occasionally, load -bearing members were simply too small to carry the loads above them. Deflection or wood "creep" (deflection that occurs over time) can create cracks in plaster. - Overloading and structural movement (especially when combined with rotting lath, rusted nails, or poor quality plaster) can cause plaster to detach from the lath. The plaster loses its key. When the mechanical bond with the lath is broken, plaster becomes loose or bowed. If repairs are not made, especially to ceilings, gravity will simply cause chunks of plaster to fall to the floor. Settlement/Vibration. Cracks in walls can also result when houses settle. Houses built on clay soils are especially vulnerable. Many types of clay (such as montmorillonite) are highly expansive. i �1 In the dry season, water evaporates from the clay Stress cracks in plaster over a kitchen particles, causing them to contract. During the rainy door frame can be repaired using fiberglass mesh tape and joint compound. season, the clay swells. Thus, a building can be riding Photo: NPS flies. on an unstable footing. Diagonal cracks running in opposite directions suggest that house settling and soil conditions may be at fault. Similar symptoms occur when there is a nearby source of vibration -blasting, a train line, busy highway, or repeated sonic booms. Lath movement. Horizontal cracks are often caused by lath movement. Because it absorbs moisture from the air, wood lath expands and contracts as humidity rises and falls. This can cause cracks to appear year after year. Cracks can also appear between rock lath panels. A nail holding the edge of a piece of lath may rust or loosen, or structural movement in the wood framing behind the lath may cause a seam to open. Heavy loads in a storage area above a rock -lath ceiling can also cause ceiling cracks. Errors in initial building construction such as improper bracing, poor corner construction, faulty framing of doors and windows, and undersized beams and floor joists eventually "telegraph" through to the plaster surface. Poor Workmanship In addition to problems caused by movement or weakness in the structural framework, plaster durability can be affected by poor materials or workmanship. y Poorly proportioned mix. The proper proportioning and mixing of materials are vital to the quality of the plaster job. A bad mix can cause problems that appear years later in a plaster wall. Until recently, proportions of aggregate and lime were mixed on the job. A plasterer may have skimped on the amount of cementing material (lime or gypsum) because sand was the cheaper material. Over sanding can cause the plaster to weaken or crumble. Plaster made from a poorly proportioned mix may be more difficult to repair. I http://www2.cr.nps.gov/tps/briefs/brief2l.htm 3/30/2003 w.. Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 6 of 15 Incompatible base coats and finish coats. Use of perlite as an aggregate also presented problems. Perlite is a lightweight aggregate used in the base coat instead of sand. It performs well in cold weather and has a slightly better insulating value. But if a smooth lime finish coat was applied over perlited base coats on wood or rock lath, cracks would appear in the finish coat and the entire job would have to be redone. To prevent this, a plasterer had to add fine silica sand or finely crushed perlite to the finish coat to compensate for the dramatically differing shrinkage rates between the base coat and the finish coat. Improper plaster application. The finish coat is subject to "chip cracking" if it was applied over an excessively dry base coat, or was insufficiently troweled, or if too little gauging plaster was used. Chip cracking looks very much like an alligatored paint surface. Another common problem is called map cracking --fine, irregular cracks that occur when the finish coat has been applied to an over sanded base coat or a very thin base coat. Too much retardant. Retarding agents are added to slow down the rate at which plaster sets, and thus inhibit hardening. They have traditionally included ammonia, glue, gelatin, starch, molasses, or vegetable oil. If the plasterer has used too much retardant, however, a gypsum plaster will not set within a normal 20 to 30 minute time period. As a result, t!---e surface becomes soft and powdery. delaminated from the brown coat underneath. Photo: Marylee MacDonald. Inadequate plaster thickness. Plaster is applied in three coats over wood lath and metal lath --the scratch, brown, and finish coats. In three -coat work, the scratch coat and brown coat were sometimes applied on successive days to make up the required wall thickness. Using rock lath allowed the plasterer to apply one base coat and the finish coat --a two -coat job. If a plasterer skimped on materials, the wall may not have sufficient plaster thickness to withstand the normal stresses within a building. The minimum total thickness for plaster on gypsum board (rock lath) is 1/2 inch. On metal lath the minimum thickness is 5/8 inch; and for wood lath it is about 3/4 to 7/8 inch. This minimum plaster thickness may affect the thickness of trim projecting from the wall's plane. Improper Curing Proper temperature and air circulation during curing are key factors in a durable plaster job. The ideal temperature for plaster to cure is between 55 to 70 degrees Fahrenheit. However, historic houses were sometimes plastered before window sashes were put in. There was no way to control temperature and humidity. Dry outs, freezing, and sweat -outs. When temperatures were too hot, the plaster would return to its original condition before it was mixed with water, that is, calcined gypsum. A plasterer would have to spray the wall with alum water to reset the plaster. If freezing occurred before the plaster had set, the job would simply have to be redone. If the windows were shut so that air could not circulate, the plaster was subject to sweat -out or rot. Since there is no cure for rotted plaster, the affected area had to be removed and replastered. http://www2.cr.nps.gov/tps/briefs/brief2l.htm 3/30/2003 Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 7 of 15 Y ; Moisture — Plaster applied to a masonry wall is vulnerable to water damage if the wall is constantly wet. When salts from the masonry substrate come in contact with water, they migrate to the surface of the plaster, appearing as dry bubbles or efflorescence. The source of the moisture must be eliminated before replastering the damaged area. Sources of Water Damage. Moisture problems occur for several reasons. Interior plumbing leaks in older houses are common. Roofs may leak, causing ceiling damage. Gutters and downspouts may also leak, pouring rain water next to the building foundation. In brick buildings, dampness at the foundation level can wick up into the above -grade walls. Another common source of moisture is splashback. When there is a paved area next to a masonry building, rainwater splashing up from the paving can dampen masonry walls. In both cases water travels through the masonry and damages interior plaster. Coatings applied to the interior are not effective over the long run. The moisture problem must be stopped on the outside of the wall. Repairing Historic Plaster Many of the problems described above may not be easy to remedy. If major structural problems are found to be the source of the plaster problem, the structural problem — should be corrected. Some repairs can be made by removing only small sections of plaster to gain access. Minor structural problems that will not endanger the building can generally be ignored. Cosmetic damages from minor building movement, holes, or -- bowed areas can be repaired without the need for wholesale demolition. However, it y may be necessary to remove deteriorated plaster caused by rising damp in order for masonry walls to dry out. Repairs made to a wet base will fail again. _ Canvassing Uneven Wall Surfaces Uneven wall surfaces, caused by previous patching or by partial wallpaper removal, are common in old houses. As long as the plaster is generally sound, cosmetically unattractive plaster walls can be "wallpapered" with strips of a canvas or fabric -like material. Historically, canvassing covered imperfections in the plaster and provided a stable base for decorative painting or wallpaper. Filling Cracks Hairline cracks in wall and ceiling plaster are not a serious cause for concern as long as the underlying plaster is in good condition. They may be filled easily with a patching material. For cracks that reopen with seasonal humidity change, a slightly different method is used. First the crack is widened slightly with a sharp, pointed tool such as a -- crack widener or a triangular can opener. Then the crack is filled. For more persistent y cracks, it may be necessary to bridge the crack with tape. In this instance, a fiberglass mesh tape is pressed into the patching material. After the first application of a quick setting joint compound dries, a second coat is used to cover the tape, feathering it at the edges. A third coat is applied to even out the _. surface, followed by light sanding. The area is cleaned off with a damp sponge, then dried to remove any leftover plaster residue or dust. http://www2.cr.nps.gov/tps/briefs/brief2l.htm 3/30/2003 Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 8 of 15 When cracks are larger and due to structural movement, repairs need to be made to the structural system before repairing the plaster. Then, the plaster on each side of the crack should be removed to a width of about 6 inches down to the lath. The debris is cleaned out, and metal lath applied to the cleared area, leaving the existing wood lath in place. The metal lath usually prevents further cracking. The crack is patched with an appropriate plaster in three layers (i.e., base coats and finish coat). If a crack seems to be expanding, a structural engineer should be consulted. Replacing Delaminated Areas of the Finish Coat Sometimes the finish coat of plaster comes loose from the base coat. In making this type of repair, the plasterer paints a liquid plaster -bonding agent onto the areas of base -coat plaster that will be replastered with a new lime finish coat. A homeowner wishing to repair small areas of delaminated finish coat can use the methods described in "Patching Materials." Patching Holes in Walls 1790s, the original plaster was asingle coat of lime, sand, and horsehair applied over split lath. A one -coat repair, in this case, is appropriate. For small holes (less than 4 inches in diameter) Photo: John Leeke. that involve loss of the brown and finish coats, the repair is made in two applications. First, a layer of base coat plaster is troweled in place and scraped back below the level of the existing plaster. When the base coat has set but not dried, more plaster is applied to create a smooth, level surface. One -coat patching is not generally recommended by plasterers because it tends to produce concave surfaces that show up when the work is painted. Of course, if the lath only had one coat of plaster originally, then a one -coat patch is appropriate. For larger holes where all three coats of plaster are damaged or missing down to the wood lath, plasterers generally proceed along these lines. First, all the old plaster is cleaned out and any loose lath is re -nailed. Next, a water mist is sprayed on the old lath to keep it from twisting when the new, wet plaster is applied, or better still, a bonding agent is used. To provide more reliable keying and to strengthen the patch, expanded metal lath (diamond mesh) should be attached to the wood lath with tie wires 4 r or nailed over the wood lath with lath nails. The Flat -head wood screws and plaster washers taster is then applied in three layers over the were used to reattach loose k Is plaster to p pp y the wood lath. After the crack Is covered with metal lath, lapping each new layer of plaster over fiberglass mesh tape, all will be skim -coated the old plaster so that old and new are evenly Curtis.with a Patching compound. Photo: John Obed joined. This stepping is recommended to produce a strong, invisible patch. Also, if a patch is made in a plaster wall that is slightly wavy, the contour of the patch should be made to conform to the irregularities of the existing work. A flat patch will stand out from the rest of the wall. Patching Holes in Ceilings http://www2.cr.nps.gov/tps/brie fs/brief21.htm 3/30/2003 Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 9 of 15 _ Hairline cracks and holes may be unsightly, but when portions of the ceiling come loose, a more Serious problem exists. The keys holding the plaster to the ceiling have probably broken. First, the plaster around the loose plaster should be examined. Keys may have deteriorated because of a localized moisture problem, poor quality _ plaster, or structural overloading; yet, the surrounding system may be intact. If the 1 areas surrounding the loose area are in reasonably good condition, the loose plaster can be reattached to the lath using flathead wood screws and plaster washers. To patch a hole in the ceiling plaster, metal lath is fastened over the wood lath; then the hole is — filled with successive layers of plaster, as described above. Establishing New Plaster Keys ; If the back of the ceiling lath is accessible (usually from the attic or after removing floor boards), small areas of bowed -out plaster can be pushed back against the lath. A padded piece of plywood and braces are used to secure the loose plaster. After dampening the old lath and coating the damaged area with a bonding agent, a fairly liquid plaster mix (with a glue size retardant added) is applied to the backs of the lath, and worked into the voids between the faces of the lath and the back of the plaster. While this first layer is still damp, plaster -soaked strips of jute scrim are laid across the backs of the lath and pressed firmly into the first layer as reinforcement. The original lath must be secure, otherwise the weight of the patching plaster may loosen it. Loose, damaged plaster can also be re -keyed when the goal is to conserve decorative surfaces or wallpaper. Large areas of ceilings and walls can be saved. This method requires the assistance of a skilled conservator --it is not a repair technique used by most plasterers. The conservator injects an acrylic adhesive mixture through holes drilled in the face of the plaster (or through the lath from behind, when accessible). The loose plaster is held firm with plywood bracing until the adhesive bonding mixture sets. When complete, gaps — between the plaster and lath are filled, and the loose plaster is secure. When ceiling repairs are made with wet plaster or with an injected adhesive mixture, the old loose plaster must be supported with a plywood brace until re -keying is complete. Photo: John Leeke. Replastering Over the Old Ceiling If a historic ceiling is too cracked to patch or is sagging (but not damaged from moisture), — plasterers routinely keep the old ceiling and simply relath and replaster over it. This repair technique can be used if lowering the ceiling slightly does not — affect other ornamental features. The existing ceiling is covered with 1x3-inch wood furring strips, one to each joist, and fastened completely through the old lath and plaster using a screw gun. `- Expanded metal lath or gypsum board lath is nailed over the furring strips. Finally, two or three coats are applied according to traditional methods. Replastering over the old ceiling saves time, creates much less dust than demolition, and gives - added fire protection. http://www2.cr.nps.gov/tps/briefs/brief2I htrn 3/30/2003 - rreservatton tsnet zl: Kepairing riistonc rlat Plastcr--Walls and (_;eilings Page to of 1:) When Damaged Plaster Cannot be Repaired --Replacement Options Partial or complete removal may be necessary if plaster is badly damaged, particularly if the damage was caused by long-term moisture problems. Workers undertaking demolition should wear OSHA -approved masks because the plaster dust that flies into the air may contain decades of coal soot. Lead, from lead based paint, is another danger. Long-sleeved clothing and head -and -eye protection should be worn. Asbestos, used in the mid -twentieth century as an insulating and fireproofing additive, may also be present and OSHA -recommended precautions should be taken. If plaster in adjacent rooms is still in good condition, walls should not be pounded --a small trowel or pry bar is worked behind the plaster carefully in order to pry loose pieces off the wall. When the damaged plaster has been removed, the owner must decide whether to replaster over the existing lath or use a different system. This decision should be based in part on the thickness of the original plaster and the condition of the original lath. Economy and time are also valid considerations. It is important to ensure that the wood trim around the windows and doors will have the same "reveal" as before. (The "reveal" is the projection of the wood trim from the surface of the plastered wall). A lath and plaster system that will give this required depth should be selected. Replastering--Alternative Lath Systems for New Plaster Replastering old wood lath. When plasterers work with old lath, each lath strip is re - nailed and the chunks of old plaster are cleaned out. Because the old lath is dry, it must be thoroughly soaked before applying the base coats of plaster, or it will warp and buckle; furthermore, because the water is drawn out, the plaster will fail to set properly. As noted earlier, if new metal lath is installed over old wood lath as the base for new plaster, many of these problems can be avoided and the historic lath can be retained. The ceiling should still be sprayed unless a vapor barrier is placed behind the metal lath. Replastering over new metal lath. An alternative to reusing the old wood lath is to install a different lathing system. Galvanized metal lath is the most expensive, but also the most reliable in terms of longevity, stability, and proper keying. When lathing over open joists, the plasterer should cover the joists with kraft paper or a polyethylene vapor barrier. Three coats of wet plaster are applied consecutively to form a solid, monolithic unit with the lath. The scratch coat keys into the metal lath; the second, or brown, coat bonds to the scratch coat and builds the thickness; the third, or finish coat, consists of lime putty and gauging plaster. Replastering over new rock lath. It is also possible to use rock lath as a plaster base. Plasterers may need to remove the existing wood lath to maintain the woodwork's reveal. Rock lath is a 16x36-inch, 1/2-inch thick, gypsum -core panel covered with absorbent paper with gypsum crystals in the paper. The crystals in the paper bond the wet plaster and anchor it securely. This type of lath requires two coats of new plaster --the brown coat and the finish coat. The gypsum lath itself takes the place of the first, or scratch, coat of plaster. Painting New Plaster http://www2.cr.nps.gov/tpsibriefs/brief2l .htm 3/30/2003 Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 11 of 15 I The key to a successful paint job is proper drying of the plaster. Historically, lime plasters were allowed to cure for at least a year before the walls were painted or papered. With modern ventilation, plaster cures in a shorter time; however, fresh gypsum plaster with a lime finish coat should still be perfectly dry before paint is applied --or the paint may peel. (Plasterers traditionally used the "match test" on new plaster. If a match would light by striking it on the new plaster surface, the plaster was considered dry.) Today it is best to allow new plaster to cure two to three weeks. A good alkaline - resistant primer, specifically formulated for new plaster, should then be used. A compatible latex or oil -based paint can be used for the final coat. ❑x repair with metal lath, base coats, and finish coat Repairs are being made to the historic plaster. Expanded metal lath is cut to fit A Modern Replacement System the hole, then attached to the wood lath with a tie -wire. Two ready -mix gypsum coats are applied, then a smooth-trowled Veneer Plaster. Using one of the traditional lath and coat of gauged lime. Photo: Walter plaster systems provides the highest quality plaster job. Jowan. However, in some cases, budget and time considerations may lead the owner to consider a less expensive replacement alternative. Designed to reduce the cost of materials, a more recent lath and plaster system is less expensive than a two -or -three coat plaster job, but only slightly more expensive than drywall. This plaster system is called veneer plaster. The system uses gypsum -core panels that are the same size as drywall (4x8 feet), and specially made for veneer plaster. They can be installed over furring channels to masonry walls or over old wood lath walls and ceilings. Known most commonly as "blue board," the panels are covered with a special paper compatible with veneer plaster. Joints between the 4-foot wide sheets are taped with fiberglass mesh, which is bedded in the veneer plaster. After the tape is bedded, a thin, 1/16-inch coat of high -strength veneer plaster is applied to the entire wall surface. A second veneer layer can be used as the "finish" coat, or the veneer plaster can be covered with a gauged lime finish -coat- -the same coat that covers ordinary plaster. Although extremely thin, a two -coat veneer plaster system has a 1,500 psi rating and is thus able to withstand structural movements in a building or surface abrasion. With either a veneer finish or a gauged lime putty finish coat, the room will be ready for painting almost immediately. When complete, the troweled or textured wall surface looks more like traditional plaster than drywall. The thin profile of the veneer system has an added benefit, especially for owners of uninsulated masonry buildings. Insulation can be installed between the pieces of furring channel used to attach blue board to masonry walls. This can be done without having to fur out the window and door jambs. The insulation plus the veneer system will result in the same thickness as the original plaster. Occupants in the rooms will be more comfortable because they will not be losing heat to cold wall surfaces. Patching Materials Plasterers generally use ready -mix base -coat plaster for patching, especially where large holes need to be filled. The ready -mix plaster contains gypsum and aggregate in proper http://www2.cr.nps.gov/tpsibriefs/brief2 l . htm 3/30/2003 Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 12 of 15 proportions. The plasterer only needs to add water. Another mix plasterers use to patch cracks or small holes, or for finish -coat repair, is a "high gauge" lime putty (50 percent lime; 50 percent gauging plaster). This material will produce a white, smooth patch. It is especially suitable for surface repairs. Although property owners cannot duplicate the years of accumulated knowledge and craft skills of a professional plasterer, there are materials that can be used for do-it- yourself repairs. For example, fine cracks can be filled with an all-purpose drywall joint compound. For bridging larger cracks using fiberglass tape, a homeowner can use a "quicksetting" joint compound. This compound has a fast drying time--60, 90, or 120 minutes. Quick -setting joint compound dries because of a chemical reaction, not because of water evaporation. It shrinks less than all-purpose joint compound and has much the same workability as ready -mix base -coat plaster. However, because quick -set joint compounds are hard to sand, they should only be used to bed tape or to fill large holes. All-purpose point compound should be used as the final coat prior to sanding. Homeowners may also want to try using a ready -mix perlited base -coat plaster for scratch and brown coat repair. The plaster can be hand -mixed in small quantities, but bagged ready -mix should be protected from ambient moisture. A "millmixed pre - gauged" lime finish coat plaster can also be used by homeowners. A base coat utilizing perlite or other lightweight aggregates should only be used for making small repairs (less than 4 ft. patches). For large-scale repairs and entire room replastering, see the precautions in Table 1 for using perlite. Homeowners may see a material sold as "patching plaster" or "plaster of Paris" in hardware stores. This dry powder cannot be used by itself for plaster repairs. It must be combined with lime to create a successful patching mixture. When using a lime finish coat for any repair, wait longer to paint, or use an alkaline - resistant primer. Summary The National Park Service recommends retaining historic plaster if at all possible. Plaster is a significant part of the "fabric" of the building. Much of the building's history is documented in the layers of paint and paper found covering old plaster. For buildings with decorative painting, conservation of historic flat plaster is even more important. Consultation with the National Park Service, with State Historic Preservation Officers, local preservation organizations, historic preservation consultants, or with the Association for Preservation Technology is recommended. Where plaster cannot be repaired or conserved using one of the approaches outlined in this Brief, documentation of the layers of wallpaper and paint should be undertaken before removing the historic plaster. This information may be needed to complete a restoration plan. Plaster Terms Scratch coat. The first base coat put on wood or metal lath. The wet plaster is "scratched" with a scarifier or comb to provide a rough surface so the next layer of base http://www2.cr.nps.gov/tpsibriefsA)rief2 I.htm 3/30/2003 Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 13 of 15 — coat will stick to it. + Brown coat. The brown coat is the second application of wet, base -coat plaster with wood lath or metal systems. With gypsum board lath (rock lath, plasterboard), it is the only base coat needed. Finish coat. Pure lime, mixed with about 35 percent gauging plaster to help it harden, i is used for the very thin surface finish of the plaster wall. Fine sand can be added for a sanded finish coat. Casing Bead. Early casing bead was made of wood. In the 19th century, metal casing beads were sometimes used around fireplace projections, and door and window openings. Like a wood ground, they indicate the proper thickness for the plaster. Corner Bead. Wire mesh with a rigid metal spline used on Outside corners. Installing the corner bead plumb is important. ' Cornerite. Wire mesh used on inside corners of adjoining walls and ceilings. It keeps — corners from cracking. Ground. Plasterers use metal or wood strips around the edges of doors and windows — and at the bottom of walls. These grounds help keep the plaster the same thickness and provide a stopping edge for the plaster. Early plaster work, however, did not use grounds. On early buildings, the woodwork was installed and primed before plastering began. Some time in ,the early 19th century, a transition occurred, and plasterers applied their wall finish before woodwork was installed. Gypsum. Once mined from large gypsum quarries near Paris (thus the name plaster of — Paris), gypsum in its natural form is calcium sulfate. When calcined (or heated), one - and -a -half water molecules are driven off, leaving a hemi-hydrate of calcium sulfate. When mixed with water, it becomes calcium sulfate again. While gypsum was used in base -coat plaster from the 1890s on, it has always been used in finish coat and decorative plaster. For finish coats, gauging plaster was added to lime putty; it causes the lime to harden. Gypsum is also the ingredient in moulding plaster, a finer plaster used to create decorative moldings in ornamental plaster work. Lime. Found in limestone formations or shell mounds, naturally occurring lime is calcium carbonate. When heated, it becomes calcium oxide. After water has been added, it becomes calcium hydroxide. This calcium hydroxide reacts with carbon dioxide in the air to recreate the original calcium carbonate. Screed. Screeds are strips of plaster run vertically or horizontally on walls or ceilings. They are used to plumb and straighten uneven walls and level ceilings. Metal screeds are used to separate different types of plaster finishes or to separate lime and cement ., plasters. Reading List Ashurst, John and Ashurst, Nicola. Practical Building Conservation, English Heritage Technical Handbook, Volume 3. Mortars, Plasters and Renders. New York: Halsted Press, http://www2.cr.ni)s. jzov/tps/briefsibrief2 l .htm 3/30/2003 M,. Preservation Brief 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 14 of 15 1988. Gypsum Construction Handbook. Chicago: United States Gypsum Company, 1986. Hodgson, Frederick Thomas. Plaster and Plastering: Mortars and Cements, How to Make and How to Use. New York: The Industrial Publication Company, 1901 lowers, Walter. "Plaster Patching, Part II." Restoration Primer. New England Builder, November, 1987, pp. 4143. Leeke, John. "Problems with Plaster, Part One." Landmarks Observer, Vol. 12. March/April, 1985., pp. 10,14. Also "Problems with Plaster, Part Two." Vol. 12., May/June, 1985, p. 12. Leeke, John. "Saving Irreplaceable Plaster." Old House Journal. Vol. XV, No. 6, November/December, 1987, pp. 5155. McKee, Harley J., FAIA. Introduction to Early American MasonryStone, Brick, Mortar, and Plaster. New York: National Trust for Historic Preservation and Columbia University. 1973. Phillips, Morgan. "Adhesives for the Reattachment of Loose Plaster" APT Bulletin, Vol. XII, No. 2, 1980, pp. 3763. Poore, Patricia. "The Basics of Plaster Repair." Old House Journal, Vol. 16, No. 2, March/April, 1988, pp. 2935. Shivers, Natalie. Walls and Molding: How to Care for Old and Historic Wood and Plaster. Washington, D.C.: National Trust for Historic Preservation, 1989. Stagg, W. D. and B. Pegg. Plastering: A Craftsman's Encyclopedia. Woodstock, New York: Beekman Publishers, 1976. Van den Branden, F. and Thomas L. Hartsell. Plastering Skills. Homewood, Illinois: American Technical Publishers, Inc., 1984. Weaver, Martin. "Nuts and Bolts: Properly Plastered." Canadian Heritage. Aug./Sept., 1981, pp. 3436. Also "Nuts and Bolts: Fixing Plaster." Oct., 1981, pp. 3335. Acknowledgements Preservation Brief 21 was based on an article in Old House Restoration on repairing historic plaster, published by the University of Illinois at Urbana -Champaign, 1984. Kay D. Weeks, Preservation Assistance Division, Technical Preservation Services Branch, expanded the article and made substantial contributions to its development as a Brief. y Special thanks go to the technical experts in the field who reviewed and comment upon the draft manuscript: Andrew Ladygo (society for the Preservation of New England Antiquities), David Flaharty, Gilbert Wolf (National Plastering Industries), Michael Kempster, and Walter Jowers. Insightful comments were offered by the Technical Preservation Services Branch which is directed by H. Ward Jandl. Finally, staff member Karen Kummer, Small Homes Council - Building Research Council, University of Illinois, provided invaluable production assistance. Washington, D.C. October, 1989 http://www2.cr.nps.gov/tpsibriefs[brief2l.htm 3/30/2003 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410Bid Bond 00420Statement of Bidder's Qualifications 00430Schedule of Subcontractors 7/96 Section 00410 Page 1 Preservation briet 21: Repairing Historic Flat Plaster --Walls and Ceilings Page 15 of 15 Home page logo: Plasterers applying rough and finish coats of plaster. Drawing: From the "Book of Trades." This publication has been prepared purscfant to the National Historic Preservation Act of 1966, as amended, which directs the Secretary of the Interior to develop and make available information concerning historic properties. Technical Preservation Services (TPS), Heritage Preservation Services Division, National Park Service prepares standards, guidelines, and other educational materials on responsible historic preservation treatments for a broad public. Order Brief I Technical Preservation_Services I Preservation Briefs I Search QUk ; s/Answe-s KD W Nadona lu Se Ica Privary & Disclaimer hftp://www2.cr.nps.go,v/tpsibriefs/brief2l.htm 3/30/2003 M .. Preservation Bnet 26: The Preservation and Repair of Historic Log Buildings Page 1 of 18 26Technical Preservation Briefs Preservation Services V National Park Service The Preservation and Repair of Historic Log Buildings Bruce D. Bomberger »Historical Background »Traditional Log Construction »Historical Evaluation and Damage_Assessment »Preservation Treatments »Log Repair »Preserving Log Buildings in Their Historic Settings »Summary »Selected Reading The intent of this Brief is to present a concise history and description of the diversity of American log buildings and to provide basic guidance regarding their preservation and maintenance. A log building is defined as a building whose structural walls are composed of horizontally laid or vertically positioned logs. While this Brief will focus upon horizontally -laid, corner -notched log construction, and, in particular, houses as a building type, the basic approach to preservation presented here, as well as many of the physical treatments, can be applied to virtually any kind of log structure. Log buildings, because of their distinct material, physical structure, and sometimes their architectural design, can develop their own unique deterioration problems. The information presented here is intended to convey the range of appropriate preservation techniques available. It does not, however, detail how to perform these treatments; this work should be left to professionals experienced in the preservation of historic log buildings. Rustic log structures were a popular choice for Despite the publication since the 1930s of a vacation cabins In the 20th century. Photo: Courtesy, number of books and articles on the history of HAGS Collection, NPS. log construction in America, some misconceptions persist about log buildings. Log cabins were not the first type of shelter built by all American colonists. The term "log cabin" today is often loosely applied to any type of log house, regardless of its form and the historic context of its setting. "Log cabin" or "log house" often conjures up associations with colonial American history and rough frontier life. While unaltered colonial era buildings in general are rare, historic log buildings as a group are neither as old nor as rare as generally believed. One and two- story log houses were built in towns and settlements across the country until about the middle of the 19th century, and in many areas, particularly in the West, as well as the http://www2.cr.nps.gov/tps/briefs/br-ief26.htm 3/30/2003 Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 2 of 18 1 Midwest and southern mountain regions, log continued to be a basic building material despite the introduction of wooden balloon frame construction. By the early 20th century, the popularity of "rustic" architecture had revived log construction throughout the country, and in many areas where it had not been used for decades. A distinction should be drawn between the traditional meanings of "log cabin" and "log house." "Log cabin" generally denotes a simple one, or one -and -one-half story structure, somewhat impermanent, and less finished or less architecturally sophisticated. A "log cabin" was usually constructed with round rather than hewn, or hand -worked, logs, and it was the first generation homestead erected quickly for frontier shelter. "Log house" historically denotes a more permanent, hewn -log dwelling, either one or two stories, of more complex design, often built as a second generation replacement. Many of the earliest 18th and early 19th century log houses were traditionally clad, sooner or later, with wood siding or stucco. Historical Background Unlike western log cabins, 18th and 19th century log houses in the eastern part of the V.S. were almost always covered with siding or stucco. Photo: NPS files. No other architectural form has so captured the imagination of the American people than the tog cabin. Political supporters of 1840 presidential candidate William Henry Harrison appropriated the log cabin as a campaign symbol. The log cabin was birthplace and home for young Abe Lincoln, as well as other national figures, and assumed by many 19th century historians to be the very first type of house constructed by English colonists. In 1893 Frederick Jackson Turner in his influential paper, "The Significance of the Frontier in American History" suggested that European colonists had adopted this means of shelter from the Indians. More recent 20th century scholarship has demonstrated that horizontal log buildings were not the first form of shelter erected by all colonists in America. Nor was log construction technology invented here, but brought by Northern and Central European colonists. Finnish and Swedish settlers are credited with first introducing horizontal log building in the colony of New Sweden (now Pennsylvania) on the upper shores of Delaware Bay in 1638, who later passed on their tradition of log construction to the Welsh settlers in Pennsylvania. During the 17th and 18th centuries, new waves of Eastern and Central Europeans, including Swiss and Germans, came to America bringing their knowledge of log construction. Even the Scotch -Irish, who did not possess a log building tradition of their own, adapted the form of the stone houses of their native country to log construction, and contributed to spreading it across the frontier. In the Mississippi Valley, Colonial French fur traders and settlers had introduced vertical log construction in the 17th century. Through the late 18th and early 19th centuries, frontier settlers erected log cabins as they cleared land, winding their way south in and along the Appalachian valleys through the back country areas of Maryland, Virginia, the Carolinas and Georgia. They moved westward across the Appalachian http://www2.cr.nps.gov/tps/briefs/brief26.htm 3/30/2003 N k . Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 3 of 18 Mountain barrier into the Ohio and Mississippi River valleys transporting their indispensable logcraft with them, into Kentucky and Tennessee, and as far to the southwest as eastern Texas. Log buildings are known to have been constructed as temporary shelters by soldiers during the Revolutionary War, and across the country, Americans used logs not only to build houses, but also commercial structures, schools, churches, gristmills, barns, corncribs and a variety of outbuildings. This lodge constructed of logs in the 1880s is an example of the Adirondack style of rustic camp architecture. Photo: NPS riles. Around the mid-19th century, successive generations of fur traders, metal prospectors, and settlers that included farmers and ranchers began to construct log buildings in the Rocky Mountains, the Northwest, California, and Alaska. In California and Alaska, Americans encountered log buildings that had been erected by Russian traders and colonists in the late 18th and early 19th centuries. Scandinavian and Finnish immigrants who settled in the Upper Midwest later in the 19th century also brought their own log building techniques with them. And, many log structures in the Southwest, particularly in New Mexico, show Hispanic influences of its early settlers. n the While many parts of the country never stopped buildingThe gabeendi edoorce19thcntered century gable end in this Tate-19th century log with logs, wooden balloon frame construction had made it building is a typical feature of the obsolete in some of the more populous parts of the Rocky Mountain Cabin style. Photo: country by about the mid-19th century. However, later in NPS files. the century, log construction was employed in new ways. In the 1870s, wealthy Americans initiated the Great Camp Movement for rustic vacation retreats in the Adirondack Mountains of upstate New York. Developers such as William Durant, who used natural materials, including wood shingles, stone, and log --often with its bark retained to emphasize the Rustic style --designed comfortable summer houses and lodges that blended with the natural setting. Durant and other creators of the Rustic style drew upon Swiss chalets, traditional Japanese design, and other sources for simple compositions harmonious with nature. Old Faithful Inn, Yellowstone National Park, Wyoming brought the Rustic style to the West in 1903 in an original design, and a scale befitting its setting. Photo: Courtesy, The Adirondack or Rustic style was balanced in the West with construction of the Old Faithful Inn at Yellowstone National Park in Wyoming, designed by Robert C. Reamer, and begun in 1903. This popular resort was tremendously influential in its use of locally -available natural materials, especially log, and gave impetus to Rustic as a true national style. From the turn of the century through the 1920s, Gustav Stickley and other leaders of the Craftsman Movement promoted exposed log construction. During the 1930s and 40s, the Civilian Conservation Corps (CCC) used log construction extensively in many of the country's Federal and State parks to build cabins, lean-tos, visitor centers, and http://www2.cr.nps.gov/tps/briefs/brief26.htm 3/30/2003 _. 1 u.a . . .,i n .. .. ......... I Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 4 of 18 — i Historic American Buildings Survey, Has. maintenance and support buildings that are still in service. Traditional Log Construction Plan and Form When settlers took the craft of log construction with them onto the frontier, they successfully adapted it to regional materials, climates and terrains. One of the most notable characteristics of the earliest 18th and 19th century log houses is the plan and form. The plan can sometimes provide clues to the ethnic origin or route of migration of the original inhabitant or builder. But in the absence of corroborating documentary evidence, it is important not to infer too much about the ethnic craft traditions of a particular log house. Historians have identified a number of traditional house plans and forms as prototypes. They were often repeated with simple variations. The basic unit of each of these types is the one room enclosure formed by four log walls joined at their corners, called a single "pen" or "crib." The single pen was improved upon by installing interior partitions _ or by adding another log pen. Some variations of historic log house plans include: the typically mid -Atlantic "continental" plan, consisting of a single -pen of three rooms organized around a central hearth; the "saddlebag" or double -pen plan, composed of two contiguous log pens; and the "dogtrot" plan, formed by two pens separated by an -' open passage space (sometimes enclosed later), all covered by a continuous roof. The continental plan originated in central and eastern Europe and is attributed to 18th century German immigrants to Pennsylvania. Non -log interior partition walls form the multi -room plan within the exterior log walls. The saddlebag plan consists of two adjoining log pens that share a central chimney. A saddlebag is often the evolution of a single pen with an end chimney, expanded by adding a second pen onto the chimney endwall. The saddlebag was built in a number of different regions across the country. The dogtrot plan may be seen with variation in many parts of the country, although it is sometimes, perhaps erroneously, considered the most typically southern, because its covered passageway provided both air circulation and shelter from the heat. All these plan types were typically built in the form of one or one -and -one-half story settlement cabins. A somewhat different form evolved in the West around the middle of the 19th century which became especially distinctive of the Rocky Mountain cabin. While the entrance doorway to most earlier log houses was generally placed beneath the eaves, as a -- means of adapting to the greater snowfall in the Rockies, here the entrance was placed in the gable end, and sometimes protected from roof slides by a porch supported by two corner posts created by an extension of the roof beyond the gable wall. _ From the late 18th through the mid-19th centuries, Americans also built many substantial two-story log houses in towns throughout the eastern half of the country. In _ rural areas two-story log houses were sometimes built to replace earlier, first - generation settlement cabins, but just as often the early hewn -log house was retained and enlarged. A second story was added by removing the roof and gables, constructing a second floor, laying additional courses of logs, and building a new roof, or reassembling the old one. Each generation of owners might expand an early log core building by adding on new log pens, or masonry or wood frame extensions. The addition of a rear ell, or infill construction to link a formerly freestanding outbuilding, such as a kitchen to the log main house was particularly common. Such a layering of alterations is part of the evolution of many log buildings. - http://www2.cr.nps.gov/tps/briefs/brief26.htm 3/30/2003 Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 5 of 18 Corner Notching and Other Fastening Techniques Corner notching is another of the characteristic features of log construction. Most notching methods provide structural integrity, by locking the log ends in place, and give the pen rigidity and stability. Like the floor plan, the type of corner notching can sometimes be a clue to the ethnic craft origin of a log building, but it is important not to draw conclusions based only on notching details. Numerous corner notching techniques have been identified throughout the country. They range from the simple "saddle" notching, which demands minimal time and A log to replace the deteriorated sill is being hewn in hewing skill, to the very common "V the traditional manner with a broad axe. Photo: NPS notching or "steeple" notching, to "full files. dovetail" notching, one of the tightest but most time-consuming to accomplish, "half -dovetail" notching which is probably one of the most common, and "square" notching secured with pegs or spikes. The notching method on some of the earliest eastern cabins and most 19th century western cabins, particularly saddle notching, left an extended log end or "crown." Crowns are especially pronounced or exaggerated in Rustic style structures, and sometimes they are cut shorter as the wall rises, creating a buttress effect at the corners of the building. Another method of securing log ends consists of fastening logs that are laid without notching ("false notching") with tenons into vertical corner posts, or using spikes or pegs to attach them to vertical corner planks. Vertically positioned logs were secured at their top and bottom ends, usually into roof and sill plate timbers. Selecting Logs and Assembling the Building Although wood selection was most likely to be determined by availability, chestnut, white oak, cedar, and fir were preferred because these trees could provide long, straight, rot -resistant logs. Pine, which also provided long straight logs, was also used in areas where it was plentiful. Woods were often mixed, utilizing harder, heavier rot - resistant wood such as white oak for the foundation,"sill log", and lighter, more easily hewn wood such as yellow poplar for the upper log courses. One of the principal advantages of log construction was the economy of tools required to complete a structure. A felling axe was the traditional tool for bringing down the tree and cutting the logs to length. For many frontier and western structures the round logs were debarked or used in their original form with the bark left on, or one or more sides of the logs were hewn flat with a broadaxe, or more finely finished with an adze as smooth thick planks. Notching was done with an axe, hatchet or saw; openings for doors and windows were usually cut after the logs were set into place, and door and window frames, particularly jambs, were put in place during construction to help hold the logs in place. Roof framing members and floor joists were either hewn from logs or of milled lumber. A log cabin could be raised and largely completed with as few as two to four different tools, including a felling axe, a broad axe, and a hand saw or crosscut saw. http://www2.cr.nps.gov/tps/briefs/brief26.htm 3/30/2003 Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 6 of 18 z _ e The upper gable walls were completed with logs if the roof was constructed with purlins, — which is more typical of Scandinavian or Finnish construction, and western and 20th century Rustic styles. However, vertical or horizontal weatherboard sheathing was commonly used throughout the country to cover wood -framed gables. _ 115 Chinking and Daubing The horizontal spaces or joints between logs are usually filled with a combination of materials that together is known as "chinking" and "daubing." Chinking and daubing completed the exterior walls of the log pen by sealing them against driving wind and snow, helping them to shed rain, and blocking r the entry of vermin. In addition, chinking and cry r daubing could compensate for a minimal amount of hewing and save time if immediate shelter was needed. Not all types of log buildings were chinked. Stone or wood strips served to fill in the Corncribs, and sometimes portions of barns where chinking areas over which the daubing was applied. Photo: NPS files. ventilation was needed were not chinked. While more typical of Swedish or Finnish techniques, and not as common in American log construction, tight -fitting plank -hewn or scribed -fit round logs have little or no need for chinking and daubing. A variety of materials were used for chinking and daubing, including whatever was most conveniently at hand. Generally though, it is a three-part system applied in several steps. The chinking consists of two parts: first, a dry, bulky, rigid blocking, such as wood slabs or stones is inserted into the joint, followed by a soft packing filler such as oakum, moss, clay, or dried animal dung. Daubing, which completes the system, is the outer wet -troweled finish layer of varying composition, but often consisting of a mixture of clay and lime or other locally available materials. Instead of daubing, carefully fitted quarter poles or narrow wood strips were sometimes nailed lengthwise across the log joints. Chinking, especially the daubing, is the least durable part of a log building. It is susceptible to cracking as a result of freeze -thaw action, structural settlement, drying of the logs, and a thermal expansion -contraction rate that differs from that of the logs. _ Seasonal deterioration of chinking necessitates continual inspection and regular patching or replacement. Exterior Wall Treatments Although the exterior logs of cabins in the West, and 20th century Rustic buildings are generally not covered, many 18th and 19th century log houses east of the Mississippi, — with the exception of some of the simpler cabins and houses in remote or poorer areas, were covered with exterior cladding. The exterior of the log walls was covered for both aesthetic and practical reasons either as soon as the building was completed or sometime later. j In some instances, the exterior (and interior) of the logs was whitewashed. This served to discourage insects, and sealed hairline cracks in the daubing and fissures between the daubing and logs. Although the solubility of whitewash allows it to heal some of its own hairline cracks with the wash http://www2.cr.nps.gov/tpsibriefs/brief26.htm 3/30/2003 "" p. , rreservation 13net 26: the Preservation and Repair of Historic Log Buildings Page '/ of IS of rain, like daubing it has to be periodically reapplied. Usually, a more permanent covering such as wood siding or stucco was applied to the walls, which provided better insulation and protection, and reduced the maintenance of the log walls. Sometimes log houses were sided or stuccoed later in an attempt to express a newly -achieved financial or social status. Many log houses were immediately sided and trimmed upon completion to disguise their simple construction beneath Georgian, Federal and later architectural styles. Frequently a log house was covered, or recovered, when a new addition was erected in order to harmonize the whole, especially if the original core and its addition were constructed of different materials such as log and wood frame. Once the siding is gone, the logs may rapidly deteriorate unless another protective treatment is applied. Photo: NPS files. Vertical wood furring strips were generally nailed to the logs prior to applying weatherboarding or stucco. This ensured that the walls would be plumb, and provided a base on which to attach the clapboards, or on which to nail the wood lath for stucco. Foundations Log building foundations varied considerably in quality, material, and configuration. In many cases, the foundation consisted of a continuous course of flat stones (with or without mortar), several piers consisting of rubblestone, single stones, brick, short vertical log pilings, or horizontal log "sleepers" set on grade. The two "sill logs," were laid directly upon one of these types of foundations. Climate and intended permanence of the structure were the primary factors affecting foundation construction. The earliest log cabins, and temporary log dwellings in general, were the most likely to be constructed on log pilings or log sleepers set directly on grade. Where a more permanent log dwelling was intended, or where a warm, humid climate accelerated wood decay, such as in the South, it was sometimes more common to use stone piers which allowed air to circulate beneath the sill logs. Full cellars were not generally included in the original construction of most of the earliest log houses, but root cellars were often dug later. Roofs Log buildings were roofed with a variety of different framing systems and covering materials. Like log house plans and corner notching styles, the types of roof framing systems used were often variations on particular ethnic and regional carpentry traditions. In most cases wood shingles were the first roof covering used on the earliest 18th and 19th century log houses. As wood shingle roofs deteriorated, many were replaced with standing seam metal roofs, many of which continue to provide good service today. Later pioneer log buildings west of the Mississippi were likely to be roofed with metal or roll roofing, or even with sod. Other log buildings have been re -roofed in the 20th century with asphalt shingles. For some rustic log buildings in the West and Great Camps in the Adirondacks, asphalt shingles are the original historic roofing material. Chimneys http://www2.cr.nps.gov/tps/briefs/brief26.htm 3/30/2003 Preservation Brief 26: The Preservation and Repair of Historic Log Buiidings rage 6 of i is — Ethnic tradition and regional adaptation also influenced chimney construction and placement. Chimneys in loghouses were usually built of stone or brick, a combination of the two, or even -clay -lined, notched logs or smaller sticks. Later log buildings were frequently constructed with only metal stacks to accommodate wood stoves. The — chimneys of log buildings erected in cold climates tended to be located entirely inside the house to maximize heat retention. In the South, where winters were less severe the chimney stack was more typically constructed outside the log walls. With the advent of more efficient heating systems, interior chimneys were frequently demolished or relocated and rebuilt to maximize interior space. Interior Finishes Logs on the interiors of many of the simpler cabins and Rustic style structures were often given a flattened surface or left exposed. But, in the more finished log houses of the 18th and 19th century, they were more commonly covered for most of the same reasons that the exterior of the logs was covered --improved insulation, ease of maintenance, aesthetics, and keeping out vermin. Covering the interior log walls with 7 planks, lath and plaster, boards pasted with newspaper, fabric such as muslin, or wallpaper increased their resistance to air infiltration and their insulation value. Finished walls could be cleaned and painted more easily, and plastered walls and ceilings obscured the rough log construction and prepared interior surfaces for decorative wood trim in the current styles. Historical Evaluation and Damage Assessment Before undertaking preservation work on a historic log building, its history and design should be investigated, and physical condition evaluated. It is always advisable to hire a historical architect or qualified professional experienced in preservation work to supervise the project. In addition, State Historic Preservation Offices, regional offices of _ the National Park Service, and local historical commissions may also provide technical and procedural advice. The historical investigation should be carried out in conjunction with a visual inspection of the log building. Physical assessment needs to be systematic and thorough. It should include taking notes, photographs or video recording, and making drawings of existing conditions, including overall and detail views. This will serve as a record of the appearance and condition which can be referred to once work is under way. A physical assessment should also identify causes of deterioration, not just symptoms or manifestations and, in some instances, may need to include a structural investigation. — Foundation Inspection The foundation of a log building should always be inspected before beginning work because, as in any building, foundation -related problems can transfer structural defects to other components of the building. Settling of the foundation is a typical condition of _ log buildings. If settlement is not severe and is no longer active, it is not necessarily a problem. If, however, settlement is active or uneven, if it is shifting structural weight to unintended bearing points away from the intended main bearing points of the corner _ notches and sill log, serious wall deflections may have resulted. Causes of settlement may include foundation or chimney stones or sill logs that have sunk into the ground, decay of log pilings, log sleepers, or of the sill logs themselves. _ Log Inspection - http://www2.cr.nps.gov/tpsibriefs/brief26.htm 3/30/2003 Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 9 of 18 Foundation problems usually result in damage to the sill logs and spandrels, which are often the most susceptible to deterioration. Sill logs, along with the corner notching, tend to bear most of the weight of the building, and are closest to vegetation and the ground, which harbors wood -destroying moisture and insects. If the sill log has come into contact with the ground, deterioration is probably underway or likely to begin. It is also important to check the drainage around the building. The building assessment should note the condition of each log and attempt to identify the sources of problems that appear to exist. Sill log inspection should not necessitate destruction of historic exterior cladding if it exists. Inspection can usually be made in areas where cladding is missing, loose, or deteriorated. Sill log, as well as upper log, deterioration may also be revealed by loose or peeling areas of the cladding. If pieces of cladding must be removed for log inspection, they should be labeled and saved for reinstallation, or as samples for replacement work. Historic cladding generally need not be disturbed unless there are obvious signs of settling or other indications of deterioration. Other areas of the log walls which are particularly susceptible to deterioration include window and door sills, corner notches, and crowns, and any other areas regularly saturated by rain runoff or backsplash. The characteristic design feature of Adirondack or Rustic style log buildings of leaving log ends or crowns to extend beyond the notched corners of the building positions the crowns beyond the drip -line of the roof edge. This makes them vulnerable to saturation from roof runoff, and a likely spot for deterioration. Saddle notching in which the cut was made out of the top surface of the log and which cups upward, and flat notching, may also be especially susceptible to collecting runoff moisture. Detection of decay requires thorough inspection. Probing for rot should be done carefully since repair techniques can sometimes save even badly deteriorated logs. Soft areas should be probed with a small knife blade or icepick to determine the depth of decay. Logs should be gently tapped at regular intervals up and down their lengths with the tool handle to detect hollow -sounding areas of possible interior decay. Long cracks which run with the wood grain, called "checks," are not signs of rot, but are characteristic features of the seasoning of the logs. However, a check can admit moisture and fungal decay into a log, especially if it is located on the log's upper surface. Checks should also be probed with a tool blade to determine whether decay is underway inside the log. Sill log ground contact and relative moisture content also provide ideal conditions for certain types of insect infestation. Wood building members, such as sill logs or weatherboarding, less than eight inches from th— ground, should be noted as a potential problem for monitoring or correction. Sighting of insects, or their damage, or telltale signs of their activity, such as mud tunnels, exit holes, or "frass," a sawdust -like powder, should be recorded. Insect infestation is best treated by a professionally licensed exterminator, as the chemicals used to kill wood -destroying insects and deter reinfestation are generally toxic. Roof Inspection This rotted sill cannot be repaired and must be replaced. Photo: NPS tiles. Along with the foundation, the roof is the other most vital component of any building. htti)://www2.cr.nDS.2ov/tt)s/hriefsfbrief26.htm 3/30/2003 Sent By: American Family Insurance; 970 229 9087; �n 00'ft<-) Western Surety C BID BOND (mod Amount) . KNOW ALL PERSONS BY THESE PRESENTS. That we Box 245, ULe .rue, CO refeemad b its brie PrUK:ipal. end _.. as a as Surety, are had and firmly hound unto — Ofaon S& 2r�d F]�gor, Fo=t Ci mkvW t0 as the Obligee, in the sum of M m5xyapA am Doll#fs ($ 90, 0oo. UO .), for fhe paytfwnt ofwhich we hind and assigns. jokttly OM tevM*, firmht by these pamagnbs. WHERE -AS, Principal has submbed or is about to submit a Proposal to M htl x May-15-03 9:09AM; Page 1 of • � herabrafter .--_, hereintaf6er Our legal row"entativas, su000080M an a condeat br NOW. THEREFORE, if the said contract be &warded to Prirtdpal and Prin at shay. within ach time as may be apac3fiad, wor into the contud in wddM and on such band or bonds amay be spedped in the bidding or con4v ct domor wits with surety acceptable to Ohiibgee: or if PFndpal -aim 1 trait to do so, psy to Obftw the daretmpaa•whid► Obligor may 69W by reMn of such Mure not the penauy Of this bond, than this 0h tft rha g bo void: aowwime to remain infug farce and affect. SIGNED. SEALED AND DATED this 22M day Of 0 3 Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 10 of 18 t The roof system consists of, from top to bottom, the covering, usually some form of shingles or metal sheeting and flashing; board sheathing or roof lath strips; the framing structure, such as rafters or purlins; the top log, sometimes referred to as the "roof plate" or "rafter plate;" and, sometimes, but not always, gutters and downspouts. The roof and gutters should be inspected and checked for leaks both from the exterior, 2 as well as inside if possible. Inspection may reveal evidence of an earlier roof type, or covering, and sometimes remnants of more than one historic covering material. The roof may be the result of a later alteration, or raised when a second story was added, or repaired as the result of storm or fire damage. Often, roof framing may be composed of reused material recycled from earlier buildings. Inspection of the roof framing should note its configuration and condition. Typical problems to look for are framing members that have been dislodged from their sockets in the roof plate, or that are cracked, ridge _ damage, sagging rafters, broken ties and braces, and decay of exterior exposed rafter or purlin ends, especially common on Rustic style buildings. Other Features The rest of the building should also be inspected as part of the overall assessment, including siding, window sash and frames, door frames and leafs, chimneys, porches, and interior walls, trim, and finishes. Any of these features may exhibit deterioration problems, inherent to the material or to a construction detail, or may show the effects of problems transmitted from elsewhere, such as a deformed or mis-shapen window - frame resulting from a failed sill log. The inspection should note alterations and repairs made over time, and identify those modifications which have acquired significance and should be preserved. Nothing should be removed or altered before it has been examined and its historical significance noted. Preservation Treatments Since excessive moisture promotes and hastens both fungal and insect attack, it should be dealt with immediately. Not only must the roof and gutters be repaired --if none ' exist, gutters should probably be added --but the foundation grade should be sloped to ensure drainage away from the building. If the distance from the ground to the sill log or exterior sheathing is less than eight inches, the ground should be graded to achieve _ this minimum distance. Excess vegetation and debris such as firewood, dead leaves, or rubbish should be cleared from the foundation perimeter, and climbing vines whose leaves retain moisture and tendrils erode daubing, should be killed and removed. Moisture problems due to faulty interior plumbing should also be remedied. Solving or reducing moisture problems may in itself end or halt the progress of rot and wood - destroying insects. Log Repair Stabilizing and repairing a log that has been only partially damaged by decay or insects is always preferable to replacing it. Retaining the log, rather than substituting a new one, preserves more of the building's integrity, including historic tool marks and the wood species which may no longer be obtainable in original dimensions. Log repair can generally be done with the log in place at less cost, in less time, and with less damage to building fabric, than by removing, and installing a new hewn and notched replacement log. Log repair is accomplished by two basic methods: traditional methods _ of splicing in new or old wood, or through the use of epoxies. These treatments are sometimes combined, and may also be used in conjunction with reinforcing members. s.M http://www2.cr.nps.gov/tpsibriefs/brief26.htrn 3/30/2003 Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 11 of 18 Historic log repair, whether it involves patching techniques or the use of epoxies, should always be performed only by an experienced craftsperson or architectural conservator. Wood Splicing Wood splicing can involve several types of techniques. Also referred to as "piecing -in" or "Dutchman" repair, it involves treating a localized area of deterioration by cutting out the decayed area of the log, and carefully carving and installing a matching, seasoned wood replacement plug or splice. The wood species, if available, and the direction and pattern of the grain should match that of adjacent original wood. The location and depth of decay should determine the splicing technique to be used. In a case where decay runs deep within a log, a full -depth segment containing the affected area can be cut out, severing the log completely, and a new segment of log spliced in, using angled "scarf" joints or square -cut "half -lap" joints. The splice is secured to the severed log by angling lag screws or bolts through the upper and lower surfaces that will be concealed by daubing. Splicing can also be performed using epoxy as an adhesive. A log with shallow decay on its outer face can be cut back to sound depth, and a half -log face spliced on, adhered with epoxy, screws or bolts. A technique for the repair of badly deteriorated log crowns involves cutting them back to sound wood, and into the notching joint if necessary, and installing new crowns cut to match. Fiberglass or aluminum reinforcement rods are inserted into holes drilled into the new crowns, and into corresponding holes drilled in the ends of the original cutoff logs. Epoxy is used as an adhesive to attach and hold the new crowns in place. Long lag screws can be angled up through the underside of the crown into the log above to provide additional support for the repair. Epoxy Consolidation and Repair In some instances, epoxies may be used by themselves to consolidate and fill the voids left by deteriorated wood. Epoxies are versatile in performance, relatively easy to use by experts, and, after curing, may be shaped with woodworking tools. Their use requires that sufficient sound wood survives for the epoxy to adhere. But they can be used to stabilize rotted wood, return full or greater than original strength to decayed structure -bearing members, and to reconstitute the shape of decayed log ends. Epoxies resist decay and insects, and while epoxy itself is resistant to moisture, epoxy tends to cause adjacent wood to retain moisture rather than dry out, and if not used in the right location, can actually further a continuing cycle of wood decay. Hence, epoxy repairs are most successful in areas where they are protected from moisture. Epoxies, of which there are a variety of commercially -available products on the market, are prepared in essentially two forms: a liquid consolidant and a flexible putty filler.Each consists of a resin and a hardener which must be mixed prior to use. The technique of treating, for an example, a decayed log crown with epoxies is begun by removing loose decayed wood, and drying the area if necessary. The rot -affected cavity and surface of the log end is then saturated with liquid epoxy by repeated brushing, or by soaking it in a plastic bag filled with epoxy that is attached to the log. The porous condition of the rot -damaged wood will draw up the epoxy like a lamp wick. Once the liquid epoxy has saturated the log end and cured, the log end has been consolidated, and is ready for the application of an epoxy putty filler. The filler resin and hardener must also be mixed, pigments must be mixed with the filler epoxy to color the patch, and more importantly to protect it from ultraviolet sunlight. The filler can be applied with a putty knife, pressing it into the irregularities of the cavity. The cured patch can be worked like wood and painted with an opaque stain or a dull finish paint to htti)://www2.cr.nps.gov/tDs/briefs/brief26.htm 3/30/2003 Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 12 of 18 _ help it blend with surrounding wood, although epoxy repairs can be difficult to disguise on natural, unpainted wood. Epoxies can be used to consolidate and repair other areas of a log, including rotted internal areas which have not yet progressed to damage the log's outer surface. Saturation of small internal areas can be accomplished by drilling several random holes _ into the log through an area that will be concealed by daubing, and then pouring in liquid epoxy. If a pure resin is used, it should be a casting resin to minimize shrinkage, and it is best to fill voids with a resin that contains aggregates such as sand, or micro - balloons. Epoxy is frequently used by architectural conservators to strengthen deteriorated structural members. The damaged log can be strengthened by removing the deteriorated wood, and filling the void by imbedding a reinforcing bar in epoxy filler, making sure the void is properly sealed to contain the epoxy before using it. Sometimes larger decayed internal areas of a log can be more easily accessed and repaired from the interior of a structure. This may be a useful technique if it can be accomplished without causing undue damage to the interior finishes in the log building. However, _ despite its many advantages, epoxy may not be an appropriate treatment for all log repairs, and it should not be used in an attempt to conceal checking, or extensive log surface patching that is exposed to view, or logs that are substantially decayed or collapsed. Log Replacement Repairing or replacing only a segment of a log is not always possible. Replacement of an entire log may be the only solution if it has been substantially lost to decay and collapsed under the weight of logs above it. Log replacement, which should be carried out only by experienced craftspersons, is begun by temporarily supporting the logs above, and then jacking them up just enough to insert the new log. Potential danger to the structure may include creating inadequate temporary bearing points, and crushing _ chinking and interior finishes which may have settled slowly into non -original positions that cannot withstand jacking. The new sill matches the original and is a compatible replacment. Photo: NPS tiles. To begin the process of log replacement, the entire length of the log must be inspected from the exterior and the interior of the structure to determine whether it supports any structural members or features, and how their load can be taken up by bracing during jacking and removal. On the exterior, sheathing such as weatherboard, and adjacent chinking, must be removed along the length of the log to perform this inspection. Likewise, on the interior, abutting partition walls and plaster may also need to be removed around the log to determine what, if any, features are supported by - or tied into the log to be removed. _ A replacement log should be obtained to match the wood species of the original being removed. If it Is a hewn log, then the replacement must be hewn to replicate the dimensions and tool marks of the original. If the same wood species cannot be obtained in the original dimensions, a substitute species may have to be used, and may even be preferable in some instances if a more durable wood can be found than the original wood species. It should, however, be chosen to match the visual characteristics of the original species as closely as possible. http://www2.cr.nps.gov/tps/briefs/brief26.htm 3/30/2003 k ,.. Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 13 of 18 Wood Preservatives In most instances, the use of chemical wood preservatives is not generally recommended on historic log buildings. Preservatives tend to change the color or appearance of the logs. In addition, many are toxic, they tend to leach out of the wood over time, and like paint, must be periodically reapplied. Many of the late 19th and early 20th century Rustic structures were constructed of logs with the bark left on which may provide protection, while others have been painted. However, some log buildings, and especially log houses that have been inappropriately stripped of historic cladding in an earlier restoration, and now show signs of weathering, such as deep checking, may be exceptions to this guidance. A preservative treatment may be worth considering in these cases. Boiled linseed oil may sometimes be appropriate to use on selected exposures of a building that are particularly vulnerable to weathering, although linseed oil does tend to darken over time. Borate solutions, which do not alter the color or appearance of wood, may be another of the few effective, nonhazardous preservatives available. However, borate solutions do not penetrate dry wood well, and thus the wood must be green or wet. Because borate solutions are water-soluble, after treating, the wood must be coated with a water-repellent coating. In some instances, it may be appropriate to reapply varnish where it was used as the original finish treatment. Pressure -treating, while effective for new wood, is not applicable to in -place log treatment, and is generally not effective for large timbers and logs because it does not penetrate deeply enough. Foundation Repair The foundation should have good drainage, be stable, adequately support the building as well as any future floorloads, and keep the sill log sufficiently clear of the ground and moisture to deter decay and insect infestation. Log buildings with cellars are less likely to suffer problems than those built upon the ground or with crawl spaces, as long as the cellar is kept dry and ventilated. Because the foundations of many log buildings were neither dug nor laid below the frost -like, they generally tend to be susceptible to freeze - thaw ground heaving and settlement. Also, as previously noted, some foundations consisted of wooden sleepers or pilings in direct contact with the ground. If a foundation problem is minor, such as the need for repointing or resetting a few stones, work should address only those areas. Loose stones should be reset in their original locations if possible. A clearly inadequate foundation that has virtually disappeared into the ground, or where large areas of masonry have buckled or sunk, resulting in excessively uneven or active settlement, will need to be rebuilt using modern construction methods but to match the historic appearance. Chinking Repair Repair of chinking, whether it is finished on the exterior with wooden strips or with daubing, should not be done until all log repair or replacement, structural jacking and shoring is completed, and all replacement logs have seasoned. Historically, patching and replacing daubing on a routine basis was a seasonal chore. This was because environmental factors -- building settlement, seasonal expansion and contraction of logs, and moisture infiltration followed by freeze -thaw action --cracks and loosens daubing. If the exterior log walls are exposed, and the chinking or daubing requires repair, as much of the remaining inner blocking filler and daubing should be retained as possible. A daubing formula and tooled finish that matches the http://www2.cr.nps.gov/tpsibriefs/brief26.htm 3/30/2003 .. _ .. .. Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 14 of 18 Daubing composed entirely of Portland cement is never appropriate to use on a hi tod to buildin Photo: historic daubing, if known, should be used, or based on one of the mixes listed here. For the most part, modern commercially - available chinking products are not suitable for use on historic log buildings, although an exception might be on the interior of a log building where it will be covered by plaster or wood, and will not be visible. These products tend to have a sandy appearance that may be compatible with some historic daubing, but the color, and other visual and physical characteristics are generally incompatible with historic log surfaces. Sections of wood chinking which are gone or cannot be made weathertight should be replaced with same -sized species saplings or quarter poles cut to fit. Generally, unless bark was used originally, it should be removed before nailing the new wood chinking replacements tightly into place. Nas files., g Analysis of daubing can be done in much the same way as mortar analysis. If that is not feasible, by crushing a loose piece of daubing its constituent parts can be exposed, which may typically include lime, sand, clay, and, as binders, straw or animal hair. The color imparted by the sand or pigmented constituents should be noted, and any areas of original daubing should be recorded with color film for later reference. Daubing that is loose or is not adhered to the logs must first be cleaned out by hand. Blocking filler should be left intact, refitting only loose pieces. (Sometimes it may be difficult to obtain a good bond in which case it may be necessary to clean out the joint entirely.) If needed, soft filler should be added, such as jute or bits of fiberglass batt, pressed firmly into voids with a stick or blunt tool. Concealed reinforcement may sometimes be used, depending upon the authenticity of the restoration. This can include galvanized nails partially inserted only on the upper side of the log to allow for the daubing to move with the upper log and keep the top joint sealed, or galvanized wire mesh secured with galvanized nails. Like repointing masonry, daubing should not be done in full sun, excessive heat or when freezing temperatures are expected. The daubing materials should be dry -mixed, the chinking rechecked as being tight and secure, and the mix wetted and stirred to a stiff, paste - like consistency. The mix dries quickly, so no more daubing should be prepared at a time than can be applied in about 30 minutes. A test patch of new daubing, either on the building, or in a mockup elsewhere, will help test the suitability of the formula's color and texture match. Before applying the daubing, the chinking area, including filler and log surfaces to be covered, should be sprayed with water to prevent the dry filler from too rapidly drawing off the daubing moisture which will result in hairline cracking. A trowel, ground to the width of the daubing, is used to press the daubing into the chinking space, and to smooth the filled areas. Wide or deep chinking spaces or joints may have to be daubed in layers, to prevent sagging and separation from the logs, by applying one or two scratch coats before finishing the surface. Portland cement was a part of the original daubing used in many late 19th and early 20th century log buildings, and is therefore appropriate to include in repairing buildings of this period. Although a small amount of portland cement may be added to a lime, clay and sand mix for workability, there should not be more than 1 part portland cement to 2 parts of lime in daubing mixes intended for most historic log buildings. Portland cement tends to shrink and develop hairline cracks, and retain moisture, all of which can be potentially damaging to the logs. httn-//www2_cr.nns.eov/tos/briefs/btief26.htm 3/30/2003 *_ Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 15 of 18 Daubing Mixes ` MIX A 1 MIX B MIX C parts (volume) material 1/4 cement 1 lime 4 sand 1/8 dry color hog bristles or excelsior 6 sand 4 lime 1 cement 1 portland cement 4-8 lime 7-10 sand Mix A (Donald A. Hutsler, "Log Cabin Restoration: Guidelines for the Historical Society," American Association for State and Local History, Technical Leaflet No. 74, "History News," Vol. 29, No. 5 (May 1974.) Mix B and C are reprinted from "Log Structures: Preservation and Problem -Solving," by Harrison Goodall and Renee Friedman, Nashville, TN: American Association for State and Local History, 1980. Interior Treatments There is no single appropriate way to finish or restore the interior of a historic log house. Each building and its history is unique. The temptation should be resisted to impart an unfinished frontier character by removing plaster to expose interior log walls or joists in the ceiling. Instead, interior treatments should be based on existing evidence, and guided by old photographs, written documentation, and interviews with previous owners. Interior features and finishes that might exist in some 18th and 19th century log houses include wood paneled walls, wood moldings, stairs, and fireplace mantels; where they have survived, these features should be retained. Many of the more rustic log buildings built later in the 19th or early 20th century intentionally featured exposed interior log walls, sometimes with the logs peeled and varnished. If interior plaster is severely damaged or has previously been removed, and evidence such as lath ghosting on the logs exists, walls should be replastered or recovered with gypsum board or dry wall to match the historic appearance. Preserving Log Buildings in Their Historic Settings http://v✓�vw2.cr.ni)s.,Rov/tps/briefs/brief26.htm 3/30/2003 Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 16 of 18 — K Log buildings are too often viewed as portable resources. Like other historic buildings, moved or relocated log structures can suffer a loss of integrity of materials and of setting. Historic buildings listed in the National Register of Historic Places may be subject to loss of that status if moved. Despite the popularity of dismantling and relocating log buildings, they should be moved only as a last resort, if that is the only way to save them from demolition. If they must be moved, it is preferable that they be moved intact-- that is, in one piece rather than disassembled. Disassembling and moving a log building can result in considerable loss of the historic building materials. While the logs and roof framing members can be numbered for reassembly, dismantling a log building can result in loss of such features as foundation and chimney, chinking and daubing, exterior cladding, and interior finishes. Furthermore, log buildings can rarely be put back together as easily as they were taken apart. Summary Historic log buildings regardless of whether they are of horizontal or vertical ' construction, or whether they are 18th century log houses or early 20th century Rustic style cabins, are unique. Their conservation essentially centers on the preservation and repair of the logs, and appropriate repairs to chinking and daubing, which like — repointing of masonry, is necessary to ensure that most log buildings are weathertight. Log building preservation may be accomplished with a variety of techniques including splicing and piecing -in, the use of epoxy, or a combination of patching and epoxy, and — often, selected replacement. But, like any historic building, a log structure is a system that functions through the maintenance of the totality of its parts. The exterior of many of the earliest late 18th and 19th century log buildings, and particularly those east of the Mississippi, were commonly covered with some type of cladding, either horizontal or vertical wood siding, stucco, or sometimes a combination. If extant, this historic cladding, which may be hidden under a later, non -historic — artificial siding such as aluminum, vinyl, or asbestos, should be preserved and repaired, or replaced if evidence indicates that it existed, as a significant character -defining feature of the building. _ Selected Reading Briscoe, Frank. "Wood -Destroying Insects." The Old -House Journal. Vol. XIX, No. 2 (March/April 1991), pp. 3439. Caron, Peter. "Jacking Techniques for Log Buildings." Association for Preservation Technology Bulletin. Special Issue: Alberta Culture. Vol. XX, No. 4 (1988), pp. 4254. Cotton, J. Randall. "Log Houses in America." The Old -House Journal. Vol. XVIII, No. 1 (January/February 1990), pp. 37-44. Elbert, Duane E., and Keith A. Sculle. Log Buildings in Illinois: Their Interpretation and — Preservation. Illinois Preservation Series: Number 3. Springfield, IL: Illinois Department of Conservation, Division of Historic Sites, 1982. Goodall, Harrison. "Log Crown Repair and Selective Replacement Using Epoxy and Fiberglass Reinforcing Rebars: Lamar Barn, Yellowstone National Park, Wyoming." Preservation Tech Notes, Exterior Woodwork Number 3. Washington, D.C.: Preservation Assistance Division, National Park Service, U.S. Department of the Interior, 1989. httn://www2.cr.nns. eov/tns/brie fs/brief26.htm 3/30/2003 Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 17 of 18 and Renee Friedman. Log Structures: Preservation and Problem -Solving. Nashville, TN: American Association for State and Local History, 1980. Hutslar, Donald A. The Architecture of Migration: Log Construction in the Ohio Country, 17501850. Athens, OH: Ohio University Press, 1986. Log Cabin Restoration: Guidelines for the Historical Society, American Association for State and Local History Technical Leaflet 74. History News. Vol. 29, No. 5, May 1974. Jordan, Terry G. American Log Buildings: An Old World Heritage. Chapel Hill, NC: The University of North Carolina Press, 1985. Kaiser, Harvey H. Great Camps of the Adirondacks. Boston: David R. Godine Publisher, Inc., 1986. Merrill, William. Wood Deterioration: Causes, Detection and Prevention." American Association for State and Local History Technical Leaflet 77. History News. Vol. 29, No. 8, August, 1974. Rowell, R.M., J.M. Black, L.R. Gjovik, and W.C. Feist. Protecting Log Cabins from Decay. U.S.D.A. Forest Service Products Laboratory, General Technical Report, FPL11. Madison, WI: Forest Products Laboratory, Forest Service, U.S. Department of Agriculture, 1977. St. George, R.A. Protecting Log Cabins, Rustic Work and Unseasoned Wood from Injurious Insects in the Eastern United States. Farmer's Bulletin No. 2104, United States Department of Agriculture. Washington, D.C.: Government Printing Office, 1962 (Rev. 1970). Tweed, William C., Laura E. Soulliere, and Henry G. Law. National Park Service Rustic Architecture: 1916-1942. San Francisco, CA: Division of Cultural Resource Management, Western Regional Office, National Park Service, February 1977. Wilson, Mary. Log Cabin Studies. Cultural Resources Report No. 9. Ogden, UT: United States Department of Agriculture, Forest Service, 1984. Acknowledgements The author, a Preservation Specialist at the Pennsylvania Historical and Museum Commission, wishes to thank those experts who reviewed and commented upon the draft manuscript: James Caufield; 1. Randall Cotton; Harrison Goodall; Donald A. Hutslar; Terry G. Jordan; Bernard Weisgerber; Rodd Wheaton; and National Park Service professional staff. Anne E. Grimmer is credited with directing this cooperative publication project and general editorship. Washington, D.C. September, 1991 Home page logo: The log cabin was used on this 1840 campaign metal to symbolize frontier life and egalitarianism, a platform that successfully elected William Henry Harrison to the presidency. Photo: The State Museum of Pennsylvania, Pennsylvania Historical and Museum Commission. This publication has been prepared pursuant to the National Historic Preservation Act of 1966, as amended, which directs the Secretary of the Interior to develop and make hftn•UAa.nanv7 rr nnc onvhnc/hriefc/hrip.06i htm 3/30/2003 Preservation Brief 26: The Preservation and Repair of Historic Log Buildings Page 18 of 18 available information concerning historic properties. Technical Preservation Services (TPS), Heritage Preservation Services Division, National Park Service prepares standards, guidelines, and other educational materials on responsible historic preservation treatments for a broad public. Order Brief I Technical_ Preservation Services I Preservation Briefs I Search I Questi— An KD W Nadonnvsawce Privacy 8 Disclaimer http://www2.cr.nps.gov/tps/briefs/biief26.htm 3/30/2003 .. 9GIIL Yy• I�MG, 14911 1 9.ILir 111uu. u1.4 ,. v.v - - - vvv• t ..._I —------- \Akswian Surety POWER Or ATTORNEY - xaow All Mma By Tb me Pttweaem, that W8,89''SBN SURM COMPANY,!& mq laws of the &aa of ®auk Dakota tad bariss its prtadpsi a0m is Visas Palls, gone stake, maatimakmad appelas. CrLAij Zdv rd 1latit191INX yet etw &sd Imarm ateemUsy(a)la-6met, With &U lower wd authority b w4y conptrred, iea beoaif ma Asaw. boade 1 ar. Pdoov t Empire Carpentry. LLC .ObHps: City of tort Collin Ammut $500.000.00 COPY Bond No. _. 6-9520086 rstlm duly mpaised sad adsdn6 mader as LAW& (as'Ceatpaar4 dear by thmme tuaaoato r smuuta, aokmmwlsdp mad dalirer Jhr sad ea amd ID bird the Catapagy thaeeby a ARRY and to tha ease aamm u Vt web bead& mp W by taw Sevier Vice Pmastdapt, wlyd with tits awrwab au at ohm Cmmpamy and duly ammmurd a i4 Petmagl im raftin{ and omEmsies all that the mid attarm"Wnfi rosy do Wawa the &boss atddad Use tadaei. Adid appaiatpwns ft ads uadsr mad by mmmeeky oT ma IbOo•!os bylaw etAemmam gueety twapany whkk mmaita is 11A lxat esd !Batt 95eotimn 7. All Ueda. pal au►, madar akiap, Powers of Atmmnmy or QTW ObW eatpmato name atba CeaWpapy by for PneMem.. Samoa any Andemat Saararat other 6011mm as the Broad d Dieeeeom msy amdbostw. The Prasidsa4 aw Vise •Prod Tram~ may plat AMmis ye in Pad st "sate wha aW haw addkadW ta.itaao sbs tkeapao The eorporaM amal is rot mommaay the dm vaUdity otsmy bands. pots ohiisadme of the camporaWsm. The a cdatmra damy mach WBw sad eke wrgomm seal A_LI l dhacity temeby "Oka" WARD eisptre and mrsalnam, -*k mt as4as. **Wu r hr—me. but matil smelt time shsU be knvronhle sad in to them and *Sma. 7a Wieser tvlom mg Weston Swim Cm Apmgr bra camead tome p Heasat spy ram anal to tr t�tad Whir 13t i'h dw at —... m bo W IE a on ehls LUb day of may to die year h Paul T. avlat, vita bring Om ame daly tmroe;, atkaawtadpd "be board tM &bass WEVI'lISM SUsRCPY COMPANY a" sdatewlsdpdmaidbastmument m he the veluataty O. KREL4 rra�utd� aN Camryeeton mlpr.e itbuame+r aC, 400s I the uo&MgaWd sffiar atwateah Suety C*mpaty, a awk eospoeaeian mf the tilt &ttaolMd Pewee at Atmmnny is in NU low mat stbet bad to iemMmaable. tad eked swa ima as ma dortk In the Poww of Accom p Is now iv lhtra. vasumm r. mar aqy Vtiadw�PresMannt mtr byi and Sso»tmr, say Artmaat Ymm»tmtr. or tha Is, p "*$. mar uadertmump in the Asrw of �odmsra)d�a Pmwm of AWmay or adm ha mrtmad hoomils.• beftemAnoaot AveuaF_]3_ by its paslar Vm Prsaide m Paul T. 2003 BURRY COMPANY ro aWe. a no" publk. pummally appowA was at Atdmaq as do afsramid arbour of sad dead of yid ompwadaik t at Seat% Dakar&. de bmby esrdW that the that Smotios 7 of the bylaws of tbs Cmmpmay Ia teetllsmeay wbeneL i bwe bommia Mt my !road mm! sal of ftstm S weir ce a tmy m - I nth _.... ._ dry st I shiw w$s":L& SUREMY COMPANY India I ttrsidset Rem paeea.e.tma 4.. Sent By: American Family Insurance; 970 229 9097; May-15-03 9:10AM; Page 3/3 AMPO laoOOKPM of SURMY MTf: OF )(1300NOINuaozney-;n-Faara Cotner of ROE On We �►? day of MW and fir add Causty, Perooaany appeared Craig r lbatur to me poffmwaUy kwwn wW Erma by > " sworn. did may, that ha is .t COWANY. a awpsration of swux Fans. amth Dakota. woobR% maaniad'=A as !haft of fknllb Dakota. that tit kdd L=rUMMMS was aoosanad oa babW of Ots Direaltaa and tML tbo aaie Cra 1 e X6ftrd Ha 11bMr adMvwlod;os aid tukeua+sat a be no frw art tad dead oc said aoty eAva and' Nitbntic t(ddaF eba aorpotsfa ayai of aid strporatten. III F TUM P. I haw >waute w sag ad tarn na and a!I[xad lapt-ONSINtba day and you Fat oio" written. frw,oe.,dn.a 2003 , boom M. a notary IMMW is is Atesrnaydw-Paat of VIEW lfi BORErY jww radar and by virtue of tM taws of tbo ad aorirratiaa by authority of its ]hard of Iasi he hw autbstigr t, � � iaaRrusaat aicl%��eal at ry.: tom! �1.� M s x SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. Name of Bidder: Empire Carpentry LLC 2. Permanent main office address: Mail & legal: PO Box 245, Bellvue, CO 80512 (Shop local: 521-1/2 Sycamore St, Fort Collins, CO 80521) 3. When organized: September,1979 4. If a corporation, where incorporated: Colorado, LLC 5. How many years have you been engaged in the contracting business under your present firm or trade name? 23 years 9 months 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) Buffington Residence remodel ($37,000) Start: 6/11/03 End: 10/30/03 Dedner basement remodel ($28,000) Start: 6/8/03 End: 7/11/03 Kerst window install ($2,500) Start: 6/8/03 End: 6/13/03 General character of Work performed by your company: Historic rehabilitation and stabilization of historic properties, including residences and commercial. Remodels and additions to eiristing structures. 8. Have you ever failed to complete any Work awarded to you? If so, where and why? No 9. Have your ever defaulted on a contract? If so, where and why? No 10, Are you debarred by any government agency? No If yes list agency name. 7/96 Section 00420 Pagel of 5 5 12 REGLREPAIR, PAINT fp,) 12 AND REIN REINSTALL WINDOW SASHES AND WINDOW 5TOP5 Gerou & REPLACE M1551NG TRIM AND SILL WITH WHITE PINE OF Associates 51MILAR DIMEN51ON AND TOOLING Civic ST ELEVATION 2' • 1'-0' Architecture, Ltd. 303. RE -ATTACH GABLE ww.ge4 u.net www•Seiou.net END TO 5TRUCTURE - REPAIR OR REPLACE Memba American ANY M1551NO WOOD CLADDING Institute of Architects O Historic Preservation For TREATMENT OF HIGH The City of Fort MO15111RE CONTENT Collins LOG TO BE DETERMINED DURING 6ON5TRUCTION Franz -Smith Cabin .03 RUBBLE VENEER OVER TREATED TIMBER5 AND STEEL CHANNEL J Fort Collins Museum Courtyard Fort Collins, Colorado Copyright 2003 TwrrY.Y.r�N rr,r..l�rr �my�ysre.urrsu.r r l4Y.oarYYOIMr� .radr�..mwaie �YrYr...us sheet title s a r T aevnnoas O revision 53 DS O date 53ODS O project# 0506.01 O drawn by PAD checked by ► o A3 12. 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Berrittini-Heath Remodel — Fort Coffins Completed May 2003 1940's residential remodel $67,000 Massey Remodel — Bellvue, CO Completed May 2003 Contemporary residential remodel $98,319 Zeidner Residence — Fort Collins Completed Nov 2002 Contempoary residential addition/ remodel $96,370 Laupa Garage — Fort Collins Historic stabilization/remodel $14,269 Nix Farm (Ft Collins Dept Nat Resources) — Fort Collins Historic restoration sub for Cottier Coast $21,300 Dearfield Townsite (OT Jackson Home) — Dearfield, CO Historic stabilization $68,000 Haines Addition -Remodel — Fort Collins Addition/ Historic residential remodel $180,130 List your major equipment available for this contract. Skilled labor and specialized hand tools. Completed Oct 2002 Completed Oct 2002 Completed Jun 2002 Completed Aug 2001 13. Experience in construction Work similar in importance to this project: Overland Trail Stage Station Virginia Dale, Colorado Architect: Charles Mayhugh Funding: is part Colorado State Historical Fund Work completed: Stabilization of structure with new point load pier system, rebuilding of stone foundation (including locating similar stone), and replacement of rotted away, hand-hewn sill logs with replication of original mortise and tenon log joinery and hewing techniques. OT Jackson Home Dearfield, Colorado Owner: Black American West Museum Architect: Andrews & Anderson Funding: in part Colorado State Historical Fund Work Completed: Helped assess the scope of work. Supervised the lifting and moving of house off existing foundation, excavation and placing of new concrete foundation. Supervised re -placement of house on new foundation, parging of foundation, rebuilding of chimneys, and laying of block foundation under addition. Repaired roof, walls, and floor structure to stabilize building. Repaired siding, facia, and other visual aspects. Rebuilt front porch structure. Built new storm windows to cover windows, and repaired window frames to support storms. Other carpentry, as needed by plans. 7/96 Section 00420 Page 2 of 5 14. 7/96 One West Art Center (Old Fort Collins Post Office) Phase 1 201 South College Ave. Fort Collins, Colorado Architect: Hill and Associates National Register of Historic Places Work completed: Restoration of Corbels, rosettes, brackets, and fascia detail. Work done to Secretary of Interior's Standards for Rehabilitation. Earnest Waycott House 1501 West Mountain Ave. Fort Collins, Colorado National Register of Historic Places Work completed: Rehabilitation of the exterior including restoration of front porch rail with original pieces and replacing missing pieces with similar, restoration of trim and soffitt detail, and repair/ repointing of sandstone foundation. Work done to Secretary of Interior's Standards for Rehabilitation. Cross Residence 300 Peterson St. Fort Collins, Colorado Work Completed: Returning a duplex into it's original single family residence historically correct state. Manufacture trim to match existing trim (including newel posts). Remove and relay original fir floor. Stucco patching. Repair soft brick walls. Repair plaster walls. Saint Peter's Fly Shop 202 Remington Fort Collins, Colorado Work Completed: Supervise re -pointing of all masonry on building. Background and experience of the principal members of your organization, including officers: Kevin Murray, Manager Timber Framer's Guild of North America. See attached resume for detailed background and experience Chuck Wdliss, Master Carpenter Has made significant contributions to all Empire Carpentry projects since 1989. Chuck has attended Architectural Preservation Institute Preservation Technology Workshops for wood preservation and completed window restoration training with exhibit specialists from Rocky Mountain National Parks Service. Terry Schmitz, Lead Carpenter Employed by Empire Carpentry since 1997. Has 5 years experience in logging. Terry has attended Architectural Preservation Institute Preservation Technology Workshops for masonry preservation. Section 00420 Page 3 of 5 15. Credit available: $20,000 16. Bank reference: Key Bank 300 W Oak Fort Collins, CO 80521 970482-3216 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General CONTRACTOR? Yes If yes, in what city, county and state? Fort Collins, Colorado What class, license and numbers? License Cl-2 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? 11 % and to whom? See Sub list form 00430 attached 20. Are any lawauits pending against you or your firm at this time? No If yes, DETAIL 21. What are the limits of your public liability? General Liability: See attached Certificate of Liability Insurance Larry D Peterson Agency Worker's Compensation Liability: See attached Certificate of Liability Insurance Pinnacol Assurance Charles Doggett, Underwiter 22. What are your company's bonding limitations? $500,000.00 See attached Western Surety Company Power of Attorney — Certified Copy Attached in section 00410 7/96 Section 00420 Page 4 of 5 «,. 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at: This 21j�__day of v , 2003 Empire Carpentry LLC By: evin urray Title: Manager State of Colorado County of Larimer k� h C - being duly sworn deposes and says that he is �9TEmpire Carpentry LLC, and that the answers to the foregoing questions and lill stat enln is therein contained are true and correct. ubs 'bed and sworn to before me this lt�ay of 2003. u is My commission expires /tr_/9_(34 7/96Section 00420 Page 5 of 5 SECTION 00500 AGREEMENT FORMS 00510Notice of Award 00520Agreement 00530 Notice to Proceed M ,. SECTION 00510 NOTICE OF AWARD Date: January 15, 2004 TO: Empire Carpentry LLC PROJECT: RESTORATION OF FRANZ-SMITH CABIN; Bid No. 5787 OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated April 18, 2003 for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for RESTORATION OF FRANZ-SMITH CABIN; Bid No. 5787. The Price of your Agreement is One ($117,000.00). Seventeen Thousand Dollar Three (3) copies of each of .the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by January 30, 2004. 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully -signed counterpart of the Agreement with the Contract Documents attached. City of Fort Collins OWNER B me B. O'Neil II, CPPO, FNIGP D re for of Purchasing and Risk Management 'Title 9/12/01 Section 00510 Page 1 SECTION 00520 AGREEMENT THIS AGREEMENT is dated as of the 15th day of January in the year of 2004 and shall be effective on the date this AGREEMENT is signed by the City. The City of Fort Collins (hereinafter called OWNER) and Empire Carpentry, LLC (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as final placement and restoration of the Franz -Smith cabin to be included in the museum exhibits of the Fort Collins Museum. The Fort Collins Museum plans to use the Franz -Smith cabin as part of its interpretive program involving three other relocated historic cabins. The Contractor must follow the Secretary of the Interior's Standards for Rehabilitation in all aspects of the restoration of the Franz -Smith cabin. Restoration work includes; exterior wall construction and structural systems; roof framing and roof systems; foundation systems; perimeter foundation drainage; exterior finishes; exterior windows, doors, hardware, and trim; interior doors, windows, hardware and trim; fire detection systems; stairs; electrical distribution, service, panels, and lights; interior finishes; exterior masonry. and is generally described in Section 01100. ARTICLE 2. ENGINEER The Project has been designed by Gerou & Associates Civic Architecture, Ltd., who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIMES 3.1 The Work shall be Substantially Complete within 110 days after the date when the Contract Times commence to run as provided in the General Conditions and completed and ready for Final Payment and Acceptance in accordance with the General Conditions within 130 days after the date when the Contract Times commence to run. 3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1. above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. 9/12/01 Section 00520 Page 1 They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. 1) Substantial Completion: Five Hundred Dollars ($500.00) for each calendar day or fraction thereof that expires after the One Hundred Ten (110) calendar day period for Substantial Completion of the Work until the Work is Substantially Complete. 2) Final Acceptance: After Substantial each calendar day (20) calendar day Work is ready for ARTICLE 4. CONTRACT PRICE Completion, Two Hundred Fifty Dollars ($250.00) for or fraction thereof that expires after the Twenty period for Final Payment and Acceptance until the Final Payment and Acceptance. 4.1. OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: ($117,000.00), One Hundred Seventeen Thousand Dollars, in accordance with Section 00300, attached and incorporated herein by this reference. ARTICLE 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1. Prior to Substantial Completion, progress payments will be in the amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 90% of the value of Work completed until the Work has been 50% completed as determined by ENGINEER, when the retainage equals 5% of the Contract Price, and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial 9/12/01 Section 00520 Page 2 Completion will be in an amount equal to 1000 of the Work completed. 90% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application for payment. 5.1.2. Upon Substantial Completion payment will be made in an amount sufficient to increase total payments to CONTRACTOR to 950 of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. ARTICLE 6. CONTRACTOR'S REPRESENTATION In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within 9/12/O1 Section 00520 Page 3 the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5. CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 7. CONTRACT DOCUMENTS 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of "Contract Documents" in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4Consent of Surety 7.2.5Application for Exemption Certificate 7.2.6Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: Cl-General Notes/Site Plan, Al -Floor Plans, A2-South & East Elevations, A3-North & South Elevations, A4-Building Sections & Details, Sl-Structural Plans, El - Electrical Plans. The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4. Addenda Numbers 1 to 3, inclusive. 7.5. The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.6. There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the 9/12/01 Section 00520 Page 4 M RE -INSTALL REBUILT - to WINDOW5 JGerou & Associates PROVIDE STAIR Civic HANDRAIL a +36" Architecture, OFF TREAD NOSIN65 (BOTH SIDES) Ltd. 303 .674 .4177 www.gerou.net NEW 2X4 R.5. STUD j" RAILING ®+36" Member American Institute of Architects I' O = ry o Historic Preservation . -- -_.__... ._._....�_ ...._.... _�._� For The City of Fort t Collins rr—--.._....__..._.._...._.... RE .... - ...... ....... .... _. NEW LATH AND II = —PLA5TER II CEILING II -HANG DOOR Franz -Smith Cabin II = — FOR OVE 11 EXCESS Fort Collins PIPE ® INC MATERIAL Museum Courtyard IN GAP Fort Collins, BETWEEN Colorado L055 0 jI I I Copyright STRIN R5, II , 5.22.03 TREADS AND II 11 r rrr��.r�wrr� (lyp C -1,�.._� STAIRWELL I I = O .p BEYOND ' I O sheet title BRICK CHIMNEIl II TO 5LA BELOW CrV.._ -TO II O 05E 11 - revision 52205 ...... / date sNDs a TREATED 2X4 SLEEPERS BETWEEN CONCRETE O `—SLAB AND MAIN LEVEL FLOOR JOISTS - project# csoeni PROVIDE 12" 6AP5 a 4'-T" O.G. FOR _UNDERFLOOR VENTILATION_ o drawn by CAD 2X8 STEEL CHANNEL SUB5TRUGTUREJ checked by r" TO REMAIN - PLACE CHANNEL OVER V V 2X8 NAILED TO ANCHORED TREATED 6X6 TIMBERS NORTH -SOUTH SU I LC7 I N6 SECTION A 4 .,lN/ STAIR SeGT ION � scwe� �n• . r-o• General Conditions. ARTICLE 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 9/12/01 Section 00520 Page 5 OWNER: CITY OF FORT COLLINS BY: �i- 14 - ;aj111e.P JOHN ISCHBACH, CITY MANAGER BY: JAMES 'NEILL II, CP O, FNIGP DI,E OR OF PURCHASING Date: A RI' IMENT Attest: Address for P. O. Box 580 Fort Collins, CO 80522 Approved a to Form r J Assist City Attorney 9/12/01 CONTRACTgR: Empire Carpentry By: Title: Date: ( CO I�i� ins Attest: Address for giving notices: '�3ox aEf�� LICENSE NO.: cz—CZ Section 00520 Page 6 t SECTION 00530 NOTICE TO PROCEED Description of Work: Restoration of Franz -Smith Cabin; Bid No. 5787 To: This notice is to advise you: That the contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Agreement. Dated this day of , 20 The dates for Substantial Completion and Final Acceptance shall be and 20_, respectively. City of Fort Collins OWNER By: Title: ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this day of 20 CONTRACTOR By: Title: 7/96 Section 00530 Page 1 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615Payment Bond 00630Certificate of Insurance 00635Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660Consent of Surety 00670Application for Exemption Certificate A 4 4..1. .. SECPIGN 00610 PERFORMANCE Bono KNOW ALL MEN BY THESE PRESENTS: that Bond No. 69640471 (Firm) Empire Carpentry, LLC (Address) P. O. Sox 245, Sellvuer CO 80512 ( (a Corporationl. hereinafter referred to as the "Principal" and (F i rm) WMtRN SMWY =MANY (Address) 101 S. Phillips Avenue, Sioux Falls, SD 57104-6703 hereinafter referred to as "the Surety", are held and firmly bound unto Cif of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of Ore Firdwd SrArfte t 2nt' m l a d n.11iO3 i.n lawful money of the United States, for the payment of wh ch sum veil ark truly to be made, we bind ourselves, su&cessors and assigns, jointly and severally, firmly by tbese presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement, wit'A the OWNER, dated the 1Sth day of January . 2004, • copy -of which is hereto attached and merle a part. her.te or ' the performance of The City of Fort Collins project, Restorstion of Frant-Smith Cabin; Bid No. 5187. NOW, TKEREkVRE, if .the Prin=.ipal shall well, truly and faithfully%perform its duties, all the undertakings. covenants, terms, conditions and agreements of said Agreement during the origina.. term thereof, and any exitunsions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and If the Principal shall satisfy all Hain" and demands incurzed under such Agreement, and shall gully indwmify and save harmless the OWNER from all coat and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur In staring gooq any default rhea this obligation shall be void; otherwise to s•emain in full :.Dxce and effect. if96 Section 00610 Page 1. 3 4 4.. . PROVIDED. Ft77tTN6R, that thG: *aid Surety, for value received, hereby stipulates And agrees that no change, gAtension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. BROVIm, rwrHER, that no .final settlennent between the OWNrit and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may bs unsatisfied. PROvrm, ruRTHER, that the surety Company must be authorised to transact' business in the State of Cclorado and be acceptable to the OWNER. IN RYTNESs WAEREOP, thia'irstriment is executwd in three (3) counterparts, each one of which shall be deemed an original, this 15th day of January , 2004. IN PRESENCS OF: -,-C / PriNaipal (Corporate Seal) IN PRESENCE OF: 1 , LLC BY: P. 01 Box 245 Bellvue, CO 80512 _ (A dscsz) other Partners By. I By: meaty WFSTEyaj Sa2STS COMPANY By: Tess) Autiaw, madsxb K (Surety 3aa1) NOTE: Date of Bond mus- not be prior to date of Rgrewent. If CONTRACTOR is Partnership, all partners should execute bond. 7/96 Section 00610 Page 2 SECTION 00615 PAYMENT BOND Bond No. 69640471 KNOW ALL ME11 DY THESE "ESEMTS: that (Firth) Empire Carpentry, LLC (Address)p. 0. Box 245, Bellvue, CO 60512 (a Cozpofation), hereinafter referred to as i "Principal" and A (F1rM) WESTERN SURETY CCMP Y (Ad'dress) 101-S- Phillips Avenue, Sioux Fallar SD 571044703 hareinafter referred to. as "the Surety`, axe -held and firmly bound unto this of Fort Collins, 3QQ Lapo.:te Ave., Fort Collins, Colorado 94522 a (e4unicipal Cocporation) iwrainafter referred to as "the OWN&R"r in the penal sum of One Hundred Seventeen R7tousand and nq/10D in lawful money of the United States# for the payment of which sum will and truly to be made, we bind ourselves, successors .ind Laslynal Jointly and savrrdlly, firmly by these yrea,euls. THE CLV401TIONS Of' THIS 08litahTION are such that whereas the principal entered ti into a certain Agreement v..th the OWNER, dated the.'15th day of Ja=aq _, 20 0copy of which is hereco attached and evade a part hereot for the performance a of The City of Fort Collins project, Restoration of FrAn2-smith Cabin: Bid No. 5181. 'I NOW, THEREFORE, if the Principal shall make payment to all persons, firms, i subcontractors, and corporations furnishing naterials for or performing labor in the prosecution of the Work provided for in such Agreement and any authorized exLension yr mudIZICALlou thereof, ineludinp all maout%te elute Lur Materials, lubricants, repairs on machinery, equipment and toole, consumed, rented or used In connection with the convtruction of such work, and all insurance premiums on said Work, and for ail labor, performed in such Mork whether by subcontractor or otherwise, chat Chis obligation shall be void; otherwise to rtwktn in full force I and efsect. 1 7196 SOULivre 00625 Page 7 PROVIDED, FARTHER, that the said Surety, for value received, hereby stipulates and agrees that no change+, extension of time, alteration or addition to the terms of the Agreement or to the 'Work to be performed thersuceder or the 3pmcifieations accompanying the same a}hsll in any way arfrcc its, obligation on this bond; and it does hereby waive :,otjcs of illy such change, extension or time, alteration or addition to th.Q t0rma of the Agreement or to the Mork or to the Specifications. 9HOVIDED0 FURTHER, that r.o final settlement between the OWNER and the CONTRACTOR .shall abridge the right. of any beneficiary hereunder, whore claim may be u tsatisfied. PROVi060, FORT9ER, that the Surety Company must be authorized to' Lransaet business in the State of Colorado and be acceptable to the owNER. IN WITNESS WHEREOF, this instruniel+t is executed in three (3) counterparts, each one of whictr shall be dermed an original, this 15th day of Janthary 2004. IN PRESRNC - F: >teineipal _'_ --- Eupire Carpentry, LLC _ BY: Titleyy P_ O. IBOX 245 Helivue, CO 80512 (Address) (Corporate Seal) IN PRESENCE or; rM PRESENCE OF:. _ n ju (Surety Seal) Other Pastnere spurety WESTERN SURM Ck WANY By. By: Aaialy, NOTE: Date of Bond must not be prior to date of Agreement. If CONMACTOR is Partnership, all partners sttouLd execute Bond. 7/96 Section 00615 Page 2 4 a. 1. Western Surety Company POWER OF ATTORNEY - CERTIFIED COPY Bond No. 6 964 04 71 Know All Men By These Presents, that WESTERN SURETY COMPANY, a corporation duly organised and existing under the laws Of the State of Son1.h Dakota, and having its priodpal office in Sioux Falls, South Dakota (the "Company" ), does by these presents make, constitute and appoint Craia Edward Kallbauer its true and lawful attoruey(s)-tn-fact, with full power and authority hereby conferred, to execute, acknowledge and deliver for and on its behalf as Surety, bonds for: PnaaP& Empire Carpentry, LLC Obligee- City of Fort Collins Amount:. $500, 000. 00 and to bmd the Company thereby as hilly and to the same extent as if such bands wereaigned by the Senior Vice President, sealed with the corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said attera ey(s)-in-fact may do within the above stated limitations. Said appointment is made under and by authority of the following bylaw of Western Surety Company which remains in f M fiorce and effect. 'Section 7. All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, aaw Assistant Secretary, Treasurer, or any Vice President or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds poliaibi tr undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any ruck officer and the corporate seal may be printed by fackimie." All authority hereby conferred shall expire and terminate, without notice, unless used before midnight of Auau s t 31 20 04 , but until such time shall be irrevocable and in full force and effect. In Witness Whereof, Western Surety Company bus caused these presents to be signed by its Senior Vice President, Paul T. Brutlat, and ita y¢��Itltobeaffixedthis 15th day of January 2004 �d rn- WEST R SURE COMPANY�T Paul T. Brufla 'or Vice Pre adept ST I CO JJ On this 15th day of January in the year 2004 before me, a notary public, personally appeared Paul T. Breat, who being to me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid oliicer of WESTERN SURETY COMPANY and ar]mo+wledged said instrument to be the voluntary act and deed of said corporation. \N\\NNNNNNNNN\ D. KRELL I NMAW wiau"so i /& f E10M Notary Public - South Dakota My Conmission Fires November 30, 2006 I the undersigned ofacer of Western Surety Company, a stock corporation of the State of South Dakota, do hereby certify that the attached Power of Attorney is in full fan and affect and is irrevocable, and fiathermme, that Section 7 of the bylaws of the Company a, out forth in the Power of Attorney is now inlforee. In teatimogy whereof, I have hereunto soet my hand and seal of Western Surety Company this 15th day of January 1 2004 WEST R SURE COMPANY T Paul T. Brull a tor Vire President Rom F63064-2002 STATE OF AFi�e - n 9 j f COUNTY OF Dane es ACKNOWLEDGMENT OF SURETY (Attorney4n Fact) On this 15th da3r of January 2004 —,before me, a notary public in and for said County, personally appeared Craig 7dward Hall auer to me personally known and being by me duly sworn, did say, that he is the Attorney -in -Fact of WESTERN SURETY COMPANY, a corporation of Sicux Falls, South Dakota, created, organized and Busting under and by virtue of the laws of the State of South Dakota, that the said instrument was executed on behalf of the said corporation by authority of its Board of Directors and that the said Craig Edward Hallbaue* acknowledges said instrument to be the free act and deed of said corporation and that he has thorny to.sig}i said instrument without affixing the corporate seal of said corporation. IN WITNESS WHEREOF, I have hereunto subscribed my n and ef6xe jy official se at Madison iscons th dayat40yef8`last above mrhten. My comn ires ©� 4, NatIty Pubbe Forth 1 D6.42000 Citv of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 BID #5787 RESTORATION OF FRANZ-SMITH CABIN SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5787 Restoration of Franz -Smith Cabin OPENING DATE: May 29, 2003, 3:00pm (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. The Opening Date has been changed to May 29, 2003, 3:00pm (Our Clock).\ If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. 215 North Mason Street - 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance. 7/96 Section 00630 Page 1 CERTIFICATE OF LIABILITY INSURANCE American Family Insurance Company ❑ American Family Mutual Insurance Company if selection box Is not checked. 6000 American Pky Madison, Wisconsin 53783.0001 Agent's Name, Address And Phone Number (AgI.0st.) Insured's Name and Address Larry D Peterson (1191309) Empire Carpentry LLC 149 W Harvard, Suite102 PO Box 245 Fort Collins„ CO 80625 Belivue, CO 80512-0245 970-229-9393 This certificate Is issued as a matter of information or ly and confers no rights upon the Certificate Holder. 7.1'.)' (... This is to certify that policies of insurance listed below have boon issued to the Insured named above for the policy period indicated, notwithstanding any requirement, term or condition of any contract or other do_ument with respect to which this certificate may be issued or may pertain, the insurance afforded by the policies described herein >s sub ect to all the terms, exclusions, and conditions of such lictes. POLICY TYPE TYPE OF INSURANCE POLICY NUMBER LIMITS OF LIABILITY Effective Expiration Mo Oa Yr Mp Da Yr MOmeowners/ Bodily Injury and Property Damage Mobtlehomeowners Liability Each Occurrence Boatowners Liability Bodily Injury and Property Damage Each Occurrence Personal Umbrella Liability Bodily Injury and Property Damage Each Occurrence Form/Ranoh Liability Farm & Personal Liability Each Occurrence Farm Em r s Liability Each Occurrence Workers Compensallon and Statutory ... . Each Accident Employers Liability Disease - Each Employee Disease - PolicyLimit General Liability General Aggregate $ 2,000,000 ® Commercial General 05-Xie948 11/13/2003 11/13/2004 Products - Completed Operations Aggregate $ 2,000,000 Liability (occurrence) ❑ Personal and Advertising Injury $ 1,000,000 EaCh Occurrence $ 1,000,000 ❑ Piro Onmage (Any One Fire) $ 100,000 MndiCal Ex Tense ny One Person $ 5,000 Bualnessowners Liability Each Occurrence ++ Aaareolkle++ Automobile Liability Bodily Injury - Each Person $110001000 ® Owned Autos (Basic form) 05-X90782 09/01/9003 09/01/2004 Bodily Injury - Each Accident $1,000,000 ❑ Owned Autos (Comp form) ❑ Hued Autos Property Damage $1,000,000 ❑ Non -owned Autos Bodily Injury & Property Damage Combined ❑ Garage liability Excess Liability Commercial Blanket Excess Each Oceurrence/Aggregats DESCRIPTION OF OPERATIONS/LOCATIONS/VEHIGLESAIESTRIC11ON8/SPECIAL ITEMS + The In&Wuai a' patfivis shuwn as Insured -- elected to be 'the City of FortCollins Department of Purehming Is I-sted as an additional Insured, rXwered as employees under this policy. ++ PmduCIS-Completed Operations aggregate is equal to each occunanoe IimH and is indudo in k te. ADDITIONAL INSURED City of Fort Collins DW of Purohneing PO Box 580 Fort Collins, CO 00522 Paz: 221-6707 Attn! John Stephens ® Should any of the above described pogdas be canceled before the expiration date thereof, the company will endeavor to mail •(1a days) written notice to 01a Carlifil la Holder named, but failure to mail such notice shall Impose no obligation or liability of any kind upon the company, its agents or repra9arltatives. •10 days unless different number of days shown. © This eenlfles coverage on the data of Issua only. Tee above described policies are subject to canoellaton In conformity with their tents and by the 12/02/03 -- Carunaote Molder, COPIES to Sarvloes, In Agent I/I 869d °Wd?; :B EO-ii-De0 r•L806 6i;Z OL6 feoue.lnsuI ATT11118d ueo>:Jawy :Aq 4ueg OWCER innacol Assurance SO I E Lowry Blvd DENVER CO 80230-7006 INSURED NWIRE CARPENTRY LLC 21.5 SYCAMORE ST _'ORT COLLINS CO 80521 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND. EXTEND OR ALTER THE COVERAGE n!j�� ri::a:i:i:.:.v::r:,:.::....-:.::...r :ter... .w.:.....:..... ... .... ...... 'HIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM AND CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBIECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS IF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. O TYPE OF aOR/RANCE POLICY NUMBER IOLICY EPFECTTVE POLTCY EYPDIATTON IAffPS CLAMS MADE L1 OCCUR OWNWS & CUNTRACIOWS MOT ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS NIRM AUTOS NON4"ED AUTOS ANY AUTO BODLLY mmy 1 V9 mO SoOmy MNTRY ID®R®.VI NORM AM WC STATU- Lj OTHER WORE= CO&U%NMnON AND TORY 6MPLOYERE• LWD.17T A 1519590 09/01/2003 09/01/2004 TIE;PROPRETIORO+ARTNERM RTCL IR. D17AS6-POIJCY T pmCIUMON OF OPE"yToNNLOCATIONSNENICLES/SPECIAL (TENS IS'EE BACK OF CERTIFICATE FOR CLASS COVERAGE AND OWNERSHIP COVERAGE DETAIL .. ... :: :::n:. : :. ::..:::: ... .. .. ..::: :.: ..j'i:42::.:::i.r: - :i�:iri2.4"ir•iii: j:�ni:l" C :ii'r`>:.'i:iJx ::jf:.:..::...4..: J.. ..:.. ..:..<.. .. .... .r +.;:kii" .. k.._.,... _. .. . WORM- 727T46 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE ]OHN STEPHEN EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL CITY OF FT COLLINS/PURCHASING _ DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT. PO BOX 580 BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR FORT COLLINS CO 80522-0580 LIABILITYOF ANY =ND UPON THE COMPANY. ITS AGENTS OR REPRESENTATIVES AUTHORIZED REPRESENTATIVE Charles Doggett AICILUIND CA4 S1ppn II'06AR M:12:31 1319m UI,LJIaI: 121I5119 12:99:M IRVM SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: Restoration of Franz -Smith Cabin; Bid No. 5787 PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins CONTRACTOR: CONTRACT DATE: The Work performed under this contract has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. ENGINEER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. By: CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substan- tially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS, COLORADO OWNER REMARKS: 7/96 By: AUTHORIZED REPRESENTATIVE DATE Section 00635 Page 1 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE TO Gentlemen: . 20 You are hereby notified that on the _ day of , 20_, the City of Fort Collins, Colorado, has accepted the Work completed by for the City of Fort Collins project, Restoration of Franz -Smith Cabin; Bid No. 5787. A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents which are dated In conformance with the Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: Sincerely, OWNER: Citv of Fort Collins By: Title: ATTEST: Title: 7/96 Section 00640 Page 1 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) PROJECT: Restoration of Franz -Smith Cabin; Bid No. 5787 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 7/96 Section 00650 Page 1 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this ATTEST: Secretary STATE OF COLORADO day of CONTRACTOR By: Title: )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this 20 , by Witness my hand and official seal. My Commission Expires: n day of 20 Notary Public 7/96 Section 00650 Page 2 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: PROJECT: Restoration of Franz -Smith Cabin; Bid No. 5787 CONTRACT DATE: In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as indicated above, for on bond of (Surety) hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this day of , (Surety Company) By ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. 7/96 Section 00660 Page 1 SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE Insert State certificate here. DR onz (12/98) COLORADO DEPARTMENT OF REVENUE 80261 (303)n224016 CONTRACTOR APPLICATION FOR EXEMPTION CERTIFICATE Pursuant to Statute Section 39-26.114(1)(a)(M) 0 DO NOT WRITE IN THIS SPACE The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building materials for the exempt projectdescribed below. This exemption does not include or apply to the purchase or rental of equipment, supplies, and materials which are purchased, rented, or consumed by the contractor and which do not become a part of the structure, highway, road, street, or other public works owned and used by the exempt organization. Any unauthorized use of the exemption certificate will result in revocationof your exemption certificate and otherpenalties provided by law. A separate certificate is required for each contract. Subcontractors will not be issued certificates of Exemption by the Department of Revenue. It is the responsibility of the prime contractor to issue certificates to each of the subcontractors. (See reverse side.) FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED. RegistratioNAccount No. (to be assigned by DOR) Period 0170-750 999 $0.00 89 - n�Ihal :'A" A NC t9s ca a. _ }- )) µµwad Trade name/DBA: owner, partner, or corporate name: Mailing address (City, State, Zip): Contact Person E•Mail address: Federal Employer's Identification Number: Bid amount for your contract: Fax number: Business telephone number: Colorado withholding tax account number. .fR 1 F d'�$ rsso e ame of exempt organization (as shown on contract): Exempt organizatlon's number. 98 - Address of exempt organization (City, State, Zip): Principal contact at exempt organization: Principal contact's telephone number: Physical location of project site (give actual address when applicable and Cities and/or County (ies) where project Is located) Scheduled Month Day Year Estimated Month Day Year construction start date: completion date: ..OI .�}N .{yy ''. r♦ { 5 J � F: Y.y� SSA j'ry,++'F � �x�* } 'Pj 4��� �j4� ` +a� h .� I declare under penalty of perjury in the second degree that the statements made in this application are true and complete to the best of my knowledge. Signature of owner, partner or corporate officer. Title of corporate officer: Date: DO NOT WRITE BELOW THIS LINE Citv of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 1 Bid #5787 RESTORATION OF FRANZ-SMITH CABIN SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5787 Restoration of Franz -Smith Cabin OPENING DATE: May 13, 2003, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. 1. This project has been partially funded by a State Historical Fund grant from the Colorado Historical Society. 2. The drawings and specifications for this project are not copyrighted under Gerou & Associates Civic Architecture Ltd. The drawings and specifications are the sole property of the City of Fort Collins. 3. The concrete path indicated on the drawings is not a part of this contract and should not be included in the scope of work or pricing. 4. Section 04810 to include the following: PART 2 - PRODUCTS 2.1 MASONRY UNITS A. Concrete Masonry Units: UBC Standard 21-4; Weight Classification, Normal Weight. 1. Special shapes for lintels, corners, jambs, sash, control joints, and other special conditions. 2. Square -edged units for outside corners, unless otherwise indicated. 5. The mortar described in Section 04810 Unit Masonry Assemblies to be used on concrete masonry units and/or new brick only. If reclaimed or antique brick is to be used on the veneer of the chimney, mortar should be of like permeability as consistent with old brick. This matching of permeability will prevent damage to surface of brick due to moisture intrusion into the brick. Hard, portland-cement mortar traps moisture in the brick wall and is unable to evaporate through the mortar which is intended to be 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 SECTION 00700 GENERAL CONDITIONS GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT These GENERAL CONDITIONS have been developed by using the STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT prepared by the Engineers Joint Contract _Documents Committee, EJCDC No. 1910-8 (1990 Edition), as a base. Changes to that document are shown by underlining text that has been added and striking through text that has been deleted. EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) WITH CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) No Text TABLE OF CONTENTS OF GENERAL CONDITIONS Article or Paragraph Page Article or Paragraph Page Number & Title Number Number & Title Number 1. DEFIMTIONS.....................................................d 2. PRELIMINARY MATTERS 1.1 Addenda ....................................I........ 2. I .................... .......3 Delivery of Bonds 3 1.2 Agreement........................................... 1 2.2 . ............................. Copies of Documents 1.3 Application for Payment,,,,,,,,,,,,,,,,,,,,,,, 2.3 Commencement of Contract 1.4 Asbestos............................................ .. Times; Notice to Proceed 3 1.5 1.6 Bid ., .................................................. Bidding Documents., 1 2.4 Starting the Work., l 2.5-2.7 Before Starting Construction; 1.7 Bidding Requirements .......................... CONTRACTOR's Responsibility L8 Bonds................................................. l to Report; Preliminary Schedules; 1.9 Change Order,,,,,,,,,,,,,,,,,,,,,,, I Delivery of Certificates of 1.10 Contract Documents m............................. . Insurance 1.11 Contract Price- .......1 2.8 ........................ Preconstruction Conferenc@ 4 1.12 Contract Times ............................ 1 2.9 ............. Initially Acceptable Schedules 4 1.13 CONTRACTOR , """"" 1.14 defective ............................... ............� . 3. CONTRACT DOCUMENTS: INTENT, L IS Drawings.....,-,,,,. I AMENDING, REUSE„ 1.16 Effective Date of the Agreement ,,,,,,,,,,1 3.1-3.2 Intent 1.17 ENGINEER,,,,,,,,,,,,,,, 1 3.3 Reference to Standards and Speci- 1.18 ENGINEER's Consultant ...................... fications of Technical Societies; 1.19 Field Order Reporting and Resolving Dis- 1.20 General Requirements .........................2 crepancies... 4-5 1.21 Hazardous Waste ................................. 2 3.4 .............................. Intent of Certain Terms or 1.22.a Laws and Regulations; Laws or Adjectives,,,,..,- 5 Regulations ............. .......................... 2 3.5 .. Amending Contract Docunents 5 Legal Holidays ......................... 2 3.6 Supplementing Contract 1.23 Liens Documents 1.................................... 24 Milestone ............................................. 2 3.7 Reuse of Documents S .25 Notice of Award ............. ............. 1.26 Notice to Proceed ...............2 4. AVAILABILITY OF LANDS; 1.27 OWNER ............................................. 2 SUBSURFACE AND PHYSICAL CONDITIONS; 1.28 Partial Utilization 2 REFERENCE POINTS 1.29 PCBs ....... ............ " ........................ 2 . 4.1 Availability of Lands 5-6 1.30 Petroleum .......................2 .................... 4.2 ..................... Subsurface and Physical 1.31 Project................................................ ? Conditions 6 2.a Radioactive Material 2 4.2.1 ............................... Reports and Drawings,,,,,,,,,,,,,,,,,,,,,, 6 1.32.b Regular Working Hours,,,,,,..*...............2 4.2.2 Limited Reliance by CONTRAC- 1.33 Resident Project Representative............ 2 TOR Authorized; Technical 1.34 Samples ............................. 2 Data 1.35 Shop Drawings ........................ 2 4.2.3 Notice of Differing Subsurface 1.36 Specifications ...................................... 2 or Physical Conditions,,,,,,,,,,,,,,,;,, 6 1.37 Subcontractor.-,.,..,, .............. 4.2.4 ENGINEERS Review 1....................... 38 Substantial Completion.,,,,........_.... 2 4.2.5 ........................ Possible Contract Documents 1.39 Supplementary Conditions ..................... 2 Change,,,,,,,,,,,,,,,„ 6 0 Supplier..,,.,.. - , 2 4.2.6 ........... Possible Price and Times 1.41 Underground Facilities ......................2-3 Adjustments ¢-7 1.42 Unit Price Work ................................... 3 4.3 ............................... Physical Conditions --Underground 1.43 Work Facilities 7 1.44 Work Change Directive ........................ 4.3.1 ....................................... Shown or Indicated 7 1.45 Written Amendment .................. 3 4.3.2 Not Shown or Indicated 7 4.4 Reference Points ........................ „7 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Article or Paragraph Page Article or Paragraph Page Number & Title Number Number & Title Number 4.5 Asbestos, PCBs, Petroleum, 6.25 Submittal Proceedures; CON- - Hazardous Waste or TRACTOR's Review Prior Radioactive Material to Shop Drawing or Sample ....................7-8 Submittal .................................... 16 5, BONDS AND INSURANCE 8 6.26 Shop Drawing & Sample Submit- 5.1-5.2 ................................. Performance, Payment and Other tals Review by ENGINEER ...... 16-17 Bonds 6.27 Responsibility for Variations 5.3 ............................................... Licensed Sureties and Insurers; From Contract Documents ,........... 17 _ Certificates of Insurance .......... ........8 6.28 Related Work Performed Prior 5.4 CONTRACTOR's Liability to ENGINEER's Review and Insurance Approval of Required 5.5 ..........................................9 OWNER's Liability Insurance,,,,,,,,,,,,,, 9 Submittals,,,,,,............................. 17 5.6 Property Insurance ..........................9-10 6.29 Continuing the Work ..................... 17 5.7 Boiler and Machinery or Addi- 6.30 CONTRACTOR's General tional Property Insurance ,,,,,,.... *...... 10 Warranty and Guarantee...............17 5.8 Notice of Cancellation Prousion......... 10 6.31-6.33 Indemnification .........................17-18 5.9 CONTRACTOR's Responsibility 6.34 Survival of Obligations ................... j 8 for Deductible Amounts,,,,,,,,,,,,,,,,,,, 10 5.10 Other Special Insurance,,,,,,,,,,,,,,,,,,,,, 10 7. OTHER WORK ................................................. 18 5.11 Waiver of Rights ................................ 11 7.1-7.3 Related Work at Site,,,,,,,,,,,,,,,,,,,,, 18 5.12-5.13 Receipt and Application of 7.4 Coordination,,.,,„...........................18 Insurance Proceeds 5.14 .....................10-11 Acceptance of Bonds and Insir- 8. OWNER'S RESPONSIBILITIES .........................18 ance; Option to Replace ................... 11 8.1 Communications to CON- 5.15 Partial Utilization --Property TRACTOR.................................18 Insurance,,.,,,,,,„ l 8.2 Replacement of ENGINEER ............ 18 .............................1 8.3 Furnish Data andPay Promptly 6. CONTRACTOR'S RESPONSIBILITIES ...............I I When Due .................................. 18 6.1-6.2 Supervision and Superintendenc(; ....... 11 8.4 Lands and Easements; Reports .. 6.3-6.5 Labor, Materials and Equipment,,, 11-12 and Tests...............................)8-19 6.6 Progress Schedule..............................12 8.5 Insurance ....................................... 19 6.7 Substitutes and "Or -Equal" Items; 8.6 Change Orders...............................19 CONTRACTOR's Expense; 8.7 Inspections, Tests and ' Substitute Construction Approvals...................................19 Methods or Procedures; 8.8 Stop or Suspend Work; ENGINEER's Evaluation Terminate CONTRACTOR's _ 6.8-6.11 .............12-13 Concerning Subcontractors, Services......................................19 Suppliers and Others; 8.9 Limitations on OWNER'S Waiver of Rights ...... ..................13-14 Responsibilities ............................ 19 6.12 Patent Fees and Royalties ................... 14 8.10 Asbestos, PCBs, Petroleum, 6.13 Permits Hazardous Waste or 6.14 .............................................14 Laws and Regulations ........................14 Radioactive Material,.,,,,,.,.,,........ L9 6.15 Taxes 8.11 Evidence of Financid 6.16 ...........................................14-15 Use of Premises.................................15 Arrangements ..................... I ........ 19 6.17 6.18 Site Cleanliness ................................ 15 Safe Structural Loading 9. ENGINEER'S STATUS DURING 6.19 .....................15 Record Documents .............................15 CONSTRUCTION .............................................. 19 ^. 19 6.20 Safety and Protection 9.1 OWNER's Representative ................ 6.21 ....................15-16 Safety Representative .........................16 9.2 Visits to Site .................................. 19 6.22 Hazard Communication Programs,,, 16 9.3 Project Representative ...............19-21 6.23 Emergencies 9.4 Clarifications and Interpre- 6.24 .....................................16 Shop Drawings and Sample§..............16 tations.............. ........................... 21 9.5 Authorized Variations in V,6rk........ 21 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w! CITY OF FORT COLLINS MODIFICATIONS (REV 9199) ,..,, Article or Paragraph Page Article or Paragraph Page Number & Title Number Number & Title Number 9.6 Rejecting Defective Work...................21 13.8-13.9 Uncovering Work at ENGI- 9.7-9.9 Shop Drawings, Change Orders NEER's Request...." 27-28 and Payments.................................... 21 13.10 ............. OWNER May Stop the Work 28 9.10 Determinatims for Unit Prices ....... 21-22 13.11 ........... Correction or Removal of 9.11-9.12 Decisions on Disputes; ENGI- Defective Work 28 NEER as Initial Interpreter..............22 13.12 .................. Correction Period,,,,._„""","" 2g 9.13 Limitations on ENGINEER's 13.13 Acceptance ofDefective Work 28 Authority and Responsibilities.... 22-23 13.14 OWNER May Correct Defective CHANGES IN THE WORK........ Work.....................................28-29 10.1 OWNER's Ordered Change................23 14. PAYMENTS TO CONTRACTOR AND 10.2 Claim for Adjustment ........................23 COMPLETION .,,,...,.."..." 29 10.3 Work Not Required by Contract 14.1 , Sched.ule of . . Values " . ................... . 29 Documents ...................................... 23 14.2 Application for Progress . 10.4 Change Orders ................................... 23 Payment 29 10.5 Notification of Surety ........................23 14.3 ................... ................ CONTRACTOR's Warranty of CHANGE OF CONTRACT PRICE .............. ...............23 14.4 14.7 Title...........................................29 Review of Applications for 11.1-11.3 Contract Price; Claim for Progress Payments„ Adjustment; Value of 14.8-14.9 ................29-30 Substantial Completion"" 30 the Work"" .............................. 23-24 14.10 ............. Partial Utilization"""..................30-31 11.4 Cost of the Work ........................... 24-25 14.11 Final Inspection,"„ 31 11.5 Exclusions to Cost of the Worts.........25 14.12 .......................... Final Application for Payment,,,,"","31 11.6 CONTRACTOR's Fee........ ................. 25 . 14.13-14.14 Final Payment and Acceptance 31 11.7 Cost Records"".._"....... ...........25-26 14.15 ....... Waiver of Claims,.."",.,.."...".".....31-32 11.8 Cash Allowances..,,.""".,,,,"".... 11.9 Unit Price Work ................................26 t5. SUSPENSION OF WORK AND TERMINATION 32 CHANGE OF CONTRACT TIMES ........ . ..................... 26 15.1 ...... ...................... ............I...... OWNER May Suspend Work 12.1 Claim for Adjustment ........................26 15.2-15.4 ..... OWNER May Terminate,.._....,_.",,,. ...,.32 32 12.2 Time of the Essence .......................... 26 15.5 CONTRACTOR May Stop 12.3 Delays Beyond CONTRACTOR's Work or Terminate„ 32-33 Control ...................................... 26-27 ............... 12.4 Delays Beyond OWNER's and 16. DISPUTE RESOLUTION 33 CONTRACTOR's Control................27 ............................... ... 17. MISCELLANEOUS,,,... 33 TESTS AND INSPECTIONS; CORRECTION, 17.1 Giving Notice......* 33 REMOVAL OR ACCEPTANCE OF 17.2 ...... Computation of Times, 33 DEFECTIVE 13.1 WORK.. .................................................. Notice Defects., 17.3 " " "'"""' Notice of Claim., " .........................33 """' of . 17.4 Cumulative Remedies 13.2 Access to the Work.... *........",.„.," 27 17.5 .....................33 Professional Fees and Court 13.3 Tests and Inspections; Costs Included,,._" 33 CONTRACTOR's Cooperation........, 27 17.6 ................. Applicable State Laws 33-34 13.4 OWNER's Responsibilities; Intentionally ............... left blank Independent Testing Laboratory....." 27 ................................... ....35 13.5 CONTRACTOR's EXHIBIT GC -A: (Optional) Responsibilities ............................ _."27 Dispute Resolution Agreement,."....._.",..."" GC -AI 13.6-13.7 Covering Work Prior to Inspec- 16.1-16.6 C-Al ArbitrationGC-Al.... lion, Testing or Approval „".""„.........27 16.7 Mediation„ . .,.."""",..... ,.."." . GC ............................. -At 1v E1CDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) INDEX TO GENERAL CONDITIONS City of Fort Collins modifications to the General Conditions of the Construction Contract are not shown in this index Article or Paragraph Number Acceptance of -- Bonds and Insurance........................................5.14 defective Work............................10.4.1, 13.5, 13.13 final payment ........................................ 9.12, 14.15 insurance.........................................................5.14 other Work, by CONTRACTOR ..........................7.3 Substitutes and "Or -Equal" Item*.....................G•7.1 Work by OWNER..............................2.5, 6.30, 6.34 Access to the -- Lands, OWNER and CONTRACTOR responsibilities ............................................. 4.1 site, related Work...............................................7.2 Work...........................................13.2, 13.14, 14.9 Acts or Omissions--, Acts and Omissions-- CONTRACTOR...................................6.9.1, 9.13.3 ENGINEER .......................................... 6.20, 9.13.3 OWNER....................................................G.20, 8.9 Addenda --definition of (also see definition of Specifications) ....... (1.6, 1.10, 6.19), 1.1 Additional Property Insurances., 5.7 Adjustments -- Contract Price or Contract Times ...........................1.5, 3.5, 4.1, 4.3.2, 4.5.2, .............................4.5.3, 9.4, 9.5, 10.2-10.4, ......................................... 11, 12, 14.8, 15.1 progress schedule .............................................. 6.6 Agreement -- definition of......................................................1.2 "All -Risk" Insurance, policy form............................5.6.2 Allowances, Cash....................................................11.8 Amending Contract Documents, 3.5 Amendment, Written -- in general... ............. J. 10, 1.45, 3.5, 5.10, 5.12, 6.6.2 ...........................6.8.2, 6.19, 10.1, 10.4, 11.2 ..12.1, 13.12.2, 14.7.2 N Appeal, OWER or CONTRACTOR intent to ..........................9.10, 9.11, 10.4, 16.2, 16.5 Application for Payment -- definition of......................................................1.3 ENGINEER's Responsibility 9.9 final payment ................. 9.13.4, 9.13.5, 14.12-14.15 in general ..........................2.8, 2.9, 5.6.4, 9.10, 15.5 progress payment......................................14.1-14.7 review of .................:14.4-14.7 ................... Arbitration ......16.1-16.6 ............................................... Asbestos -- claims pursuant thereto..........................4.5.2, 4.5.3 CONTRACTOR authorized to stop Work .......... 4.5.2 definition of........................................................IA v Article or Paragraph Number OWNER responsibility for ............................ 4.5.1, 8.10 possible price and times change ....................... 4.5.2 Authorized Variations in Work......,., 3.6, 6.25, 6.27, 9.5 Availability of Lands ......................................... 4.1, 8.4 Award, Notice of--defined.......................................1.25 Before Starting Construction...............................2.5-2.8 Bid --definition of ........................1.5 (l.l, 1.10, 2.3, 3.3, ................•....••, 4.2.6.4, 6.13, 11.4.3, 11.9.1) Bidding Documents --definition of ................. 6 6.8.2 Bidding Requirements --definition of..........................................1.7 (l.l, 4.2.6.2) Bonds -- acceptance of....................................................5.14 additional bonds..................................10.5, 11.4.5.9 Cost of the Work .............................. ..............11.5.4 definition of.......................................................1.8 delivery of...................................................2.1, 5. l final Application for Payment .................14.12-14.14 general......................................1.10, 5.1-5.3, 5.13, ....................................9.13, 10.5, 14.7.6 Performance, Payment and Other .............. ..... 5.1-5.2 Bonds and Insurance --in general.................................5 Builder's risk "all-risk" policy form ........................5.6.2 Cancellation Provisions, Insurance•,•..... 5.4.11, 5.8, 5.15 Cash Allowances....................................................11.8 Certificate of Substantial Completion..._... 1.38, 6.30.2.3, 14.10 ..................................................14.8, Certificates of Inspection ..... ............9.13.4, 13.5, 14.12 Certificates of Insurance,.............2.7, 5.3, 5.4.11, 5.4.13, .......................5.6.5, 5.8, 5.14, 9.13.4, 14.12 Change in Contract Price -- Cash Allowances .............................................. 11.8 claim for price adjustment ............ 4.1, 4.2.6, 4.5, 5.t5, 6.8.2, 9.4 ...................9.5, 9.11, 10.2, 10.5, 11.2, 13.9, I ........... 13.13, 13.14, 14.7, 15.1, 15.5 ............ CONTRACTORs fee.........................................11.6 Cost of the Work general ................................................ 11.4-11.7 Exclusions to,.. ........................................... 11.5 Cost Records.....................................................11.7 in general ............. j,19, 1.44, 9.11, 10.4.2, 10.4.3, 11 Lump Sum Pricing..........................................11.3.2 Notification of Surety.........................................10.5 Scope of....................................................10.3-10.4 Testing and Inspection, Uncovering the Work .................................. 13.9 E)CDC GENERAL CONDITIONS 1910-8 (1990 EDITION) wl CITY OF FORT COLLINS MODIFICATIONS (REV 9l99)_.. Unit Price Work ................................ „.,11.9 Article or Paragraph Number Value of Work. ................................................. i 1.3 Change in Contract Times -- Claim for times adjustment ........ 4.1, 4.2.6, 4.5, 5.15, ............ 6.8.2, 9.4, 9.5, 9.11, 10.2, 10.5, 12.1, .............. . 13.9, 13.13, 13.14, 14.7, 15 . 1, 15.5 Contractual time limit5,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,12.2 Delays beyond CONTRACTOR's control........................................................12.3 Delays beyond OWNER's and CONTRACTOR's control ..................... ........12.4 Notification of surety........................................10.5 Scope of change ......... ............................... 10.3-10.4 Change Orders -- Acceptance ofDefechve Work ..........................13.13 Amending Contract Documents..., ....................... 15 Cash Allowances .............................................. l 1.8 Change of Contract Price.....................................I I Change of Contract Times ................... I...............12 Changes in the Work. ........ ......... ........10 CONTRACTOR's fee........................................ 11.6 Cost of the Work11.4-11.7 Cost Records ........, ...................................... .......11.7 definition of .............................. ....................1.9 emergencies.....................................................0.23 ENGINEER's responsibility._,,,.,, 9.8, 10.4, 11.2, 12.1 execution of.....................................................10.4 Indemnifictioq .........................6.12, 6.16, 6.31-6.33 Insurance, Bonds and,.,,.,._„.............5.10, 5.13, 10.5 OWNER may terminate „....... ...........A5.2-15.4 OWNER's Responsibility ............................ 8.6, 10.4 Physical Conditions -- Subsurface and..............................................4.2 Underground Facilities--............................4.3.2 Record Documents,..., Scope of Change, ...................................... 10.3-10.4 Substitutes ............................................. 6.7.3, 6.8.2 Unit Price Work...............................................11.9 value of Work, covered by ...............................„ 11.3 Changes in the Work,,,,,,,,,,,,,,,,,,,,,,, ........................... 10 Notification of surety.........................................10.5 OWNER's and CONTRACTOR's responsibilities...........................................10.4 Right to an adjustment......................................10.2 Scope of change ......... ......... ............10.3-10.4 Claims -- against CONTRACTOR....................................6.16 against ENGINEER.........................................6.32 against OWNER...............................................0.32 Change of Contract Price„ ......................... 9.4, 11.2 Change of Contract Times .......................... 9.4, 12.1 CONTRACTOR's.............4, 7.1, 9.4, 9.5, 9.1 I, 10.2, .....................11.2, 11.9, 12.1, 13.9, 14.8, .......................................I....15.1, 15.5, 17.3 CONTRACTOR's Fee ...................: ......i 1.6 Article or Paragraph Number CONTRACTOR's liability ......... ,,5.4, 6.12, 6.16, 6.31 Cost of the Work11.4, 11.5 Decisions on Disputes .................... .......... 9.11, 9.12 Dispute Resolution............................................16.1 Dispute Resolution Agreement. ...................16.1-16.6 ENGINEER as initial interpretor .......................9.11 Lump Sum Pricing.......................................113.2 Noticeof..........................................................17.3 OWNER's................... 9.4, 9.5, 9.11, 10.2, 11.2, 11.9 ......*.................12.1, 13.9, 13.13, 13.14, 17.3 OWNER's liability .............................................. 5.5 OWNER may refuse to make paymen; ................14.7 Professional Fees and Court Costs Included......................................................17.5 request for formal decision on,,,,,,,,,,,,,,,,,,,,,,,,,,,,Q.it Substitute Items,,,,,6.7.1.2 Time Extension.................................................12.1 Time requirements ................................... 9.11, 12.1 Unit Price Work,. 11.9.3 Valueof...........................................................1.1.3 Waiver of --on Final Payment.................14.14, 14.15 Work Change Directive ...... ......... .............10.2 written notice requires,,,,,,,,,,,,,, 9.11, 111, 12.1 Clarifications and Interpretations,,,...,,.,,, 3.6.3, 9.4, 9.11 CleanSite............................................................0..17 Codes of Technical Society, Organization or Association ................................................. 3.3.3 Commencement of Contract Times ...........................2.3 Communications-- general..............................................6.2, 6.9.2, 8. t Hazard Communication Programs ....................6.22 Completion -- Final Application for Payment., ................. ...... 14.12 Final inspection ................ ......... ...........J4.11 Final Payment and Acceptance ..............J4.13-14.14 Partial Utilization ............................................ J4.10 Substantial Completion ......................1.38, 14.8-14.9 Waiver of Claims 14.15 Computation of Times...............................17.2.1-17.2.2 Concerning Subcontractors, Suppliers and Others ................................................... 6.8-6.11 Conferences -- initially acceptable schedules .............................. 2.9 preconstructioq ................. ........ .............. 2.8 Conflict, Error, Ambiguity, Discrepancy-- CONTRACTOR to Report .... ...... ................2.5, 3.3.2 Construction, before starting by CONTRACTOR ...................... ......... .......... ...2.5-2.7 Construction Machinery, Equipment, etc,,,,,,,,,,,,,,,,,, 6.4 Continuing the Work......................................6.29, 10.4 Contract Documents-- Amending..........................................................3.5 Bonds............................................................. 5.1 vi EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w.! CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Cash Allowances..............................................11.8 Article or Paragraph Number Change of Contract Price ........... .............. I.......... 11 Change of Contract Times .................................. 12 Changes in the Work ..... ......... ................10.4-10.5 .. check and verify ................................................. 2.5 Clarifications and Interpretations .........................3.2, 3.6, 9.4, 9.11 definition of.....................................................1.10 ENGINEER as initial interpreter of,,,,,,,,,,,,,,,,,, 9.11 ENGINEER as OWNER's representative,,,,,,,,,,,,, 9.1 general3 Insurance...........................................................5.3 Intent ........:........................ ...................... 3• 1-3.4 minor variations in the Work..............................3.6 OWNERS responsibility to furnish data...............8.3 OWNERs responsibility to make prompt payment ..........................$•3, 14.4, 14.13 precedence................................................3.1, 3.3.3 Record Documents............................................6.19 Reference to Standards and Specifications of Technical Societies...................................3.3 Related Work.....................................................7.2 Reporting and Resolving Discrepancies ......... 15, 3.3 Reuseof............................................................3.7 Supplementing..............................-................... 3.6 Termination of ENGINEERS Empioyment.,.,,,,...8.2 Unit Price Work ...................... ......................... 11.9 variations .......................................... 3.6, 6,23, 6.27 Visits to Site, ENGINEER's ............................... 9.2 Contract Price -- adjustment of .................3.5, 4.1, 9.4, 10.3, 11.2-11.3 Changeof .... ... ... ................................................1 I Decision on Disputes........................................9.11 definition of.....................................................1.11 Contract Times -- adjustment of ..........................3.5, 4.1, 9.4, 10.3, 12 Change of.................................................12.1-12.4 Commencement of ............................................ 2.3 definition of....................................................1.12 CONTRACTOR -- Acceptance of Insurance ................................... 5.14 Communications......................................6.2, 6.9.2 Continue Work ........................................ 6.29, 10.4 coordination and scheduling............................0..9.2 definition of.....................................................1.13 Limited Reliance on Technical Data Authorized.........................................4.2.2 May Stop Work or Terminate............................1.5.5 provide site access to others.. * .................... 7.2, 13.2 Safety and Protection ...................4.3.1.2, 6.16, 6.18, ...............6.21-6.23, 7.2, 13.2 Shop Drawing and Sample Review Prior to Submittal........................................6.25 vll Stop Work requirements..................................4.5.2 CONTRACTOWO Article or Paragraph Number Compensation ................................. ...........11.1-11.2 Continuing Obligation. .................................... 14.15 Defective Work ............................... 9.6, 13.10-13.14 Duty to correct defective Work ..........................13.11 Duty to Report -- Changes in the Work caused by Emergency............................................6.23 Defects in Work of Others ............................. 7.3 Differing conditions .................................. 14.2.3 Discrepancy in Documents........ 2.5, 3.3.2, 6.14.2 Underground Facilities not indicated.,,,.,,,,, 4.3.2 Emergencies.....................................................6.23 Equipment and Machinery Rental, Cost of the Work..........................................11.4.5.3 Fee --Cost Plus .......................... 11.4.5.6, 11.5.1, 11.6 General Warranty and Guaranteq .......................6.30 Hazard Communication Programs .....................6.22 Indemnification .........................C12, 6.16, 6.31-6.33 Inspection of the Work ...... .........................7.3, 13.4 Labor, Materials and Equipment .................... 0.3-6.5 Laws and Regulations, Compliance by ............. 6.14.1 Liability Insurance .............................................. 5.4 Notice of Intent to Appeal ......................... 9• 10, 10.4 obligation to perform and complete theWork....................................................6.30 Patent Fees and Royalties, paid for by................6.12 Performance and Other Bonds ............................5.1 Permits, obtained and paid for by.......................6.13 Progress Schedule. .......................... 2.6, 2.8, 2.9, 6.6, .....6.29, 10.4, 15.2.1 Request for formal decisionon disputes ............... 9.11 Responsibilities -- Changes in the Work ..........10.1 ....................... Concerning Subcontractors, Suppliers and Others......................................6.8-6.11 Continuing the Work ..........................0.29, 10.4 CONTRACTOR's expense .......................... 6.7.1 CONTRACTORs General Warranty and Guarantee.......................................6.30 CONTRACTOR's review prior to Shop Drawing or Sample Submittal................6.25 Coordination of Work ................................ 6.9.2 Emergencies ............................................... 6.23 ENGINEER's evaluation, Substitutes or "Or -Equal" Items...............................6.7.3 For Acts and Omissions of Others ............... ....... .......6.9.1-6.9.2, 9.13 for deductible amounts, insurance...................5.9 general................................I.......6, 7.2, 7.3, 8.9 Hazardous Communication Programs,.,,,.,... 6.22 Indemnification...................................6.31-6.33 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) wl CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Labor, Materials and Equipment..............6.3-6.5 Laws and Regulations,.,.,,,, 6.14 .......................... Liability Insurance 5.4 ......................................... Article or Paragraph Number Notice of variation from Contract Documents ............ 6.27 Patent Fees and Royalties,,,,,,,,,,,,,,,,,,,,, 6.12 Permits....................................................... 6.13 Progress Schedule ....................................... 6.6 Record Documents.. ............................... ..... 6.19 related Work performed prior to ENGINEER's approval of required submittals-,,,.,,,,, 6.28 safe structural loading„..............................6.18 Safety and Protection,,,,,,,,,,,,,,,,, 6.20, 7.2, 13.2 Safety Representative,,. ................... „6.21 Scheduling the Work ................................. 6.9.2 Shop Drawings and Samples ........................6.24 Shop Drawings and Samples Review by ENGINEER ...... ............................... 6.26 Site Cleanliness ... ...................................... . 6.17 Submittal Procedures ....................... 6.25 Substitute Construction Methods and Procedures.....................................6.7.2 Substitutes and "Or -Equal" Items................6.7.1 Superintendence ............................................. 6.2 Supervision .............................. 6. Survival of Obligations...*........* .............. 6.34 Taxes.................. ....... ......... Tests Inspections .......6.15 and .......................... 13.5 To Report,,,,,,,,,,,,, ......... ......... .........2.s Use of Premises......................6.16-6.18, 6.30.2.4 Review Prior to Shop Drawing or Sample Submittal ..................... .............. 6.25 Right to adjustment for changes in the Work ..... 10.2 right to claim;,,,,,,.,,,, 4, 7.1, 9.4, 9.5, 9.11, 10.2,11.2, ........... 11.9,12.1,13.9,14.8,15.1,15.5,17.3 Safety and Protection,,,,,,,,,,,,,,,,,, 6.20-6.22, 7.2, 13.2 Safety Representative ........................................ 6.21 Shop Drawings and Samples Submittals -.... 6.24-6.28 Special Consultants,,.,_-,,..., ........................ ....11.4.4 Substitute Construction Methods and Procedure8,6.7 Substitutes and "Or -Equal" Items, Expense .......................................... 6.7.1, 6.7.2 Subcontractors, Suppliers and Others ,,,...,.,-6.8-6.11 Supervision and Superintendence ......... 6.1, 6.2, 6.21 Taxes, Payment by ...................... ............6.15 Use of Premises ... ............... ...................... 6.16-6.18 Warranties and guarantees ......................... 6.5, 6.30 Warranty of Title Written Notice Required-- CONTRACTOR stop Work or terminate ........ 15.5 Reports of Differing Subsurface and Physical Conditions ................ 4.2.3 Substantial Completion...,.,, ......................... 14.8 viii CONTRACTORS --other ..............................................? Contractual Liability Insurance,,,,,,,,,,,,,, Contractual Time Limits., 12 2 ..............................I....... . Article or Paragraph Number Coordination— CONTRACTOR's responsibility,,,,,,,,,,,,,, 6.9.2 Copies of Documents_-- ............................. 2.2 Correction Period ....................... .......................13.12 Correction, Removal or Acceptance of Defective Work-- in general...................................10.4.1, 13.10-13.14 Acceptance ofDefective Work ........................ 13.13 Correction or Removal of Defective Work.................................6.30, 13.11 Correction Period ...................... .....................13.12 OWNER May Correct Defective Work ,,,,,,,,,,,,,,13.14 OWNER May Stop Work .................. .............. 13.10 Cost-- ofTestsand Inspections,,,,,,,,,,,,,,,,,,,, ................13.4 Recordsll.7 Cost of the Work -- Bonds and insurance, additional,, ................. 11.4.5.9 Cash Discounts,,,,,,,,,,,,,,,,, ............................. 11.4.2 CONTRACTORSs Fee .................. ................. 11.6 Employee Expenses ..................... 11.4.5.1 Exclusions to ........................................ .............11.5 General11.4-11.5 Home office and overhead expenses ....................11.5 Losses and damages ......................... 11.4.5.6 Materials and equipment,,, ... ........., 11.4.2 Minor expenses .............. ................... 11.4.5.8 Payroll costs on changes,,,,,,,,,,,,,,,,,,,,,, 11.4.1 performed by Subcontractors...........................11.4.3 Recordsll.7 Rentals of construction equipment and machinery„............ ......................... 11.4.5.3 Royalty payments, permits and license fees .......................J1.4.5.5 ..................... Site office and temporary facilities ................ j 1.4.5.2 Special Consultants, CONTRACTORS11.4.4 Supplemental ..................11.4.5 ............................... Taxes related to the Work ................... 11.4.5.4 Tests and Inspection. .............. .................. .....13.4 Trade Discounts ......................................... ....I 1.4.2 Utilities, fuel and sanitaryfacilities..............11.4.5.7 Work after regular hours ............................... _.11.4.1 CoveringWork................................. ,,,,,,,,,,,,,,13.6-13J Cumulative Remedies ..... ....... .... ...................... 17.4-17.5 Cutting, fitting and patching,,,,,,,,,,,,,,,,,,,,,,, 7.2 Data, to be furnished by OWNER ............................... $.3 Day --definition of................................................17.2.2 Decisions on Disputes .................................. 9.1 I, 9.12 defective --definition of ............................... .............1.14 defective Work -- Acceptance of ............ ......................... 10.4.1, 13.13 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) sacrificial, and thus protect the bricks. When this type of mortar is used with old bricks, moisture, which remains in the brick, causes brick wall surface to "pop" or destroy the surface of the bricks. Proper mortar formulations of antique brick use lime as the primary binding material. Lime should conform to ASTM C 207, Type S or Type SA, Hydrated Lime for Masonry Purposes. If you have any questions please contact John Stephen, CPPB, Senior Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Correction or Removal of .....................10.4.1, 13.11 Correction Period ................................. ...........13.12 in general.........................................13, 14.7, 14.11 Article or Paragraph Number Observation by ENGINEER ................................ 9.2 OWNER May Stop Work.................................13.10 Prompt Notice of Defects...................................13.1 .................................................9.6 Rejecting ........ .. Uncovering the Work.......................................13.8 Definitions................................................................ I Delays......................................4.1, 6.29, 12.3-12.4 Delivery of Bonds.....................................................2.1 Delivery of certificates of insurance ............................2.7 Determinations for Unit Prices................................9.10 Differing Subsurface or Physical Conditions-- Noticeof.........................................................4.2.3 ENGINEER's Review......................................4.2.4 Possible Contract Documents Changq.............. 4.2.5 Possible Price and Times Adjustment$..............4.2.6 Discrepancies -Reporting and Resolving................................2.5, 3.3.2, 6.14.2 Dispute Resolution -- Agreement ............................................... 16. I - l 6.6 Arbitration ...............................................16.1-16.5 generall6 Mediation........................................................16.6 Dispute Resolution Agreement ....................... 16.1-16.6 Disputes, Decisions by ENGINEER ..................9.11-9.12 Documents -- Copiesof...........................................................2.2 Record 6.19 Reuseof............................................................3.7 Drawings --definition of..........................................1.15 Easements............................................................4.1 Effective date of Agreement -- definition of .............J.16 Emergencies.......................................................... 6.23 ENGINEER — as initial interpreter on disputes................9.11-9.12 definition of.....................................................t.17 Limitations on authority and responsibilities ..... 9.13 Replacement of ....................... ....... I .................... 8.2 Resident Project Representative ...........................9.3 ENGINEER's Consultant -- definition of..................1.18 ENGINEER's-- authority and responsibility, limitations oq........ 9.13 Authorized Variations in the Work.....................9.5 Change Orders, responsibility for....... 9.7, 10, 11, 12 Clarifications and Interpretations ...............3.6.3, 9.4 Decisions on Disputes .............................. 9.11-9.12 defective Work, notice of ............................ .... 13.1 Evaluation of Substitute Items........ I.................6.7.3 Liability...................................................4.32, 9.12 Notice Work is Acceptable..............................14.13 Observations...........................................6.30.2, 9.2 OWNER's Representative....................................9.1 Payments to the CONTRACTOR, Responsibility for.....................................9.9, 14 Recommendation of Payment ....................14.4, 14.13 Article or Paragraph Number Responsibilities --Limitations o4.................9.11-9.13 Review of Reports on Differing Subsurface and Physical Conditions..............................4.2.4 Shop Drawings and Samples, review responsibility...............................................6.26 Status During Cmstruction— authorized variations in the Work..................9.5 Clarifications and Interpretations ..................9.4 Decisions on Disputes..........................9.11-9.12 Determinations on Unit Price......................9.10 ENGINEER as Initial InterpreteZ.......... .11-9.12 ENGINEER's Responsibilities ................9.1-9.12 Limitations on ENGINEER's Authority and Responsibilities..............................9.13 OWNER's Representative..............................9.1 Project Representative...................................9.3 Rejecting Defective Work..............................9.6 Shop Drawings, Change Orders and Payments ................................... 9.7-9.9 Visits to Site.................................................9.2 Unit Price determinations..................................9.10 Visits to Site.......................................................9.2 Written consent required..............................7.2, 9.1 Equipment, Labor, Materials and ........................0.3-6.5 Equipment rental, Cost of the Work .................. 11.4.5.3 Equivalent Materials and Equipment........................0.7 error or omissions..................................................6.33 Evidence of Financial Arrangements .......................?.I t Explorations of physical conditions ....................... 4.2.1 Fee, CONTRACTOR's--Costs Plus ...........................11.6 Field Order -- definition of.....................................................1.19 issued by ENGINEER ................................ 3.6.1, 9.5 Final Application for Payment..............................14.12 Final Inspectioq...................................................14.11 Final Payment -- and Acceptance.....................................14.13-14.14 Prior to, for cash allovances„.............................11.8 General Provisions..........................................17.3-17.4 General Requirements -- definition of.....................................................1.20 principal references to..............7.6, 6.4, 6.6-6.7, 6.24 Giving Notice........................................................17.1 Guarantee of Work --by CONTRACTOR ........ 6.30, 14.12 Hazard Communication Programs ..........................6.22 Hazardous Waste -- definition of.....................................................1.21 general............................................................ 4.5 OWNER's responsibility for...............................8.10 ix EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) .,,� iN . i Ilk i . i. Indemnification ............................. ¢,12, 6.16 6.31-6.33 Initially Acceptable Schedules.,,,, 2.9 .......................... Inspection -- Certificates of ......................... 9.13.4, 13.5, 14.12 Final ...................................... 14.11 Article or Paragraph Number Special, required by ENGINEER ......................... 9.6 Tests and Approval ...................... $.7, 13.3-13.4 Insurance -- Acceptance of, by OWNER ............................. ..5.14 Additional, required by changes in the Work...........................................11.4.5.9 Before starting the Work ............................... 2.7 Bonds and --in general..........................................5 Cancellation Provisions 5_8 Certificates of ................. 2.7, 5, 5.3, 5.4.11, 5.4.13, ........................5.6.5, 5.8, 5.14, 9.13.4, 14.12 completed operations _,,, .....5.4.13 CONTRACTOR's Liability..................................5.4 CONTRACTOR's objection to coverage ............. 5.14 Contractual Liability ................. 5.4.10 deductible amounts, CONTRACTOR's responsibility ................................. ............... 5.9 Final Applicafion for Payment ..................... 14.12 Licensed Insurers ............................ ................ Notice requirements, material changes........ ...5.3 5.8, 10.5 Option to Replace,,,,.... ..5.14 other special insurances„ ................................ 5.10 OWNER as fiduciary for insureds,..........„. 5.12-5.13 OWNER's Liability............................................5.5 OWNER's Responsibility.....................................8.5 Partial Utilization, Property Insurance...............5.15 Property.....................................................5.6-5.10 Receipt and Application of Insurance Proceeds .............................................. 5.12-5.13 Special Insurance 5.10 Waiver of Rights..............................................5.11 Intent of Contract Documents 3,1-3.4 Interpretations and Clarifications ..................... 3,6.3, 9.4 Investigations of physical conditions 4.2 Labor, Materials and Equipment,,,,,,,,,,, ,,,,,, . . . 6.3-6.5 Lands-- and Easements,,,,,,,,,,,,,,,,,,,,, 8.4 Availability of. ..........................................4.1, 8.4 Reports and Tests .......................................... 8 4 Laws and Regulations --Laws or Regulations -- Bonds Changes in the Work .................................... 10.4 Contract Documents ....... ................. 3.1 CONTRACTOR's Responsibilities .............. 6.14 Correction Period, defective Work ............. 13.12 Cost of the Work, taxes ................... ....... l 1.4.5.4 definition of ................... ............................ 1.22 general6.14 Indemnification ....... ................................. 6.31-6.33 Insurance...........................................................5.3 Precedence................................................3.1, 3.3.3 Reference to ................................ 3.3.1 Safety and Protection ............ .........6.20, ....... 13.2 Subcontractors, Suppliers and Others ........... 6.8-6.11 Article or Paragraph Number Tests and Inspections .................... 13.5 Use of Premises ............... 0.16 Visits to Site.......................................................9.2 Liability Insurance-- CONTRACTOR's............................................... 5.4 OWNER's...........................................................5.5 Licensed Sureties and Insurers ............... 5.3 Liens -- Application for Progress Payment-.... 14.2 CONTRACTOR's Warranty of Title....................14.3 Final Application for Payment .......................... definition of ..........................1.23 Waiver of Claims.....................................14.15 Limitations on ENGIN R's authority and responsibilities................................................. 9.13 Limited Reliance by CONTRACTOR Authorized......................................................4.2.2 Maintenance and Operating Manuals -- Final Application for Payment ................... 14.12 Manuals (of others)-- Precedence ... .................. .............................. 3.3.3.1 Reference to in Contract Documents „....3.3.1 Materials and equipment -- furnished by CONTRACTOR 6 not incorporated in Work 14.2 Materials or equipment --equivalent ...................... 6.7 Mediation (Optional) .................. _ 16.7 Milestones --definition of.......................................1.24 Miscellaneous -- Computation of Times ........................................ 17.2 Cumulative Remedies ......................................... 17.4 Giving Notice.,,.. .....................17.1 Notice of Claim.................................................17.3 Professional Fees and Court Costs Included 17.5 Multi -prime contracts 7 Not Shown or Indicated.........................................4.3.2 Notice of -- Acceptability of Project,...... 14.13 Award, definition of.........................................1.25 Claim.............................17.3 ............................... Defects,13.1 Differing Subsurface or Physical Condition$ ...... 4.2.3 Giving..: ............... ............................. Tests and Inspections............ ............ 13.3 Variation, Shop Drawing and Sample ........... 6.27 Notice to Proceed -- definition ................. of ..................26 .. 1 givingof ........................................................... 2.3 FJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Notification to Surety.............................................J0.5 Observations, by ENGINEER ........................... 6.30; 9.2 Occupancy of the Work ................... 5.15, 6.30.2.4, 14.10 Omissions or acts by CONTRACTOIt...............0.9, 9.13 Open Peril policy form,Insurancq ..........................5.6.2 Option to Replace„ ................................................. 5.14 Article or Paragraph Number "Or Equal" Items......................................................6.7 Other work 7 Overtime Work --prohibition o(.................................6.3 OWNER -- Acceptance ofdefective Work ..........................13.13 appoint an ENGINEER__ ................................. 8.2 as fiduciary ...............................................5.12-5.13 Availability of Lands, responsibility ....................4.1 definition o(.....................................................1.27 data, furnish......................................................8.3 May Correct Defective Work............................13.14 May refuse to make payment.............................14.7 May Stop the Work ........................................ J3.10 May Suspend Work, Terminate ...........................8.8, 13.10, 15.1-15.4 Payment, make prompt ..................... $ 3, 14.4, 14.13 performance of other work..................................7.1 permits and licenses, requirements ....................6.13 purchased insurance requirements ...............5.6-5.10 OWNER's-- Acceptance of the Work... ........................... 0.30.2.5 Change Orders, obligation to execute,,.,,_.,,, 8.6, 10.4 Communications ............... 8.1 Coordination of the Work ................................... 7.4 Disputes, request for decision ...........................9.1l Inspections, tests and approvals ........ ......... $.7, 13.4 Liability Insurance, ................. .......................... 5.5 Notice of Defects...................„_..,,,_....,..,,..._,,,,,J3.1 Representative --During Construction, ENGINEER's Status......................................9.1 Responsibilities -- Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Material................8.10 Change Orders.............................................8.6 Changes in the Worl;...................................10.1 communications............................................8.1 CONTRACTOR's responsibilities .................8.9 evidence of financial arrangementp ..............$. I 1 inspections, tests and approvals ..................... 8.7 insurance...................................................... 8.5 lands and easements .................................... 8A prompt payment by ........................................ 8.3 replacement of ENGINEEI............. ?..............$.2 reports and tests............................................8.4 stop or suspend Work..................8.8, 13.10, 15.1 terminate CONTRACTOR's services..........................................8.8, 15.2 separate representative at site ............................. 9.3 xi testing, independent.........................................13.4 use or occupancy of the Work ............. ............ 5,15, 6.30.2.4, 14.10 written consent or approval required.........................................9.1, 6.3, 11.4 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) wl CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) ... 4 Article or Paragraph Number written notice required ........................7.1, 9.4, 9.11, .................................. ..11.2,11.9, 14.7, 15.4 PCBs -- definition of.....................................................1.29 general..............................................................4.5 OWNER's responsibility for ..................... 8.10 Partial Utilization -- definition of .............................................. 1.28 general 6.30.2.4, 14.10 Property Insurance ............................................ 5.15 Patent Fees and Royalties ..................... 6.12 Payment Bonds, ................................ Payments, Recommendation of..............14.4-14.7, 14.13 Payments to CONTRACTOR and Completion -- Application for ProgressPayments„....................14.2 CONTRACTOR's Warranty of Title ...................14.3 Final Application for Payment........ ................. 14.12 Final Inspection .............................................. 14.11 Final Payment and Acceptance ................14.13-14.14 general.........................................................$ 3, 14 Partial Utilization............................................14.10 Retain age..........................................................14.2 Review of Applications for Progress Payments ............................. 14.4-14.7 prompt payment,,,,.., * $3 Schedule of Values., ................................. 14.1 Substantial Completion ............................... 14.8-14.9 Waiver of Claims.............................................14.15 when payments due * ............................... 14.4, 14.13 withholding payment,,,...*, ._...*... ............ ..........14.7 Performance Bonds .............. ................. . ............5.1-5.2 Permits............................... .............................6.13 Petroleum -- definition of .....................1.30 ................................. general..............................................................4.5 OWNER's responsibility for...............................8.10 Physical Conditions -- Drawings of, in or relating to ....................... 4.2.1.2 ENGINEER's review ........................................ 4.2.4 existing structures...........................................4.2.2 general 4.2.1.2 ............................... Notice of Differing Subsurface or. ................... 4.2.3 Possible Contract Documents Change ............... 4.2.5 Possible Price and Times Adjustments ..............4.2.6 Reports and Drawings .................................... 4.2.1 Subsurface and, Subsurface Conditions .................................... 4.2.1.1 Technical Data, Limited Reliance by CONTRACTOR Authorized ...................... 4.2.2 Underground Facilities-- general........................................................ 4.3 Not Shown or Indicaed ........................ ...._.4.3.2 Protection of ......._...4.3, .............................. 6.20 xii Article or Paragraph Number Shown or Indicated ................. ............................. 4.3.1 Technical Data...............................................4.2.2 Preconstruction Conference,,,....._ Preliminary Matters .................................................... 2 Preliminary Schedules, ........................ . 2.6 Premises, Use of„ ............. ............................ 6.16-6.18 Price, Change of Contract ........................................... 11 Price, Contract --definition of .................... 1.11 Progress Payment, Applications for ........................ 14.2 Progress Payment--retainage,,..,..... 14.2 Progress schedule, CONTRACTOR's............. 2.6, 2.8, 2.9, ................................. 6.6, 6.29, 10.4, 15.2.1 Project --definition of*............................................1.31 Project Representative-- ENGINEER's Status During Construction ............ 9.3 Project Representative, Resident --definition of .........1.33 prompt payment by OWNER ...................................... 8.3 Property Insurance -- Additional ........................................ 7 general5.6-5.10 Partial Utilization .............................. 5.15, 14.10.2 receipt and application of proceeds ........... 5.12-5.13 Protection, Safety and ............................ 6.20-6.21, 13.2 Punch list 1,4.11 Radioactive Material-- defintion of.....................................................1.32 general4.5 OWNER's responsibility for ........................ $.10 Recommendation of Payment ... *....... „...„14.4, 14.5, 14.13 Record Documents .......................... 6.19, 14.12 Records, procedures for maintaining ..........................z.8 Reference Points Reference to Standards and Specifications of Technical Societies ......................................... 3.3 Regulations, Laws and (or)., .................... 6.14 Rejecting Defective Work..........................................9.6 Related Work -- at Site .......................7.1-7.3 ................................. Performed prior to Shop Drawings and Samples submittals review....................6.28 Remedies, cumulative„..........................I.........17.4, 17.5 Removal or Correction ofDefective Work ................ 13.11 rental agreements, OWNER approval required ..... 11.4.5.3 replacement of ENGINEER, by OWNER ..................... 8.2 Reporting and Resolving Discrepancies................................2.5, 3.3.2, 6.14.2 Reports -- and Drawings............................... ..................4.2.1 and Tests, OWNER's responsibility .....................8.4 Resident and Project Representative -- definition of .................... ................................1.33 . provision for q 3 .............................................................. EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Article or Paragraph Number Resident Superintendent, CONTRACTOR';; ................ .2 Responsibilities— CONTRACTOR's-in general .................................. 6 ENGINEER's-in general ........................................ 9 Limitations on.............................................9.13 OWNER'S -in general ............................................. Retainage............................................................14.2 Reuse of Documents..................................................3.7 Review by CONTRACTOR: Shop Drawings and Samples Prior to Submittal ,...........• .............6.25 Review of Applications for Progress Payments .,,•................................ 14.4-14.7 Right to an adjustment..........................................10.2 Rightsof Way..........................................................4.1 Royalties, Patent Fees and ...................................... 6.12 Safe Structural Loading ........................................... 6.18 Safety -- and Protection................................4.3.2, 6.16, 6.18, ...................6.20-6.21, 7.2, 13.2 general ......................................... 6.20-6.23 Representative, CONTRACTOR's......................6• 21 Samples -- definition of......................................................1.34 general.....................................................0.24-6.28 Review by CONTRACTOR ••...._.•...................... 6.25 Review by ENGINEER..............................6.26, 6.27 related Work.....................................................6.28 submittal of. ................................................... 0.24.2 submittal procedures ......................................... 0.25 Schedule of progress.............................2.6, 2.8-2.9, 6.6, ...............6.29, 10.4, 15.2.1 Schedule of Shop Drawing and Sample Submittals..............................2•6, 2.8-2.9, 6.24-6.28 Schedule of Values•.............................2.6, 2.8-2.9, 14.1 Schedules -- Adherence to..................................................15.2.1 Adjusting...........................................................6.6 Change of Contract Times ............ .....................10.4 Initially Acceptable ................. ..................... 2.8, 2.9 Preliminary......................................................2.6 Scope of Changes......................................10.3-10.4 Subsurface Conditions ......................................... 4.2.1.1 Shop Drawings -- and Samples, general ................................. .24-6.28 Change Orders & Applications for Payments, and.........................................9.7-9.9 definition of......................................................1.35 ENGINEER's approval of ................................. 3.6.2 ENGINEER's responsibility for review ..................................... 9.7, 6.24-6.28 related Work....................................................6.28 review procedures ................................ 2.8, 6.24-6.28 Article or Paragraph Number submittal required................................................6.24.1 Submittal Procedures ......................................... 6.25 use to approve substitutions..............................6.7.3 Shown or Indicated ............................................... 4.3.1 Site Access......................................................7.2, 13.2 Site Cleanliness.......................................................0.17 Site, Visits to -- by ENGINEER .......................................... 9.2, 13.2 byothers..........................................................13.2 "special causes of loss" policy form, insurance........................................................5.6.2 definition of. .................................................... 1.36 Specifications— defination of.....................................................1.36 of Technical Societies, reference t9 ...................3.3.1 precedence......................................................3.3.3 Standards and Specifications of Technical Societies........................................3.3 Starting Construction, Before..............................2.5-2.8 Starting the Work ..................................................... 2.4 Stop or Suspend Work -- by CONTRACTOR.......................................I...15.5 by OWNER ..................................... 8.8, 13.10, 15.1 Storage of materials and equipment ..................... 4.1, 7.2 Structural Loading, Safety ...................................... 6.18 Subcontractor -- Concerning ................................................ 6.8-6.11 definition of• .................................................... 1.37 delays ,...................... .....................................12.3 . waiver of rights................................................0.11 Subcontractors --in general ••,..•...........................6.8-6.11 Subcontracts --required provisions......... 5.11, 6.11, 11.4.3 Submittals -- Applications for Payment .................................. 14.2 Maintenance and Operation Manuals...............14.12 Procedures.......................................................0.25 Progress Schedules......................................2.6, 2.9 Samples...................................................6.24-6.28 Schedule of Values ..................................... 2.6, 14.1 Schedule of Shop Drawings and Samples Submissions, ..................................... 2.6, 2.8-2.9 Shop Drawings ........................................ 6.24-6.28 Substantial Completion -- certification of ............................ 6. 30.2.3, 14.8-14.9 definition of ..................................................... 38 Substitute Construction Methods or Procedure* ........ 6.7.2 Substitutes and "Or Equal" Items ............................... 6.7 CONTRACTOR'S Expense............................0.7.1.3 ENGINEER's Evaluation.................................6.7.3 "Or -Equal" ................................................... 0.7.1.1 Substitute Construction Methods EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) „� !M iI," I. Article or Paragraph Number or Procedures...........--........6.7.2 ...................... „ Substitute Items ................ ..... 6.7.1.2 Subsurface and Physical Conditions -- Drawings of, in or relatug to ................... 4.2.1.2 ENGINEER's Review ....................................... 4.2.4 general..............................................................4.2 Limited Reliance by CONTRACTOR Authorized........................_..,-„..................4.2.2 Notice of Differing Subsurface or Physical Conditions ....................................... 4.2.3 Physical Conditions„_.,,,„ ............................. 4.2.1.2 Possible Contract Documents Change ............... 4.2.5 Possible Price andTimes Adjustments ...... .......4.2.6 Reports and Drawings ..................................... 4.2.1 Subsurface and ................................................... 4.2 Subsurface Conditions at the Site .................... 4.2.1.1 Technical Data................................................ 4.2.2 Supervision— CONTRACTOR's responsibility ...........................¢.1 OWNER shall not supervise,: .................... 8.9 ENGINEER shall not supervise ................ 9.2, 9.13.2 Superintendence ......................... .............. .............0-2 Superintendent, CONTRACTOR's resident-------------„6.2 Supplemental costs .............................................. 11.4.5 Supplementary Conditions -- definition of.....................................................1.39 principal references to.................1.10, 1.18, 2.2, 2.7, ....................... 4.2, 4.3, 5.1, 5.3, 5.4, 5.6-5.9, ................. 5.11,6.8,6.13,7.4,8.11,9.3,9.10 Supplementing Contract Documents,,,,,,,,,,,,,,, , 3.6 Supplier-- definition of.....................................................1.40 principal references to ........... 3.7, 6.5, 6.8-6.11, 6.20, ..........................................0.24, 9.13, 14.12 Waiver of Rights ............................................... 6.11 Surety -- consent to final payment„--,-,.,-,,.. 14.12, 14.14 ENGINEER has no duty to .................... . .. ..........9.13 Notification of ... .............................10.1, 10.5, 15.2 qualification of.............................................5.1-5.3 Survival of Obligations...........................................6.34 Suspend Work, OWNER May ..................... 13.10, 15.1 Suspension of Work and Termination--—...,,-„ .-.15 CONTRACTOR May Stop Work or Terminate ............................................... 15.5 OWNER May Suspend Work ............................... 15.1 OWNER May Terminate ...... ..................... .15.2-15.4 Taxes --Payment by CONTRACTOR ................. 6.15 Technical Data -- Limited Reliance by CONTRACTOR .................4.2.2 Possible Price and Times Adjustments..............4.2.6 Reports of Differing Subsurface and Physical Conditions . .......................... -,...4.2.3 xiv Temporary construction facilities 4.1 ........................ Article or Paragraph Number Termination -- by CONTRACTOR...........................................15.5 by OWNER ............ ... .........................8.8, 15.1-15.4 of ENGINEER's employment ................... $,2 Suspension of Work-in general,,. ........................... 15 Terms and Adjectives .................. .......................3.4 Tests and Inspections -- Access to the Work, by others,,,,,,,,,,,,,,,, 13.2 CONTRACTOR's responsibilities,,,,,,,,,,,,,,,,,,, 13.5 cost of 13.4 covering Work prior to,,,,,,,,,,,,,,,,,,,,,, 13.6-13.7 Laws and Regulations (or) .................. 13.5 Notice of Defects,,,,,,,,,,,,,,,,,, 13.1 OWNER May Stop Work.................................13.10 OWNER'S independent testing ................... 13.4 special, required by ENGINEER ................ . y.6 timely notice required ............... Uncovering the Work, at ENGINEER's request ............... .................................. 13.8-13.9 Times -- Adjusting.......................................... .................6.6 Change of Contract ............................. 12 Computation of ......... .......... .............................. 17 2 Contract Times --definition Of ............... 1.12 day..........................................................1.7.2.2 Milestones..........................................................12 Requirements-- appeals.................................................9.10, 16 clarifications, claims and disputes ,,,,,,,,,,,,,,,,,,9.11, 11.2, 12 Commencement of Contract Times„ .............. 2.3 Preconstruction Conference ?,8 schedules.........................................2.6, 2.9, 6.6 Starting the Work.........................................2.4 Title, Warranty of,,,,,,,,_ ................. ........................ 14.3 Uncovering Work,,,..,,,, ,, .................................. 13.8-13.9 Underground Facilities, Physical Conditions-- definition of....................................................1.41 Not Shown or Indicated.... ...............................4.3.2 protection of ....... .. .....................................4.3, 6.20 Shown or Indicated..........................................4.3.1 Unit Price Work-- claims.........................................................1,1.9.3 definition of....................................................1.42 general11.9, 14.1, 14.5 Unit Prices-- general11.3.1 Determination for ................................ ............9.10 Use of Premises ..................... 6.16, 6.18, 6.30.2.4 Utility owners ......... 6 ..............13, 6.20, 7.1-7.3, 13.2 Utilization, Partial...................1.28, 5.15, 6.30.2.4, 14.10 Value of the Work ........ ........................................... l 1.3 Values, Schedule of .................. 2.6, 2.8-2.9, 14.1 E1CDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Variations in Work --Minor Authorized ....................................... 6.25, 6.27, 9.5 Article or Paragraph Number Visits to Site --by ENGINEER ................................... 9.2 Waiver of Claims --on Final Payment ......................14.15 Waiver of Rights by insured partie*..................5.11, 6.11 Warranty and Guarantee, General --by CONTRACTOR................................................0.30 Warranty of Title, CONTRACTOR's........................14.3 Work -- Accessto..........................................................1,3.2 byothers.........................................................1... 7 Changes in the, .................................................... 10 Continuing the ..................................................6.29 CONTRACTOR May Stop Work or Terminate...............................................15.5 Coordination of. ................................................. 7- A Cost of the.................................................11.4-11.5 definition of......................................................1.43 neglected by CONTRACTOR...........................13.14 otherWork............................................................ OWNER May Stop Work.................................13.10 OWNER May Suspend Work...................13.10, 15.1 Related, Work at Site....................................7.1-7.3 Starting the........................................................2.4 Stopping by CONTRACTOR..............................t5.5 Stopping by OWNER .............. ....... ... ......... 15.1-15.4 Variation and deviation authorized, minor ........... 3.6 Work Change Directive -- claims pursuant to.............................................10.2 definition of......................................................1.44 principal references to......................3.5.3, 10.1-10.2 Written Amendment -- definition of ................................. I ........ I ........... 1.45 principal references to..............1.10, 3.5, 5.10,15.12, .........................6.6.2, 6.8.2, 6.19, M.1, 10.4, „........„.,.,1 t.2, 12.1, 13. t2.2, 14.7.2 Written Clarifications and Interpretations...................................3.6.3, 9.4, 9.11 Written Notice Required -- by CONTRACTOR............................7.1, 9.10-9.11, .......................... 10.4, 11.2, 12.1 by OWNER ....................9.10-9.11, 10.4, 11.2, 13.14 xv EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9199) ...� r (This page left blank intentionally) xvi EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) No Text GENERAL CONDITIONS ARTICLE 1—DEFINITIONS Wherever used in these General Conditions or in the other Contract Documents the following terms have the meanings indicated which are applicable to both the singular and plural thereof. 1.1. Addenda —Written or graphic instruments issued prior to the opening of Bids which clarify, correct or change the Bidding Requirements or the Contract Documents. 1.2. Agreement —The written contract between OWNER and CONTRACTOR covering the Work to be performed; other Contract Documents are attached to the Agreement and made a part thereof as provided therein. 1.3. Application for Payment —The form accepted by ENGINEER which is to be used by CONTRACTOR in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 1.4. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 1.5. Bid —The offer or proposal of the bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 1.6. Bidding Documents —The advertisement or invitation to Bid, instructions to bidders, the Bid form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 1.7. Bidding Requirements —The advertisement or invitation to Bid, instructions to bidders, and the Bid form. 1.8. Bonds —Performance and Payment bonds and other instruments of security. 1.9. Change Order --A document recommended by ENGINEER, which is signed by CONTRACTOR and OWNER and authorizes an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement. 1.10. Contract Documents —The Agreement, Addenda (which pertain to the Contract Documents), CONTRACTOR's Bid (including documentation accompanying the Bid and any post Bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Agreement, the Notice to Proceed, the Bonds, these General Conditions, the Supplementary Conditions, the Specifications and the Drawings as the EJCDC GENERAL CONDITIONS 1910-8 (1990 Edifion) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 412000) same are more specifically identified in the Agreement, together with all Written Amendments, Change Orders, Work Change Directives, Field Orders and ENGINEER's written interpretations and clarifications issued pursuant to paragraphs 3.5, 3.6.1 and 3.6.3 on or after the Effective Date of the Agreement. Shop Drawing submittals approved pursuant to paragraphs 6.26 and 6.27 and the reports and drawings referred to in paragraphs 4.2.1 and 4.2.2 are not Contract Documents. 1.11. Contract Price —The moneys payable by OWNER to CONTRACTOR for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of paragraph 11.9.1 in the case of Unit Price Work). 1.12. Contract Times —The numbers of days or the dates stated in the Agreement: (i) to achieve Substantial Completion, and (ii) to complete the Work so that it is ready for final payment as evidenced by ENGINEER's written recommendation of final payment in accordance with paragraph 14.13. 1.13. CONTRACTOR —The person, firth or corporation with whom OWNER has entered into the Agreement. 1.14. defective --An adjective which when modifying the word Work refers to Work that is unsatisfactory, faulty or deficient in that it does not conform to the Contract Documents, or does not meet the requirements of any inspection, reference standard, test or approval referred to in the Contract Documents, or has been damaged prior to ENGINEER's recommendation of final payment (unless responsibility for the protection thereof has been assumed by OWNER at Substantial Completion in accordance with paragraph 14.8 or 14.10). 1.15. Drawings —The drawings which show the scope, extent and character of the Work to be furnished and Performed by CONTRACTOR and which have been prepared or approved by ENGINEER and are referred to in the Contract Documents. Shop drawings are not Drawings as so defined. 1.16. Effective Date of the Agreement —The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 1.17. ENGINEER —The person, firm or corporation named as such in the Agreement. 1.18. ENGINEER'S Consultant —A person, firm or corporation having a contract with ENGINEER to fumish services as ENGINEER's independent professional associate or consultant with respect to the Project and who is identified as such in the Supplementary Conditions. 1.19. Field Order —A written order issued by ENGINEER which orders minor changes in the Work in accordance with paragraph 9.5 but which does not involve a change in the Contract Price or the Contract Times. CONTRACT DOCUMENTS TABLE OF CONTENTS Section BID INFORMATION 00020 Notice Inviting Bids 00100 Instruction to Bidders 00300 Bid Form 00400 Supplements to Bid Forms 00410 Bid Bond 00420 Statements of Bidders Qualifications 00430 Schedule of Major Subcontractors CONTRACT DOCUMENTS 00500 Agreement Forms 00510 Notice of Award 00520 Agreement 00530 Notice to Proceed 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release(Contractor) 00660 Consent of Surety 00670 Application for Exemption Certificate CONDITIONS OF THE CONTRACT 00700 General Conditions Exhibit GC -A 00800 Supplementary Conditions 00900 Addenda, Modifications, and Payment 00950 Contract Change Order 00960 Application for Payment SPECIFICATIONS Pages 00020-1 - 00020-2 00100-1 - 00100-9 00300-1 - 00300-2 00400-1 00410-1 - 00410-2 00420-1 - 00420-3 00430-1 00500-1 00510-0 00520-1 - 00520-6 00530-1 00600-1 00610-1 - 00610-2 00615-1 - 00615-2 00630-1 00635-1 00640-1 00650-1 - 00650-2 00660-1 00670-1 - 00670-2 00700-1 - 00700-34 GC -Al - GC-A2 00800-1 - 00800-2 00900-1 00950-1 - 00950-2 00960-1 - 00960-2 ,. .... ,, ... - 1.20. General Requirements -Sections of Division 1 of the Specifications. 1.21. Hazardous Waste -The term Hazardous Waste shall have the meaning provided in Section 1004 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to time. 1.22.a. Laws and Regulations, Laws or Regulations -Any and all applicable laws, rules, regulations, ordinances, codes and orders of any and all governmental bodies, agencies, authorities and courts having jurisdiction. l 22 b Legal Holidays-shall be those holidays observed by the City of Fort Collins. 1.23. Liens -Liens, charges, security interests or encumbrances upon real property or personal property. 1.24. Milestone -A principal event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work. 1.25. Notice of Award -A written notice by OWNER to the apparent successful bidder stating that upon compliance by the apparent successful bidder with the conditions precedent enumerated therein, within the time specified, ' OWNER will sign and deliver the Agreement. 1.26. Notice to Proceed -A written notice. given by OWNER to CONTRACTOR (with a copy to ENGINEER) fixing the date on which the Contract Times will commence to run and on which CONTRACTOR shall start to perform CONTRACTOR'S obligations under the Contract Documents. 1.27. OWNER -The public body or authority, corporation, association, firm or person with whom CONTRACTOR has entered into the Agreement and for whom the Work is to be provided 1.28. Partial Utilization -Use by OWNER of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. 1.29. PCBs -Polychlorinated biphenyls. 1.30. Petroleum -Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene and oil mixed with other non -Hazardous Wastes and crude oils. 1.31. Project --The total construction of which the Work to be provided under the Contract Documents may be the whole, or a part as indicated elsewhere in the Contract Documents. 1.32.a. Radioactive Material -Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of EICDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) 1954 (42 USC Section 2011 et seq.) as amended from time to time. 1 32 b Re-oular Working Hours -Regular working hours are defined as 7:00am to 6:00um unless otherwise specified in the General Requirements. 1.33. Resident Project Representative -The authorized representative of ENGINEER who may be assigned to the site or any part thereof. 1.34. Samples -Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 1.35. Shop Drawings -All drawings, diagrams, illustrations, schedules and other data or information which are specifically prepared or assembled by or for CONTRACTOR and submitted by CONTRACTOR to illustrate some portion of the Work. 1.36. Specifications -Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work and certain administrative details applicable thereto. 1.37. Subcontractor -An individual, firm or corporation having a direct contract with CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the site. 1.38. Substantial Completion -The Work (or a specified part thereol) has progressed to the point where, in the opinion of ENGINEER as evidenced by ENGINEEWs definitive certificate of Substantial Completion, it is sufficiently complete, in accordance with the Contract Documents, so that the Work (or specified part) can be utilized for the purposes for which it is intended; or if no such certificate is issued, when the Work is complete and ready for final payment as evidenced by ENGINEER's written recommendation of final payment in accordance with paragraph 14.13. The terms "substantially complete" and "substantially completed" as applied to all or part of the Work refer to Substantial Completion thereof. 1.39. Supplementary Conditions -The part of the Contract Documents which amends or supplements these General Conditions. 1.40. Supplier -A manufacturer, fabricator, supplier, distributor, materialman or vendor having a direct contract with CONTRACTOR or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by CONTRACTOR or any Subcontractor. 1.41. Underground Facilities -All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasements containing such facilities which have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems or water. 1.42. Unit Price Work -Work to be paid for on the basis of unit prices. 1.43. Work -The entire completed construction or the various separately identifiable parts thereof required to be furnished under the Contract Documents. Work includes and is the result of performing or furnishing labor and furnishing and incorporating materials and equipment into the construction, and performing or furnishing services and furnishing documents, all as required by the Contract Documents. 1.44. Work Change Directive -A written directive to CONTRACTOR, issued on or after the Effective Date of the Agreement and signed by OWNER and recommended by ENGINEER, ordering an addition, deletion or revision in the Work, or responding to differing or unforeseen physical conditions under which the Work is to be performed as provided in paragraph 4.2 or 4.3 or to emergencies under paragraph 623. A Work Change Directive will not change the Contract Price or the Contract Times, but is evidence that the parties expect that the change directed or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Times as provided in paragraph 10.2. 1.45. Written Amendment -A written amendment of the Contract Documents, signed by OWNER and CONTRACTOR on or after the Effective Date of the Agreement and normally dealing with the nonengineering or nontechnical rather than strictly construction -related aspects of the Contract Documents. ARTICLE 2-PRELIMINARY MATTERS Delivery of Bonds. 2.1. When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds as CONTRACTOR may be required to famish in accordance with paragraph 5.1. Copies of Documents: 2.2. OWNER shall furnish to CONTRACTOR up to ten copies (unless otherwise specified in the Supplementary Conditions) of the Contract Documents as are reasonably necessary for the execution of the Work. Additional copies will be furnished, upon request, at the cost of reproduction. Commencement of Contract Times; Notice to Proceed: 2.3. The Contract Times will commence to run on the thirtieth day after the Effective Date of the Agreement, or, EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within thirty days after the Effective Date of the Agreement. in ne &veat ill the C- Times of Bid opening of the thit4: h a afteF t, Effeetive of the Affeemencwhichever date is earlieF. Starting the Work. 2.4. CONTRACTOR shall start to perform the Work on the date when the Contract Times commence to run, but no Work shall be done at the site prior to the date on which the Contract Times commence to run. Before Starting Construction: 2.5. Before undertaking each part of the Work, CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements. CONTRACTOR shall promptly report in writing to ENGINEER any conflict, error, ambiguity or discrepancy which CONTRACTOR may discover and shall obtain a written interpretation or clarification from ENGINEER before proceeding with any Work affected thereby; however, CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any conflict, error, ambiguity or discrepancy in the Contract Documents, unless CONTRACTOR knew or reasonably should have known thereof. 2.6. Within ten days after the Effective Date of the Agreement (unless otherwise specified in the General Requirements), CONTRACTOR shall submit to ENGINEER for review: 2.6.1. a preliminary progress schedule indicating the times (numbers of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract Documents; 2.6.2. a preliminary schedule of Shop Drawing and Sample submittals which will list each required submittal and the times for submitting, reviewing and processing such submittal; 2.6.2.1. In no case will a schedule be acceptable which allows less than 21 calendar days for each review by Engineer. 2.6.3. A preliminary schedule of values for all of the Work which will include quantities and prices of items aggregating the Contract Price and will subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work. 2.7. Before any Work at the site is started, CONTRACTOR and Q1A44PR shall eaeh deliver to the ether OWNER, with copies to identified in the Supplementary Ge-n—ditions ENGINEER, certificates of insurance (and other evidence of insurance reasonably —request gguested by OWNER) which CONTRACTOR is required to purchase and maintain in accordance with paragraphs 5.4, `� 6 aid 5.. Preconstruction Conference: 2.8. Within twenty days after the Contract Times start to run, but before any Work at the site is started, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop Drawings and other submittals processing Applications for Payment and maintaining required records. Initially Acceptable Schedules: 2.9. Unless otherwise provided in the Contract Documents, at !east ten days before stibmission of the fi before any work at the site begins, a conference attended by CONTRACTOR, ENGINEER and others as apprepriate designated by OWNER will be held to review for acceptability to ENGINEER as provided below the schedules submitted in accordance with paragraph 2.6. and Division 1 - General Requirements. CONTRACTOR shall have an additional ten days to make corrections and adjustments and to complete and resubmit the schedules. No progress payment shall be made to CONTRACTOR until the schedules are submitted to and acceptable to ENGINEER as provided below. The progress schedule will be acceptable to ENGINEER as providing an orderly progression of the Work to completion within any specified Milestones and the Contract Times, but such acceptance will neither impose on ENGINEER responsibility for the sequencing, scheduling or progress of the Work nor interfere with or relieve CONTRACTOR from CONTRACTORS full responsibility therefor. CONTRACTOR's schedule of Shop Drawing and Sample submissions will be acceptable to ENGINEER as providing a workable arrangement for reviewing and processing the required submittals CONTRACTOR's schedule of values will be acceptable to ENGINEER as to form and substance. ARTICLE 3—CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE Intent: 3.1. The Contract Documents comprise the entire agreement between OWNER and CONTRACTOR concerning the Work. The Contract Documents are complementary; what is called for by one is as binding as if called for by all. The Contract Documents will be construed in accordance with the law of the place of the Project. 3.2. It is the intent of the Contract Documents to EICDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) describe a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents. Any Work, materials or equipment that may reasonably be inferred from the Contract Documents or ^ from prevailing custom or trade usage as being required to produce the intended result will be furnished and performed whether or not specifically called for. When words or phrases which have a well-known technical or construction industry or trade meaning are used to describe Work, materials or equipment, such words or phrases shall be interpreted in accordance with that meaning. Clarifications and interpretations of the Contract Documents shall be issued by ENGINEER as provided in paragraph 9.4. 3.3. Reference to Standards and Specifications of Technical Societies, Reporting and Resolving Discrepancies: 3.3.1. Reference to standards, specifications, manuals or codes of any technical society, organization or association, or to the Laws or Regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard, specification, manual, code or Laws or Regulations in effect at the time of opening of Bids (or, on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. -- 3.3.2. If, during the performance of the Work, CONTRACTOR discovers any conflict, error, ambiguity or discrepancy within the Contract Documents or between the Contract Documents and any provision of any such Law or Regulation applicable to the performance of the Work or of any such standard, specification, manual or code or of any _ instruction of any Supplier referred to in paragraph 6.5, CONTRACTOR shall report it to ENGINEER in writing at once, and, CONTRACTOR shall not proceed with the Work affected thereby (except in an emergency as authorized by paragraph 6.23) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in paragraph 3.5 or 3.6; provided, however, that CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any such conflict, error, ambiguity or discrepancy unless CONTRACTOR knew or reasonably should have known thereof. 3.3.3. Except as otherwise specifically stated in the Contract Documents or as may be provided by amendment or supplement thereto issued by one of the methods indicated in paragraph 3.5 or 3.6, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity or discrepancy between the provisions of the Contract Documents and: 3.3.3.1. the provisions of any such standard, specification, manual, code or instruction (whether or not specifically incorporated by reference in the Contract Documents); or 3.3.3.2. the provisions of any such Laws or Regulations applicable to the performance of the Work (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Law or Regulation). No provision of any such standard, specification, manual, code or instruction shall be effective to change the duties and responsibilities of OWNER, CONTRACTOR or ENGINEER, or any of their subcontractors, consultants, agents or employees from those set forth in the Contract Documents, nor shall it be effective to assign to OWNER, ENGINEER or any of ENGINEER's Consultants, agents or employees any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of paragraph 9.13 or any other provision of the Contract Documents. 3.4. Whenever in the Contract Documents the terms "as ordered", "as directed", "as required", "as allowed", "as approved" or terms of like effect or import are used, or the adjectives "reasonable", "suitable", "acceptable", "proper" or "satisfactory" or adjectives of like effect or import are used to describe a requirement, direction, review or judgment of ENGINEER as to the Work, it is intended that such requirement, direction, review or judgment will be solely to evaluate, in general, the completed Work for compliance with the requirements of and information in the Contract Documents and conformance with the design concept of the completed Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). The use of any such term or adjective shall not be effective to assign to ENGINEER any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibility contrary to the provisions of paragraph 9.13 or any other provision of the Contract Documents. Amending and Supplementing Contract Documents: 3.5. The Contract Documents may be amended to provide for additions, deletions and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: 3.5.1. a formal Written Amendment, 3.5.2. a Change Order (pursuant to paragraph 10.4), or EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) 3.5.3. a Work Change Directive (pursuant to paragraph 10.1). 3.6. In addition, the requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, in one or more of the following ways: 3.6.1. A Field Order (pursuant to paragraph 9.5), 3.6.2. ENGINEER's approval of a Shop Drawing or Sample (pursuant to paragraphs 6.26 and 6.27), or 3.6.3. ENGINEER's written interpretation or clarification (pursuant to paragraph 9.4). Reuse of Documents: 3.7. CONTRACTOR, and any Subcontractor or Supplier or other person or organization performing or furnishing any of the Work under a direct or indirect contract with OWNER (i) shall not have or acquire any tide to or ownership rights in any of the Drawings, Specifications or other documents (or copies of any thereof) prepared by or hearing the seal of ENGINEER or ENGINEER's Consultant, and (ii) shall not reuse any of such Drawings, Specifications, other documents or copies on extensions of the Project or any other project without written consent of OWNER and ENGINEER and specific written verification or adaptation by ENGINEER. ARTICLE 4—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS Availability of Lands: 4.1. OWNER shall furnish, as indicated in the Contract Documents, the lands upon which the Work is to be performed, rights -of -way and easements for access thereto, and such other lands which are designated for the use of CONTRACTOR , of o filing a meehafii& lien against sueh lands meerdanee with applicable Lam�s and Regulations. OWNER shall identify any encumbrances or restrictions not of general application but specifically related to use of lands so furnished with which CONTRACTOR will have to comply in performing the Work. Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by OWNER, unless otherwise provided in the Contract Documents. If CONTRACTOR and OWNER are unable to agree on entitlement to or the amount or extent of any adjustments in the Contract Price or the Contract Times as a result of any delay in OWNER's furnishing these lands, rights -of - way or easements, CONTRACTOR may make a claim therefor as provided in Articles 11 and 12. CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. 4.2 Subsurface and Physical Conditions. 4.2.1. Reports and Drawings: Reference is made to the Supplementary Conditions for identification of: 4.2.1.1. Subsurface Conditions: Those reports of explorations and tests of subsurface conditions at or contiguous to the site that have been utilized by ENGINEER in preparing the Contract Documents; and 4.2.1.2. Physical Conditions: Those drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) that have been utilized by ENGINEER in preparing the Contract Documents. 4.2.2. Limited Reliance by CONTRACTOR Authorized; Technical Data: CONTRACTOR may rely upon the general accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Except for such reliance on such "technical data", CONTRACTOR may not rely upon or ma a any claim against O NER ENGINEER or any of ENGINEERS Consultants with respect to: 4.2.2.1. the completeness of such reports and drawings for CONTRACTORS purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto, or 4.2.2.2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings, or 4.2.2.. any CONTRACTOR interpretation of or conclusion drawn from any "technical data" or any such data, interpretations, opinions or information. 4.2.. Notice of Differing Subsurface or Physical Conditions: If CONTRACTOR believes that any subsurface or physical condition at or contiguous to the site that is uncovered or revealed either: 4.2.3.1. is of such a nature as to establish that any "technical data" on which CONTRACTOR is entitled to rely as provided in paragraphs 4.2.1 and 4.2.2 is materially inaccurate, or 4.2.3.2. is of such a nature as to require a change in the Contract Documents, or 4.2.3.3. differs materially from that shown or EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) indicated in the Contract Documents, or 4.2.3.4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; then CONTRACTOR shall, preffW immediately after becoming aware thereof and before further disturbing conditions affected thereby or performing any Work in connection therewith (except in an emergency as permitted by paragraph 623), notify OWNER and ENGINEER in writing about such condition. CONTRACTOR shall not further disturb such conditions or perform any Work in connection therewith (except as aforesaid) until receipt of written order to do so. 4.2.4. ENGINEER's Review: ENGINEER will promptly review the pertinent conditions, determine the necessity of OWNER's obtaining additional exploration or tests with respect thereto and advise OWNER in writing (with a copy to CONTRACTOR) of ENGINEER's findings and conclusions. 4.2.5. Possible Contract Documents Change: If ENGINEER concludes that a change in the Contract Documents is required as a result of a condition that meets one or more of the categories in paragraph 4.2.3, a Work Change Directive or a Change Order will be issued as provided in Article 10 to reflect and document the consequences of such change. 4.2.6. Possible Price and Times Adjustments: An equitable adjustment in the Contract Price or in the Contract Times, or both, will be allowed to the extent that the existence of such uncovered or revealed condition causes an increase or decrease in CONTRACTOR's cost of, or time required for performance of, the Work; subject, however, to, the following: 4.2.6.1. such condition must meet any one or more of the categories described in paragraphs 4.2.3.1 through 4.2.3 A, inclusive; 4.2.6.2. a change in the Contract Documents pursuant to paragraph 4.2.5 will not be an automatic authorization of nor a condition precedent to entitlement to any such adjustment; 4.2.6.3. with respect to Work that is paid for on a Unit Price Basis, any adjustment in Contract Price will be subject to the provisions of paragraphs 9.10 and 11.9; and 4.2.6.4. CONTRACTOR shall not be entitled to any adjustment in the Contract Price or Times if; 4.2.6.4.1. CONTRACTOR knew of the existence of such conditions at the time CONTRACTOR made a final commitment to OWNER in respect of Contract Price and Contract Times by the submission of a bid or becoming bound under a negotiated contract; or 4.2.6.4.2. the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation, exploration, test or study of the site and contiguous areas required by the Bidding Requirements or Contract Documents to be conducted by or for CONTRACTOR prior to CONTRACTOR's making such final commitment; or 4.2.6.4.3. CONTRACTOR failed to give the written notice within the time and as required by paragraph 4.2.3. If OWNER and CONTRACTOR are unable to agree on entitlement to or as to the amount or length of any such equitable adjustment in the Contract Price or Contract Times, a claim may be made therefor as provided in Articles I 1 and 12. However, OWNER, ENGINEER and ENGINEER's Consultants shall not be liable to CONTRACTOR for any claims, costs, losses or damages sustained by CONTRACTOR on or in connection with any other project or anticipated project. 4.3. Physical Conditions —Underground Facilities: 4.3.1. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the site is based on information and data furnished to OWNER or ENGINEER by the owners of such Underground Facilities or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 4.3.1.1. OWNER and ENGINEER shall not be responsible for the accuracy or completeness of any such information or data; and 4.3.1.2. The cost of all of the following will be included in the Contract Price and CONTRACTOR shall have full responsibility for: (i) reviewing and checking all such information and data, (ii) locating all Underground Facilities shown or indicated in the Contract Documents,(iii) coordination of the Work with the owners of such Underground Facilities during construction, and (iv) the safety and protection of all such Underground Facilities as provided in paragraph 6.20 and repairing any damage thereto resulting from the Work. 4.3.2. Not Shown or Indicated: If an Underground Facility is uncovered or revealed at or contiguous to the site which was not shown or indicated in the Contract Documents, CONTRACTOR shall, promptly immediately after becoming aware thereof and before further disturbing conditions affected thereby or performing any Work in connection therewith (except in an emergency as required by paragraph 6.23), identify the owner of such Underground Facility and FJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) give written notice to that owner and to OWNER and ENGINEER. ENGINEER will promptly review the Underground Facility and determine the extent, if any, to which a change is required in the Contract Documents to reflect and document the consequences of the existence of the Underground Facility. If ENGINEER concludes that a change in the Contract Documents is required, a Work Change Directive or a Change Order will be issued as provided in Article 10 to reflect and document such consequences. During such time, CONTRACTOR shall be responsible for the safety and protection of such Underground Facility as provided in paragraph 6.20. CONTRACTOR shall my be allowed an increase in the Contract Price or an extension of the Contract Times, or both, to the extent that they are attributable to the existence of any Underground Facility that was not shown or indicated in the Contract Documents and that CONTRACTOR did not know of and could not reasonably have been expected to be aware of or to have anticipated. If OWNER and CONTRACTOR are unable to agree on entitlement to or the amount or length of any such adjustment in Contract Price or Contract Times, CONTRACTOR may make a claim therefor as provided in Articles I I and 12. However, OWNER, ENGINEER and ENGINEER's Consultants shall not be liable to CONTRACTOR for any claims, costs, losses or damages incurred or sustained by CONTRACTOR on or in connection with any other project or anticipated project. Reference Points. 4.4. OWNER shall provide engineering surveys to establish reference points for construction which in ENGINEER's judgment are necessary to enable CONTRACTOR to proceed with the Work. CONTRACTOR shall be responsible for laying out the Work, shall protect and preserve the established reference points and shall make no changes or relocations without the prior written approval of OWNER. CONTRACTOR shall report to ENGINEER whenever any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points by professionally qualified personnel. 4.5. Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Material. 4.5.1. OWNER shall be responsible for any Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Material uncovered or revealed at the site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work and which may present a substantial danger to persons or property exposed thereto in connection with the Work at the site. OWNER shall not be responsible for any such materials brought to the site by CONTRACTOR, Subcontractors, Suppliers or anyone else for whom CONTRACTOR is responsible. 1. - . _.......... ... ! Y • y ! .,,. _. _.... .... . • Y • ! • - ! . Y • ! _ ------------ �1. ,1. 1 ! I. 1• .. • _.. .. ...... .. ..... ... .. ... . EICDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) ARTICLE 5-110NDS AND INSURANCE Performance, Payment and Other Bonds. 5.1. CONTRACTOR shall furnish Performance and Payment Bonds, each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all CONTRACTOR's obligations under the Contract Documents. These Bonds shall remain in effect at least until one year after the date when final payment becomes due, except as provided otherwise by Laws or Regulations or by the Contract Documents. CONTRACTOR shall also furnish such other Bonds as are required by the Supplementary Conditions. All Bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations and shall be executed by such sureties as are named in the current list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department. All Bonds signed by an agent must be accompanied by a certified copy of such agenes authority to act. 5.2. If the surety on any Bond furnished by CONTRACTOR is declared a bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of paragraph 5.1, CONTRACTOR shall within ten days thereafter substitute another Bond and surety, both of which must be acceptable to OWNER. 5.3. Licensed Sureties and Insurers; Certificates of Insurance: 5.3.1. All Bonds and insurance required by the Contract Documents to be purchased and maintained by OWNER or CONTRACTOR shall be obtained from surety or insurance companies that are duly licensed or authorized in the jurisdiction in which the Project is located to issue Bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.3.2. CONTRACTOR shall deliver to OWNER, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by OWNER or any other additional insured) which CONTRACTOR is required to purchase and maintain in accordance with paragraph 5.4. 9W#ER shah a.1' t insufed •a •aed in the a......rr� lwtwav M'., 11 11 CONTRA CTOR's Liability Insurance: 5.4. CONTRACTOR shall purchase and maintain such liability and other insurance as is appropriate for the Work being performed and furnished and as will provide protection from claims set forth below which may arise out of or result from CONTRACTOR's performance and furnishing of the Work and CONTRACTOR's other obligations under the Contract Documents, whether it is to be performed or flimished by CONTRACTOR, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform or furnish any of the Work, or by anyone for whose acts any of them may be liable: 5.4.1. claims under workers' compensation, disability benefits and other similar employee benefit acts; 5.4.2. claims for damages because of bodily injury, occupational sickness or disease, or death of CONTRACTOR's employees; 5.4.3. claims for damages because of bodily injury, sickness or disease, or death of any person other than CONTRACTOR's employees; 5.4.5. claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; and 5.4.6. claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. The policies of insurance so required by this paragraph 5.4 to be purchased and maintained shall: 5.4.7. with respect to insurance required by paragraphs 5.4.3 through 5.4.6 inclusive and 5.4.9, include as additional insureds (subject to any customary exclusion in respect of professional liability), OWNER, ENGINEER, ENGINEER's Consultants and any other persons or entities identified in the Supplementary Conditions, all of whom shall be listed as additional insureds, and include coverage for the respective officers and employees of all such additional insureds; 5.4.8. include the specific coverages and be written for not less than the limits of liability provided in the Supplementary Conditions or required by Laws or Regulations, whichever is greater; 5.4.9. include completed operations insurance; EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 412000) 5.4.10. include contractual liability insurance covering CONTRACTOR's indemnity obligations under paragraphs 6.12, 6. l6 and 6.31 through 6.33; 5.4.11. contain a provision or endorsement that the coverage afforded will not be cancelled, materially changed or renewal refused until at least thirty days' prior written notice has been given to OWNER and CONTRACTOR and to each other additional insured identified in the Supplementary Conditions to whom a certificate of insurance has been issued (and the certificates of insurance furnished by the CONTRACTOR pursuant to paragraph 5.3.2 will so provide); 5.4.12. remain in effect at least until final payment and at all times thereafter when CONTRACTOR may be correcting, removing or replacing defective Work in accordance with paragraph 13.12; and 5.4.13, with respect to completed operations insurance, and any insurance coverage written on a claims -made basis, remain in effect for at least two years after final payment (and CONTRACTOR shall furnish OWNER and each other additional insured identified in the Supplementary Conditions to whom a certificate of insurance has been issued evidence satisfactory to OWNER and any such additional insured of continuation of such insurance at final payment and one year thereafter). OWNER's Liability Insurance: 5.5. In addition to insurance required to be provided by CONTRACTOR under paragraph 5.4, OWNER, at OWNER's option, may purchase and maintain at OWNER's expense OWNER's own liability insurance as will protect OWNER against claims which may arise from operations under the Contract Documents. Property Insurance: -, awasiefied by eafereenwW of Layn and Regulations speeifieally required by the SHpplementafy Conditions; limited te fees and ehairges of eagineeB and aFekiteets); EA. oil, I.Wj AWO 5.9. OWNER shall not be responsible for purchasing and maintaining any property insurance to protect the interests of CONTRACTOR, Subcontractors or others in idwAfied in the SuMemwtary Gen"ens. The Fisk of 0 iF.111ii�ll�lill��il'i�!�1, . . �. . ' .. 1. FRI • Y • r • EICDC GENERAL CONDITIONS 1910-8 (1990 Edition) 10 w/ CfrY OF FORT COLLINS MODIFICATIONS (REV 4/2000) ---- ---- ----- all TA. 1_. ... OR aw- IN I . .. Fin •. _ _ 1. 1. . FROOMPAR Afffii Receipt and Application of Insurance Proceeds: SA2. Any insured loss under the policies of insurance required by paragraphs 5.6 and 5.7 will be adjusted with OWNER and made payable to OWNER as fiduciary for the insureds, as their interests may appear, subject to the requirements of any applicable mortgage clause and of paragraph 5.13. OWNER shall deposit in a separate account any money so received, and shall distribute it in accordance with such agreement as the parties in interest may reach. If no other special agreement is reached the damaged Work shall be repaired or replaced, the moneys so received applied on account thereof and the Work and the cost thereof covered by an appropriate Change Order or Written Amendment. 5.13. OWNER as fiduciary shall have power to adjust and settle any loss with the insurers unless one of the parties in interest shall object in writing within fifteen days after the occurrence of loss to OWNER's exercise of this power. If such objection be made, OWNER as fiduciary shall make settlement with the insurers in accordance with such agreement as the parties in interest may reach. If no such agreement among the parties in interest is reached, OWNER as fiduciary shall adjust and settle the loss with the insurers aftd, if required in A), in Acceptance of Bonds and Insurance; Option to Replace: 5.14. If OWNER has any objection to the coverage afforded by or other provisions of the Bends er insurance required to be purchased and maintained by the edwr— rt CONTRACTOR in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the OWNER will notify CONTRACTOR in writing within ten fifteen days after reeeipt delivery of the certificates (o" other o vaene requested) to OWNER as required by paragraph 2.7. party does nett - - Of allt� r Welk of efsue,fail r� Partial Utilization —Property Insurance: 5.15. If OWNER fords it necessary to occupy or use a portion or portions of the Work prior to Substantial EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) Completion of all the Work, such use or occupancy may be accomplished in accordance with paragraph 14.10; provided that no such use or occupancy shall commence before the insurers providing the property insurance have acknowledged notice thereof and in writing effected any changes in coverage necessitated thereby. The insurers providing the property insurance shall consent by endorsement on the policy or policies, but the property insurance shall not be cancelled or permitted to lapse on account of any such partial use or occupancy. ARTICLE 6—CONTRACTOR'S RESPONSIBILITIES Supervision and Superintendence: 6.1. CONTRACTOR shall supervise, inspect and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, techniques, -sequences and procedures of construction, but CONTRACTOR shall not be responsible for the negligence of others in the design or specification of a specific means, method, technique, sequence or procedure of construction which is shown or indicated in and expressly required by the Contract Documents. CONTRACTOR shall be responsible to see that the completed Work complies accurately with the Contract Documents. 6.2. CONTRACTOR shall keep on the Work at all times during its progress a competent resident superintendent, who shall not be replaced without written notice to OWNER and ENGINEER except under extraordinary circumstances. The superintendent will be CONTRACTORSs representative at the site and shall have authority to act on behalf of CONTRACTOR. All communications to the superintendent shall be as binding as if given to CONTRACTOR. Labor, Materials and Equipment: 6.3. CONTRACTOR shall provide competent, suitably qualified personnel to survey, lay out and construct the Work as required by the Contract Documents. CONTRACTOR shall at all times maintain good discipline and order at the site. Except as otherwise required for the safety or protection of persons or the Work or property at the site or adjacent thereto, and except as otherwise indicated in the Contract Documents, all Work at the site shall be performed during regular working hours and CONTRACTOR will not permit overtime work or the performance of Work on Saturday, Sunday or any legal holiday without OWNER's written consent given after prior written notice to ENGINEER. CONTRACTOR shall submit requests to the ENGINEER no less than 48 hours in advance of any Work to he performed on Saturday Sunday Holidays or outside the Regular Working Hours SECTION 00020 INVITATION TO BID 6.4. Unless otherwise specified in the General Requirements, CONTRACTOR shall furnish and assume full responsibility for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary for the furnishing, performance, testing, start-up and completion of the Work. 6 4.1. Purchasing Restrictions: CONTRACTOR must comply with the City's purchasing restrictions. A copy of the resolutions are available for review in the offices of the Purchasing and Risk Management Division or the City Clerk's office. 6.4.2. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that bur hazardous waste asa fuel. 6.5. All materials and equipment shall be of good quality and new, except as otherwise provided in the Contract Documents. All warranties and guarantees specifically called for by the Specifications shall expressly run to the benefit of OWNER. If required by ENGINEER, CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the kind and quality of materials and equipment. All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with instructions of the applicable Supplier, except as otherwise provided in the Contract Documents. Progress Schedule: 6.6. CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.9 as it may be adjusted from time to time as provided below: 6.6.1. CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indicated in paragraph 2.9) proposed adjustments in the progress schedule that will not change the Contract Times (or Milestones). Such adjustments will conform generally to the progress schedule then in effect and additionally will comply with any provisions of the General Requirements applicable thereto. 6.6.2. Proposed adjustments in the progress schedule that will change the Contract Times (or Milestones) shall be submitted in accordance with the requirements of paragraph 12.1. Such adjustments may only be made by a Change Order or Written Amendment in accordance with Article 12. 6.7. Substitutes and "Or -Equal" Items: 6.7.1. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function and quality required. Unless the specification or description EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) 12 w/CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) contains or is followed by words reading that no like, equivalent or "or -equal" item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be accepted by ENGINEER under the following circumstances: 6.7.1.1. "Or -Equal". If in ENGINEER's sole discretion an item of material or equipment proposed by CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by ENGINEER as an "or -equal" item, in which case review and approval of the proposed item may, in ENGINEER's sole discretion, be accomplished without compliance with some or all of the requirements for acceptance of proposed substitute items. 6.7.1.2. Substitute Items: If in ENGINEER's sole discretion an item of material or equipment proposed by CONTRACTOR does not qualify as an "or -equal" item under subparagraph 6.7.1.1, it will be considered a proposed substitute item. CONTRACTOR shall submit sufficient information as provided below to allow -- ENGINEER to -determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. The procedure for review by the ENGINEER will include the following as supplemented in the General Requirements and as ENGINEER may decide is appropriate under the circumstances. Requests for review of proposed substitute items of material or equipment will not be accepted by ENGINEER from anyone other than CONTRACTOR. If CONTRACTOR wishes to furnish or use a substitute item of material or _ equipment, CONTRACTOR shall fast make written application to ENGINEER for acceptance thereof, certifying that the proposed substitute will perform adequately the functions and achieve the results called for by the general design, be similar in substance to that specified and be suited to the same use as that specified. The application will state the extent, if any, to which the evaluation _ and acceptance of the proposed substitute will prejudice CONTRACTORS achievement of Substantial Completion on time, whether or not •acceptance of the substitute for use in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) to adapt the design to the proposed substitute and whether or not incorporation or use of the substitute in connection with the Work is subject to payment of any license fee or royalty. All variations of the proposed substitute from that specified will be identified in the application and available maintenance, repair and replacement service will be indicated. The application will also contain an itemized estimate of all costs or credits that will result directly or indirectly from acceptance of such substitute, including costs of redesign and claims of other contractors affected by the resulting change, all of which will be considered by ENGINEER in evaluating the proposed substitute. ENGINEER may require CONTRACTOR to famish additional data about the proposed substitute. 6.7.1.3. CONTRACTOR Ss Expense: All data to be provided by CONTRACTOR in support of any proposed "or -equal" or substitute item will be at CONTRACTOR' expense. 6.7.2. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence or procedure of construction is shown or indicated in and expressly required by the Contract Documents, CONTRACTOR may furnish or utilize a substitute means, method, technique, sequence or procedure of construction acceptable to ENGINEER. CONTRACTOR shall submit sufficient information to allow ENGINEER, in ENGINEER's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The procedure for review by ENGINEER will be similar to that provided in subparagraph 6.7.1.2. 6.7.3. Engineer's Evaluation: ENGINEER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to paragraphs 6.7.1.2 and 6.7.2. ENGINEER will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized without ENGINEER's prior written acceptance which will be evidenced by either a Change Order or an approved Shop Drawing. OWNER may require CONTRACTOR to furnish at CONTRACTOR' expense a special performance guarantee or other surety with respect to any "or -equal" or substitute. ENGINEER will record time required by ENGINEER and ENGINEER's Consultants in evaluating substitutes proposed or submitted by CONTRACTOR pursuant to paragraphs 6.7.1.2 and 6.7.2 and in making changes in the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) occasioned thereby. Whether or not ENGINEER accepts a substitute item so proposed or submitted by CONTRACTOR, CONTRACTOR shall reimburse OWNER for the charges of ENGINEER and ENGINEER's Consultants for evaluating each such proposed substitute item. 6_8. Concerning Subcontractors, Suppliers and Others: 6.8.1. CONTRACTOR shall not employ any Subcontractor, Supplier or other person or organization (including those acceptable to OWNER and ENGINEER as indicated in paragraph 6.8.2), whether initially or as a substitute, against whom OWNER or ENGINEER may have reasonable objection. CONTRACTOR shall not be required to employ any Subcontractor, Supplier or other person or organization to furnish or perform any of the Work against whom CONTRACTOR has reasonable objection. EJCDC GENERAL. CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) 6_9. CONTRACTOR shall perform not less than 20 percent of the Work with its own forces (that is without subcontracting) The 20 percent requirement shall be understood to refer to the Work the value of which totals not less than 20 percent of the Contract Price. 6.8.2. if the Sapplemefftafy Ceriditie Bidding Documents require the identity of certain Subcontractors, Suppliers or other persons or organizations (including those who are to furnish the principal items of materials or equipment) to be submitted to OWNER in ^'vane of the s e_:fi°a date prior to the Effective Date of the Agreement for acceptance by OWNER and ENGINEER —an" CONTRACTOR CTO has L A 1' L C in OWNER's or ENGINEER's acceptance (either in writing or by failing to make written objection thereto by the date indicated for acceptance or objection in the bidding documents or the Contract Documents) of --ation so identified may be Fevoked en th easa GOMFRACTOR shall submit aeeeptable substitute, the Contrast Priee Ail! b will be issued er Wnttea Adr&ndnaeat signed; will constitute a condition of the Contract requiring the use of the named subcontractors, suppliers or other persons or organization on the Work unless prior written approval is obtained from OWNER and ENGINEER. No acceptance by OWNER or ENGINEER of any such Subcontractor, Supplier or other person or organization shall constitute a waiver of any right of OWNER or ENGINEER to reject defective Work. 6.9.1. CONTRACTOR shall be fully responsible to OWNER and ENGINEER for all acts and omissions of the Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with CONTRACTOR just as CONTRACTOR is responsible for CONTRACTOR's own acts and omissions. Nothing in the Contract Documents shall create for the benefit of any such Subcontractor, Supplier or other person or organization any contractual relationship between OWNER or ENGINEER and any such Subcontractor, Supplier or other person or organization, nor shall it create any obligation on the part of OWNER or ENGINEER to pay or to see to the payment of any moneys due any such Subcontractor, Supplier or other person or organization except as may otherwise he required by Laws and Regulations. OWNER or ENGINEER may furnish to any subcontractor, supplier or other person or organization evidence of amounts paid to CONTRACTOR in accordance with CONTRACTOR'S "Applications for Payment". 13 6.9.2. CONTRACTOR shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with CONTRACTOR CONTRACTOR shall require all Subcontractors, Suppliers and such other persons and organizations performing or furnishing any of the Work to communicate with the ENGINEER through CONTRACTOR. 6.10. The divisions and sections of the Specifications and the identifications of any Drawings shall not control CONTRACTOR in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by any specific trade. 6.11. All Work performed for CONTRACTOR by a Subcontractor or Supplier will be pursuant to an appropriate agreement between CONTRACTOR and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of OWNER and ENGINEER the War-k. if the insurm en a" swh poheiesrequiFe sepamtewaiver- fenm to be signed by any SubeentFaetoc- of Patent Fees and Royalties: 6.12. CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product or device is specified in the Contract Documents for use in the performance of the Work and if to the actual knowledge of OWNER or ENGINEER its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by OWNER in the Contract Documents. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultants and the officers, directors, employees, agents and other consultants of each and any of them from and against all claims, costs, losses and damages arising out of or resulting from any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product or device not specified in the Contract Documents. E]CDC GENERAL CONDITIONS 1910-8 (1990 Edition) 14 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) Permits: 6.13. Unless otherwise provided in the Supplementary Conditions, CONTRACTOR shall obtain and pay for all construction permits and licenses. OWNER shall assist CONTRACTOR, when necessary, in obtaining such permits and licenses. CONTRACTOR shall pay all governmental charges and inspection fees necessary for the prosecution of the Work, which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement. CONTRACTOR shall pay all charges of utility owners for connections to the Work, and OWNER shall pay all charges of such utility owners for capital costs related thereto such as plant investment fees. 6.14. Laws and Regulations: 6.14.1. CONTRACTOR shall give all notices and comply with all Laws and Regulations applicable to f mishing and performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, neither OWNER nor ENGINEER shall be responsible for monitoring CONTRACTOR's compliance with any Laws or Regulations. - 6.14.2. If CONTRACTOR performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, CONTRACTOR shall bear all claims, costs, losses and damages caused by, arising out of or resulting therefrom; however, it shall not be CONTRACTOR's primary responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve CONTRACTOR of CONTRACTOR's obligations under paragraph 3.3.2. Taxes: 6.15. CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid by CONTRACTOR in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the Work. 6.15. 1. OWNER is exempt from Colorado State and local sales and use taxes on materials to be permanently incorporated into the proiect Said taxes shall not be included in the Contract Price. Address: Colorado Department of Revenue State Capital Annex 1375 Sherman Street Denver, Colorado, 80261 Sales and Use Taxes for the State of Colorado Regional Transportation District (RTD) and certain Colorado counties are collected by the State of Colorado and are included in the Certification of Exemption. All applicable Sales and Use Taxes (including State collected taxes), on any items other than construction and building materials physically incorporated into the proiect are to be paid by CONTRACTOR and are to be included in appropriate bid items. Use of Premises. 6.16. CONTRACTOR shall confine construction equipment, the storage of materials and equipment and the operations of workers to the site and land and areas identified in and permitted by the Contract Documents and other land and areas permitted by Laws and Regulations, rights -of -way, permits and easements, and shall not unreasonably encumber the premises with construction equipment or other materials or equipment. CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any adjacent land or areas, resulting from the performance of the Work. Should any claim be made by any such owner or occupant because of the performance of the Work, CONTRACTOR shall promptly settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law. CONTRACTOR shall, to the fullest extent permitted by Laws and Regulations, indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultant and anyone directly or indirectly employed by any of them from and against all claims, costs, losses and damages arising out of or resulting from any claim or action, legal or equitable, brought by any such owner or occupant against OWNER, ENGINEER or any other party indemnified hereunder to the extent caused by or based upon CONTRACTOR's performance of the Work. 6.17. During the progress of the Work, CONTRACTOR shall keep the premises free from accumulations of waste materials, rubbish and other debris resulting from the Work. At the completion of the Work CONTRACTOR shall remove all waste materials, rubbish and debris from and about the premises as well as all tools, appliances, construction equipment and machinery and surplus materials. CONTRACTOR shall leave the site clean and ready for occupancy by OWNER at Substantial Completion of the Work. CONTRACTOR shall restore to original condition all property not designated for alteration by the Contract Documents. 6.18. CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it. Record Documents: EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) 6.19. CONTRACTOR shall maintain in a safe place at the site one record copy of all Drawings, Specifications, Addenda, Written Amendments, Change Orders, Work Change Directives, Field Orders and written interpretations and clarifications (issued pursuant to paragraph 9.4) in good order and annotated to show all changes made during construction. These record documents together with all approved Samples and a counterpart of all approved Shop Drawings will be available to ENGINEER for reference. Upon completion of the Work, and prior to release of final payment, these record documents, Samples and Shop Drawings will be delivered to ENGINEER for OWNER. Safety and Protection: 6.20. CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. CONTRACTOR shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 6.20.1. all persons on the Work site or who may be affected by the Work; 6.20.2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the site; and 6.20.3. other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities and Underground Facilities not designated for removal, relocation or replacement in the course of construction. CONTRACTOR shall comply with all applicable Laws and Regulations of any public body having jurisdiction for safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. CONTRACTOR shall notify owners of adjacent property and of Underground Facilities and utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation and replacement of their property. All damage, injury or loss to any property referred to in paragraphs 6.20.2 or 6.20.3 caused, directly or indirectly, in whole or in part, by CONTRACTOR, any Subcontractor, Supplier or any other person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, shall be remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or ENGINEER or ENGINEER's Consultant or anyone employed by any of them or anyone for whose acts any of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of CONTRACTOR or any Subcontractor, Supplier or other person or organization directly or indirectly employed by any of them). CONTRACTOR's duties and responsibilities for the safety and protection of the Work shall continue until such time as all the Work is completed and ENGINEER has issued a 15 notice to OWNER and CONTRACTOR in accordance with paragraph 14.13 that the Work is acceptable (except as otherwise expressly provided in connection with Substantial Completion). 6.21. Safety Representative. CONTRACTOR shall designate a' qualified and experienced safety representative at the site whose duties and responsibilities shall be the prevention of accidents.and the maintaining and supervising of safety precautions and programs. Hazard Communication Programs. 6.22. CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the site in accordance with Laws or Regulations. Emergencies. 6.23. In emergencies affecting the safety or protection of persons or the Work or property at the site or adjacent thereto, CONTRACTOR, without special instruction or authorization from OWNER or ENGINEER, is obligated to act to prevent threatened damage, injury or loss. CONTRACTOR shall give ENGINEER prompt written notice if CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If ENGINEER determines that a change in the Contract Documents is required because of the action taken by CONTRACTOR in response to such an emergency, a Work Change Directive or Change Order will be issued to document the consequences of such action. 6.24. Strop Drawings and Samples. 6.24.1. CONTRACTOR shall submit Shop Drawings to ENGINEER for review and approval in accordance with the accepted schedule of Shop Drawings and Sample submittals (see paragraph 2.9). All submittals will be identified as ENGINEER may require and in the number of copies specified in the General Requirements. The data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials and similar data to show ENGINEER the materials and equipment CONTRACTOR proposes to provide and to enable ENGINEER to review the information for the limited purposes required by paragraph 6.26. 6.24.2. CONTRACTOR shall also submit Samples to ENGINEER for review and approval in accordance with said accepted schedule of Shop Drawings and Sample submittals. Each Sample will be identified clearly as to material, Supplier, pertinent data such as catalog numbers and the use for which intended and otherwise as ENGINEER may require to enable ENGINEER to review the submittal for the limited EJCDC GENERAL CONDITIONS 1910-8 (1990 Edison) 16 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) purposes required by paragraph 6.26. The numbers of each Sample to be submitted will be as specified in the Specifications. 6.25. Submittal Procedures. 6.25.1. Before submitting each Shop Drawing or Sample, CONTRACTOR shall have determined and verified: 6.25.1.1. all field measurements, quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers and similar information with respect thereto, 6.25.1.2. all materials with respect to intended use, fabrication, shipping, handling, storage, assembly and installation pertaining to the performance of the Work, and 6.25.1.3. all information relative to CONTRACTOR's sole responsibilities in respect of means, methods, techniques, sequences and procedures of construction and safety precautions and programs incident thereto. CONTRACTOR shall also have reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents. 6.25.2. Each submittal will bear a stamp or specific written indication that CONTRACTOR has satisfied CONTRACTOR's obligations under the Contract Documents with respect to CONTRACTOR's review and approval of that submittal. 6.25.3. At the time of each submission, CONTRACTOR shall give ENGINEER specific written notice of such variations, if any, that the Shop Drawing or Sample submitted may have from the requirements of the Contract Documents, such notice to be in a written communication separate from the submittal; and, in addition, shall cause a specific notation to be made on each Shop Drawing and Sample submitted to ENGINEER for review and approval of each such variation. 6.26. ENGINEER will review and approve Shop Drawings and Samples in accordance with the schedule of Shop Drawings and Sample submittals accepted by ENGINEER as required by paragraph 2.9. ENGINEER's review and approval will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. ENGINEER's review and approval will not extend to means, methods, techniques, sequences or procedures of construction (except where a particular means, method, technique, sequence or procedure of M construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. CONTRACTOR shall make corrections required by ENGINEER, and shall return the required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. CONTRACTOR shall direct specific attention in writing to revisions other than the corrections called for by ENGINEER on previous submittals. 6.27, ENGINEER's review and approval of Shop Drawings or Samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called ENGINEER's attention to each such variation at the time of submission as required by paragraph 6.25.3 and ENGINEER has given written approval of each such variation by a specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by ENGINEER relieve CONTRACTOR from responsibility for complying with the requirements of paragraph 6.25.1. 6.28. Where a Shop Drawing or Sample is required by the Contract Documents or the schedule of Shop Drawing and Sample submissions accepted by ENGINEER as required by paragraph 2.9, any related Work performed prior to ENGINEER's review and approval of the pertinent submittal will be at the sole expense and responsibility of CONTRACTOR. Continuing the Work: 6.29. CONTRACTOR shall cant' on the Work and adhere to the progress schedule during all disputes or disagreements with OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as permitted by paragraph 15.5 or as OWNER and CONTRACTOR may otherwise agree in writing. 6.30. CONTRACTOR's General Warranty and Guarantee: 6.30.1. CONTRACTOR wan -ants and guarantees to OWNER, ENGINEER and ENGINEER's Consultants that all Work will be in accordance with the Contract Documents and will not be defective. CONTRACTOR's warranty and guarantee hereunder excludes defects or damage caused by: 6.30.1.1. abuse, modification or improper maintenance or operation by persons other than CONTRACTOR, Subcontractors or Suppliers; or 6.30.1.2. normal wear and tear under normal usage. 6.30.2. CONTRACTOR's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w CITY OF FORT COLLINS MODIFICATIONS (REV 4l2000) accordance with the Contract Documents or a release of CONTRACTOR's obligation to perform the Work in accordance with the Contract Documents: 6.30.2.1. observations by ENGINEER; 6.30.2.2. recommendation of any progress or final payment by ENGINEER; 6,30.2.3. the issuance of a certificate of Substantial Completion or any payment by OWNER to CONTRACTOR under the Contract Documents; 6.30.2.4. use or occupancy of the Work or any part thereof by OWNER; 6.30.2.5. any acceptance by OWNER or any failure to do so; 6,30.2.6. any review and approval of a Shop Drawing or Sample submittal or the issuance of a notice of acceptability by ENGINEER pursuant to paragraph 14.13; 6.30.2.7. any inspection, test or approval by others; or 6.30.2.8. any correction of defective Work by OWNER. Indemnification: 6.31. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultants and the officers, directors, employees, agents and other consultants of each and any of them from and against all claims, costs, losses and damages (including, but not limited to, all fees and charges of engineers, architects, attorneys and other professionals and all court or arbitration or other dispute resolution costs) caused by, arising out of or resulting from the performance of the Work, provided that any such claim, cost, loss or damage: (i) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself), including the loss of use resulting therefrom, and (ii) is caused in whole or in part by any negligent act or omission of CONTRACTOR, any Subcontractor, any Supplier, any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, regardless of whether or not caused in part by any negligence or omission of a person or entity indemnified hereunder or whether liability is imposed upon such indemnified party by Laws and Regulations regardless of the negligence of any such person or entity. 6.32. In any and all claims against OWNER or ENGINEER or any of their respective consultants, agents, officers, directors or employees by any employee (or the survivor or personal representative of such employee) of CONTRACTOR, any Subcontractor, any Supplier, any person or organization directly or indirectly employed by 17 any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, the indemnification obligation under paragraph 6.31 shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for CONTRACTOR or any such Subcontractor, Supplier or other person or organization under workers' compensation acts, disability benefit acts or other employee benefit acts. 6.33. The indemnification obligations of CONTRACTOR under paragraph 6.31 shall not extend to the liability of ENGINEER and ENGINEER's Consultants, officers, directors, employees or agents caused by the professional negligence, errors or omissions of any of them. Survival of Obligations: 6.34. All representations, indemnifications, warranties and guarantees made in, required by or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion and acceptance of the Work and termination or completion of the Agreement. ARTICLE 7—OTHER WORK Related Work at Site: 7.1. OWNER may perform other work related to the Project at the site by OWNERS own forces, or let other direct contracts therefor which shall contain General Conditions similar to these, or have other work performed by utility owners. If the fact that such other work is to be performed was not noted in the Contract Documents, then: (i) written notice thereof will be given to CONTRACTOR prior to starting any such other work and (ii) CONTRACTOR may make a claim therefor as provided in Articles 11 and 12 if CONTRACTOR believes that such performance will involve additional expense to CONTRACTOR or requires additional time and the parties are unable to agree as to the amount or extent thereof. 7.2. CONTRACTOR shall afford each other contractor who is a party to such a direct.contract and each utility owner (and OWNER, if OWNER is performing the additional work with OWNER's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, CONTRACTOR shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. CONTRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of ENGINEER and the others whose work will be affected. The duties and responsibilities of CONTRACTOR under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) 18 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) provisions for the benefit of CONTRACTOR in said direct contracts between OWNER and such utility owners and other contractors. 7.3. If the proper execution or results of any part of CONTRACTOR'S Work depends upon work performed by others under this Article 7, CONTRACTOR shall inspect such other work and promptly report to ENGINEER in writing any delays, defects or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of CONTRACTOR's Work. CONTRACTOR's failure so to report will constitute an acceptance of such other work as fit and proper for integration with CONTRACTOR's Work except for latent or nonapparent defects and deficiencies in such other work. Coordination: 7.4. If OWNER contracts with others for the performance of other work on the Project at the site, the following will be set forth in Supplementary Conditions: 7.4.1. the person, firm or corporation who will have authority and responsibility for coordination of the activities among the various prime contractors will be identified; 7.4.2. the specific matters to be covered by such authority and responsibility will be itemized, and 7.4.3. the extent of such authority and responsibilities will be provided. Unless otherwise provided in the Supplementary Conditions, OWNER shall have sole authority and responsibility in respect of such coordination. ARTICLE 8—OWNER'S RESPONSIBILITIES 8.1. Except as otherwise provided in these General Conditions, OWNER shall issue all communications to CONTRACTOR through ENGINEER. 8.2. In case of termination of the employment of ENGINEER, OWNER shall appoint an engineer against whom CONTRACTOR wakes no reasonable objeetioft whose status under the Contract Documents shall be that of the former ENGINEER 8.3. OWNER shall furnish the data required of OWNER under the Contract Documents promptly and shall make payments to CONTRACTOR promptly when they are due as provided in paragraphs 14.4 and 14.13. 8.4. OWNER's duties in respect of providing lands and easements and providing engineering surveys to establish reference points are set forth in paragraphs 4.1 and 4.4. Paragraph4.2 refers to OWNERSs identifying and making available to CONTRACTOR copies of reports of explorations and tests of subsurface conditions at the site and drawings of physical conditions in existing I Y 1 . " structures at or contiguous to the site that have been utilized by ENGINEER in preparing the Contract Documents. 8.6. OWNER is obligated to execute Change Orders as indicated in paragraph 10.4. 8.7. OWNER's responsibility in respect of certain inspections, tests and approvals is set forth in paragraph 13.4. 8.8. In connection with OWNER's right to stop Work or suspend Work, see paragraphs 13.10 and 15.1. Paragraph 15.2 deals with OWNER's right to terminate services of CONTRACTOR under certain circumstances. 8.9. The OWNER shall not supervise, direct or have control or authority over, nor be responsible for, CONTRACTOR's means, methods, techniques, sequences or procedures of construction or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the furnishing or performance of the Work. OWNER will not be responsible for CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. . �+:+rrFrr�nrsq ARTICLE 9—ENGINEER'S STATUS DURING CONSTRUCTION OWNER's Representative: 9.1. ENGINEER will be OWNER's representative during the construction period. The duties and responsibilities and the limitations of authority of ENGINEER as OWNER's representative during construction are set forth in the Contract Documents and shall not be extended without written consent of OWNER and ENGINEER. Visits to Site: 9.2. ENGINEER will make visits to the site at intervals appropriate to the various stages of construction as ENGINEER deems necessary in order to observe as an experienced and qualified design professional the progress EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) that has been made and the quality of the various aspects of CONTRACTOR's executed Work. Based on information obtained during such visits and observations, ENGINEER will endeavor for the benefit of OWNER to determine, in general, if the Work is proceeding in accordance with the Contract Documents. ENGINEER will not be required to make exhaustive or continuous on - site inspections to check the quality or quantity of the Work. ENGINEER's efforts will be directed toward providing for OWNER a greater degree of confidence that the completed Work will conform generally to the Contract Documents. On the basis of such visits and on - site observations, ENGINEER will keep OWNER informed of the progress of the Work and will endeavor to guard OWNER against defective Work. ENGINEER's visits and on -site observations are subject to all the limitations on ENGINEER's authority and responsibility set forth in paragraph 9.13, and particularly, but without limitation, during or as a result of ENGINEER's on -site visits or observations of CONTRACTOR's Work ENGINEER will not supervise, direct, control or have authority over or be responsible for CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the furnishing or performance of the Work. Project Representative: 9.3. If OWNER and ENGINEER agree, ENGINEER will furnish a Resident Project Representative to assist ENGINEER in providing more continuous observation of the Work. The responsibilities and authority and limitations thereon of any such Resident Project Representative and assistants will be as provided in paragraphs 9.3 and 9.13 and ift the Supplementaf) Conditions of these General Conditions. If OWNER designates another representative or agent to represent OWNER at the site who is not ENGINEER'S Consultant, agent or employee, the responsibilities and authority and limitations thereon of such other person will be as provided in paragraph 9.3 of these General Conditions. If the ENGINEER furnishes a Resident Project Representative (RPR) or other assistants, or if the OWNER designates a Representative or agent, all as provided in paragraph 9.3 of the General Conditions, these Representatives shall have the authority and limitations as provided in paragraph 9.13 of the General Conditions and shall be subject to the following: 9.3.1. The Representative's dealings in matters pertaining to the on -site work will, in general, be with the ENGINEER and CONTRACTOR. But. the Representative will keep the OWNER properly advised about such matters. The Representative's dealings with subcontractors will only be through or with the full knowledge and approval of the CONTRACTOR 9.3.2. Duties and Responsibilities. Representative will: 9.3.2. 1. Schedules - Review the progress 19 schedule and other schedules prepared by the CONTRACTOR and consult with the ENGINEER concerning accepubility. 9.3.2.2. Conferences and Meeting - Attend meeting with the CONTRACTOR such as preconstruction conferences, progress meetings and other job conferences and prepare and circulate copies of minutes of meetings. 9.3.2.3. Liaison 9.3.2.3.1. Serve as ENGINEER'S liaison with CONTRACTOR, workingprincipally through CONTRACTOR'S superintendent to assist the CONTRACTOR in understanding the Contract Documents. 9.3.2.3.2. Assist in obtaining from OWNER additional details or information, when required for proper execution of the Work. 9.3.2.3.3. Advise the ENGINEER and CONTRACTOR of the commencement of any Work requiring a Shop Drawing or sample submission if the submission has not been approved by the ENGINEER 9.3.2.4.Review of Work, Resection of Defective Work, Inspections and Tests - 9.3.2.4.1. Conduct on -site observations of the Work in progress to assist the ENGINEER in determining that the Work is proceeding in accordance with the Contract Documents. 9.3.2.4.3. Accompany visiting inspectors representing public or other agencies having iurisdiction over the Proiect, record the results of these inspections and report to the ENGINEER. 9.3.2.5. lnterpretation of Contract Documents. Report to ENGINEER when clarifications and interpretations of the Contract Documents are needed and transmit to CONTRACTOR clarification and jnterpretation of the Contract Documents as issued by the ENGINEER. 9.3.2.6. Modifications. Consider and evaluate CONTRACTOR'S suggestions for EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) 20 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) modification in Drawings or Specifications and report these recommendations to ENGINEER Accurately transmit to CONTRACTOR decisions issued by the ENGINEER. 9.3.2.7. Records. 9.3.2.7.2. Keep a diary, daily Wort form, or log book, recording hours on the job site, weather conditions, data relative to questions of work directive changes. Change Orders, or changed conditions, list of iob site visitors, daily activities, decisions observations in general and specific observations in more detail as in the case of observing test procedures, send copies to the ENGINEER. 9.3.2.7.3. Record names addresses and telephone numbers of all CONTRACTORS, subcontractors and major suppliers of equipment and materials. 9.3.2.8. Reports. 9.3.2.8.1. Furnish ENGINEER periodic reports, as required of the progress of the Work and of the CONTRACTOR'S compliance with the progress schedule and schedule of shop Drawing and sample submittals. 9.3.2.8.2. Consult with ENGINEER in advance of scheduling major tests, inspections or start of important phases of the Work. 9.3.2.8.3. Draft proposed Change Orders and Work Directive Changes, obtaining backup material from the CONTRACTOR and recommend to ENGINEER Chance Orders. Work Directive Changes and field orders. 9.3.2.8.4. Report immediately to ENGINEER and OWNER the occurrence of any accident. 9 3 2 9 Payment Requests Review applications for payment with CONTRACTOR for compliance with the established procedure for their submission and forward with recommendation to ENGINEER, noting particularly the relationship of the payment requested to the schedule of values, work corMlted and materials and equipment delivered at the site but not incorporated in the Work. 9.3.2.10. Completion. 9.3.2.10.1. Before ENGINEER issues a Certificate of Substantial Completion, submit to CONTRACTOR a list of observed items requiring correction or completion. 9.3.2.10.2. Conduct final inspection in the company of the ENGINEER, OWNER and CONTRACTOR and prepare a final list of items to be corrected or completed. 9.3.2.10.3. Observe that all items on the final list have been corrected or completed and make recommendations to ENGINEER concerning acceptance. 9.3.3. Limitation of Authority: The Representative shall not: 9.3.3.1. Authorize any deviations from the Contract Documents or accept any substitute materials or equipment, unless authorized by the ENGINEER. 9.3.3.2. Exceed limitations of ENGINEER'S authority as set forth in the Contract Documents. 9.3.3.3. Undertake any of the responsibilities of the CONTRACTOR. Subcontractors, or CONTRACTOR'S superintendent. 9.3.3.4. Advise on, or issue directions relative to, or assume control over any aspect of the means, methods, techniques, sequences or procedures for construction unless such is specifically called for in the Contract Documents. 9.3.3.5. Advise on or issue directions regarding or assume control over safetx precautions and programs in connections with the Work. 9.3.3.6. Accept Shop Drawings or sample submittals from anyone other than the CONTRACTOR. 9.3.3.7. Authorize OWNER to occupy the Work in whole or in part. 9.3.3.8. Participate in specialized field or laboratory tests or inspections conducted by others except as specifically authorized by the ENGINEER. Clarifications and Interpretations: 9.4. ENGINEER will issue with reasonable promptness such written clarifications or interpretations of the EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) requirements of the Contract Documents (in the form of Drawings or otherwise) as ENGINEER may determine necessary, which shall be consistent with the intent of and reasonably inferable from the Contract Documents. Such written clarifications and interpretations will be binding on OWNER and CONTRACTOR. If OWNER or CONTRACTOR believes that a written clarification or interpretation justifies an adjustment in the Contract Price or the Contract Times and the parties are unable to agree to the amount or extent thereof, if any, OWNER or CONTRACTOR may make a written claim therefor as provided in Article 11 or Article 12. Authorized Variations in Work: 9.5. ENGINEER may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Times and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on OWNER and also on CONTRACTOR who shall perform the Work involved promptly. If OWNER or CONTRACTOR believes that a Field Order justifies an adjustment in the Contract Price or the Contract Times and the parties are unable to agree as to the amount or extent thereof, OWNER or CONTRACTOR may make a written claim therefor as provided in Article 11 or 12. Rejecting Defective Work: 9.6. ENGINEER will have authority to disapprove or reject Work which ENGINEER believes to be defective, or that ENGINEER believes will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. ENGINEER will also have authority to require special inspection or testing of the Work as provided in paragraph 13.9, whether or not the Work is fabricated, installed or completed. Shop Drawings, Change Orders and Payments: 9.7. In connection with ENGINEER's authority as to Shop Drawings and Samples, see paragraphs 6.24 through 6.28 inclusive. 9.8. In connection with ENGINEER's authority as to Change Orders, see Articles 10, 11, and 12. 9.9. In connection with ENGINEER's authority as to Applications for Payment, see Article 14. Determinations for Unit Prices: 9.10. ENGINEER will determine the actual quantities and classifications of Unit Price Work performed by CONTRACTOR. ENGINEER will review with CONTRACTOR the ENGINEER's preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application 21