Loading...
HomeMy WebLinkAboutGENERAL CORRESPONDENCE - CSU COOVER CLARKCOOVER-CLARK & ASSOCIATES, P.C. r(-hi&,c1e A Pl adz zo-,' A L.crrtrL�wtape a h1tCVi0FV August 13, 2004 Mr. Steve White City of Fort Collins 117 North Mason Street Fort Collins, CO 80522 RE: REVISED PROFESSIONAL SERVICES DESIGN (4 Pages) per 4-16-04 Scope and per 8/6/2004 Accepted Hourly Rates CSU Transit Center, Phase II, Project #0320 Dear Steve Thank you for the opportunity to refine our proposal to you for design services for the Phase 11 Transit Center at Colorado State University. We have reduced the meeting time to match our scope of work and per our discussions. Hours have also been refined throughout to match the scope document. We understand the scope to include architectural, civil, structural, mechanical and electrical design for a new 12,000 SF transit center addition. A total construction cost of $4,864,887 is anticipated. We have omitted the work that the CSU programming effort has provided. Coover-Clark & Associates, P.C. (CCA) understands we will be working closely with you to facilitate this project in a timely manner. As we have been discussing with the City, Transfort, & CSU, we understand numerous design review submittal meetings will be required for approval as listed below. As requested, initial meetings are proposed to be with the City, Transfort and LSC during the initial design. This level of detail is provided so we can all be on one page. We offer the following estimate for professional fees. City/Transfort Meetings (2-3 People)2 Avg.) 6 * 137.50 825.00 12 * 116.43 1,397.16 12 * 88.00 1,056.00 Field Verification/Drawing Review 16 137.50 2,200.00 16 88.00 1,409.00 CSU/LSC Meetings (future meeting with Mike Ellis) 6 * 137.50 825.00 (Dave Clark attended 10/03) 6 * 116.43 698.58 6 * 88.00 528.00 Phase A - Programming Verification 8 137.50 1,100A0 8 116.43 931.44 32 88.00 2,816.00 Finalize Transfort Programming & Early Design 4 137.50 550.00 8 116.43 931.44 20 88.00 1,760.00 Clerical to support above tasks 20 33.00 660.00 Phase B Meetings (2-3 People/2Avg.) 8 * 137.50 1,100.00 12 * 116.43 1,397.16 12 * 88.00 1,056.00 City/Public Meeting Allowance 4 * 137.50 550.00 4 * 121.00 484.00 4 * 88.00 352.00 Phase B Architectural Design 30 137.50 4,125.00 40 116.43 4,657.20 80 88.00 7,040.00 120 63.12 7,574.40 Phase B - Landscape Architect 16 88.00 1,409.00 j10320/proposalslproposal Page t Finalize Design 4 137.50 550.03 12 116.43 1,397.16 40 88.00 3,520.00 60 63.12 3,787.20 Clerical to support above tasks 30 33.00 990.00 Phase C Meetings/Meeting Allowances 6 137.50 825.00 (2-3 People/2 Avg.) 12 116.43 1,397.16 12 88.00 1,056.00 City/Public Meeting Allowance 4 137.50 550.00 4 116.43 465.72 4 88.00 352.00 Phase C Architectural Design 30 137.50 4,125.00 60 116.43 6,985.80 70 88.00 6,160.00 70 101.24 7,086.80 180 63.12 11,361.60 Phase C Landscape Architect 20 88.00 1,760.00 Finalize Design, Phasing Plan & Cost Opinion 6 137.50 825.00 12 116.43 1,397.16 20 88.00 1,760.00 20 101.24 2,024.80 60 63.12 3,787.20 Clerical to support above tasks 40 33.00 1,320.00 Phase D Meetings/Meeting Allowances 12 137.50 1,650.00 (2-3 People/2 Avg.) 12 116.43 1,397.16 12 88.00 1,056.00 City/Public Meeting Allowance 4 137.50 550.00 4 116,43 465.72 4 88.00 352.00 35% Drawings - Architectural to City only 30 137.50 4,125.00 60 116.43 6,985.80 160 89.00 14,080.00 280 63.12 17,673.60 65% Drawings - Architectural to City only 30 137.50 4,125.00 80 116.43 9,314.40 120 116.43 13,971.60 240 63.12 15,148.80 95% Drawings - Architectural 30 137.50 4,125.00 80 116.43 9,314.40 120 88.00 10,560.00 240 63.12 15,148.80 100% Drawings - Architectural 8 137,50 1,100.00 20 116.43 2,328.60 60 88.00 5,280.00 80 63.12 5,049.60 Landscape Architect 40 88.00 3,520.00 Final Design Documents 8 137.50 1,100.00 8 116.43 931.44 24 63.12 1,514.88 Lobby Furnishings/Fabric Selections 16 88.00 1,408.00 45 63.12 2,840.40 Specifications 40 88.00 3,520.00 120 63.12 7,574.40 80 33.00 2,640.00 Clerical to support above tasks 60 33.00 1,980.00 7 527 - 910 174,00 Y0320/proposalwproposal Page 2 At this point in time, we have included all the services we anticipate to be necessary for a complete and successful project. Additional services which may be added during the course of the project include: 1. Survey 2. Geotechnical Services 3. Drainage Studies 4. Traffic Studies 5. Construction or design documents in any format other than CCA standards. 6. Graphics Design 7. Any design outsite of the 12,000 SF footprint. 8. Air Quality and water quality studies. 9. Processing and design of parking or meetings with CSU parking. 10. As-builts of existing or new construction 11. Meetings beyond those hours stated 12. Scope beyond that noted above. B. Permitting (Hourly) 14. LEED Certification, comissioning, or work beyond hours listed above. 15. Specification of FF&E, beyond hours listed above. 16. Construction administration beyond those services listed above. jl03201proposalvproposal Page 3 17. Security monitoring systems & communications systems. 18. Vibration or accoustics study or design. 19. Industrial Hygienist Services 20. Environmental Services 21. Art selection beyond public artist meetings 22. Energy modeling 23. Cafe and convenience store equipment selection, or provisions for cooking equipment in design. Sincerely, Coover-Clark ociates, P.C. i C of Coover-Clark, AIA, NCARB President Proposal Accepted: Name & Date: Title: Company: IM20/proposals/proposal Page 4