EXHIBIT "A*
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
WRIGHT-BALLA,RD
DATED: JANUARY 1, 1997
work Order Number: CP-02-2004
Purchase order Number:
Project Title: Utilities Bldg. CRestroomRemodel
Commencement Date: Apri105,20D4
Completion Date: ALwi130,2004
Maximum Fee (time and reimbursable direct costs): s5,830.00
Project Description: RCM06ireatroominUtilities Building C.
Scope of Services: Ranove and dispose or toilet partitives, wall tile, existing door &jamb and eeilmg tiles Frame new
wail to create Janitot's Closet. Install drywall, me 21SX7/4 amb and door, one 3=7/0 jamb and door, now lockwt on closet door,
Push Plato and door pulls on be thromn dour, new ceiling tiles & new toilet partitions mirrors & ata a nones
Service Provider agrees to perform
the services identified above and on
the attached forms in accordance
with the terms and conditions
contained herein and in the Services
Agreement between the parties. In
the event of a conflict between or
ambiguity in the terms of the
Services Agreement and this work
order (including the attached forms)
the Services Agreement shall
control.
SERVICE PROVIDER
gx: � Date. _H7//
CC: Purchasing rr
ACCEPTANCE
USER
The attached forms consisting
Of _ L-) pages are hereby
accepted and incorporated
herein by this reference, and
Notice to Proceed is hereby
given -
CITY OF T COLLINS � By: e3L t
Date: Much25,2004 c
Director of Pumhasing and Risk Monagernent over
$30,000.
WI IGHT-BALLARD CONSTRUCTION, INC.
6821 Aaron Drive
Fort Collins. CO 80524
TO:
City of Fort Collins
Operation Services
PO Box 580
Fort Collins, CO 80522-0580
ESTIMATE
DATE 3/22/2004
PROJECT NO. 04021
JOB SITE 700 Wood St Bldg C
DESCRIPTION TOTAL
DEMOLITION 5,830.00
Removal and disposal of all toilet partition and urinal screen
Removal and disposal of all wall tile
Removal and disposal of existing door and jamb
Removal and disposal of ceiling tiles
NEW WORK
Frame wall to create janitorial closet
Install drywall on wall and area where tile was removed and finish to match existing
Install one (1) 2/8 X 7/0 doorjamb and door
Install one (1) 3/0 X 7,D doorjamb and door
Install lock on janitorial closet to match existing building locks
Install push plates and door pulls on door into bathroom
Install new ceiling tiles
Install new toilet partitions, urinal screens, toilet paper dispensers, paper towel holders and mirrors in the new
bathroom
All material is guaranteed to be as specified, and the above work to be performed in
accordance with the drawings and specifications submitted for above work and completed
in a substantial workmanlike manner.
Any alteration or deviation from above specifications involving extra costs, will be
executed only upon written orders, and will become an extra charge over and above the
estimate. All agreements contingent upon strikes, accidents or delays beyond our control.
Owner to carry fire, tornado and other necessary insurance upon above work. WorkmaWs
Compensation and Public Liability Insurance on above work to be taken out by Customer/Date
WRIGHT-BALLARD CONSTRUCTION, INC.
TOTAL
$5,830.00