Loading...
HomeMy WebLinkAboutWORK ORDER - REQUISITION - 20675r 03/25/2004 10:45 9702216534 FACILITIES PAGE 02 EXHIBIT "A* WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND WRIGHT-BALLA,RD DATED: JANUARY 1, 1997 work Order Number: CP-02-2004 Purchase order Number: Project Title: Utilities Bldg. CRestroomRemodel Commencement Date: Apri105,20D4 Completion Date: ALwi130,2004 Maximum Fee (time and reimbursable direct costs): s5,830.00 Project Description: RCM06ireatroominUtilities Building C. Scope of Services: Ranove and dispose or toilet partitives, wall tile, existing door &jamb and eeilmg tiles Frame new wail to create Janitot's Closet. Install drywall, me 21SX7/4 amb and door, one 3=7/0 jamb and door, now lockwt on closet door, Push Plato and door pulls on be thromn dour, new ceiling tiles & new toilet partitions mirrors & ata a nones Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. SERVICE PROVIDER gx: � Date. _H7// CC: Purchasing rr ACCEPTANCE USER The attached forms consisting Of _ L-) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given - CITY OF T COLLINS � By: e3L t Date: Much25,2004 c Director of Pumhasing and Risk Monagernent over $30,000. WI IGHT-BALLARD CONSTRUCTION, INC. 6821 Aaron Drive Fort Collins. CO 80524 TO: City of Fort Collins Operation Services PO Box 580 Fort Collins, CO 80522-0580 ESTIMATE DATE 3/22/2004 PROJECT NO. 04021 JOB SITE 700 Wood St Bldg C DESCRIPTION TOTAL DEMOLITION 5,830.00 Removal and disposal of all toilet partition and urinal screen Removal and disposal of all wall tile Removal and disposal of existing door and jamb Removal and disposal of ceiling tiles NEW WORK Frame wall to create janitorial closet Install drywall on wall and area where tile was removed and finish to match existing Install one (1) 2/8 X 7/0 doorjamb and door Install one (1) 3/0 X 7,D doorjamb and door Install lock on janitorial closet to match existing building locks Install push plates and door pulls on door into bathroom Install new ceiling tiles Install new toilet partitions, urinal screens, toilet paper dispensers, paper towel holders and mirrors in the new bathroom All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner. Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance upon above work. WorkmaWs Compensation and Public Liability Insurance on above work to be taken out by Customer/Date WRIGHT-BALLARD CONSTRUCTION, INC. TOTAL $5,830.00