HomeMy WebLinkAboutWORK ORDER - REQUISITION - 20677FROK : Rocky Mountain Coatings
01 ./20/2004 15:d7 470221b534
.,.. e11 Y
FAX NO.
472-1349 Mar. 30 2004 06:57PM P2
FACILIIIE5 rr.tiee u�
URISIT "A^
%ORx C-RDPIR FORM
1'DRSUANT 'LC AN AGREEMENT BE--xEEN
THE CET:4 Or RORT COLLINS
AND
POCKY MOCNTAIN COAT3Nc5
DA'."EA: J0:,7 i, 2003
work Oraer Numbex: I'i4)62004
Puxcbase order Number:
Proiect Title: EPIC Ire Rink RerwvationPlans --
Ca.=enc®mErt Date: Apai105,2004
Completioe Oat*: Atjuat13.2004
MaBimum Pee (time and reimbursable direct costsi: S9,780-00
Frolect Description: RenDvvefiogoftheBlue RinkatEPIC_
s c ape of Se rvi ee s : t CUU wags 10 AFF with wo coat lom egg8ixA1 a ned mad rjepa and paint Ctvilt waU8
from floor to 10' AFF with taro coats latex epoxy gloss.
service Provider agrees to pertoxm
the services identified above ar_d or
the attached forma in aecordanoe
with zhe terse and conditions
contained herein and in the Services
Agreement between the parties. In
the event of a conflict between or
ambiguity in the terms of the
Services Agreement and this work
order (including the ettaehetl forms)
the Services Agreement shall
control,
SERVICE PROVIDER
lip r
.rm.
= Purchasing
9CCEPTANCE
�sER
The attached forms coAaisting
of - f 1 pages are hereby
accepted and incorporated
herein by this reference, and
Notiee to Proceed is Hereby
given -
CITY OF FQJQ2 COLLINS
By; -0� v_�
Date, Mwth 30, 2004
Director of Purohasi% and Risk ftugemern ever
$30,000,
PROPgsu_sl SMW-FEDTO PHONE DATE
City o€ Fort Collins 221-6805 3/26/04
sTTrEET JOB NAME
Attn: Ron Kechter- EPIC
ORY. STATE and MP CODE JOB LOCATION - - - -
ARCHfTECf DATEOF PUNS - JOBPHONIE
We hereby subn* spedkebom arrd esbrrreles W.
EPICICERINK RENOVATION - Repaint walls in two phases
Supply labor, equipment and materials to repaint CMU walls
PHASE 1 - Repaint walls 10' above floor to ceiling with one coat
latex eggshell enamel. *NOTE--- additional primer and finish
coats of paint was figured to assure the graphics would be
covered. And Manlift rental include in_prioe
TOTAL: 5y500.00
PHASE 2 - Prep and repaint CMU walls from floor to 10' above floor,
with two coats of Latex Epoxy Gloss
TOTAL: 4,280.00
*NOTE - Price is for CMU only, drywall and handrail magbe
additional cost.
We Propose hereby to furnish material and tabor — complete n accordance with above specifications, for the sum of
Payment to be made as torows: dollars
All materiel is guarofted to be as spedFad. AN wok to be conpkbd in a wadowrBte
nvm wr aowv ft b San I praploss. Any arwaear or deMMion ion above .paolbxeas aunwrbad
kwoNirg MdM opals we be ewraad ady upon mitt aNwa. sad vM b.oane an extra Srla"
do suer arai abosa to odknre. AN aWawnwrw ooraI - Wm abI P, accidemc or
delays WPM our caved Owaar ID am am tarrdo and aala necaswy kmmnoe. Orr Note: This proposal any be
waken we bay caved by Wakmerta Oanpwwdbn kaa mnm wNhdrawn by us a not exept witlf§l days
Acceptance of Proposal-Th.ebmplow,Wedftaftm
and conditions ale safisbtcWy and are Hamby accepawf. You ate authorized to do the Sorahwe