Loading...
HomeMy WebLinkAboutWORK ORDER - REQUISITION - 20537Aug-03-04 11:27A Lv nIV 1L'YI 111 P.O1 P. 02 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND i of a1ppomrtCollins VOGEL CONCRETE ft BID ff 5473 Date: Jury 19, 2004 Work Order: 006.2004 Purchase Order: Project Title: Miscellaneous Concrete Repair Commencement Date: 7126/04 Completion Date: 7/30/04 Maximum Fee: $22,053.42 Project Description: Chestnut Lot Rehabilitation - Parking Services Scope of Services: Concrete repair and Installation at Chestnut Parking Lot between Jefferson and South End. See attached bid estimate. Acceptance: ��- Use( Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement bebmen the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. Service Provider ' G By: Date: The attached forms consisting of one (1) page are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins p By: Date: City of Fort Collins Parking Services Chestnut Lot Cost Estimate DESCRIPTION - ' UNIT PRIDE- UNIT - ESTIMATED QUANTITY TOTAL COST- - CONCRETE -VOGEL CONCRETE - - Remove Concrete/As ludt S 2.46 SF 1 427 S 1510.42 Metal Sidewalk Culvert - 2' O etun . 5/8" plate S 1,200.73 EA 3 $ 3,602.25 Vertical Curb mid Gutter - No Sidewalk Hi hback Curb Gutter and Drive Approach - R S R S 16,37 S 38.00 LF LF 31 6 S 507,47 8 228.00 Higliback Cinb and Gutter S 2L83 LF 225 $ 4.91175 4" Flatwork S 2.73 SF 351 S 958.23 6" Flalwork S 3.27 SF 866 S 2.83LS2 Valley Pail -6"Depth Hi hback Alley Approach 8" - R 8 R $ 6.01 S 5t.00 SF LF 260 24 S 1562.60 $ 1 224.00 Traffic Control S 2 716.88 Contict aic $ 1854.30 Subtotal S 22 0G7:42' PATCHING:-. LAFARGE' - As halt Patclung - 6" De 0r $ 60.69 TON 34988 S 21,234.46 Embmdanent (Borrow CL-5 or CL-6. Complete hi Place $ 30.57 TON 35 $ 1 069.95 Traffic Control $ 3,185.17 Conte en S 2,548.96 Subtotal S 28 038.54 SLURRY INTERMOUNTAIN SLURRY. SEAL Type II Asphalt Autry Seal - All Street Locations S 1. I S SY 3134 $ 3,604.10 Sweeping -All Streets $ 250.00 LS 2 $ 500.00 Traffic Control $ 540.62 Contillilencv $ 464.47 Subtotal S 5109i19 TOTAL PROJECT COST - S 55,201.141' Payment Breakdown 300 E. Mountain - Harold Summery Remove Concrete/Asphalt Is 246 SF 866 $ 213036 6" Flatwmk Is 3.27 SF 866 is 2,831.82 $ 4 62.18 Alley Approach - Stor irwater/Pod Accen Retrieve Co icrete/Asphalt $ 2.46 SF 268 $ 659.28 Highback Alley Approach 8" - R 8 R $ 51.00 LF 24 $ 1,224.00 4" Flatwork $ 2.73 SF 220 S 600.60 Highback Curb mid Gutter $ 21.83 LF 16 $ 349.28 S 2 833:12 " Frontage Pstching - Pod Access ,sphalt Patching - 6" Depth S 60.69 TON 1016 $ 622.68 S 62261 Vogel Concrete Humid Summers $ 4,962.18 Stonnwater $ 786.64 Ped Access S 2,046.52 Packing S 14.258.08 S 22,053.42 Lafarge Pod Access S 622.68 Parlaug S 27.415.S6 $ 28,038.54 Intermountain Slurry Seal Parting S 5J09. 19 Project Total S 55$01.14 page 1 of 1