HomeMy WebLinkAboutAddenda - BID - 5839 ASPHALT OVERLAY PROJECT 2004City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
BID #5839
ASPHALT OVERLAY PROJECT 2004
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5839 Asphalt Overlay Project 2004
OPENING DATE: March 17, 2004
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
1. Section 2000 Project Specifications, Revision of Section 108, page 8, change the number of
working days to 45.
2. Add new bid item 403.35 HBP Grading S, 64-22 Binder, 2,500 Ton. Contractor must use the
REVISED bid tab provided.
3. Reduce bid quantity for item 403.30HBP Grading S, 64-28 Binder, to 8,600 Ton.
4. For clarification, in the event of a City caused delay, the traffic control plan re -submittal fee of
$10 will be paid for by the City of Fort Collins.
5. The following are a list of anticipated dates when each area will be ready for paving. These
are subject to change, and are intended for use only as a guideline for bidding purposes.
Mathews
4/16
Worthington
4/22
Southridge
4/27
Meadowlark
6/10
West Elizabeth
7/22
W illox
8/11
Aspen
8/18
Oak
8/20
Golden Meadows
9/10
Chapparral
9/28
If you have any questions contact John Stephen, CPPO, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
00330 ADDENDUM 1
BID SCHEDULE - REVISED
City of Fort Collins
2004 Asphalt Overlay Project - Bid No. 5839
Item No.
Description
Unit
Estimated
Quantity
Unit Cost
Total Cost
202.10
Grinding (planing) Surface Preparation < 3"
S.Y.
500
$
$
202.20
Grinding (planing) Surface Preparation 3" to 5"
S.Y.
500
$ _
$
202.30
Grinding (planing) Surface Preparation 5" to 7"
S.Y.
500
$ _
$
202.40
Grinding (planing) Surface Preparation 7" to 9"
S.Y.
500
$ _
$
202.50
Taper Planing Adjacent to Gutter
L.F.
500
$
$
202.60
Bobcat Style Milling < 3"
S.Y.
50
$
$
202.70
Bobcat Style Milling - Additional Inch Thickness
S.Y.-inch
50
$
$
203.10
Excavation -General Less Than 100 CY
C.Y.
50
$
$
203.11
Excavation - General Over 100 C.Y.
C.Y.
100
$
$
203.20
Excavation - Muck
C.Y.
100
$
$
203.30
Borrow -Less Than 100 Ton
Ton
50
$
$
203.31
Borrow - Over 100 Ton
Ton
100
$
$
210.01
Adjust Valve Box
Each
129
$
$
210.02
Adjust Valve Box with Ring
Each
40
$
$
210.03
Adjust Valve Box with Tyler 6860 Series, Item R 69,
Screw Type Adjustable Riser
Each
5
$ -
S -
210.04
Adjust and Replace Top Section of Valve Box
Each
10
$
$
210.05
Tyler 6850 Series, Item 58, 14" Valve Box Extension
(Part Only)
Each
5
$
$
210.06
Tyler 6860 Series, 16" Valve Box Top Section Without
Lid (Part Only)
Each
5
$
$
210.07
Tyler 6860 Series, 26" Valve Box Top Section Without
Lid (Part Only)
Each
10
$
$
210.08
Total Valve Box Replacement
Each
5
$
$
210.09
Adjust Standard Manhole < 24"
Each
126
$
$
210.10
Adjust Special Manhole > 24"
Each
2
$
$
210.11
Adjust Manhole with Ring
Each
10
$
$
307.10
Class C Fly Ash Delivered and Spread 12" Depth @
10 /o
Ton
100
$
$
307.20
Stabilize Subgrade - Tilled, Watered & Compacted
S.Y.
2,000
$
$
403.10
HBP - Grading SX Parking Lot Overlay
Ton
85
$
$
403.15
HBP - Grading SX Basketball Court
Ton
230
$
$
403.20
HBP - Grading SX
Ton
8,600
$
$
403.30
HBP - Grading S, 64-28 Binder
Ton
8,600
S
$
403.35
HBP - Grading S, 64-22 Binder
Ton
2,500
$
$
403.40
HBP -Grading SG
Ton
100
$
$
L. 403.50
Patching
Ton
1,320
$
$
Page] oft
00330 ADDENDUM 1
BID SCHEDULE - REVISED
City of Fort Collins
2004 Asphalt Overlay Project - Bid No. 5839
Item No.
Description
Unit
Estimated
Quantity
Unit Cast
Total Cost
403.55
10" Arterial Patching
Ton
30
$
$
403.60
Geotextile Paving Fabric
S.Y.
45,761
$
$
614.01
"No Parking' Sign With Stand
Per Day Per Each
2,000
$
$
614.02
Vertical Panel Without Light
Per Day Per Each
700
$
$
614.03
Drum Without Light
Per Day Per Each
700
$
$
614.04
Type I Barricade Without Light
Per Day Per Each
200
$
$
614.05
Type II Barricade Without Light
Per Day Per Each
20
$
$
614.06
Type III Barricade Without Light
Per Day Per Each
200
$
$
614.07
Size A Sign With Stand
Per Day Per Each
1,500
$
$
614.08
Size B Sign With Stand
Per Day Per Each
300
$
$
614.09
Size A Specialty Sign - Cost of Manufacturing
Each
10
$
$
614.10
Size B Specialty Sign - Cost of Manufacturing
Each
10
$
$
614.11
Cone With Reflective Strip
Per Day Per Each
5,000
$
$
614.12
Safety Fence
Per Day Per Roll
75
$
$ _
614.13
Light - Steady Bum
Per Day Per Each
2,000
$
$ _
614.14
Light - Flashing
Per Day Per Each
1,000
$
$ _
614.15
Advance Warning Flashing or Sequencing Arrow Panel
Per Unit Per Day
20
$
$ _
614.16
Traffic Control Supervisor
Per Day
45
$
$
614.17
Traffic Control Supervisor
Per Hour
150
$
$
614.18
Flagging
Per Hour
1,500
$
$
TOTAL COST - Pages 1 & 2
$
Signed
Company
Check One:
Address
Phone/Fax
Individual Doing Business in Company Name
Corporation
Partnership
Dollars and
cents.
Page 2 of 2
ATTENDANCE RECORD
PRE CONFERENCE
Project: Bid #5839 ASPHALT OVERLAY PROJECT 2004
Time: 1:00P.M.
Date: MARCH 8, 2004
Location: 215 NORTH MASON, CONFERENCE ROOM 2A
NAME
FIRM NAME
ADDRESS
TELEPHONE
FAX #
E-MAIL ADDRESS
9D5a
dQd-47010
oZoZ j-(o37 S--
Cia�ien•v�o�..�
�vs�r✓A/
C3GZA�c7�T
U'�"t��Q sz�,urt3[s
/yuHiu�ts-_
02Y�6 E�sr 9r.�/
sr. Lcvcci9a�� ro 90�3�
�67- 36�20
(6 7.39'o3
Steele
b5e
NT-k41//E/.�
al
g�
7 Z
Ile3gd
.f4
S e-- AP I:-:-
n0
Z%n73y
Ca✓r��
d 9''o
C'oIo goS�/�
cj 7D
S6S' 363z
9 70
S6A-3t65
�t�(��
�vt3�
ug.
�i • Ccx Li�S. �U-
IRS-0 SCo5
qg
�Ie�r�C oII
Ck 6 — G
413 a� mszi
4I�-20�2
ZZI-680
esc�aliC ter_
69
3-3/S1
A.'Z3—NW
C-pl����
-10A(/S71/
c
j , nn "6ry
2-26 6.7
S~F��k jou,
WA
. 16,
Pre -Bid Meeting Agenda
City of Fort Collins 2004 Asphalt Overlay Project - Bid No. 5839
Monday, March 8, 2004 10:00 a.m. 215 North Mason 2A
I. INTRODUCTIONS Rick Richter - Project Manager 221-6798
Darren Moritz - Construction Inspector 222-4706
Eileen Scholl - Parks 566-1342
John Stephen - Purchasing 221-6777
Erika Keeton — Project Engineer 221-6605
IL PARTICIPANT INTRODUCTIONS
III. PROJECT DESCRIPTION/L.00ATIONS
IV. BID OPENING Wednesday, March 17, 2004, 3:00 p.m. (our clock)
Purchasing — 215 North Mason Street, Fort Collins
V. SCHEDULE - See Revision of Section 108, Prosecution and Progress
Schedule Submitted with Bid — days per area Priority
Milestones Concrete Construction
10 Day Mobilization
Project Length: 45 working days— See Addendum No,
VI. GENERAL CONDITIONS AND GENERAL REQUIREMENTS
Liquidated Damages - $1000.00 per day
1 Year Contract - renewable for 2 additional years in one year increments
Warranty - 2 years after the date of Notice of Substantial Completion
Construction Hours - 7:00 a.m. to 6:00 p.m., Monday through Friday.
VIL TRAFFIC CONTROL
No Parking signs must have all information except dates printed on sign
Pay per unit per day (max. number of a unit at one time during day)
Traffic Control Plans submittal required, $35 review fee is incidental to the work
Parking Restriction Plans for "NO PARKING" signs required
Placement of "NO PARKING" signs requires 24 hours prior to commencement of work
Flagging by the hour ONLY while work is underway (NO STANDBY TIME)
Flaggers by the hour — breaks shall be included in the unit price for flagging
TCS must have cellular phone, minimum of 1 year experience as a TCS
Work on arterials is permitted from 8:30 a.m. to 3:30 p.m. only
VIII. PROJECT SPECIFICATIONS - SECTION 02000
Asphalt Mix Design - Superpave Mixes
Parks - Bobcat Milling, Basketball Court
Fly Ash
Testing — CTL Thompson
Adjust Structures Prior to Overlay— note tolerances
Addendum No. 1 — 45 working days, new line item S 100 64-22 mix
IX. QUESTIONS