Loading...
HomeMy WebLinkAboutAddenda - BID - 5836 PARK SHELTER REPLACEMENT AT ROLLAND MOORE (3)City of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 1 Bid #5836 PARK SHELTER REPLACEMENT AT ROLLAND MOORE PARK SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5836 Park Shelter Replacement at Rolland Moore Park OPENING DATE: February 6, 2004 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. A. Model # of Skylark Shelter should be Apex SP-29 which has columns on 26 foot centers. B. There will be no temporary, power at the shelters. Contractor should plan on using generators. C. The staging areas will be on grass adjacent to the shelters. D. The contractor will be responsible for landscaping and irrigation damage for areas outside of the designated staging area and route. City will be responsible for areas in the staging area and designated route. E. Any damage to concrete (walks, curb & gutter) will be the responsibility of the contractor. F. Contactor will be responsible for obtaining the permit but the fees will be paid by the City (Parks Dept). G. Contractor will be responsible for any special inspection required by the City Building Dept for steel structure/foundation. H. City contractor will do the open hole/soils inspection. I. City will provide site plan, legal description and electrical plan. Contractor will need to supply any other documentation. J. Site verification is not required from Stormwater Dept. K. Restroom facilities will not be available. Contractor will need to make own provisions. L. If water is turned back on in the playground restroorn, it will be available. If it is still winterized, contractor must make own provisions. M. The LD's will remain at $500/day. N. Contractor will be responsible for builder's risk insurance. 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 O. Contractor will be required to provide a bid bond and the awarded contractor will be required to provide payment and performance bonds for this project. Bid, payment and performance bond forms are included in this addendum. P. Please refer to the attached Soils Report. Shelter manufacturer approval: Classic is approved as equal with their option of the 20 gauge "corrugated" galvanized, primed and painted roof. Poligan, Litchfield and Natural Structures do not meet specifications. If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970- 221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. ATTENDANCE RECORD PRE CONFERENCE Project: Bid #5836 PARK SHELTER REPLACEMENT AT ROLLAND MOORE PARK Time: 10:OOA.M. Date: JANUARY 26, 2004 Location: ROLLAND MOORE PARK 2001 S SHIELDS NAME FIRM NAME ADDRESS TELEPHONE FAX # E-MAIL ADDRESS /Z3- L1vs7G11 ve 353 �o? 3tzo t$4zo +� - cox AV R33v � /�ui.�.•-c �AX epwfo'S -ins L✓ 2