HomeMy WebLinkAboutAddenda - BID - 5847 CONCRETE PROJECT PHASE IICity of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid 5847 Concrete Project Phase II
OPENING DATE: 3:00 PM March 31, 2004
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
1. Delete: paragraph 4 on page 22 of Section 2000, Project Specifications, which begins
"All pedestrian access ramps shall be equipped with truncated domes....." and replace it with the
following two paragraphs:
"All pedestrian access ramps shall be placed in accordance with the details
contained herein. The ramp items shall include all labor, materials,
equipment and incidentals, including tile red concrete, removal, sawcutting,
haul and disposal, and for doing all the work involved in removal and
replacement of pedestrian access ramps.
"At the direction of the Engineer, Truncated Dome Panels may be placed in
lieu of the red concrete on pedestrian access ramps. Item 608.26,
Truncated Dome Panel (2' x 2'), will be paid as an up -charge in addition to
the ramp item, as a replacement for the tile red concrete. This item shall
include all labor , materials, and surface preparation to supply and place the
panels at pedestrian access ramps. Truncated Dome Panels shall be red,
pre -fabricated concrete, and shall meet all ADA requirements. The type of
Truncated Dome Panels to be used shall be submitted to the Engineer for
approval prior to installation. Dome panels shall be placed at the same
time as the initial ramp placement. All panels shall be epoxied on the non -
exposed surfaces prior to being set in wet concrete."
2. Change: the quantity for Item 608.26 Truncated Dome Panel to 70 Each.
3. Add: Contractor must use the Revised Bid Schedule attached.
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
Addendum #1
Bid Schedule
Bid 5847
Item No.
Description
Unit
Contract
Quantity
Estimated Cost
Unit Cost
Total
202.01
Sawcut 4"
L.F.
100
$
$
202.02
Sawcutting - Additional Inch Depth
L.F./inch
100
$
$
203.01
General Excavation
C.Y.
50
$
$
203.02
Borrow
Ton
100
$
$
304.07
Aggregate Base Course
Ton
1400
$
$
403.50
Temporary Patching
Ton
300
$
$
604.01
Type R Inlet - Remove and Replace
Each
1
$
$
604.02
Reconstruct Inlet Deck - Catch Basin
Each
20
$
$
604.03
Reconstruct Inlet Deck - Catch Basin
Additional Foot Opening
L.F.
1
$
$
604.04
Reconstruct Curb Inlet Deck - 4' Opening
Each
2
$
$
604.05
Reconstruct Curb Inlet Deck - Additional
Foot Opening
L.F.
4
$
$
604.06
Type 13 - Curb Inlet with Frame, Grate and
Adjustable Curb Bonnet
Each
1
$
$
604.07
Concrete Sidewalk Culvert
Each
1
$
$
604.08
Metal Sidewalk Culvert - 5/8" Plate
Each
1
$
$
604.09
Additional Square Foot 5/8" Plate
S.F.
5
$
$
608.01
Remove Concrete
S.F.
3280
$
$
608.02
Remove and Haul Fillets
Each
4
$
$
608.03
Apron - Remove and Replace
S.F.
3025
$
$
608.04
Crosspan - Remove and Replace
S.F.
3025
$
$
608.05
Driveover Curb, Gutter & 4" Sidewalk -
Remove and Replace
L.F.
4150
$
$
608.06
Driveover Curb, Gutter and 6" Sidewalk -
Remove and Replace
L.F.
2225
$
$
608.07
Driveover Curb and Gutter - No Sidewalk -
Remove and Replace
L.F.
90
$
$
608.08
Driveover Curb, Gutter & Drive Approach -
Remove and Replace
L.F.
175
$
$
608.09
Vertical Curb, Gutter & 4" Sidewalk -
Remove and Replace
L.F.
610
$
$
608.10
Vertical Curb, Gutter & 6" Sidewalk -
Remove and Replace
L.F.
470
$
$
608.11
Vertical Curb and Gutter - No Sidewalk -
Remove and Replace
L.F.
4500
$
$
608.12
Vertical Curb, Gutter and Drive Approach -
Remove and Replace
L.F.
640
$
$
Item No.
Description
Unit
Contract
Estimated Cost
Unit Cost
Total
Quantity
608.13
Vertical Curb, Gutter and Drive Approach -
No Sidewalk - Remove and Replace
L.F.
50
$
$
608.14
Vertical Outfall Curb and Gutter - Remove
and Replace
L.F.
50
$
$
608.15
Barrier Curb 12"
L.F.
395
$
$
608.16
Hollywood Curb, Gutter & 4" Sidewalk -
L.F.
100
$
$
Remove and Replace
608.17
Hollywood Curb, Gutter & 6" Sidewalk -
L.F.
25
$
Remove and Replace
$
608.18
Hollywood Curb and Gutter - No Sidewalk -
Remove and Re lace
L.F.
50
$
$
608.19
Hollywood Curb, Gutter & Drive Approach
- Remove and Replace
L.F.
50
$
$
608.20
Highback Curb & Gutter - No Sidewalk-
Remove and Replace
L.F.
50
$
$
608.21
Highback Curb, Gutter and Drive Approach
- Remove and Replace
L.F.
50
$
$
608.22
Pedestrian Access Ramp, Dve riover Curb
Remove and Replace
L.F.
990
$
$
608.23
Pedestrian Access Ramp, Vertical Curb -
Remove and Replace
L.F.
245
$
$
608.24
Pedestrian Access Ramp, Hollywood Curb -
Remove and Replace
L.F.
20
$
$
608.25
Pedestrian Access Ramp, Highback Curb -
Remove and Replace
S.F.
50
$
$
608.26
Truncated Dome Panel (2' x 2')
Each
70
$
$
608.27
4" Flatwork - Remove & Replace
S.F.
2180
$
$
608.28
Colored Concrete (4") San Diege Buff -
UpCharge
S.F.
20
$
$
608.29
6" Flatwork - Remove & Replace
S.F.
25000
$
$
608.30
Replace Flatwork - I" Additional Depth
S.F.
295
$
$
608.31
4' Valley Pan - 6" Depth
S.F.
50
$
$
608.32
8" Alley Pavement - Remove & Replace
S.F.
3200
$
$
608.33
Highback Alley Approach 8" - Remove &
L.F.
50
$
Replace
$
608.34
Expansion & Caulking
L.F.
765
$
$
614.01
"No Parking" Sign With Stand
Per Day
300
$
$
Per Each
614.02
Vertical Panel Without Light
Per Day
3900
$
$
Per Each
614.03
Channelizing Barrels
Per Day
2000
$
$
Per Each
614.04
Type I Barricade Without Light
Per Day
I5000
$
$
Per Each
Item No.
Description
Unit
Contract
Estimated Cost
Unit Cost
Total
Quantity
614.05
Type II Barricade Without Light
Per Day
10
$
$
Per Each
614.06
Type III Barricade Without Light
Per Day
250
$
$
Per Each
614.07
Size A Sign With Stand
Per Day
2200
$
$
Per Each
614.08
Size B Sign With Stand
Per Day
250
$
$
Per Each
614.09
Size A Specialty Sign - Cost of
Manufacturing
Each
10
$
$
614.10
Size B Specialty Sign - Cost of
Each
10
$
$
Manufacturing
614.11
Cone With Reflective Strip
Per Day
3000
$
$
Per Each
614.12
Safety Fence
Per Day
20
$
$
Per Roll
614.13
Light - Steady Bum
Per Day
500
$
$
Per Each
614.14
Light - Flashing
Per Day
500
$
$
Per Each
614.15
Advance Warning Flashing - or Sequencing
Per Day
Arrow Panel
Per Each
30
$
$
614.16
Traffic Control Supervisor
Per Day
90
$
$
614.17
Traffic Control Supervisor
Per Hour
100
$
$
614.18
Flagging
Per Hour
1675
$
$
TOTAL COST
$
Signed
Company
Check
One:
Individual Doing Business in Company
Name
Corporation
Partnership
Address
Phone/Fax
Cents.
Dollars and
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
TRANSACTION REPORT P,01
MAR-25-04 THU 03:04 PM
SEND(M)
DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP
MAR-25 03:03 PM 96631566 1'27" 4 SEND ( M) OK 061
TOTAL 1M 27S PAGES: 4
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No.1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid 5847 Concrete Project Phase II
OPENING DATE: 3:00 PM March 31, 2004
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
1. Delete: paragraph 4 on page 22 of Section 2000, Project Specifications, which begins
"All pedestrian access ramps shall be equipped with truncated domes._..." and replace it with the
following two paragraphs:
"All pedestrian access ramps shall be placed in accordance with the details
contained herein. The ramp items shall include all labor, materials,
equipment and incidentals, including tile red concrete, removal, sawcutting,
haul and disposal, and for doing all the work involved in removal and
TRANSACTION
REPORT
P. 01
MAR-25-04
THU 01:35 PM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
MAR-25 01:15
PM
94822724 ''
2'34"
4
SEND
( M)
OK
056
01:18
PM
910703560887
1'27"
4
SEND
( M)
OK
056
01:20
PM
92233191.
1'28"
4
SEND
( M)
OK
056
01:34
PM
949894796631566
0
SEND
( M)
BUSY
056
01:23
PM
913034581424
1'32"
4
SEND
( M)
OK
056
01:25
PM
96673930 •
1'28"
4
SEND
( M)
OK
056
01:26
PM
92290846_
08"
0
SEND
( M)
COM E-7
056
01:27
PM
919703361317.
2'35"
4
SEND
( M)
OK
056
01:32
PM
95683165,
1'25"
4
SEND
( M)
OK
056
TOTAL
12M 37S
PAGES:
28
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid 5847 Concrete Project Phase II
OPENING DATE: 3:00 PM March 31, 2004
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
1. Delete: paragraph 4 on page 22 of Section 2000, Project Specifications, which begins
"All pedestrian access ramps shall be equipped with truncated domes....." and replace it with the
following two paragraphs:
"All pedestrian access ramps shall be placed in accordance with the details
contained herein. The ramp items shall include all labor, materials,
equipment and incidentals, including tile red concrete, removal, sawcutting,
haul and disposal, and for doing all the work involved in removal and
TRANSACTION REPORT P,01
MAR-25-04 THU 01:43 PM
BROADCAST
DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP
MAR-25 01:42 PM 92290846 1'27" 4 SEND ( M) OK 056
TOTAL iM 27S PAGES: 4
TRANSACTION REPORT P,01
MAR-25-04 THU 02:07 PM
SEND(M)
DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP
MAR-25 02:04 PM 94989477 2'39" 4 SEND ( M) OK 057
TOTAL 2M 39S PAGES: 4
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid 5847 Concrete Project Phase II
OPENING DATE: 3:00 PM March 31, 2004
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
1. Delete: paragraph 4 on page 22 of Section 2000, Project Specifications, which begins
"All pedestrian access ramps shall be equipped with truncated domes....." and replace it with the
following two paragraphs:
"All pedestrian access ramps shall be placed In accordance with the details
contained herein. The ramp items shall include all labor, materials,
equipment and incidentals, including file red concrete, removal, sawcutting,
haul and disposal, and for doing all the work involved in removal and
.n,nlnr. -f of n=Amo rian arroGC rmmn.-