HomeMy WebLinkAboutRESPONSE - BID - 5855 WARREN PARK IMPROVEMENTS (5)SECTION 00300
BID FORM
PROJECT: WARREN PARK IMPROVEMENTS; BID NO.5855
Place Fort Collins
Date May 11, 2004
1. In compliance with your Invitation to Bid dated April 21, 2004
and subject to all conditions thereof, the undersigned
G.L. Hoff Company a "(Corporation,
�a :�nr��lpr_daiz�L s1er�er-ar- Sc�l�-P�epi�tor.� ** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of 5% of bid amount ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written .no.tice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: Employers Mutual Casualty Company,. PO Box 370010, Denver, CO 80237
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.1
through Acknowledgement is attached.
7/96 Section 00300 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
Please _ refer to the attached information
12. List your major equipment available for this contract.
dun truck. CAT 928 loader, CAT 320 Track excavator, backhoes, bobcats,
motor grader, grading tractor, concrete pump
13. Experience in construction Work similar in importance to this
project:
_- Please refer to the attached information
14. Background and experience of the principal members of your organization,
including officers:
Please refer to the attached information
15. Credit available: $ 100;000.
16. Bank reference: Loran Emmons, Bank One Loveland
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? yes
If yes, in what city, county and state? Fort Collins, of ers What
class, license and numbers? #$-6
19. Do you anticipate subcontracting Work under this Contract? yes
If yes, what percent of total contract? refer to bid information
and to whom?
20. Are any lawsuits pending against you or your firm at this time? no
If
DETAIL
yes,
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
2 million plus 2 million umbrella
What company? Travelers, agent: Flood & Peterson Insurance
22. What are your company's bonding limitations? 5 million
23. The undersigned
corporation to
verification of
Qualifications.
Dated at Loveland
C
IC�
G.L. Hoff Company
hereby authorizes and requests any person, firm or
furnish any information requested by the OWNER in
the recital comprising this Statement of Bidder's
this llth day of May
Title: Miriam T. Hoff, Secretary Treasurer
State of Colorado
County of Larimer
2004
Miriam T. Hoff being duly sworn deposes and says that he is
Secretary Treasurer of G.L. Hoff Company and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this day of
/i / , 2 0 D5/.
otary Public ,
My commission expires
7/96
//- - /.3 - 07
Section 00420 Page 3
G.L. Hoff Company
Construction Experience
Gregory L. Hoff, President and Construction Manager
For the past thirty years, Greg has been involved with all aspects of construction. Greg
established G.L. Hoff Company in 1984. Serving as president and project superintendent,
Greg is a driving force in the company.
Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering
Technology, his early work included surveying and architectural design and drafting. He
has held a Class B Commercial Contractor's License with the City of Fort Collins since
1976. Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, and
Boulder.
Prior to 1984, Greg worked with Al Hockett, Inc. initially as an architectural draftsman and
progressing to project superintendent. He was also a partner in H&M Builders from 1976
to 1980. This company specialized in custom homes, tenant finish and custom millwork.
Beginning in 1984, Greg established G.L. Hoff Company, a commercial general contracting
company which specializes in all types of commercial construction including sitework,
excavation, structural concrete, and commercial buildings. As president and construction
superintendent for G.L. Hoff Company, Greg supervises a wide variety of projects
including, schools, churches, city and government projects, city park developments, as well
as many light industrial and concrete construction jobs. Greg oversees project scheduling,
review of construction procedures and specifications, monitors quality control and safety
enforcement on job sites. As president and construction supervisor, Greg works closely
with project owners, architects and engineers throughout the project.
Greg is an active member of the Loveland construction community. He has volunteered his
time to the Loveland Construction Advisory Board for over 15 years. While serving as
Chairman, this Board, the city adopted licensing for contractors. He is currently serving on
a review committee to study the International Building Code prior to adoption by the City
of Loveland.
Joel S. Reger, Estimator and Project Manager
Joel has a Bachelor of Science Degree in Construction Management from Colorado State
University and seventeen years experience in the construction field. He has continued his
education with estimating seminars including training with American Building Company's
estimating Access workshop. He is also an active member of the Sigma Lambda Chi
honorary national construction fraternity.
During the past thirteen years, as the chief estimator with G.L. Hoff Company, Joel has
compiled bids and development estimates for projects valued at up to five million dollars.
As chief estimator, he directs the project bidding process as well as the review of
specifications. He also works directly with project management, coordinating proposal
requests and change orders with the architect or owner, overseeing material orders to insure
that the project is completed in a timely manner and according to specifications. Joel is an
important and effective member of every Design -Build project with G.L. Hoff Company.
He works closely with the owner and architect to understand project goals and provide
detailed project budgets and construction options to meet the owner's needs.
Patrick R. Norris, Estimator/Project Manager
Pat brings over twenty five years of construction experience to his position as estimator and
project manager. His background includes experience with residential, commercial and
industrial construction. Pat began his career as a carpenter, form setter and equipment
operator. With 18 years working as a field foreman, he has a broad understanding of
building methods and materials as well as site safety and personnel management. His
knowledge of construction has enabled Pat to be an effective estimator and project
manager. During the past 6 years, Pat has bid and managed projects valued up to $_
G.L. Hoff Company
2004 Projects
CSU Transit Center
Construction of parking improvements at the Lory Student Center on
the Colorado State University campu s. The scope of work includes
site excavation and demolition, grading, landscaping, irrigation
system, fencing, and electrical lighting.
Owner: City of Fort Collins
215 North Mason Street
Fort Collins, CO 80524
Contact: Steve White, Project Manager, 970-221-6273
Contract: $208,761.
Completion: 4-2004
Loveland Industries Remodel
This remodel is a design -build tenant finish project for United Agri
Products, Inc. The work involves the complete remodel of an existing
metal building warehouse space into a laboratory. The scope of work
includes carpentry, dyrwall, HVAC, plumbing, electrical and all finishes.
Owner: United Agri Products, Inc.
14520 WCR 64
Greeley, CO 80631
Contact: Robert Bath, 970-356-8920 ext.201
Contract: $142,817.00
Completion: 4-2004
UNC Apartments Playground
Removal of existing playgournd equipment, sitework, concrete, irrigation
and installation of new playground equipment.
Owner: University of Northern Colorado
Greeley, CO 80631
Contact: George Galida, UNC Project Manager, 970-351-1892
Contract: $125,008.00
Completion: 2-2004
Rolland Moore Park Shelter Replacement
Remove four existing wood laminate picnic shelters and replace with
structural steel shelters for the City of Fort Collins Rolland Moore Park.
Owner: City of Fort Collins
215 North Mason, Fort Collins, CO 80521
Contact: Eileen School, Project Manager, 970-416-2062
Contract: $121,962.
Completion: 4-2004
G.L. Hoff Company
2003 Projects
East Riverside Drive Retaining Wall and Street Rehabilitation Project
Construction of approximately 200 feet of 10 foot high retaining wall with
associated brick trim and metal top railing along the Big Thompson River.
Removal of two city blocks of existing street asphalt. Installation of an 8
inch water line with two hydrants, new service connections to 10 buildings,
3 street inlets and piping. Installation of concrete curb & gutter, drives and
pans, sidewalk, and the roadway base course and asphalt pavement along a
two block section of East Riverside Drive in Estes Park. Phase One of the
project was completed in October and November of 2002 and Phase Two
was completed between March and May of 2003.
Owner: Town of Estes Park
PO Box 1200, Estes Park, CO 80517
Contact: John Spooner, Project Manager, 970-586-9388
Van Horn Engineering and Surveying
1043 Fish Creek Road
Estes Park, CO 80517
Contract: $373,388.00
Completion: June, 2003
Butch Butler Press Box and Bleachers Project
Construction of a single pre -cast concrete structure for use as a press box
at Butch Butler Field in Greeley. The scope of work also included new
stadium bleachers and a concrete slab.
Owner: City of Greeley
Contact: Ted Trujillo, Parks Program Manager, 970-350-9340
1000 loth Street, Greeley, CO 80631
Contract: $108,282.00
Completion: February 2004
Bellvue Hatchery French Drain
Installation of a perforated and solid wall drain pipe at the Bellvue
Research Hatchery for the Division of Wildlife. Scope of work included
sitework and pipeline work.
Owner: State of Colorado Division of Wildlife
6060 Broadway, Denver, CO 80216
Contact: Kay Sinclair, 970-472-4433, Fort Collins
Contract: $17,073.00
Completion: 10-2003
Routt/Spruce Hall Sewer Line Replacement
Completion of sitework and utility work to remove and replace 215 LF of
sanitary sewer from Routt Hall to manhole with 6 inch PVC pipe.
Owner: Colorado State University
365 Aylesworth SE, Fort Collins, CO 80523
Contact: Michael Davis, Project Manager, Facilities, 970-491-0075
Contract: $54,279.00
Completion: 1-2004
Edwards -Ellis Parking Lot
Construction of new parking lot on Colorado State University campus.
Scope of work included demolition, sitework, storm drainage, fire line and
hydrant, asphalt paving, concrete pavement, irrigation and landscape work.
Owner: Colorado State University
365 Aylesworth SE, Fort Collins, CO 80523
Contact: Steve Kiess, Project Manager, Facilities, 970-491-0017
Contract: $282,608.
Completion: 9-2003
Fish Creek Pedestrian Trail
Construction of a concrete pedestrian trail including sitework, erosion
control, culvert installation, rip rap, seeding, fencing, concrete bikeway,
curb & gutter and traffic control.
Owner: Town of Estes Park
170 MacGregor Ave., Estes Park, CO 80517
Contact: Mike Todd, 970-586-2458
Cornerstone Engineering, 437, S. St.Vrain, Estes Park, CO
Contract: $322,056.
Completion: 3-2004
G.L. Hoff Company
2002 Projects
Estes Park Sanitation District Centrifuge Building
Construction of a new concrete block building with precast tee
construction for a centrifuge. The work included piping, valves, electrical
and instrumentation.
Owner:
Estes Park Sanitation District
1201 Graves Avenue
Estes Park, CO 880517
Contact:
Jim Duell, District Manager 970-586-2866
John Burgeson, 970-223-9600
Shepherd Miller Inc., Project Engineer
Contract:
$264,053.00
Change Orders:
one $2,586.00
Own Forces:
55%
Completion:
January, 2002
Rehabilitation of Owl Creek Ditch Hydraulic Structures
Removal and replacement of ten concrete hydraulic structures, providing
and installing 25 meter gates, 21 precast concrete flumes, and construction
of 4 cast -in -place flumes and other miscellaneous headwalls and structures
along the Owl Creek Ditch.
Owner: Owl Creek Supply and Irrigation Company
PO Box 206
Eaton, CO 80615
Contact: Duane Smith, 970-490-2620
Smith Geotechnical
Contract: $383,000.00
Change Orders: three $29,476.50
Own Forces: 100%
Completion: April, 2002
Sitework and Utilities for New Kuck Mechanical Building
Subcontracted the sitework and utilities for the new Kuck Mechanical
building to Delehoy Construction. Scope of work included overlot
grading, structural fill, building excavation, foundation insulation, underslab
gravel, fine grading, installation of sewer line, storm drainage, waterline,
fireline and asphalt patch.
Owner: Kuck Mechanical, Inc.
General Contractor: Delehoy Construction
3109 South Taft Hill Road
Fort Collins, CO 80526
Contact: Mark Delehoy, 970-226-0836
Contract: $125,840.00
Change Orders: three $7,008.00
Own Forces: 100%
Completion: March, 2002
Pedestrian Links to Transfer Areas
Street and sidewalk improvements for City of Loveland Bus system.
Scope included removal and replacement of concrete curb, gutter,
sidewalk, cross pans, bus pads and crosswalk, and asphalt paving as per
Federal and CDOT specifications.
Owner: City of Loveland
105 West 5th Street
Loveland, CO 80537
Contact: Donna Camilliere-Frye
Project Manager, 970-96202511
City of Loveland Engineering Department
Contract: $72,737.88
Change Orders: one $16,614.58 (quantity bid)
Own Forces: 85%
Completion: July, 2002
G.L. Hoff
CONTRACTOR
A.
BY:
i
VL GJ.'Vly/L• /1LV11, LLGJ1LLG11L
Y12t1ghStreet
ADDRESS:
1815 West
Loveland, CO 80537
8. BID
SCHEDULE (Base Bid)
See Addendum #1 Bid Schedule
Project: WARREN PARK IMPROVEMENTS
BID SCHEDULE
Bid Item #
Description
Unit
Unit Price
Estimated Qty.
Total
General
1
Bond
LS $
1
$
2
Mobilization
LS $
1
$
3
Surveying
LS $
1
$
4
Tree Protection
LS $
1
$
Remove and Reinstall
Existing. Drinking
5 Fountain
Earthwork
6 Topsoil - Removal
Topsoil- Furnish and
7 Place
Utilities
Sanitary Sewer Service
and Drinking Fountain
8 Drain
9 Pump Stations
10 Manhole
7/96
LS $ 1
CY $ 90
CY $ 70
LS
$
1
$
LS
$
1
$
LS
$
1
$
Section 00300
Page 2
Chlorination System Improvements
Construction of a new 11 feet wide by 25 feet long by 6 feet deep concrete
chlorine contact basin with perimeter handrail, a new chlorine solution
pump and appurtenances for the wastewater treatment plant in Pierce.
Owner: Town of Pierce
240 Main Street
Pierce, CO 80650
Contact: Steven Butherus, Project Manager
Ketterling, Butherus and Norton Engineers LLC
820 8th Street Plaza, Greeley, CO 80631
970-395-9880
Contract: $33,811.50
Change Orders: none
Own Forces: 95%
Completion: June, 2002
Colorado State University Equine Center Detention Pond
Construction of a 6 acre-foot earthen retention pond including excavation,
sitework, seeding, sluice gate, portable slurry pump and irrigation sprinkler.
Owner: Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact: Jim Stoddard, Project Manager, 491-0138
Contract: $154,410.00
Change Orders: none
Own Forces: 94%
Completion: August, 2002
Nick Davidson, Inc. Remodel
Remodeling of existing building for detailing, parts storage, and wash bay
for auto dealership.
Scope of work included landscaping, site concrete,
masonry, interior finishes, overhead doors, roofing, heating, air
conditioning, and electrical.
Owner:
Nick Davidson, Inc
1604 North Lincoln Avenue
Loveland, CO 80538
Contact:
Joe Gebhardt, owner, 970-667-3950
Contract:
$270,002.00
Change Order:
four Add $30,321.27
Own Forces:
58%
Completion:
August, 2002
Lower Hoffman Lake Spillway / Outlet Modification Project
Demolition and removal of existing bridge abutments and spillway outlet
structure including dewatering. Construction of structural concrete and
reinstallation of bridge and sluice gate. Removal and replacement of
concrete bike path and riprap.
Owner: Seven Lakes Reservoir Company
808 23rd Avenue, Greeley, CO
Contact: John Gauthiere, Engineer, 970-330-0855
Gauthiere Engineering
2157 Buena Vista Drive
Greeley, CO 80634
Contract: $103,135.07
Change Orders: none
Own Forces: 100%
Completion: October, 2002
Douglas Lake Boat Dock
Installation and construction of floating boat docks, concrete approach and
support ramps, pedestrian
pathway, and wood retaining wall.
Owner:
State of Colorado Division of Wildlife
6060 North Broadway
Denver, CO 80216
Contact:
Kay Sinclair, Project Manager, 970-472-4433
Contract:
$89,256.00
Change Order:
two Add $8,842.75
Own Forces:
100%
Completion:
October, 2002
Benner Office Buildigg
Subcontracted a portion of the work for the construction of the office
building at 3760 East 15th Street, Loveland, CO. Scope or work included
all excavation, utilities and site concrete for phase 2 including the
completion of 15th Street and building concrete.
Owner: Benner Holdings, LLC
Loveland, CO
Contact: Jeryl Benner, Manager, 970-566-9778
Benner Development Company, LLC
3053 Nature Run
Loveland, CO 80537
Contract: $109,017.00
Change Orders: one Add $373.00
Own Forces: 100%
Completion: October, 2002
Johnstown Ready Mix Batch Plant
Construction of new concrete batch plant facility including excavation and
site work, caissons, foundation, construction of pre-engineered metal
building, mechanical, electrical, interior finishes, and construction of a
truck washing facility.
Owner: Loveland Ready Mix Concrete, Inc.
PO Box 299
Loveland, CO 80539
Contact: Steve Fancher, VP, 970-667-1108
Contract: $323,152.00
Change Orders: three Deduct: ($4,179.68)
Own Forces: 61%
Completion: October, 2002
Annual Trial Gardens Shade Structure
Construction of a custom metal structure and roof system for Colorado
State University shade gardens. The project included sitework, concrete
foundation, brick veneer and colored patterned concrete walkways.
Owner: Colorado State University
365 Aylesworth Hall Southeast
Fort Collins, CO 80523
Contact: Cass Bietler, Project Manager, 970-491-0158
Facilities Management
Colorado State University
Fort Collins, CO 80523
Contract: $165,480.33
Change Orders: three, Add: $46,507.33
Own Forces: 42%
Completion: January, 2003
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
vampQpwG. L. Hoff as Principal, and Employers Mutual Casualty Company as
u et , are hereby held and firmly bound unto the City of Fort Collins, Colorado,
as OWNER, in the sum of $ 57 of total bid for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fort Collins Project, WARREN PARK IMPROVEMENTS; BID NO. 5855.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
' performance of said Contract, and for,. -payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Su::ety and its BOND shall be in no way impaired or affected by any
extension o.E the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
I
U
1 7/96
E
Section 00410 Page 2
IN WITNESS, WHEREOF, the Principal and the Surety have hereunto set their hands
and seals tliis llth day of May , 2004, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL
Name: G. L. Hoff Company
Address: 1815 W. 12th St.
WN
//�,,. �1
(SEAL)
7/96
SURETY
Employers Mutual Casualty Company
. / :.. 11 1
Denver, CO 80237
By:
Title: Attorney -in -Fact
(SEAL)
Section 00410 Page 3
No Text
MAY-03-04 MON 01:34 PM CITY/FT COLLINS, PURCHAS FAX NO, 970 2216707
P. 01/08
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No.1
BID #5855
WARREN PARK IMPROVEMENTS
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid ##6W5 Warren Park Improvements
OPENING DATE: May 11, 2004
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby trade.
GENERAL CLARIFICATION
1. Material stockpile during construction of the restroom can be held on site.
SPECIFICATIONS
SECTION 01060 REGULATORY REQUIREMENTS
Delete and replace with new Section 01080, Addendum #1.
BID FORM, SECTION 00300
BID SCHEDULE
Delete and Replace with new Addendum #1 Bid Schedule
Note: new Bid Schedule deletes Bid Item 5- E..xisting Drinking Fountain
DIVISION 1, SECTION 01800
DEFINITION OF BID ITEMS
Delete Bid Item 5 - Replace and Reinstall Existing Drinking Fountain
ATTACHMENTS
1. Section 01060 — Addendum #1
2_ Addendum #1 Bid Schedule
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNqWLEDGED BY A W�f MN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THIS ADDENPqM N RECEIVED.
Acknowledged: G.L. Hoff Company
215 NVorth Mason Street • 2nd floor • P.O. Box 580 • Fort Collins, O 80-Z2-0580 • (97bf 2216775 •FAX (`Y/O) 221-6707
Domestic Water Service
11 Conncetion
LS
$
1
$
Domestic Water Service
12 Distribution
LS
$
1
$
Electrical Service and
13 'Distribution
LS
$
1
$
Concrete
Concrete Sidewalks and
14 slabs, 5" thick
SF
$
2,700
$
Architectural Features
15 Restroom
LS
$
1
$
Irrigation
Adjustments to Irrigation
$
16 System
LS
_
1
$
Fine Grading
17 Fine Grading
SF
$
5,180
$
Sod
18 Sod
SF
$
5,180
$
TOTAL
$
Dollars
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
RESPECTFULLY SUBMITTED:
7/96 Section 00300 Page 3
MAY-03-04 MON 01:35 PM CITY/FT COLLINS, PURCHAS FAX NO. 970 2218707 P,05/08
PMi2q WARREN PARK IMPROVEMENTS
ADDENDUM
#1 BID
SCHEDULE
Bid Item
#
Description
Unit
Unit
Price
Estimated
Total
General
1
Bond
LS
$
1
$ p
2
Mobilization
LS
$3252.00
1
$ 3,252.00
3
Sup 'n
LS
$1500.0
1
$ 1,500.00
4
Tree Protection
LS
$ 207.0
1
$ 207.00
Earthwork
5
To soli - Removal
CY
$ 7.08
90
$ 637.20
6
Topsoil- Furnish and
Place
Cy
$ 24.00
70
$ 1,680.00
Utlllties
7
Sanitary Sewer Service
and Drinking Fountain
Drain
LS
$1525.0
1
$ 1,525.00
8
Pumo Stations
LS
$7493.0
1
7,493.00
9
Manhole
LS
$ 3503.(0
1
$ 3,503.00
10
Domestic Water Service
1 Conncetion
LS
$ 1425. qO
1
$ 1,425.00
11
Domestic Water Service
Distribution
LS
2250.
0 1
2,250.00
12
Electrical Service and
Distribution
LS
$ 5732.
0 1
$ 5,732.00
Concrete
13
Concrete Sidewalks and
slabs, 5" thick
SF
$ 3.48
2,700
$ 9,396.00
Architectural Features
147Restroom
LS
$
_
1
$
Irrigation
15
Adjustments to Irrigation
S tem
LS
2250.CO
1
2,250.00
Fine Grading
16 7Fine
Grading
SF
$ 0.17
f),180
880.60
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: G.L. Hoff Company
2. Permanent main office address: 1815 West 12th Street, Loveland, CO 80537
3. When organized: January 1984
4. If a corporation, where incorporated: Colorado, 1989
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 20 years
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
CSU Student Recreation Center Landscape Improvements: $332,606. 8-2004
7. General character of Work performed by your company:
Commercial general contractor: we complete slitework; concrete, carpentry,
protect management with our own forces.
RM
Have you ever failed to complete any Work awarded to you? no
If so, where and why?
9. Have your ever defaulted on a contract? no
If so, where and why?
10. Are you debarred by any government agency?
If yes list agency name.
no
7/96 Section 00420 Page 1
MAY-03-04 MON 01:35 PM CITY/FT COLLINS, PURCBAS FAX NO. 970 2218707 P,06/08
FF
G.L. Hoff
GONTRA�1
. H,6ff. Pres
ADDRESS: 1815 West 12th Street
Loveland, CO 80537
Phone/Fax 970-669-3255, 970-663-1566
Signat
Gregory U d Hoflf, President
Title
#B-6
cense Number (If Applicable
5-11-2004
Date
(Seal - if Bid is by corporat'on)
Attest:
Mfvlam T. Hoff,
Treasurer
a`r Address
0 Box 7448
I filll 4 4
H
a l���r `
�� u
�y. xi ,�• j r/
Loveland, CO 80537
970-669-3255
rs,.�F%hTdlephone
,O
•
V �¢
i�f set
n i�x
7/96 Section 00300 Page 4
r
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 150 of the contract.
ITEM
7/96
SUBCONTRACTOR
Section 00430 Page 1