Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5855 WARREN PARK IMPROVEMENTS (4)SECTION 00300 BID FORM PROJECT: WARREN PARK IMPROVEMENTS; BID NO.5855 Place Ft. Collins - Purchasing Date 5/11/04 1. In compliance with your Invitation to Bid dated 4/21/04 , and subject to all conditions thereof, the undersigned Thissen Construction Corp a **(Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% of RASP Bid ($ in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Travelers Of America 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through 7/96 Section 00300 Page 1 Ron J. Gamer General Superintendent Ron has extensive experience working on difficult projects with multiple phasing and sequencing of trade contractors. He has been in the construction industry for 25 years and has completed projects throughout the Western United States. Ron has diverse experience in multiple structural systems and complicated phasing projects. As General Superintendent, Ron is the superintendent responsible for the overall project construction. He will oversee construction on a weekly basis and is charged with looking out for pitfalls before they become major problems. Being a resident of Walden Ron brings a familiarity with project location and local labor markets. Certificates: OHSA 30-Hour, Sub part "R", Sub Part V", HAZ Com Certification, Safety Certificates Registration: Contractor/Supervisor Licenses for the State of Colorado, City of Denver, Englewood, Littleton, Loveland, Arvada, Westminster, Wheat Ridge, Fort Collins, and Thornton. Superintendent construction experience includes: • Nation Wide Self -storage, Diamond Bar, California Pre-engineered metal building, CMU in -fill (460 units) • Mission Commons Shopping Center 88th & Wadsworth retaillwarehouse (200,000 SF) • Southwest Plaza Shopping Complex Core & shell, structural steel, CMU in -fill retail/warehouse (120,000 SF) • Center Point Offices (Evergreen, Colorado) Three story Class "A" office building (75,000 SF) • Life Quotes Offices (Evergreen, Colorado) Three story Class "A" office building (240,000 SF) • Coors Field Tenant finishes • Northern Colorado Medical Center Parking Structure (245,828 SF/777spaces) Greg Nelson Possible Project Superintendent Greg has experience working on difficult projects requiring sequencing of trade contractors. He has been in the construction industry for 10 years and has completed projects throughout Colorado. Greg has diverse experience in multiple structural systems and complicated mechanical and electrical systems. As Project Superintendent, Greg is the primary on -site superintendent responsible for the overall project phasing plan, sequencing of work, trade contractor coordination, safety, coordination meetings, pre -installation meeting, schedule management and field management. He will oversee field inspections, quality control, material deliveries, monitor testing, field documentation, punch list management and will attend all Owner/Contractor meetings. Certificates: OHSA 30-Hour, Sub Part "R", Sub Part "M", Sub Part "l-", Forklift, HAZ Com, Graduate Colorado State University Construction Management Superintendent construction experience includes: • Rural Ameritown Educational building that housed Morgan Community College and Young American's education foundation. $625,128.03 • Westlake Family Physicians New Doctors office comprised of 12 exam rooms, x-ray facility, and office space. $1,078,000.00 • Highland Park site development 4 acre business site development $ 480,123.00 Current Project Workload: Dale Hall District Ofriae Building Completes April 15t 2004 Warren Park Improvements Statement of Bidder's Qualifications Question #20 Thissen has never been involved in litigation with the owner of any construction project where the owner alleged any issues with Thissen's performance. Thissen has been involved with disputes with its subcontractors where (a) Thissen sought to recover a back charge from its subcontractor and the subcontractor alleged, as a defense to Thissen's claims, that the problems arose from Thissen's, and not the subcontractor's, omissions, as alleged by Thissen (in the matter of Thissen vs. Keast Architects) and (b) in an action brought by a subcontractor who was fully paid on a project but alleged, months after the project was done, that the subcontractor was entitled to delay damages for unspecified delays caused by Thissen (which delay claims had previously been made on the owner and denied) (in the matter of Interstates Electric v. Thissen - the owner's rep advised Thissen that this same sub made delay claims against the owner on 3 out of 4 other projects, on which Thissen was not involved, undertaken between this owner - Anhueser Busch - and this subcontractor, all of which were denied by the owner). SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned *' as Principal, and . Tr ye ers Casualty and Sure$Z Company of America as Surety, are hereby held and firmly bound unto the C t of Fort Collins Colorado, as OAR, in the sum of 5% of Total Bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. **Thissen Construction Corporation THE CONDITION of this obligation is such that whereas the Principal has submitted to the Cit of Fort Collins Colorado the accompanying Bid and hereby made a part hereof to ent$r into a Construction Agreement for the construction of Fort Collins Project, WARREN PARK IMPROVEMENTS; BID NO. 5855. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received., hereby stipulates and agrees that the obligations of said Surety and its BOND shall be. in no way impaired or affected by any extension of. the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Paqe 2 IN WrTNESS WHEREOF, the Principal and the Surety have hereunto set their hand; and seals this 11th day of May , 2004, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forts above. PRINCIPAL Name: Thissen Construction Corporation Address: 2900 West "F' Street -�� Greeley, CO 80631 By: L Title : Itee S% ATTEST: Sy: (SEAL) $pit1ETT Travelers Casualty and Surety Company of America One Tower Square Hartford, CT 06183 By: - Title:I(eI-- Urwiller, Attorney -in -Fact (SEAL) 7/96 Section 00410 Page 3 Y TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA TRAVELERS CASUALTY AND SURETY COMPANY FARMINGTON CASUALTY COMPANY Hartford, Connecticut 06183-9062 POWER OF ATTORNEY AND CERTIFICATE OF AUTHORITY OF ATTORNEY(S)-IN-FACT KNOW ALL PERSONS BY THESE PRESENTS, THAT TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY COMPANY, corporations duly organized under the laws of the State of Connecticut, and having their principal offices in the City of Hartford, County of Hartford, State of Connecticut, (hereinafter the "Companies") hath made, constituted and appointed, and do by these presents make, constitute and appoint: Connie K. Boston, Donald B. Martin, Chris S. Richmond, Darlene Krings, William C. Bensler, Kelly T. Urwiller, Russell J. Michels, Debra S. Morris, Diane F. Clementson, Valerie R. Partridge, of Greeley, Colorado, their true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred to sign, execute and acknowledge, at any place within the United States, the following instrument(s): by his/her sole signature and act, any and all bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking and any and all consents incident thereto and to bind the Companies, thereby as fully and to the same extent as if the same were signed by the duly authorized officers of the Companies, and all the acts of said Attomey(s)-in-Fact, pursuant to the authority herein given, are hereby ratified and confirmed. This appointment is made under and by authority of the following Standing Resolutions of said Companies, which Resolutions are now in full force and effect: VOTED: That the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Fact and Agents to act for and on behalf of the company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, rewgnizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her. VOTED: That the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary. VOTED: That any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary, or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority. This Power of Attorney and Certificate of Authority is signed and sealed by facsimile (mechanical or printed) under and by authority of the following Standing Resolution voted by the Boards of Directors of TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY COMPANY, which Resolution is now in full force and effect: VOTED: That the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. (11-00 Standard) Thissen Construction Corporation CONTRACTOR BY: Ernie Crownover - President ADDRESS: 2900 "F" St. Greelev. CO. 80631 8. BID SCHEDULE (Base Bid) Project: WARREN PARK IMPROVEMENTS BID SCHEDULE Bid Item # I Description Unit I Unit Price Estimated Qty. Total General 1 Bond LS $ 1 $ 2 Mobilization LS $ 1 $ 3 Surveying LS $ 1 $ 4 Tree Protection LS $ 1 $ Remove and Reinstall Existing, Drinking 5 Fountain LS $ 1 $ Earthwork 6 Topsoil - Removal CY $ 90 $ Topsoil- Furnish and 7 Place CY $ 70 $ Utilities Sanitary Sewer Service and Drinking Fountain 8 Drain LS $ 1 $ 9 Pump Stations LS $ 1 $ 10 Manhole LS $ 1 $ 7/96 Section 00300 Page 2 MAY-03-04 MON 01:51 PM CITY/FT COLLINS, PURCHAS FAX NO, 970 2216707 P. 05/08 Project: WARREN PARK IMPROVEMENTS ADDENDUM #1 BID SCHEDULE Bid Item # _ Description Unit Unit Price Estimated Qty. Total General 1 Bond LS $ 1 $ 2 Mobilization LS $ 1 $ 3< 3 Surve in a LS $ 1 $ 4 Tree Protection — LS $ 1 $ b Earthwork 5 To soil - Removal CY CY $ $ 90 70 $ $ 6 Topsoil- Fumish and Place Utilities 7 Sanitary Sewer Service and Drinking Fountain Drain LS $ 1 $ O 8 -Purnp Stations LS $ 1 $ 9 Manhole LS LS LS $ $ $ 1 1 1 $ g 3 10 11 Domestic Water Service Conncetion Domestic Water Service Distribution 12 Electrical Service and Distribution LS $ 1 $ p Concrete 13 Concrete Sidewalks and slabs 5" thick SF $ 2,700 $ / y Architectural Features 14 Restroom LS $ 1 $ Irri ation 15 Adjustments to Irrigation system LS 1 c Fine Gradin 16 Fine Gradin SF $ 5 180 IS 57- MAY-03-04 MON 01:51 PM CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707 P. 06/08 Sod 17 _ Sod I SF $ 518gO $ TOTAL Dollars :n�,SSc-_n1 r�S�R ► on� CONTRACTOR Piz&nEJJT ADDRESS: Ao0 "F,* sf. 'rl. 0 411cz y0do3I Phone/Fax SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Thissen Construction Corporation 2. Permanent main office address:2900 'F' Street Greeley CD 80631 3. When organized: Company began in 1978, Incorporated in 1984 4. If a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name? 26 years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) 1 Farr Park, cOntxact amount.•• 11 corm. Date •• ., 7. General character of Work performed by your company: Demolition and Finish Carpentry 8. Have you ever failed to complete any Work awarded to you? No If so, where and why? 9. Have your ever defaulted on a contract? No If so, where and why? 10. Are you debarred by any government agency? No If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. North Colorado Medical Center Parking Garage - Contract Sum $7,,963,578.33 Final completion 05/04. Located in Greeley Colorado. Construction of a four story parking garage with skybridge connector to the existing hospital. 12. List your major equipment available for this contract. Skytrack, Manlifts Backhoe 13. Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: Greg Nelson - Superintendent Ron Gcmer - Superintendent RESUMES ATTACHED Jason Starks - Project Manager 15. Credit available: $500,000.00 16. Bank reference: Union Colony Bank 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General CONTRACTOR? Yes If yes, in what city, county and state? Gre class, license and numbers? General Contractor - 19. Do you If yes, and to Ft anticipate subcontracting Work under this what percent of total contract? 70% whom? See Attached 3ollins #B-197 Contract? Yes t 20. Are any lawsuits pending against you or your firm at this time? yes if yes, DETAIL See Attached 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL None What company? 22. What are your company's bonding limitations? $121000,000.00 23. The undersigned hereby authorizes. and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at2900 T' Street this 11th day of May , 20D4 . Thissen construction corporation Name of Bidder By: Ernie Crownover Title: President State of Colorado County of Weld Ernie Crownover being duly sworn deposes and says that he is President of Thissen Construction Corp, and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this 11th day of May , 2004. Notary Public Erica Sanchez-Luian My commission expires January 8, 2005 7/96 Section 00420 Page 3 u SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 150 of the contract. j" t& 7/96 ITEM SUBCONTRACTOR MA, �. A . Section 00430 Page 1 Jason Starks Project Manager Jason is an experienced Project Manager. He has been in the construction industry for over 16 years and is qualified and comfortable working in all aspects of construction from residential to commercial and industrial. He has been with Thissen Construction Corporation for several years and served his internship from Colorado State University prior to post graduation employment. Jason is proficient in all phases of construction management from conception to close out. He has extensive knowledge with contract administration; project manuals; permitting; scheduling updates; progress meetings; pre -installation meetings; processing pay requests; change order management; shop drawing and sample logs; quality control; project files; document control; verifying testing; reports; submittals; lien releases; as-builts; O& M manuals; warranties and guarantees associated with final close out. Education: Construction Management Degree, Colorado State University, Experienced Mason, OSHA 10-Hour, OSHA sub -part M, OSHA subpart R, Completed LEED Building Seminar and is LEED Certified Relevant Construction experience includes ■ Anheuser-Busch Fort Collins Brewery Unitank Expansion BP 315 3 story conventional steel and insulated wall panel, house office and production facility (62,500 SF) • BP 370 Break room Expansion Remodel of existing break room in a fully operational brewery (4,000 SF) • Rural Ameritowne Community building to house Morgan Community College and the Rural American Foundation (6,200 SF) • Northern Colorado Medical Center Parking Garage (245,828 SF/731 spaces) Current Project Workload: ■ Northern Colorado Medical Center Parking Garage Completes May 15t 2004 Buckingham/Gordon Building Restoration Completes May 1st 2004