HomeMy WebLinkAboutRESPONSE - BID - 5834 ZIEGLER ROAD WIDENING PROJECT (3)SECTION 00300
BID FORM
PROJECT: ZIEGLER ROAD WIDENING PROJECT; BID NO. 5834
Place215 N. Mason Street, 2nd Floor,
Date February 10, 2004
1. In compliance with your Invitation to Bid dated January 9 2004 r
and subject to all conditions thereof, the undersigned
Lafarge West, me a **(Corporation, Limited Liability Company,
Partnership, Joint Venture, or Sole -Proprietor)** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of 10% GAB ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
Safeco Insurance Company of America Safeco Plaza, Seattle, WA 98185
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through j
7/96 Section 00300 Page 1
IN WITNESS WHEREOF, the Principal and the Sua:ety have hereunl;o aeL their hands
and Ica]:, this 6TH day of FEBRUARY , 2004, and such of them as are
corporations have caused their corporate scab, to be hereto affixed and these
present^ to be signed by their proper officcro, the day and ycar first set forth
above..
PRINCIPAL
LAFARGE NORTH AMERICA. INC.
Name: DBA LAFARGE WEST, INC.
Addre,rt.s: 1800 N. TAFT HILL ROAD
SURETY
SAFECO.INSURANCE COMPANY OF AMERICA_
E1:1NXK1119P. m
FORT CC0y11 II INS-*-..-CO.8 . _.—. SFATTI F .-.WA._9R1R5
By: By; _ "L
Title: Mark E _Stan ley,A&ftrt Title: BRIDGETTE JA _N, ATTORNEY -IN -FACT
ATTE:
7Tamara J. W g e
(SEAL) (SEAT,)
7/96 Section 00410 Pago 3
POWER
S A F E C O" OF ATTORNEY
� NEY
KNOW ALL BY THESE PRESENTS:
SAFECO INSURANCE COMPANY OF AMERICA
GENERAL INSURANCE COMPANY OF AMERICA
HOME OFFICE: SAFECO PLAZA
SEATTLE, WASHINGTON 98185
No. 7386
That SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA, each a Washington corporation, does each
hereby appoint
*******LAWRENCE W. WALDIE; CARMEN MIMS, BRIAN M. LEBOW, DEBORAH GRIFFITH; ALLYSON DEAN; BRIDGETFE S. JACKSON; Dallas, Texas*******
its true and lawful attorney(s)-in-fact, with full authority to execute on its behalf fidelity and surety bonds or undertakings and other documents of a similar
character issued in the course of its business, and to bind the respective company thereby.
IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA have each executed and
attested these presents
this IOth day of April , 2003
CHRISTINE MEAD, SECRETARY MIKE MCGAVICK, PRESIDENT
CERTIFICATE
Extract from the By -Laws of SAFECO INSURANCE COMPANY OF AMERICA
and of GENERAL INSURANCE COMPANY OF AMERICA:
"Article V, Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary, and any Assistant Vice President appointed for that
purpose by the officer in charge of surety operations, shall each have authority to appoint individuals as attorneys -in -fact or under other appropriate titles with
authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its
business... On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority
or on any bond or undertaking of the company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided,
however, that the seal shall not be necessary to the validity of any such instrument or undertaking."
Extract from a Resolution of the Board of Directors of SAFECO INSURANCE COMPANY OF AMERICA
and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 28, 1970.
"On any certificate executed by the Secretary or an assistant secretary of the Company setting out,
(i) The provisions of Article V, Section 13 of the By -Laws, and
(ii) A copy of the power-of-attomey appointment, executed pursuant thereto, and
(iii) Certifying that said power -of -attorney appointment is in full force and effect,
the signature of the certifying officer may be by facsimile, and the seal of the Company may be a facsimile thereof."
1, Christine Mead, Secretary of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA, do hereby certify
that the foregoing extracts of the By -Laws and of a Resolution of the Board of Directors of these corporations, and of a Power of Attorney issued pursuant thereto,
are true and correct, and that both the By -Laws, the Resolution and the Power of Attorney are still in full force and effect.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of said Corporation
S-0974/SAEF 2/01
this 6TH day of FEBRUARY 2004
P,f co
r
CORPORATE Q*
SEAL
0rI t,ya �
- Ofyyay L CHRISTINE MEAD, SECRETARY
0 A registered trademark of SAFECO Corporation
04/1=003 PDF
ADDRESS:
8. BID SCHEDULE (Base Bid)
Lafarge West, Tnc
CONTRACTOR
BY:
Mark E StanleySales Manager
1800 North Taft Hill Road
Fort Collins, CO 80521
Please use the attached Bid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (250) of the total Agreement Price.
RESPECTFULLY SUBNfJTTED:
Mark E. Stanley, Sales Manager
Title
License Number (If Applicable)
(Seal - if Bid ;s by corporation)
Attest: --�
Mara J. wagne�rl
Addres 18000N®nth Taft Hill Road
Fort Collins, CO 80521
Telephone (970) 407-3600
7/96 Section 00300 Page 2
BID #5834 Addendum #1 Bid Schedule
Project: Ziegler Road Widening Project
Date: 02102=04
Number
QuaEstntity
Link
unit Con
Um CON
Zlealer Road
202-01
Widenlne Quantities:
Remove Pipe (RCP, CMP, AOS,HDPE)
251
LF
18.06
4,713.66
202-02
Remove Asphalt Pavement (0" - 2" Depth)
5.642
BY
1.67
9 , 4 2 2. 1 4
202-03
Remove Asphalt Pavement (5" -10" Depth)
3.662
SY
2.85
8,783.70
202-04
Saw Cut Existing Asphalt
513
LF
1.26
646. 39
202-05
Remove Rip -Rap
60
SY
5.83
349 - 90
202-06
Remove Concrete Irrigation Ditch (3.75' wic e x 1.75' deep)
1.460
LF
1.31
1 , 912 - 60
202-07
Remove Concrete Weir, Flume, Supports and Pipe
1
LS
2593.50
2,593.50
202-08
Remove Fence (Barbed Wire) Throe Strand
254
LF
2.21
561.34
202-09
Remove Type III Barricade at the Kechter Intersection
1
EA
81.38
R 1 - 3R
202-10
Remove Storm Sewer Manholes
2
EA
493.50
987-on
202-11
Abandon 314"Domestic WaterTap (FCLWD spec)
1
EA
619.50
66MM
202.12
Removal of debris and overgrowth
1
LS
5729.85
55,729.89
203-01
Unclassified Excavation
3,355
CY
1.18
3,958.90
203-02
Embankment - (CIP)
4,26D
CY
3.36
14,313.60
203-03
Borrow Suitable Fin Material (CIP)
910
CY
7.19
6,542.90
203-04
Haul & Dispose
300
CY
3.52
1,056.00
203-05
Borrow ABC (Class 5 or6)- (CIP)
175
TON
10.50
1 , 83 7 - 50
203-06
Muck Excavation - (CIP)
626
CY
17.69
11,073.94
203-07
Topsoil -(Stripping, Stockpiling, Placing) - 6" Depth
1,800
CY
2.36
4,248.00
203.08
Topsoil - (Stripping, Haul Off-Ske)
594
CY
3.52
2,090.88
203-09
Median Hardscape Shaping - (CIP)
950
SF
.85
807.50
203-10
Flow Fill Shallow Utilities
250
LF
11.57
2,892.50
203-11
Detour Road (11(Yx 26')
1
LS
4200.00
4,200.00
203-12
Potholing
1
Ls
7600.00
7,600.00
2D6-01
Erosion Control
1
Ls
8983.180
8,983.80
210-01
Adjust Manhole Ring/Cover
9
EA
400.00
3.600.00
210-02
Plug Existing 21.Opening
1
EA
157.90
1 57 - 5n
210-03
Adjust Valve Box (FCLWD)
8
EA
200.00
1,600.00
210.04
Relocate Mailboxes (Provide Temporary Service)
6
EA
64.02
384.12
304-01
Aggregate Base Course - (Class 5 or 6) - 6" Depth - (CIP)
3,105
TON
9.96
30,925.80
304-02
Aggregate Base Course Patch Placement - (Class 5 or 6) - 6" Depth - (CIP)
171
TON
13.21
2,258.91
306-01
Reconditioning(8")
6,072
SY
1.66
10,079.92
307-01
Flyash Subgrade Stabilization - (12%)
9.239
SY
4.41
40 , 7 41- 9 9
403-01
Hot Bituminous Pavement-GradingS (3" Depth) -(PG64.28)
1,689
TON
37.73
63,725.97
403-02
Hot Bituminous Pavement - Grading S (2' Depth) - (PG 64-28)
754
TON
38.05
28,689.70
403-03
Hot Bituminous Pavement - Grading SG (4" Depth) - (PG 64-22)
2,252
TON
33.07
74,473.64
403-04
Asphalt Paver Patching - Grading S (3" Depth) - (PG 64.28)
50
TON
67.06
3,353.00
403.06
Asphalt Paver Patching - Grading SG (4" Depth) . (PG 64.22)
99
TON
59.53
_ 5 , 893 .4 7
403.06
Asphalt Patching - Grading SG (4' Depth) - (PG 64-22)
10
TON
81.82
_
818.20
403-07
Asphalt Patching - Grading S (3" Depth) - (PG 64-28)
33
TON
92.20
3,042.60
5o6-ot
10' x 6' x 2' Type D-50 Rip -Rap, 6" Topsoil (CIP Per Detail)
1
Ls
577.50
577.50
603-01
24" RCP Class 111
176
LF
25.46
4,480.96
603-02
24" RCP Class III FES with Grate
1
EA
812.70
812.70
603-04
14" x 23" HERCP
68
LF
105.63
7,182.84
603-05
Concrete Joint Encasements
4
EA
120.75
483.00
603-06
30"PIP Irrigation Pipe -
1,346
LF
42.53
57.245.38
603-07
Tie Into Existing 42" Storm Sewer Line (for 14x23 HERCP)
1
EA
367.50
367.50
603-08
4"PVC Schedule 2001nigation Sleeving
300
LF
6.83
2,049.00
603-09
Modify siphon Structure
1
Ls
2528.40
2,528.40
Project: Ziegler Road Widerting Project
Date: 02=2004
speaatam Eatlmated
Number Deetxlpamn OuvMNy Unk Unacost Nam Cost
603-11 Air release valve 2"1 rhwr&tee 3 EA 1629.60 4 , 889 - 80
604-01
5' Type R Inlet
1
EA
3581.55
3,581.55
604-02
15'Type R Inlet
1
FA
5433.75
5,433.75
604-03
6' Manhole
1
EA
5007.45
5,007.45
604-04
Tie Into Irrigation Structure
1
FA
682.50
682.90
607.01
Orange Safety Fence
1,400
LF
1.71
2 , 394 - 00
608.01
Concrete Sidewalk (6')
15,444
SF
2.48
38,301.12
608-02
Concrete Access Ramps with colored landings (8')
1,000
SF
4.36
4,360.00
608.03
Concrete Crosspan with Aprons (91/2m)
800
SF
4.67
3,736.00
608.04
Hi -Early concrete (24 Hour)
150
cy
13.83
2,074.50
608.05
Flowable FIB Concrete
342
CY
43.40
14, 842 .80
608-06
Exposed Aggregate Median Handscaping (4')
950
SF
3.94
3,743.00
608.07
Pedestrian Refuge Island
100
SF
4.23
423.00
609-01
Vertical Curb & Gutter (30")
3,944
LF
7.54
29,737.76
609-02
outran curb & Gutter (187
286
LF
9.18
2,625.48
609-03
Thermal Blankets for Concrete Irrigation Ditch Placement
1,000
LF
.60
600.00
609-05
DdvewayCurb Cuts (2TWidth)
2
EA
54.25
108.50
609-06
R & R Vertical Curb and Gutter
50
LF
12.87
_
643.50
609-07
R & R Concrete Sidewalk
100
SF
4.47
447.00
Aden Inc. Quantities:
603-03 19' x 30' HERCP
609.04 Concrete Irrigation Ditch (Per Detail)
Landscaolna Quantities:
2900-01 Native Seeding
Miscellaneous Quantities:
Contract Bond
625-01 Construction Surveying
626-01 Mobilization
630-01 Two (2) Message Boards
630-02 Flagging
630.03 Traffic Control
Subtotal Megler Road Quantities: i 575,110.78
Subtotal Aden Inc. Quantities:
Subtotal Landscaping Quantities:
Subtotal Misc. Quantities:
TOTAL PROJECT =
Six Hundred Forry Thrnic!dnA Tl,,--
S1
40 LF $27.13- _1,085-90
1.400 LF -L_ 15.75 22,050.00
$ 23,135.20
5 Acre 655.00 3,275.00
1
1.00
Ls
5377.79 5,377-79
1.00
Ls
7052.50 7,052.50
1.00
Ls
7150.00 7,150.00
7.00
DAY
325.50 2,278.50
300.00
FIR
17.32 5 196 .00
1.0o
Ls
,
11800.00 11, 800.00
$ 38,854.79
$ 640,375.77
-fr ve Dollars
Cents
Date
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: Lafarge WBst, Inc.
2. Permanent main office address: 1800 N. Taft Hill 80521
3. When organized: 1989
4. If a corporation, where incorporated: Delaware
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 4
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
Observatory Subdivision $2,251 065 06 2005
Buffalo Creek Sub 912 540.00 2005
The Knolls Sub- 992,347.00 2004
The Meadows Subdivision 1,723,202,00 2005
7. General character of Work performed by your company:
Asphalt PAvin
8. Have you ever failed to complete any Work awarded to you? NO
If so, where and why?
9. Have your ever defaulted on a contract? NO
If so, where and why?
10. Are you debarred by any government agency? NO
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
Windsor King Soopers $748,000 00 net 2nol
Centerplace Ph 1 - Greeley $ 999 149 Ot Dec,�2003 _
28th St Overlay Boulder $1,989,591-72 Nou 2003
12. List your major equipment available for this contract.
What ever is necessary to complete the project -
13
Experience in construction Work similar in importance to this
project:
14. Background and experience of the principal members of your organization,
including officers:
Steven B. Peterson VP/GM 20+ 3.ears
Mark E. Stanley Sales Manager 20+ ;rears
Kelly Steele Senior Sales 20+ yParg
15. Credit available: $
16. Bank reference:Wells Fargo BAnk 633 17th Street, Denver, CO 80270
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
Yes
18. Are you licensed as a General CONTRACTOR? Yes
If yes, in what city, county and state? Fort Collins CO Larimer wWhat
class, license and numbers? General Contractor #00239
19. Do you anticipate subcontracting Work under this Contract? Yes, 57%
If yes, what percent of total contract? Gerrard Excavating, Express Concrete_
and to whom? Son -Haul, Kehn Construction Carnes Service Northern Engineering
Aden, Inc., A&M Landscaping
20. Are any lawsuits pending against you or your firm at this time? NO
If yes,
DETAIL
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
Please see attached Insurance Certificate
What company? Please see attached Tnaiiranre Certificate
22. What are your company's bonding limitations? 80 532 000 00
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at 8:00 a.m. this 10 day of February 1200_4•
Lafarge West Inc
Name of Bidder
Title: Mark E. Stanley Sales Manager
State of Colorado
county of Larimer
Mark E. Stanley being duly sworn deposes and says that he is
_Sales ?Manager of Lafarge West Inc and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this 10 day of
February 20 04.
Notary Public
My commission expires 5123/05
7/96
aP:•IyOTARY %-p
P
sqUBLIC
o0
P
OF COLO
Section 00420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 10% of the contract.
ITEM
Earthwork / Pipe
Concrete
Flvash
Rotomilling
Traffic Control
Surveying
Concrete Ditch
Seeding
SUBCONTRACTOR
Gerrard Excavatin. Inc.
Concrete, Inc.
Son -Haul, Inc.
Kehn Construction
Carnes Service
Northern Engineering
Aden, Inc.
A & M Landscaping
7/96 Section 00430 Page 1
SECTION 00410
BID BOND
KNOW ILL MEN BY THESE PRESENTS: that we, the undersigned
LAFARGE* as Principal, and SAFECO INSURANCE COMPANY OF AMERICA _ _ as
�irety, arc lcercby held and firmly bound unto the City c?L Fort. Collins, �Co].ozado,
as OWNNII, in the sum of $ 10%_GAB for Che payment of which, well, and
tr.ul.yT.o bc madc, we hereby jointly and sever illy bind ourselves, successors, and
assign'' *NORTH AMERICAN, INC. DBA LAFARGE WEST, INC.
THE CONDITION of this obligation is st.)ch that whereas the Principal has
submitted to Che Ci oC Fort Collins, Co,l.orndo the accompanying Did and hereby
madc a part hereof to enter into i CORStruC_Ii l Agreement for the construction of
Fort Collins Project, ZIEGLP..12 ROAD WIDENING PROJECT; BID NO. 5834.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If *aid Bid shall be accepted and the Principal shall execute and deliver a
Contract in Lhe form of Contract atta,:hed hereto (properly completed in
accordance with said Bid) and shall furnish a BONI) for his faithful
pertormance of said Contract, and for payment of all persons performing
labor or furnishing matcrial.s in connection therewith, and shall in all
other re,pects perform the Agreement cii-3ated by the accaptance of said Bid,
then thi.:: obligation shall be void; ot-herwi.se the semci shall remain in
force and effect., it being expressly understood and agreed that the
liability of the Surety for any and ,all claims hereunder shall, in no
event., exc:c:ed take penal amount of thin obligation as herein stated.
Thee Surety, for value received, hereby stipulates and agrees that the obligations
of said Suzety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bond* must be authorized to tran3not business in the
Skate of Colorado and be accepted by Lhe OWNER.
7/96 Section 00410 Page 2