Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5834 ZIEGLER ROAD WIDENING PROJECT (3)SECTION 00300 BID FORM PROJECT: ZIEGLER ROAD WIDENING PROJECT; BID NO. 5834 Place215 N. Mason Street, 2nd Floor, Date February 10, 2004 1. In compliance with your Invitation to Bid dated January 9 2004 r and subject to all conditions thereof, the undersigned Lafarge West, me a **(Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole -Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 10% GAB ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Safeco Insurance Company of America Safeco Plaza, Seattle, WA 98185 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through j 7/96 Section 00300 Page 1 IN WITNESS WHEREOF, the Principal and the Sua:ety have hereunl;o aeL their hands and Ica]:, this 6TH day of FEBRUARY , 2004, and such of them as are corporations have caused their corporate scab, to be hereto affixed and these present^ to be signed by their proper officcro, the day and ycar first set forth above.. PRINCIPAL LAFARGE NORTH AMERICA. INC. Name: DBA LAFARGE WEST, INC. Addre,rt.s: 1800 N. TAFT HILL ROAD SURETY SAFECO.INSURANCE COMPANY OF AMERICA_ E1:1NXK1119P. m FORT CC0y11 II INS-*-..-CO.8 . _.—. SFATTI F .-.WA._9R1R5 By: By; _ "L Title: Mark E _Stan ley,A&ftrt Title: BRIDGETTE JA _N, ATTORNEY -IN -FACT ATTE: 7Tamara J. W g e (SEAL) (SEAT,) 7/96 Section 00410 Pago 3 POWER S A F E C O" OF ATTORNEY � NEY KNOW ALL BY THESE PRESENTS: SAFECO INSURANCE COMPANY OF AMERICA GENERAL INSURANCE COMPANY OF AMERICA HOME OFFICE: SAFECO PLAZA SEATTLE, WASHINGTON 98185 No. 7386 That SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA, each a Washington corporation, does each hereby appoint *******LAWRENCE W. WALDIE; CARMEN MIMS, BRIAN M. LEBOW, DEBORAH GRIFFITH; ALLYSON DEAN; BRIDGETFE S. JACKSON; Dallas, Texas******* its true and lawful attorney(s)-in-fact, with full authority to execute on its behalf fidelity and surety bonds or undertakings and other documents of a similar character issued in the course of its business, and to bind the respective company thereby. IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA have each executed and attested these presents this IOth day of April , 2003 CHRISTINE MEAD, SECRETARY MIKE MCGAVICK, PRESIDENT CERTIFICATE Extract from the By -Laws of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA: "Article V, Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President, the Secretary, and any Assistant Vice President appointed for that purpose by the officer in charge of surety operations, shall each have authority to appoint individuals as attorneys -in -fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its business... On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaking." Extract from a Resolution of the Board of Directors of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 28, 1970. "On any certificate executed by the Secretary or an assistant secretary of the Company setting out, (i) The provisions of Article V, Section 13 of the By -Laws, and (ii) A copy of the power-of-attomey appointment, executed pursuant thereto, and (iii) Certifying that said power -of -attorney appointment is in full force and effect, the signature of the certifying officer may be by facsimile, and the seal of the Company may be a facsimile thereof." 1, Christine Mead, Secretary of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA, do hereby certify that the foregoing extracts of the By -Laws and of a Resolution of the Board of Directors of these corporations, and of a Power of Attorney issued pursuant thereto, are true and correct, and that both the By -Laws, the Resolution and the Power of Attorney are still in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of said Corporation S-0974/SAEF 2/01 this 6TH day of FEBRUARY 2004 P,f co r CORPORATE Q* SEAL 0rI t,ya � - Ofyyay L CHRISTINE MEAD, SECRETARY 0 A registered trademark of SAFECO Corporation 04/1=003 PDF ADDRESS: 8. BID SCHEDULE (Base Bid) Lafarge West, Tnc CONTRACTOR BY: Mark E StanleySales Manager 1800 North Taft Hill Road Fort Collins, CO 80521 Please use the attached Bid Schedule when submitting your bid. 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (250) of the total Agreement Price. RESPECTFULLY SUBNfJTTED: Mark E. Stanley, Sales Manager Title License Number (If Applicable) (Seal - if Bid ;s by corporation) Attest: --� Mara J. wagne�rl Addres 18000N®nth Taft Hill Road Fort Collins, CO 80521 Telephone (970) 407-3600 7/96 Section 00300 Page 2 BID #5834 Addendum #1 Bid Schedule Project: Ziegler Road Widening Project Date: 02102=04 Number QuaEstntity Link unit Con Um CON Zlealer Road 202-01 Widenlne Quantities: Remove Pipe (RCP, CMP, AOS,HDPE) 251 LF 18.06 4,713.66 202-02 Remove Asphalt Pavement (0" - 2" Depth) 5.642 BY 1.67 9 , 4 2 2. 1 4 202-03 Remove Asphalt Pavement (5" -10" Depth) 3.662 SY 2.85 8,783.70 202-04 Saw Cut Existing Asphalt 513 LF 1.26 646. 39 202-05 Remove Rip -Rap 60 SY 5.83 349 - 90 202-06 Remove Concrete Irrigation Ditch (3.75' wic e x 1.75' deep) 1.460 LF 1.31 1 , 912 - 60 202-07 Remove Concrete Weir, Flume, Supports and Pipe 1 LS 2593.50 2,593.50 202-08 Remove Fence (Barbed Wire) Throe Strand 254 LF 2.21 561.34 202-09 Remove Type III Barricade at the Kechter Intersection 1 EA 81.38 R 1 - 3R 202-10 Remove Storm Sewer Manholes 2 EA 493.50 987-on 202-11 Abandon 314"Domestic WaterTap (FCLWD spec) 1 EA 619.50 66MM 202.12 Removal of debris and overgrowth 1 LS 5729.85 55,729.89 203-01 Unclassified Excavation 3,355 CY 1.18 3,958.90 203-02 Embankment - (CIP) 4,26D CY 3.36 14,313.60 203-03 Borrow Suitable Fin Material (CIP) 910 CY 7.19 6,542.90 203-04 Haul & Dispose 300 CY 3.52 1,056.00 203-05 Borrow ABC (Class 5 or6)- (CIP) 175 TON 10.50 1 , 83 7 - 50 203-06 Muck Excavation - (CIP) 626 CY 17.69 11,073.94 203-07 Topsoil -(Stripping, Stockpiling, Placing) - 6" Depth 1,800 CY 2.36 4,248.00 203.08 Topsoil - (Stripping, Haul Off-Ske) 594 CY 3.52 2,090.88 203-09 Median Hardscape Shaping - (CIP) 950 SF .85 807.50 203-10 Flow Fill Shallow Utilities 250 LF 11.57 2,892.50 203-11 Detour Road (11(Yx 26') 1 LS 4200.00 4,200.00 203-12 Potholing 1 Ls 7600.00 7,600.00 2D6-01 Erosion Control 1 Ls 8983.180 8,983.80 210-01 Adjust Manhole Ring/Cover 9 EA 400.00 3.600.00 210-02 Plug Existing 21.Opening 1 EA 157.90 1 57 - 5n 210-03 Adjust Valve Box (FCLWD) 8 EA 200.00 1,600.00 210.04 Relocate Mailboxes (Provide Temporary Service) 6 EA 64.02 384.12 304-01 Aggregate Base Course - (Class 5 or 6) - 6" Depth - (CIP) 3,105 TON 9.96 30,925.80 304-02 Aggregate Base Course Patch Placement - (Class 5 or 6) - 6" Depth - (CIP) 171 TON 13.21 2,258.91 306-01 Reconditioning(8") 6,072 SY 1.66 10,079.92 307-01 Flyash Subgrade Stabilization - (12%) 9.239 SY 4.41 40 , 7 41- 9 9 403-01 Hot Bituminous Pavement-GradingS (3" Depth) -(PG64.28) 1,689 TON 37.73 63,725.97 403-02 Hot Bituminous Pavement - Grading S (2' Depth) - (PG 64-28) 754 TON 38.05 28,689.70 403-03 Hot Bituminous Pavement - Grading SG (4" Depth) - (PG 64-22) 2,252 TON 33.07 74,473.64 403-04 Asphalt Paver Patching - Grading S (3" Depth) - (PG 64.28) 50 TON 67.06 3,353.00 403.06 Asphalt Paver Patching - Grading SG (4" Depth) . (PG 64.22) 99 TON 59.53 _ 5 , 893 .4 7 403.06 Asphalt Patching - Grading SG (4' Depth) - (PG 64-22) 10 TON 81.82 _ 818.20 403-07 Asphalt Patching - Grading S (3" Depth) - (PG 64-28) 33 TON 92.20 3,042.60 5o6-ot 10' x 6' x 2' Type D-50 Rip -Rap, 6" Topsoil (CIP Per Detail) 1 Ls 577.50 577.50 603-01 24" RCP Class 111 176 LF 25.46 4,480.96 603-02 24" RCP Class III FES with Grate 1 EA 812.70 812.70 603-04 14" x 23" HERCP 68 LF 105.63 7,182.84 603-05 Concrete Joint Encasements 4 EA 120.75 483.00 603-06 30"PIP Irrigation Pipe - 1,346 LF 42.53 57.245.38 603-07 Tie Into Existing 42" Storm Sewer Line (for 14x23 HERCP) 1 EA 367.50 367.50 603-08 4"PVC Schedule 2001nigation Sleeving 300 LF 6.83 2,049.00 603-09 Modify siphon Structure 1 Ls 2528.40 2,528.40 Project: Ziegler Road Widerting Project Date: 02=2004 speaatam Eatlmated Number Deetxlpamn OuvMNy Unk Unacost Nam Cost 603-11 Air release valve 2"1 rhwr&tee 3 EA 1629.60 4 , 889 - 80 604-01 5' Type R Inlet 1 EA 3581.55 3,581.55 604-02 15'Type R Inlet 1 FA 5433.75 5,433.75 604-03 6' Manhole 1 EA 5007.45 5,007.45 604-04 Tie Into Irrigation Structure 1 FA 682.50 682.90 607.01 Orange Safety Fence 1,400 LF 1.71 2 , 394 - 00 608.01 Concrete Sidewalk (6') 15,444 SF 2.48 38,301.12 608-02 Concrete Access Ramps with colored landings (8') 1,000 SF 4.36 4,360.00 608.03 Concrete Crosspan with Aprons (91/2m) 800 SF 4.67 3,736.00 608.04 Hi -Early concrete (24 Hour) 150 cy 13.83 2,074.50 608.05 Flowable FIB Concrete 342 CY 43.40 14, 842 .80 608-06 Exposed Aggregate Median Handscaping (4') 950 SF 3.94 3,743.00 608.07 Pedestrian Refuge Island 100 SF 4.23 423.00 609-01 Vertical Curb & Gutter (30") 3,944 LF 7.54 29,737.76 609-02 outran curb & Gutter (187 286 LF 9.18 2,625.48 609-03 Thermal Blankets for Concrete Irrigation Ditch Placement 1,000 LF .60 600.00 609-05 DdvewayCurb Cuts (2TWidth) 2 EA 54.25 108.50 609-06 R & R Vertical Curb and Gutter 50 LF 12.87 _ 643.50 609-07 R & R Concrete Sidewalk 100 SF 4.47 447.00 Aden Inc. Quantities: 603-03 19' x 30' HERCP 609.04 Concrete Irrigation Ditch (Per Detail) Landscaolna Quantities: 2900-01 Native Seeding Miscellaneous Quantities: Contract Bond 625-01 Construction Surveying 626-01 Mobilization 630-01 Two (2) Message Boards 630-02 Flagging 630.03 Traffic Control Subtotal Megler Road Quantities: i 575,110.78 Subtotal Aden Inc. Quantities: Subtotal Landscaping Quantities: Subtotal Misc. Quantities: TOTAL PROJECT = Six Hundred Forry Thrnic!dnA Tl,,-- S1 40 LF $27.13- _1,085-90 1.400 LF -L_ 15.75 22,050.00 $ 23,135.20 5 Acre 655.00 3,275.00 1 1.00 Ls 5377.79 5,377-79 1.00 Ls 7052.50 7,052.50 1.00 Ls 7150.00 7,150.00 7.00 DAY 325.50 2,278.50 300.00 FIR 17.32 5 196 .00 1.0o Ls , 11800.00 11, 800.00 $ 38,854.79 $ 640,375.77 -fr ve Dollars Cents Date SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Lafarge WBst, Inc. 2. Permanent main office address: 1800 N. Taft Hill 80521 3. When organized: 1989 4. If a corporation, where incorporated: Delaware 5. How many years have you been engaged in the contracting business under your present firm or trade name? 4 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) Observatory Subdivision $2,251 065 06 2005 Buffalo Creek Sub 912 540.00 2005 The Knolls Sub- 992,347.00 2004 The Meadows Subdivision 1,723,202,00 2005 7. General character of Work performed by your company: Asphalt PAvin 8. Have you ever failed to complete any Work awarded to you? NO If so, where and why? 9. Have your ever defaulted on a contract? NO If so, where and why? 10. Are you debarred by any government agency? NO If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Windsor King Soopers $748,000 00 net 2nol Centerplace Ph 1 - Greeley $ 999 149 Ot Dec,�2003 _ 28th St Overlay Boulder $1,989,591-72 Nou 2003 12. List your major equipment available for this contract. What ever is necessary to complete the project - 13 Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: Steven B. Peterson VP/GM 20+ 3.ears Mark E. Stanley Sales Manager 20+ ;rears Kelly Steele Senior Sales 20+ yParg 15. Credit available: $ 16. Bank reference:Wells Fargo BAnk 633 17th Street, Denver, CO 80270 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General CONTRACTOR? Yes If yes, in what city, county and state? Fort Collins CO Larimer wWhat class, license and numbers? General Contractor #00239 19. Do you anticipate subcontracting Work under this Contract? Yes, 57% If yes, what percent of total contract? Gerrard Excavating, Express Concrete_ and to whom? Son -Haul, Kehn Construction Carnes Service Northern Engineering Aden, Inc., A&M Landscaping 20. Are any lawsuits pending against you or your firm at this time? NO If yes, DETAIL 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL Please see attached Insurance Certificate What company? Please see attached Tnaiiranre Certificate 22. What are your company's bonding limitations? 80 532 000 00 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at 8:00 a.m. this 10 day of February 1200_4• Lafarge West Inc Name of Bidder Title: Mark E. Stanley Sales Manager State of Colorado county of Larimer Mark E. Stanley being duly sworn deposes and says that he is _Sales ?Manager of Lafarge West Inc and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this 10 day of February 20 04. Notary Public My commission expires 5123/05 7/96 aP:•IyOTARY %-p P sqUBLIC o0 P OF COLO Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 10% of the contract. ITEM Earthwork / Pipe Concrete Flvash Rotomilling Traffic Control Surveying Concrete Ditch Seeding SUBCONTRACTOR Gerrard Excavatin. Inc. Concrete, Inc. Son -Haul, Inc. Kehn Construction Carnes Service Northern Engineering Aden, Inc. A & M Landscaping 7/96 Section 00430 Page 1 SECTION 00410 BID BOND KNOW ILL MEN BY THESE PRESENTS: that we, the undersigned LAFARGE* as Principal, and SAFECO INSURANCE COMPANY OF AMERICA _ _ as �irety, arc lcercby held and firmly bound unto the City c?L Fort. Collins, �Co].ozado, as OWNNII, in the sum of $ 10%_GAB for Che payment of which, well, and tr.ul.yT.o bc madc, we hereby jointly and sever illy bind ourselves, successors, and assign'' *NORTH AMERICAN, INC. DBA LAFARGE WEST, INC. THE CONDITION of this obligation is st.)ch that whereas the Principal has submitted to Che Ci oC Fort Collins, Co,l.orndo the accompanying Did and hereby madc a part hereof to enter into i CORStruC_Ii l Agreement for the construction of Fort Collins Project, ZIEGLP..12 ROAD WIDENING PROJECT; BID NO. 5834. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If *aid Bid shall be accepted and the Principal shall execute and deliver a Contract in Lhe form of Contract atta,:hed hereto (properly completed in accordance with said Bid) and shall furnish a BONI) for his faithful pertormance of said Contract, and for payment of all persons performing labor or furnishing matcrial.s in connection therewith, and shall in all other re,pects perform the Agreement cii-3ated by the accaptance of said Bid, then thi.:: obligation shall be void; ot-herwi.se the semci shall remain in force and effect., it being expressly understood and agreed that the liability of the Surety for any and ,all claims hereunder shall, in no event., exc:c:ed take penal amount of thin obligation as herein stated. Thee Surety, for value received, hereby stipulates and agrees that the obligations of said Suzety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bond* must be authorized to tran3not business in the Skate of Colorado and be accepted by Lhe OWNER. 7/96 Section 00410 Page 2