HomeMy WebLinkAboutRESPONSE - BID - 5834 ZIEGLER ROAD WIDENING PROJECTSECTION 00300
BID FORM
PROJECT: ZIEGLER ROAD WIDENING PROJECT; BID NO. 5834
Place Fort Collins
Date February 10, 2004
1. In compliance with your Invitation to Bid dated January 9, 2004
and subject to all conditions thereof, the undersigned
Don Kehn Construction, Inc. a **(Corporation, Limited Liability Company,
Partnership, Joint Venture, or Sole Proprietor)** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of Yive Percent ($
57. ) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
Employers Mutual Casualty Co. 6181 E. Tufts Ave., Suite 500 Denver, CO 80237
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through 1
7/96 Section 00300 Page 1
7n4ro3
Unit
No. Vehicle
7n4ro3
Unit
No. Vehicle
1904 .00 Freightliner Distributor Truck
2208
Multi -quip Generator Mitsubishi GDR
2001
94 Eagle Vision
2209
Multi -quip Generator Komatsu S67D1(
2002 94 Mercury Topaz
2210
94 CAT 3412 Generator 545KW
111nn
/_1VV
,,r,._al-,._�„ADI,m ,,,0' „__ „__
•vviuvcig1Yh-1i,ijr �rvvJ�rut�, Vcu;
2211
CAT 3412 Generator 455KW
2101
Nordberg Carrier, Dakota
2212
Multiquip Generator DCA125SSJ JD(
2102
Kolberg MDL124-60 Conveyor
6 cylinder 150 hp
2103
Universal Crusher Portable Jaw
3101
93 CAT 325 Excavator
2104
96 Dakota Conveyor w/Radial Trave
3102
CAT 345B Excavator
2105
Dakota Conveyor w/o Radial Travel
3103
89 CAT 235C Excavator
2106
92 Dakota Feeder
3104
86 CAT 225 Excavator
2107
92 Dakota 36"x100' Stacking Conve
3105
98 CAT 330B Excavator
2108
Channel Frame Phillips 3000" Feed
3200
CAT 416C LoaderBackhoe
2108A Homemade Conveyor
3201
CAT 416D LoaderBackhoe 4x4
2109
Kolberg MDL 271B Screen Plant w/z
3202
CAT 416B LoaderBackhoe 4x4
2110
Kolberg MDL 22 24"x50' Conveyor
3302
CL Beam Aligner System
2111
Kolberg MDL 30"x50' Conveyor
3303
Topcon Pipe Laser 3PG-L
2112
Kolberg 2-2440 Conveyor
3401
96 Terex 3066 Articulated Haul Truck
2113
Fabtech Simplicity Screening Plant C
3402
96 Terex 3066 Articulated Haul Truck
2114
Kolberg Screening Plant MDL 271B
3403
98 Terex 3066 Articulated Haul Truck
2115
Kolberg Radial Stacking Conv. 30"x
3404
98 Terex 3066 Articulated Haul Truck
2116
Kolberg Hydraulic Conveyor 24"x50
3404A 6000 Gal. 2001 MSE Water Tank
2117
Simplicity LP140 6x20-3 Deck Scret
3501
73 CAT 950 Wheel Loader
Fabmaster Tandem Axle Cam
3502
80 CAT 950 Wheel Loader
Under Screen Conveyor
3503
79 CAT 966C Wheel Loader
2118
Simplicity LP140 6x20-3 Deck Scree
3504
76 CAT 980B Wheel Loader
Ranco Tandem Axle Carrier v
3505
00 CAT 966G Loader 3500 Series
Under Screen Conveyor
3506
Case 1835B Uniloader
2119
Simplicity LP140 6x20-3 Deck Scree
3507
Case Skid 1835B Uniloader
Dakota Carrier # 1284 w/48"
3508
95 Case 1945C Loader
Under Screen Conveyor
3509
87 Case 480 ELL Loader
2120
Thunderbird 5xl6 516D1161 3-Decl
3511
87 Case 480E 4x4
2121
Spokane — Pioneer MDL2500 Vertica
3512
90 Case 48OF 4x4
Impact Crusher w/36" Under
3513
CAT IT18B Loader
& CAT 3406TA Engine
3514
83 CAT 966D Loader
2122
30"x60' Field Conveyor
3515
94 CAT 966F Loader
2123
24"x50' Field Conveyor
3516
94 CAT 966F Loader
2124
JC1 6'x20' Three Deck Screen
3517
CAT IT28G Loader
2125
Custombuilt 36"x34' Field Conveyor
3518
CAT 98OG Loader
2126
951MCE 30"x50' Stackable Field Co
3519
97 Case 570 LXT Loader/Tractor
2200
Nordberg HP300 Cone Crusher w/AG
3520
00 CAT 972G Loader
2201
CAT 3208 Kato Generator
3521
00 CAT 236 Skidster
2202
CAT 3208 Generator — Wash Plant
3522
02 CAT IT29G Loader
2203
CAT 3412 Generator 455KW
3610
70 CAT 955 Loader
2204
CAT 3408 Generator 340KW
4101
CAT 623B Scraper
2205
CAT 3406 Generator 320KW
4102
CAT 623B Scraper
2206
CAT 3304 Dita Generator
4103
86 CAT 627E Scraper, Rear Pullhook
2207
CAT 3412 Generator 455KW
4104
80 CAT 627B Scraper Push Pull
7/14/03 7/14/03
Unit Unit
No. Vehicle No. Vehicle
4105 . CAT 627E Scraper Push Pull
6700
90 Gomaco GT-6300
4106
CAT 627E Scraper Push Pull
6701
Gomaco 30" Verticle Curb Mold w/12" Bla
4108
CAT 613C Scraper
6702
24" Rollover Curb Nfoid
AIM
1T
Q1 f•Ar1AM 11 ds„-!'a A,.-
vim. \; A A7v" IVf0to viaA-
C'7M
V/VJ
� 72"IT).1 L._.,.- C;a.,_...n. 1A.,tA
/L i\VilV Ytd IJIYGttAlp ltiVlU
4303
84 CAT 140G Motor Grader
6704
48" Sidewalk Mold
4304
91 CAT 140G Motor Grader
6706
Allen Equip. 32' Concrete Timing & Cure]
4305
94 CAT 140G Motor Grader
7001
82 Barber Green Drum Mixer
4306
99 CAT 143H Motor Grader
7001A 82 Barber Green 3-Bin Cold Feed
4601
76 CAT D-3 Dozer
7001B 82 Barber Green Scalp Screen
4602
79 CAT D-6 Dozer
7001 C 82 Barber Green Slinger Conveyor
4603
78 CAT D-8 Dozer D8K
7001D 82 Barber Green Bucket Elevator
4604
93 CAT D-4 Dozer D4H
7001E 82 Barber Green 60 T Asphalt Storage Silo
4605
95 CAT D8N Dozer
7002
CEI Asphalt Storage Tank
5100
Gorman Rupp 2" Pump
7003
Eaton 60T Lime Silo w/Mixer
5101
Gorman Rupp 3" Pump
7004
96 Astec Portable 41000 CFM Pulsejet, Bagh
5102
76 Gorman Rupp 4" Pump
MDL PBH-41
5103
77 Gorman Rupp 6" Pump - Sa
7005
93 Astec 7' Counterflow Asphalt Mixer
5106
91 Gorman Rupp 3" Pump
7006
93 Astec Twin 200 ton Silo w/New Generatio
5107
Galigher MDL 3 VRA/1000 Rul
Auto Computer Truck Scale
5108
Gorman Rupp 6" Trash Pump
7007
93 Astec 4-Bin Cold Feed PC1012-4
5109
Gorman Rupp 6" Trash Pump
7008
93 Astec Deister Scalp Screen USX 1410
6000
97 Con-E-Co Concrete Batch 1
7009
93 Astec/Slinger Conveyor PSS410-60
6001
96 CEI IOHSSS 10,000 gal. no
7010
93 Astec Bag House BBH441515
6100
Roto Reclaimer Sand/Rock Ser
7011
93 Astec Control House
6101
Hobart GR3035 Welder
7012
93 Heatec 30,000 gal. Hot Storage Asphalt 1
6102
Hobart 353 Welder
Rear with 10,000 gal. Diesel Storage Tank
6200
97 Kolberg MCL 1814 Wash P
Front HE035P
6202
Dakota Conveyor
7102
88 Barber Green 225B Paver
6203
Dakota Conveyor
7103
92 Barber Green 225B Paver
6204
Dakota Conveyor
7104
Layton 8' Spreader Box
6205
Dakota 24CY Surge Bin
7105
92 Entyre Asphalt Curb Machine
6206
Dakota 30"x60" Lattice Frame
7106
Entyre Chip Spreader
6207
Dakota 30"x60" Conveyor
7108
Blaw Knox PF5510 Asphalt Paver
6208
Dakota Portable Belt Feeder
7109
01 CAT 1055B Paver
6601
80 Mack Concrete Truck/Boos
7201
80 Hyster 530A Roller
6602
81 Mack Concrete Truck/Boos
7202
81 Dynapac CC42A
6603
82 Mack Concrete Truck
7203
CAT 434 Tandem Roller
6604
97 Mack RD690S Mixer/Boost
7206
84 Hyster 330A Roller
6605
97 Mack RD690S Mixer/Boost
7207
01 CAT 434C Compactor
6606
96 Mack RD690S Mixer/Boost
7208
74 CAT 815A Compactor
6607
01 Mack Granite Mixer/Booste
7209
81 CAT 815B Compactor
6610
96 Oshkosh S-2146 Mixer Tru
7210
Hyster C530A Roller
6611
95 Oshkosh S-2146 Mixer Tru
7211
83 Hyster C350C Roller
6612
94 Oshkosh S-2146 Mixer Tru
7213
Case Plate Compactor
6614
94 Oshkosh Mixer Truck
7214
92 Hyster 530A Roller
6615
97 Oshkosh Mixer Truck
7215
CAT CP 563 Compactor
7216
Hyster C330B Roller
7/14ro3
Unit
No. Vehicle
7218 .88 CAT 433B Compactor
7219 Hyster 330 Roller
722V CAT 634C
'7111 nn 0 A r OC9MB
I LL 1 VV �l > l L\IJIiVVY
7222 95 Ingersoll-Rand Padfoot Compactor SI
7223 CAT PS200B
7224 CAT CB 434C Roller
7502 89 Sweepster Broom Attachment
7503 88 Elgin Eagle Sweeper GMC
7504 77 Elgin Whirlwind R Vac Truck
7505 Sweepster Broom IT18B Attachment
7506 Broce Broom RJ-300
7507 88 Vanguard Sweeper V4000SP FMC
7508 97 Johnston Sweeper 2V4000 SP
7509 Waldon Broom w/7'6" Myer Snowplow
7510 Waldon Broom
7701 Murphy Cardinal Scale
7702 Murphy Cardinal Scale 303-60PR w/Print
7703 Chamber Belt Scale
7901 72 Timpte Trailer w/Elec. Switch Gear
7902 68 Fruehauf 38' Semi Trailer Switch Geg
7903 Brown Van Trailer 18' for 3208 Generatr
8001 70 Grove 30T Hydro Crane
8002 80 John Deere 8640 Farm Tractor
8003 Action Compaction Wheel 243LBWLO(
8005 93 Grizzly Fabric Laying Attachment
8006 93 Ingersoll Rand Air Compressor
8006A 93 Multi -quip Pavement Breaker
8008 Arrow HG1250 Hydraulic Hammer
8009 99 IR P185 WJO Air Compressor
8009A 99 1R Pavement Breaker
8010 Raygo Gator Soil Stabilizer
8011 John Deere 4400Tractor w/I oaderBuc
8012 CAT 65D Challenger Tractor
8014 02 John Deere 21OLE Grading Tractor
9003 83 Raygo Barcomill 100
9004 90 CAT PR450 Rotomill 75" Cut
9006 CAT PR75 Rotomill
9007 93 CAT PR450C Rotomill 84" Cut
9008 95 CMI PR800-7 Rotomill 102" Cut
9009 97 CMI PR800-7 Rotomill 102" Cut
9010 CMI PR275T Rotomill
99 Miscellaneous Equipment
7/14ro3
Items without a unit number:
MBW Rammer 4HP Tamper
Multi -quip Plate Asphalt Tamper
1 Laser 'Jane MOD 1,35
7.T: L..r A r`lA I I 1
A �lAV1A AL IVJL L Y%A
1 General Level
Honda EB3500
Honda EB3500
Honda EB3500
Wacker Tamper
MK Floor Saw
3406 TA Engine
Electrical Switch Generator for Radial Stacker,
110V Converter Push Button & Elec. C.
1 Laserplane Model L600
Hotsy Power Washer Model 1410SS
15hp Air Compressor Pump (Grainger)
60# Air Breaker Model 160
Spectra -Precision Paver System/CAT 1055B
Deep Well Pump (Grainger)
2 -CAT Pallet Fork Carriage
Concrete Plant Pump (Powder Unloader)
CAT Forks for 236 Skidster
CAT H63 Breaker for 236 Skidster
2001 MSE 6000-Gal. Water Tank for Terex 301
CMI Fine Head Mandril fits CMI 800-7 53618`
CMI Fine Head Mandril fits CMI 800-7 53622:
Case Forks for 570XT
2 — 1' Screed Extensions for Blaw Knox
2001 Multiquip Plate Asphalt Tamper
2003 Multiquip Plate Asphalt Tamper
2 — Segmented Mud Drivers for CAT 65D
2' Mandril for CAT450B
60" 2.5M Mass Excavator Bucket fits CAT 235
86" Rear Door fits CMI 536185
CAT 235C & 330B Buckets
9W 8452 Tooth
8E 6359 Retainer
6Y 2527 Pin
AE-9 Action Rock Box (9-cyard Bedding Box)
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 10% of the contract.
ITEM
Site Concrete
Surveying
Traffic Control
Fly Ash
Seeding
SUBCONTRACTOR
Advanced Concrete Construction
New River Consulting
Northern Colorado Traffic Control
Son -Haul
Wards Reclamation
7/96 Section 00430 Page 1
SECTION 00500
AGREEMENT FORMS
00510 Notice of Award
00520 Agreement
00530 Notice to Proceed
SECTION 00510
NOTICE OF AWARD
Date: February 20, 2004
TO: Don Kehn Construction, Inc.
PROJECT: ZIEGLER ROAD WIDENING PROJECT; BID NO. 5834
OWNER: CITY OF FORT COLLINS
(hereinafter referred to as "the OWNER")
You are hereby notified that your Bid dated February 10, 2004 for the above
project has been considered. You are the apparent successful Bidder and have
been awarded an Agreement for ZIEGLER ROAD WIDENING PROJECT; BID NO. 5834.
The Price of your Agreement is Five Hundred Ninety-five Thousand Thirt
dollars and Fifty-four cents ($595,032.54).
Three (3) copies of each of the proposed Contract Documents (except Drawings)
accompany this Notice of Award. Three (3) sets of the Drawings will be
delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within fifteen (15)
days of the date of this Notice of Award, that is by March 6, 2004.
1. You must deliver to the OWNER three (3) fully executed counterparts of
the Agreement including all the Contract Documents. Each of the Contract
Documents must bear your signature on the cover of the page.
2. You must deliver with the executed Agreement the Contract Security
(Bonds) as specified in the Instructions to Bidders, General Conditions
(Article 5.1) and Supplementary Conditions.
Failure to comply with these conditions within the time specified will entitle
OWNER to consider your Bid abandoned, to annul this Notice of Award and to
declare your Bid Security forfeited.
Within ten (10) days after you comply with those conditions, OWNER will return
to you one (1) fully -signed counterpart of the Agreement with the Contract
Documents attached.
izz
9/12/01
City of Fort Collins
OWNER
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing and Risk Management
Title
Section 00510 Page 1
SECTION 00520
AGREEMENT
THIS AGREEMENT is dated as of the 20th day of February in the year
of 2004 and shall be effective on the date this AGREEMENT is
signed by the City.
The City of Fort Collins (hereinafter called OWNER) and
Don Kehn Construction, Inc.(hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants
hereinafter set forth, agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in
the Contract Documents. The Project for which the Work under the
Contract Documents may be the whole or only a part is defined as
the twelve foot (12') widening of Ziegler Road, south of Rock
Creek, to minor arterial standards and the twenty foot (201)
widening of Ziegler Road, north of Rock Creek, to full arterial
standards, including a two inch (2") mill and overlay of the east
half of the roadway. The improvements will include 3,944 lineal
feet of vertical curb and gutter, 15,444 square yards of six inch
(6") detached concrete sidewalk, the piping of the existing
irrigation lateral used by the school district, the
reconstruction and relocation of the existing concrete irrigation
lateral north of Rock Creek and storm sewer improvements along
Ziegler Road and is generally described in Section 01010.
ARTICLE 2. ENGINEER
The Project has been designed by Nolte Consulting Engineers, who
is hereinafter called ENGINEER and who will assume all duties and
responsibilities and will have the rights and authority assigned
to ENGINEER in the Contract Documents in connection with
completion of the Work in accordance with the Contract Documents.
ARTICLE 3. CONTRACT TIMES
3.1 The Work shall be Substantially Complete by August 1,
2004 as provided in the General Conditions and completed and
ready for Final Payment and Acceptance in accordance with the
General Conditions within 10 working days after August 1, 2004.
3.2. Liquidated Damages. OWNER and CONTRACTOR recognize
that time is of the essence of this Agreement and that OWNER will
suffer financial loss if the Work is not completed within the
times specified in paragraph 3.1. above, plus any extensions
thereof allowed in accordance with Article 12 of the General
Conditions.
7/96 Section 00510 Page 2
They also recognize the delays, expenses and difficulties
involved in proving in a legal proceeding the actual loss
suffered by OWNER if the Work is not completed on time.
Accordingly, instead of requiring any such proof, OWNER and
CONTRACTOR agree that as liquidated damages for delay (but not as
penalty) CONTRACTOR shall pay OWNER the amounts set forth
hereafter.
1) Substantial Completion:
One Thousand One Hundred Fifty Dollars ($1,150.00) for
each working day or fraction thereof that expires
after August 1, 2004 for Substantial Completion of the
Work until the Work is Substantially Complete.
2) Final Acceptance:
After Substantial Completion, Five Hundred Dollars
($500.00) for each working day or fraction thereof
that expires after the ten (10) working day period for
Final Payment and Acceptance until the Work is ready
for Final Payment and Acceptance.
ARTICLE 4. CONTRACT PRICE
4.1. OWNER shall pay CONTRACTOR for performance of the
Work in accordance with the Contract Documents in current funds
follows: ($595,032.54), Five Hundred Ninety-five Thousand Thirtv-
two Dollars and Fifty-four cents, in accordance with Section
00300, attached and incorporated herein by this reference.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in
accordance with Article 14 of the General Conditions.
Applications for Payment will be processed by ENGINEER as
provided in the General Conditions.
5.1. PROGRESS PAYMENTS. OWNER shall make progress
payments on account of the Contract Price on the basis of
CONTRACTOR's Application for Payment as recommended by ENGINEER,
once each month during construction as provided below. All
progress payments will be on the basis of the progress of the
Work measured by the schedule of values established in paragraph
2.6 of the General Conditions and in the case of Unit Price Work
based on the number of units completed, and in accordance with
the General Requirements concerning Unit Price Work.
5.1.1. Prior to Substantial Completion, progress payments
will be in the amount equal to the percentage indicated below,
but, in each case, less the aggregate of payments previously made
and less such amounts as ENGINEER shall determine, or OWNER may
withhold, in accordance with paragraph 14.7 of the General
7/96 Section 00510 Page 3
Conditions. 90% of the value of Work completed until the Work
has been 50% completed as determined by ENGINEER, when the
retainage equals 5% of the Contract Price, and if the character
and progress of the work have been satisfactory to OWNER and
ENGINEER, OWNER on recommendation of ENGINEER, may determine that
as long as the character and progress of the Work remain
satisfactory to them, there will be no additional retainage on
account of Work completed in which case the remaining progress
payments prior to Substantial Completion will be in an amount
equal to 100% of the Work completed. 90% of materials and
equipment not incorporated in the Work (but delivered, suitably
stored and accompanied by documentation satisfactory to OWNER as
provided in paragraph 14.2 of the General Conditions) may be
included in the application for payment.
5.1.2. Upon Substantial Completion payment will be made in
an amount sufficient to increase total payments to CONTRACTOR to
95% of the Contract Price, less such amounts as ENGINEER shall
determine or OWNER may withhold in accordance with paragraph 14.7
of the General Conditions or as provided by law.
5.2. FINAL PAYMENT. Upon Final Completion and Acceptance
of the Work in accordance with paragraph 14.13 of the General
Conditions, OWNER shall pay the remainder of the Contract Price
as recommended by ENGINEER as provided in said paragraph 14.13.
ARTICLE 6. CONTRACTOR'S REPRESENTATION
In order to induce OWNER to enter into this Agreement,
CONTRACTOR makes the following representations:
6.1. CONTRACTOR has familiarized himself with the nature
and extent of the Contract Documents, Work, site, locality, and
with all local conditions and Laws and Regulations that in any
manner may affect cost, progress, performance or furnishing of
the Work.
6.2. CONTRACTOR has studied carefully all reports of
explorations and tests of subsurface conditions and drawings of
physical conditions which are identified in the Supplementary
Conditions as provided in paragraph 4.2 of the General
Conditions.
6.3. CONTRACTOR has obtained and carefully studied (or
assumes responsibility for obtaining and carefully studying) all
such examinations, investigations, explorations, tests, reports,
and studies (in addition to or to supplement those referred to in
paragraph 6.2 above) which pertain to the subsurface or physical
condition at or contiguous to the site or otherwise may affect
the cost, progress, performance or furnishing of the Work as
CONTRACTOR considers necessary for the performance or furnishing
of the Work at the Contract Price, within the Contract Times and
7/96 Section 00510 Page 4
in accordance with the other terms and conditions of the Contract
Documents, including specifically the provisions of paragraph 4.2
of the General Conditions; and no additional examinations,
investigations, explorations, tests, reports, studies or similar
information or data are or will be required by CONTRACTOR for
such purposes.
6.4. CONTRACTOR has reviewed and checked all information
and data shown or indicated on the Contract Documents with
respect to existing Underground Facilities at or contiguous to
the site and assumes responsibility for the accurate location of
said Underground Facilities. No additional examinations,
investigations, explorations, tests, reports, studies or similar
information or data in respect of said Underground Facilities are
or will be required by CONTRACTOR in order to perform and furnish
the Work at the Contract Price, within the Contract Times and in
accordance with the other terms and conditions of the Contract
Documents, including specifically the provision of paragraph 4.3.
of the General Conditions.
6.5. CONTRACTOR has correlated the results of all such
observations, examinations, investigations, tests, reports and
data with the terms and conditions of the Contract Documents.
6.6. CONTRACTOR has given ENGINEER written notice of all
conflicts, errors or discrepancies that he has discovered in the
Contract Documents and the written resolution thereof by ENGINEER
is acceptable to CONTRACTOR.
ARTICLE 7. CONTRACT DOCUMENTS
7.1 The Contract Documents which comprise the entire
Agreement between OWNER and CONTRACTOR concerning the Work
consist of the General Conditions, Supplementary Conditions,
those items included in the definition of "Contract Documents" in
Article 1.10 of the General Conditions, and such other items as
are referenced in this Article 7, all of which are incorporated
herein by this reference.
7.2 Forms for use by CONTRACTOR in performing the Work
and related actions in carrying out the terms of this Agreement
are deemed Contract Documents and incorporated herein by this
reference, and include, but are not limited to, the following:
7.2.1Certificate of Substantial Completion
7.2.2 Certificate of Final Acceptance
7.2.3Lien Waiver Releases
7.2.4Consent of Surety
7.2.5Application for Exemption Certificate
7.2. 6 Application for Payment
7.3 Drawings, consisting of a cover sheet and sheets
7/96 Section 00510 Page 5
Don Kehn Construction, Inc.
CONTRACTOR
BY: (4"�"
rnorated under the laws of the State of Colorado.
ADDRESS: 6550 South County Road 5
Ft Collins, CO 80528
8. BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
RESPECTFULLY SUBMITTED:
Q)l V February 10, 2004
Signature Date
President
Title
License Number (If Applicable)
(Seal - if Bid
� y co
Attest:
Telephone (970) 226-4111
7/96 Section 00300 Page 2
numbered 1 through 16 inclusive with the following general title:
Cover Sheet 1, General Notes 2, Plan & Profile 3-6, Signing &
Striping Plans 7-8, Cross Sections 9-12, Irrigation Plan &
Profile 13-14, Detail Sheets 15-16.
The Contract Drawings shall be stamped "Final for Construction"
and dated. Any revisions made shall be clearly identified and
dated.
7.4. Addenda Numbers 1 to 1, inclusive.
7.5. The Contract Documents also include all written
amendments and other documents amending, modifying, or
supplementing the Contract Documents pursuant to paragraphs 3.5
and 3.6 of the General Conditions.
7.6. There are no Contract Documents other than those
listed or incorporated by reference in this Article 7. The
Contract Documents may only be amended, modified or supplemented
as provided in paragraphs 3.5 and 3.6 of the General Conditions.
ARTICLE B. MISCELLANEOUS
8.1. Terms used in this Agreement which are defined in
Article I of the General Conditions shall have the meanings
indicated in the General Conditions.
8.2. No assignment by a party hereto of any rights under
or interests in the Contract Documents will be binding on another
party hereto without the written consent of the party sought to
be bound; and specifically but not without limitations, moneys
that may become due and moneys that are due may not be assigned
without such consent (except to the extent that the effect of
this restriction may be limited by law), and unless specifically
stated to the contrary in any written consent to an assignment no
assignment will release or discharge that assignor from any duty
or responsibility under the Contract Document.
8.3. OWNER and CONTRACTOR each binds itself, its partners,
successors, assigns and legal representatives to the other party
hereto, its partners, successors, assigns and legal
representatives in respect to all covenants, Agreement and
obligations contained in the Contract Document.
7/96 Section 00510 Page 6
OWNER: CITY OF FORT COLLINS CONTRACTOR:
By: By:
JOHN F. FISCHBACH, CITY MANAGER
BY:
JAMES B. O'NEILL II, CPPO, FNIGP
DIRECTOR OF PURCHASING
AND RISK MANAGEMENT
Date:
Attest:
City Clerk
Title:
Date:
(CORPORATE SEAL)
Attest:
Address for giving notices: Address for giving notices:
P. O. Box 580
Fort Collins, CO 80522
LICENSE NO.:
Approved as to Form
Assistant City Attorney
7/96 Section 00510 Page 7
FEB-10-04
TUE 08(20 AM CITY/FT COLLINS, PURCHAS FAX
NO. 970
2216707
P,02/07
BID #5834
Addendum #1 Bid SChedule
Project;
Ziegler Road Widening Project
Date:
0210212004
Spwtem
Description
lisfi ��
DuarKrtlr
unh
Unit Coe[
Rom Gott
Number
Zealer Road
WIdenhri4 Gus . es'
LF
8.00
2.088.00
202-01
Remove Pipe (RCP, CMP. ADS,HDPE)
2a1
1.20
6,770.40
202.02
Remove Asphalt Pavement (0' - 27 Depth)
5.642
SY
2.50
7,705.00
202-03
Remove Asphalt Pavement IF - 10- Depth)
3.092
SY
202.04
Saw Cut Existing Asphalt
513
LF
1.50
769.50
202.05
Remove Rip -Rap
so
SY
10.50
30.0
202-06
Remove Concrete Irrigation Ditch (3.75' wide x 1.75' deep)
1.450
LF
1_.35
1,971.00
202-07
Remove Concrete Weir, Flume, Supports and Pipe
1
LS
1 414 50.00
1 , 4 50,Da
202-08
Remove Fence (Barbed Wire) Three Strand
254
LF
1.40
355.60
202.09
Remove Type III Barricade at the Keohter Intersection
1
EA
10Q.00
100.00
202-10
Remove Storrs Sewer Manholes
2
EA
600.00
1 r20
2,200.00
2200.00
202-11
Abandon 3/47 Domestic water Tap (FCLWD Spec)
1
EA
202-12
Removal of debris and overgrowth
1
LS
2500.00
2,500.00
203-01
Unclassified Excavation
3,355
CY
2.00
6,710.00
203-02
Embankment -(CIP)
4,260
CY
.85
3,621.OQ
203-03
Borrow Suitable Fill Material (CIP)
910
CY
5.9
4,550.00
203-04
Haul & Dispose
$00
CY
3.50
j - 050. 00
203-05
Borrow ABC (Class 5 or 6) - (CIP)
176
TON
10.00
1 r 7 SO - 00
203-06
Muck Excavation - (CIP)
626
CY
5 _ 50
3.55
3 , 410. QQ
6 390. 00
203-07
Topsoil - (Stripping. Stockpiling, Placing) • 6' Depth
1,8D0
CY
,
203-08
Topsoil -(Stripping. Haul OR -Site)
594
CY
4.65
2,762.10
203-09
Median Hardsoape Shaping - (CIP)
960
SF
1.20
1:140. 00
203-10
Flow Fill Shallow Utilities
250
LF
27. 0Q
6. 7:-Q •�QQ
203-11
Detour Road (110' x 26)
1
LS
3350.00
- 3,350.00
203-12
Potholing
1
LS
900.00
900r 00
208-01
Erosion Control
1
LS
1500.00
_ 1, 500.00
21"1
Adjust Manhole Ring/Cover
9
EA
2 50 - 00
_ 2 r 550 - 00
2.10-02
Plug Existing 21' Opening
1
EA
200.00
200.00
210-03
Adjust Valve Box (FCLWD)
8
EA
165.00
1 y 920.00
210.04
Relocate Mailboxes (Provide Temporary Service)
6
EA
7 5 - 00_
1, 90 - OQ
304-01
Aggregate Base Course • (Gass 5 or 6) • 6' Depth - (CIP)
3,105
TON
10.70
33,223.50
304-02
Aggregate Base Course Patch Placement - (Class 5 or 6) - 6" Depth - (CIP)
171
TON
12.60
2,154.60
3C6-01
Reconditioning (87)
6.072
SY
- 80
307--01
Flyash Subgrade Stabilization - (12%)
9.239
SY
4.45
41,113. 55
403-01
Hot Bituminous Pavement - Grading S (3' Depth) - (PG 64.28)
1.689
TON
_ 35.65
_f2Q�212_85_
403-02
Hot Bituminous Pavement • Grading S (2' Depth) - (PG 64.28)
754
TON
- 36 - 31
_2z1377 - 74
403-03
Hot Bituminous Pavement - Grading SG (4• Depth) • (PG 6L22)
2.252
TON
29. 30
__Saj83. 6
403-04
Asphalt Paver Patching - Grading S (3' Depth) - (PG 64.28)
50
TON
85. 00.
_ / 32 UQ M
403.05
Asphalt Paver Patching - Grading SG (4- Depth) - (PG 64.22)
99
TON
67 - 00_
6 - 6- (�33.00
403-06
Asphalt Patching - Grading SG (4- Depth) - (PG 64.22)
10
TON
_ j_ n - nn
I�-/�,Q-Q_9Q
403.,07
Asphalt Patching - Grading S (3' Depth) - (PG 64.28)
33
TON
110. QO
3,630.00
506-01
10' x 6' x T Type D-50 Rip -Rep. 6' Topsoil (CIP Per Detail)
1
LS
450.00
450.00
603.01
24' RCP Class III
176
LF
38 - 00
6,6 QQ
603-02
24' RCP Class Ill FES with Grate
1
EA
675.00
675.00
603-04
14' x 23' HERCP
68
LF
_ 119.00
7 r 820 - 00
603-05
Concrete Joint Encasements
4
EA
125.00
0�. 00
603-06
30' PIP Irrigation Pipe
1.346
LF
43. ,60
�"9.6f?5. -Q
6D3-07
Tie Into Existing 42- Storm Sewer Line (for 1dx23 HERCP)
1
EA
800.00
_800 00,
603-08
4'PVC Schedule 200 Irrigation Sleeving
300
LF
10.50
3. 150, 00
603-09
Modify Siphon Structure
1
Ls
3950.00
3,950.00
___ FEB-10-04 TUE 08:20 AM CITY/FT COLLINS, PURCHAS FAX NO. 970 2216707
P. 03/07
Project: Ziegler Road Widening Project
Date: 02JOV2004
Speentem OmeiDrlon Estimates Unit UmY Cost Item Cost
Humbor Quantity
3 EA 1550.00 4,650.00
603.11 Air release valve 27f riser&tee
1
EA
2550.00
2,550.00
604-01
S'TypsRinlet
1
EA
3808.00
3 , 808. 00
604-02
15' Type R Inlet
1
EA
2600.00
_
2,600.00
804-03
6' Manhole
1
EA
00.00
800.00
604-04
Tie Into Irrigation Structure
607.01
Orange Safety Fence
1.400
LF
_j - 60
2.240.00
60tt-01
concrete Sidewalk (6•)
15,444
SF
2.45
37,837.8
60a02
Concrete Access Ramps with colored landings (8-)
1,000
SF
5. 00
5,,000.00
G06-03
concrete Crosspan with Aprons (91rz-)
Boo
SF
5.50
4,400.0
G08-04
Hi -Early Concrete (24 Hour)
150
CY
1 0. 00
1. 50 .00
608.05
Fiowable Fill Concrete
342
CY
40 - 00
13 - 680. 00
608-06
Exposed Aggregate Median Har'dseaping (4-)
950
SF
5 _ 115
5 , 0
608.07
Pedestrian Refuge Island
too
SF
'1 S
49 5.00
609-01
Vertical Curb & Gutter (30")
3.944
LF
8.6
34.115. 60
609-02
Outfall Curb & Gutter (1 B')
286
LF
S. 00
2 . 288. 00
609-03
Thermal Blankets for Concrete Irrigation Ditch Placement
1.000
LF
,35
3 50, 0
609.OS
Driveway Curb Cuts (25' width)
2
EA
1350.0
2. 700. 00
609-M
R & R Vertical Curb and Gutter
So
LF
19.50
_ L75.00
609-07
R & R Concrete Sidewalk
100
SF
3. 50
350.0
Aden, Ine. Quantities:
603.03 19" x 30" HERCP
609-Q4 Concrete irrigation Ditch (Per Detail)
Landscao no Quantities,:
2900-01 Native Seeding
Miscellaneous Quantities:
- Contract Bond
625-01 Construction Surveying
626-01 Mobilization
630-01 Two (2) Message Boards
630-02. Flagging
630.03 'Traffic. Control
Subtotal Ziegler Road Quantities: 5 534,682.54
40 LF $ 25.00 �.000
1,400 LF S _ 1540 21.000
Subtotal Aden Inc. Quantities: 5 =000.00
5 Acre 630.00 3.150.00
Subtotal Landscaping Quantities: $ 3 - 150. 00
1.00
LS
6100.00
6,100.00
1.00
LS
6600.00
- 6, 600.00
1.00
LS
_ 5500'Q0
5,500.00
7.00
DAY
35n - no
2,450.00
300.00
HR
99 - 0
69600.00
1.00
LS
] , Q M-L0
Subtotal Mise.Ouantit as: 3
35, 200. 00
TOTAL PROJECT a s 595,032.54
Five Hundred P7inetjjive Thousand Thirty Two Dollars
__R, frFrntr Cents
MEW
Signature Date
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: Don Kehn Construction Inc.
2. Permanent main office address: 6550 So. County Rd. 5 Ft Collins CO 80528
3. When organized: 1965
4. If a corporation, where incorporated: State of Colorado
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 39 Years
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
Fox Run - Greeley T287,356 00 4/30/04
John on'S Corner IQyelapd 249,832.00
Eckerd Drug Store - Ft Collins 186.081.00 6130/04
7. General character of Work performed by your company:
Earthwork Asphalt Paving 0tilities Kotomilling Concrete Curb &
Gutter.
8. Have you ever failed to complete any Work awarded to you? NO
If so, where and why?
9. Have your ever defaulted on a contract? NO
If so, where and why?
10. Are you debarred by any government agency? NO
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
F.C. industrial nark 4i614,224.00 Urdg, Paving, milling, Concrete U & G 11A
rairgrounds Ave. 1,487,u20.00 Urdg,Paving, Util., Milling Conc. C&G 8A
Kodak - Windsor 461,071.0 Grading, Paving & Milling 11A
12. List your major equipment available for this contract.
See Attached List
13. Experience in construction Work similar in importance to this
project:
14. Background and experience of the principal members of your organization,
including officers:
Don Kehn, President Highway & Heavy Construction 39 Years.
Dan Kehn, Vice-Pres. Highway & Heavy Construciton 25 Years
15. Credit available: $
16. Bank reference: Bank One. Colorado Rita Glaser, Ufficer
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? Yes
If yes, in what city, county and state? rt Collins, Larimer Co .& What
class, license and numbers? Earthwork, raving, T1 ;1; ; s & Concrete, Colo.
19. Do you anticipate subcontracting Work under this Contract? Yes
If yes, what percent of total contract? 23%
and to whom? Advanced Concrete Const. New River Consulting, No. Colo. Traffic Contri
Son -Haul & Wards Reclamation
20. Are any lawsuits pending against you or your firm at this time? NO
If yes,
DETAIL
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL,
1 UQO OOU Each Uccurance 2,000,000 Aggregate
What company? Travelers Indemnity Company
22. What are your company's bonding limitations? As Requited.
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at rbrt Collins this 10ht day of February , 20 04.
Inc.
Name o
By:
Title: Vice -President
State of Colorado
County of Larimer
Dan Kehn being duly sworn deposes and says that he is
Vice -President of Don Kehn Construction, Inc. and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this loth day of
Fahrnary r 2 00_4.
�a4—a
otary Public
P. 0. Box 1125
Wellington, CO 80549
My commission expires November 27. 2007
7/96 Section 00420 Page 3
7/14/03 7n4ro3
Unit Unit
No. Vehicle No. Vehicle
1001
.83 Fruehauf Utility Van Trallej
1518
03 Mack Tandem Dump
1002
80 Great Dane Dry Van Trailer
1601
80 IHC 2-1/2T Service Truck
1102
91 Ranco Belly Dump Trailer
1603
73 GMC 1T W Welder
i iv3
91 1A i iCV B\.11y "Uip AAMlw
If-%(15
79 Fnrd FlathM T _7(M
1104
91 Ranco Belly Dump Trailer
1606
89 Ford Superduty F450
1201
74 Hobbs Dump Trailer
1607
90 Ford Superduty F450
1202
98 Heil Pneumatic Trailer
1608
91 Mack Fuel Truck, Maintainer Service 1
1205
85 Fruehauf Dump Trailer Alm
1609
89 Ford F-350 Flatbed
1206
85 Fruehauf End Dump Trailer
1610
94 GMC Service Truck
1207
98 Ranco Rock Trailer
1611
96 GMC Topkick Truck
1301
82 Trail King Loboy Trailer
1612
93 Freightliner Service Truck
1302
76 CM Load King Loboy Trails
1614
97 GMC Topkick MDLC-6500
1303
82 Trail King Jeep
1615
99 Ford Service Truck F450
1304
82 Trail King Loboy Trailer
1704
74 Peterbilt Water Truck
1305
82 Trail King Booster
1705
73 Mack Water Truck 6x6
1306
85 Eager Beaver Folder 20T Tri
1706
74 Mack Water Truck -
1307
84 Flat Iron Homemade Trailer
1707
66 Mack Water Truck
1310
92 CMI 603DD 60T Load King
1708
80 Ford Water Truck
1311
92 CM Load King Booster
1709
91 GMC Water Trk Top Kick Klein Tank
1313
97 Landoll Trailer
1710
94 GMC Water Trk TC7H064 Topkick Ev
1314
00 Landoll LT1016 Trailer
1810
82 Chevrolet 1/2T P/U 4x4
1315
02 Trail King Trailer
1811
84 Chevrolet 1/2T P/U 4x4
1401
79 IHC Tractor
1814
85 Dodge D350 IT P/U
1403
74 Peterbilt Tractor
1816
84 Ford '/4 T P/U
1406
77 Mack Tractor
1817
87 Ford F150 1/2T P/U
1407
90 Mack Tractor
1818
88 Chevrolet 1/2T P/U 4x4
1408
85 Mack Tractor
1820
89 Ford 1/2T P/U 4x4 (Chey)
1409
85 Mack Tractor
1821
89 Ford Ranger S. P/U
1410
85 Mack Tractor
1822
90 Ford F250 P/U
1411
92 Kenworth Tractor
1823
91 Ford F150 P/U 4x4
1412
94 Kenworth Tractor
1824
91 Ford F250 P/U
1501
92 Mack Tandem Dump
1825
89 Ford F250 P/U
1502
92 Mack Tandem Dump
1826
92 GMC P/U
1503
81 Mack Tandem Dump
1827
92 Ford F150 P/U 4x4
1504
81 Mack Tandem Dump
1828
93 Ford F150 P/U 4x4 1/2T
1505
73 Mack Tandem Dump
1829
91 Ford Ranger P/U
1506
77 Mack Tandem Dump
1830
96 Ford F350 P/U 4x4
1507
79 Mack Tandem Dump
1831
97 Ford F150 P/U 4x4
1508
79 Mack Tandem Dump
1832
97 Ford F150 P/U 4x4 (Chey)
1509
79 Mack Tandem Dump
1834
99 Ford F250 P/U 4x4
1510
77 Mack Tandem Dump
1835
99 Ford F250 3/4T P/U
1511
93 Mack Tandem Dump
1836
99 Ford F150 P/U
1512
93 Mack Tandem Dump
1837
99 Ford F250 P/U
1514
93 Mack Tandem Dump
1838
02 GMC 2500 P/U
1515
96 Mack Tandem Dump
1839
02 Ford F250 P/U
1516
00 Mack Tandem Dump
1901
83 Mack Distributor Truck
1517
03 Mack Tandem Dump
1903
81 Ford C8000 Distributor Truck