Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RESPONSE - BID - 5851 WEST ELIZABETH STREETSCAPE IMPROVEMENTS (3)
SECTION 00300 BID FORM PROJECT: WEST ELIZABETH STREETSCAPE IMPROVEMENNTS; BID NO. 5851 _ Place ror+ Co nS, Cp1OroLda Date ipr$ 1 2$1 204)Lf 1. In compliance with your Invitation to Bid dated f�01i% 5 , 200q , and subject to all conditions there to undersigned (_nneMW, WOC96 u-V C010", 1nr-- a "(Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid i s a certified or cashier's check or standard Bid bond in the sum of 5% of 4v4-41 a1moun4 b;d ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: er1%rd Fire, (n4. Co, of Conv%e"ck* x5enk:' Flood i -?eierson Into., Ine. , 93SI Groa++ 9Fre4+A s+c. 600, c":>enverr,Co 902.2-1 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No through 7/96 Section 00300 Page 1 21. What are the limits of your public liability? DETAIL SPA a lka shed What company? 22. What are your company's bonding limitat ions 23. The undersigned hereby authorizes and requests anv person, firm or corporation to furnish any information requested by the CWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at _ � (`� this 2-7-41 day of 2004 Title: MnfG L6n0_r4• 7re5;4e�n:- County of SoLLiaU AnLrr- k-enast being duly sworn deposes and says that he is ?rtsiden.� of Onnerek- ColoreA4_o Iv%e and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this 2-74'h day of Acpri 1 2004. 9 Notary Public My commission expires 7/96 Section 00420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing ove -. of the contract. ITEM SUBCONTRACTOR 7/96 Section 00430 Page 1 Concrete Works of Colorado, Inc. CURRENT CONTRACT OWNER/CONTRACTOR GENERAL/ CONTRACT AMT % COMPL. TYPE OF APPROX. DATE CONTACT SUB OWNEWCONTRACT NAME WORK COMPLETION OWNER ADDRESS CURRENT DATE 2002 CITY & COUNTY OF DENVER GEN SHERIDAN SIDEWALKS-FLORIDA TO6TH $487,496.32 93% CONCRETE R&R Jan-04 JEFF JONES - DENVER 720-913-4549 CWC 2242 201 W COLFAX DEPT 506-DENVER, CO 80202 $454 209 56 2003-Apr. HAMON CONTRACTORS, INC. SUB 1-225 AND 6TH AVENUE $2,579,916.50 29% CONCRETE PAVING May-04 LARRY MATHEWS 303-297-0340 CWC 2312 5670 FRANKLIN ST., DENVER, CO 80216 $750,172.62 2003-July KIEWIT WESTERN CO. SUB FHA -ROCKY MOUNTAIN NATIONAL $429,980.00 3% COLORED CONCRETE Jun-04 CHRIS KRUMWEIDE/JILL HENNEN 970-586-3564 PARK - BEAR LAKE ROAD PAVING, CURB & GUTTER, CWC 2334 7926 S. PLATTE CANYON RD., LITTLETON, CO 80128 $13,147.20 & SIDEWALK 2003-Sept. CITY AND COUNTY OF DENVER GEN 2003 CITYWIDE CURB & GUTTER -PH III $674,475.00 0% R&R Apr-04 JERRY MILLER, P.E. 720-913-4528 201 W COLFAX DEPT 506-DENVER, CO 80202 $0.00 CURB/GTTR 2003-Dec. CITY AND COUNTY OF DENVER GEN 2003 NEIGHBORHOOD ALLEYS $990,826.40 0% CONCRETE ALLEY PAVING Apr-04 BOB STEWART 720-913-4533 CURB & GUTTER R & R CWC 2348 201 W COLFAX DEPT 506-DENVER, CO 80202 2003-Oct. CITY OF BOULDER GEN MARTIN PARK IRRIGATION PUMP $95,400.00 0% INSTALL AN IRRIGATION Feb.-04 MIKE MUNDY 303-441.3451 STATION PUMP STATION FOR PARK PO BOX 791-BOULDER, CO S0306 2003-Nov. HAM ON CONTRACTORS, INC. SUB SH 42/96TH ST. CONNECTION - $1,193,878.45 0% May-04 RON SIGNALL 30&297-0340 LOUISVILLE RCP, WATERLINE, SEWERLINE, CWC 2384 5870 FRANKLIN ST., DENVER, CO 80216 MANHOLES, CONCRETE CURB 8 20047eb. CITY OF SHERIDAN GEN WEST MILAN STREET IMPROVEMENTS $223,645.20 0% GUTTER, RAMPS & BIKEWAY R&R RANDY MOURNING - 303-437-DO73 Apr-04 CWC 2372 4101 S. FEDERAL BLVD. , SHERIDAN, CO CURB/GTTR 2004-Jan. CITY OF LITTLETON GEN GALLUP STREET BRIDGE OVER THE $73,890.40 0% R&R Apr-04 BURT WHITAKER 303-795-3871 HIGHLINE CANAL BRIDGE DECK REPAIR CWC 2368 2255 WEST BERRY AVE., LITTLETON, CO 80165 CONCRETE BRIDGE DECK 2004-Feb. CITY OF SHERIDAN GEN WEST MILAN STREET IMPROVEMENTS $223,645.20 0% R&R Apr-04 RANDY MOURNING - 303-437-0073 CWC 2372 4101 S. FEDERAL BLVD. , SHERIDAN, CO CURB/GTTR 2003-Dec. CITY OF BRIGHTON GEN BRIGHTON ROUNDABOUTS $2,522,461.64 45% CONSTRUCTION OF NEW May-04 CWC 21e6 TERRY BENTON 22 S. 4TH AVE., BRIGHTON, CO 80601 ROUNDABOUTS AT INT. OF 2004-Feb. CDOT STA 0404-040; COLFAX $2,315,204.50 0% HWY 7 AND US85 ASPHALT PAVING, CONCRETE Aug-04 DARYL MILLER 303-370-2040 CURB/GUTTER/PAN R&R CWC 2402 4201 EARKANSAS DENVER 80222 GENERAL 2004-Feb. CDOT STA0881-013; FEDERAL $1,347,148.60 0% GRINDING, MILLING, ULTRA- Aug-04 TONY STEWART 303-954-5281 THIN ASPHALT OVERLAY, CWC 2404 4201 E ARKANSAS DENVER 80222 GENERAL CONCRETE R&R 2004-Warch CITY OF LONE TREE SOUTH YOSEMITE DECELERATION LANE $60,014.50 0% CONSTRUCTION OF NEW Apr-04 TAYLOR GOERTZ 303-662-8112 DECELERATION LANE CWC 2406 9777 S. YOSEMITE ST., LONE TREE, CO 80124 2004 Feb. CITY OF THORNTON GRAVEL LAKES PIER $166,300.09 0% CONSTRUCTION OF NEW Jul-04 DENNIS LAURITA 720-872-6058 FISHING PIER AND CONCRETE CWC 2408 95M CIVIC CENTER OR, THORNTON, CO 80229 SUPPORTS 2004-March CITY OF GREENWOOD VILLAGE WESTLANDS PARK PAVILION $75,726.48 0% CONCRETE WALLS, MOW Jun-04 CWC 2418 COLIN REUTER 303-708.6135 10001 E. COSTILLA AVE„ GRNWD VILLAGE STRIPS, EARTHWORK, FLAGSTONE CAPS, HANDRAIL Page 1 of 1 M Concrete WO71a of Colorado, lim. COMPLETED CONTRACTS CONTRACT OWNERICONTRACTOR OENERAU CONTRACT % COMP. TYPE OF DATE CONTACT SUB OWNER/CONTRACT NAME AMOUNT WORK OWNER ADDRESS DATE 2002-May CITY OF BOULDER GEN 28TH STREET -BASELINE T AARAPAHOE 1 587,500.94 100% CONCRETE PAVING JASON FELL 303i 1-3266 CONCRETE R&R CWC 2230 PO Box 791-BOULDER, CO S0308 2002-May CITY & COUNTY OF DENVER GEN DOWNING, BAYAUD & MARION INTERSE. $706,32932 100% CONCRETE R&R DENNIS OHLROGGE - DENVER 720-913.4W CWC 2244 201 W COLFAX DEFT 503-DENVER, CO 80202 2003-Feb CITY OF BOULDER GEN 2003 SMALL PUBLIC WORKS $500,000.00 100% R&R STEPHANY WESIHUSIN 303441-3266 CWC 2316 PO BOX 7D1-80ULDER, CO BMW CURB/GTTR 2002-Nov CITY & COUNTY OF DENVER GEN 23RD AVE RECONSTRUCTION $3,867,466.86 100% STREET RECONSTRUCTION BRENT NAGEN 72D913-4547 CWC 2270 201 W COLFAX DEPT 506-DENVER, CO 80202 WATER & STORM SEWER 2002-Sept CITY OF BOULDER GEN SH 931 BROADWAY $8,117,755.23 100% STREET RECONSTRUCTION ALEX MAY 303-441-3208 CWC 2272 Po Box 7e1-BotiLDER, 00 80308 WATER & STORM SEWER 2003-June PARSONS SUB CITY AND COUNTY OF DENVER $930.821.58 100% R & R CONCRETE CURB, TOM WOOD 303-764-BB50 CONTRACT NO CE31001: RADIUM GUTTER, SIDEWALK CWC 2328 1700 BROADWAY, STE 900, DENVER, CO 802DO CONTAMINATED STREETS 12'. 15" & 18" RCP INLETS 2003-July CITY OF LITTLETON GEN SOUTH BOW MAR PROJECT $882,968.35 000% R & R CONCRETE CURB, FRANK MARBURY 303-7953638 GUTTER, SIDEWALK, CWC 2338 2255 WEST BERRY AVE., LITTLETON. CO 80185 CROSSPAN 2003-July COLORADO CONSTRUCTORS, INC. SUB CDOT - NORTH FORK FRENCHMAN $332,296.00 100% CONCRETE PAVING DAVE FEDIRKO 303-477-ONS CREEK CWC 2330 6810 N. BROADWAY, STE. 8, DENVER, CO 80221 2003.Oot. CITY OF THORNTON GEN 2003 CONGESTION RELIEF AND TURN $354,698.45 100% CONCRETE CURB, GUTTER, RICHARD BORCH4RDT 72D-872-8044 LANE IMPROVEMENTS & WALK R&R, SIGNALIZATION CWC 2354 9500 CAOC CENTER OR., THORNTON, CO S= 2003-Oct CITY OF ENGLEWOOD GEN US 285 SIDEWALK PROJECT $211,190.50 100% CONCRETE PAVING, WALK, LARRY NIM IO 303.762-2300 CURB & GUTTER CWC 2368 3440 S. ELATI ENGLEWOOD, CO 80110 2003-Oct. TOWN OF SUPERIO GEN MCCASLIN BLVD. IMPROVEMENTS $131,547.10 100% CONCRETE CURB, GUTTER WAYNE ROBINSON 303-2e3.8107 WALK & MEDIAN R&R CWC 2360 IR.G. CONSULTING ENO., 1331 17TH ST., DENVER REVISED PREOUAL JOB LISTXIS 4/27/2004 10:03 AM Concrete Works of Colorado, Inc. COMPLETED CONTRACTS CONTRACT OWNER/CONTRACTOR GENERAL! CONTRACT %COMP. TYPE OF DATE CONTACT SUE OWNERICONTRACT NAME AMOUNT WORK OWNER ADDRESS DATE 2WFIAay CITY OF LAKEWOOD GENERAL 2ND & VAN GORDON $60,241.99 10D% DRAINAGE IMPROVEMENTS TERRY ROGERS 303-987-7900 CWC 2240 480 S ALLISON PKWY•LAKENOOD, 0080220 2002-June TOWN OF PARKER GENERAL 20 MILE RD I MOTSENBOCKER RD $864,663.40 10D% CONCRETE PAVING CHRIS HUDSON 303-806-32m WATERLINE CWC 2252 20120 E M41N St -PARKER. 00 $0136 Jan•03 2D02-Apr CITY OF BOULDER GENERAL 2002 SIDEWALK REPAIR $473,737.18 100% R&R DAVE DOUGHERTY 303.441-32M CWC 2214 PO BOX 791-BOULDER, CO 80300 Feb-03 CURB/GTTR 2002-Feb CITY OF BOULDER GENERAL 2OD2 SMALL PUBLIC WORKS $663,D07.00 100% R&R STEPHANY WESTHISIN 303 4"1-3265 CWC 2218 PC sox CO CO 80308 Feb-03 CURB/GTTR 2002-Aug CITY 8 COUNTY OF DENVER GENERAL VIRGINIA VILLAGE STORM SEWER N $1,000,D00.00 100% STORM SEWER JIM POTTER 303.44a-3724 CWC 2260 2000 W 3RD AVE-DENVER 00 8=3 Mar-03 2003-Feb. HOAR CONSTRUCTION SUB ASPEN GROVE LIFESTYLE CENTER- $155,098.80 100% CONCRETE FOOTINGS MIKE CN40ON 205-423-2230 BUILDING G PIPE CWC 2308 Two METROPLEX OR STE 40181RMINGHAM AL 35200 Jul-03 2003-Feb, CITY OF WESTMINSTER GENERAL 2003 CONCRETE REPLACEMENT $WI,213.50 100% R&R RON ELROD 303-430.2400 CWC 2310 4ew WEST 92ND AVE. wEsTmmTER, co a0m1 Au -03 CURB/GUTR RAMPS ASPH. 20D3-June BOW MAR WATER & SANITATION GEN BOW MAR DR&ME SHORE DR $199,673.70 100% REPLACE WATER MAIN: RICHARD CASSENS-ENS CONSULTING 3034170.140d WATER MAIN REPLACEMENT 17' PVC, 8" PVC, 6" DIP CWC 2332 730 W UTTLETON aLVD. LITTLETON, CO sol2D Oct-03 2003-Feb CITY OF BOULDER GENERAL 2003 SIDEWALK REPAIR $300,873.53 100% R&R DAVE DOUGHERTY 303-441-3250 CWC 2314 PO SOX 7914OULDER CO OWN Se CURB/GTTR 2002-Nov HOAR CONSTRUCTION SUB BRIARGATE LIFESTYLE CENTER $1,342,085.40 100% NEW MARK HENDRICKS 1-205-803-2121 CWC 2290 TWO METROPLEX DR STE 400-BIRWNCKW AL 36209 Se CURBIGTTR 2002-Oct CITY & COUNTY OF DENVER GENERAL PIED CROSSING AT EASTMOOR PARK $127,477.70 100% R&R CAL WARD 720-013.4546 CWC 2282 201 wCOLFAX DEPT 50660ENVER, CO 80202 Se CURB/GTTR 2003-June GREEN MTN. WATER & SANITATKN4 GEN 2003 SYSTEM IMPROVEMENTS $287,384.55 10D% 4,560 LF 9" PVC WATERLINE DAVE FARTKOPF 303486.1581, EXT 102 314 COPPER SERVICE LINE CWC 2324 13919 W. UTAH AVE., LAKEWOOD, DO s0228 Nov-03 2003-Sept. CITY OF GREENWOOD VILLAGE GEN FIDDLER'S GREEN CIRCLE SPECIALTY $261,698.00 IOD% CONCRETE R&R, PAVING WANDA DEVARQIS, PROD. MGR. 303.70841140 CONCRETE CURBIQUTTER, SIDEWALKS, RAMPS 10001 EAST COSTILLA AVE., GREENWOOD VLG, CO Nov-03 COLOREDiPATTERNED CONCRETE 2D03-OCt. CITY OF LONGMONT GEN 2003 SEWER LINE REHABILITATION $121.591.00 100% W- PVC SEWER PIPE, BILL TAYLOR, P.E. 303-811 MANHOLE R&R, CONCRETE CWC 2350 l looscvmsHERmANsr.,LoNGMoNr CD wwi Nov-03 R&R 2003-Aug. CONNELL RESOURCES, INC. SUB STEAMBOAT SPRINGS AIRPORT/BOB $239,632.50 1009G CONCRETE PAVING PATRICK MCOOLUJA. P.E. 970.87041200 ADAMS FIELD 43D5 E. HARMONY RD.. FT. COLLINS, CO W528 Nov-03 2DD3-July CITY OF UTTLETON GENERAF 2003 STORM DRAINAGE PROJECT $343,189.46 100% R & R CONCRETE CURB, JIM REDMOND 303-7953838 GUTTER, SIDEWALK, CWC 2340 2265 WEST BERRY AVE. LITTLETOH CO 80105 Nov-03 CROSSPAN 2003-June CITY OF LITTLETON GENERAL WEST POWERS AVE. REHABILITATION S672,455A8 IOD% R 8 R CONCRETE CURB, FRANK MARBURY 303.795J8M GUTTER, SIDEWALK, CWC 2326 22a5 WEST BERRY AVE., LrrnE7GN, CO soles Oct-03 CROSSPAN 2002-Dec CITY & COUNTY OF DENVER GENERAL 2002 CITYWIDE C & G AND CROSSPAN $1,383.398.90 100% R&R GARY KNCZYNSKI 720-91346M REPAIR PROGRAM, PH 2 CWC 2302 12111 w COLFAX DEPT 506-DOMR, CO WM Nov-03 CURB/GTTR 2003-0ct LINCOLN PARK METRO DISTRICT MARKET GREEN IRRIGATK3N LINE $122,541.00 100% 17DIP PIPELINE, 6" PVC YELENA PODINOVSKAYA. PROD. ENG. 303-293-8107 PIPELINE CWC 2368 R.G. CONSULTING ENO., 1331 17TH ST., DENVER Deck{ REVISED PREOUAL JOB LISTXIs 4I271Z004 10:03 AM Concreb Works of Colorado, Inc. COMPLETED CONTRACTS ONTRACT OWNERICONTRACTOR OENERAU CONTRACT %COMP. TYPEOF DATE CONTACT Sub OWNER/CONTRACT NAME AMOUNT WORK OWNER ADDRESS DATE Jul-02 CITY OF BRIGHTON EGBERT ST NORTH OUTFALL $83,950.00 100% STORM SEWER BILL ALLEN 3M4W2000 CWC 2254 22 S 4TH AVE BRI04TON CO 80801 GENERAL Se -02 SOP-00 EAGLE COUNTY COMMISSIONERS EAGLE COUNTY AIRPORT $1,820, 339.00 100% CONCRETE PAVING 0219 ELDON WILSON RD GYPSUM 81837 GENERAL Jan-01 Oct-00 CDOT WIGGINS REST AREA $3,134,916.00 100% CONCRETE PAVING BRAD PIERCE 970-522-0481 CWC 2048 120 N RIVERVIEW RD STERLING 80751 GENERAL Jan-02 CURB/GTTR N37-00 CDOT EMPIRE $792,421.00 100% R&R JOHN UNSEWUST 303.767.0364 4201 E ARKANSAS DENVER 80222 GENERAL i CURB/GTTR N37-00 HOAR CONSTRUCTION ASPEN GROVE LIFESTYLE CENTER $3,708,773.00 100% NEW CONCRETE C & G BRIAN COOK 205.4212231 CWC 2104 SUB Feb-02 Feb-01 DOUGLAS COUNTY 2001 CONCRETE PAVEMENT REPAIR $884,365,00 100% R&R KARL LUCERO 303.61104480 CWC 2128 100 THIRD ST-CASTLE ROCK 80104 GENERAL Dec-01 CONCRETE PAVING Jan-01 DOUGLAS COUNTY YOSEMITE STREET WIDENING $1,343,154.00 100% STREET RECONSTRUCTION PATRICK WOODS 303-880.7480 CWC2118 100 THIRD BTOAsTLE ROCK$0104 GENERAL Nov-01 Nov-01 CITY OF BRIGHTON 12' WATERLINE $290,354.37 100% WATERLINE BILL ALLEN 30345&2000 CWC 2178 22 s 4TH AVE BRIGHTON CO 80B01 GENERAL Jul-02 Feb-02 SOUTHEAST TRANSPORTATION AUTHORITY TRAFFIC SIGNAL CONSTRUCTION $401,684.00 100% CONCRETE R & R JOE HE14DERSM 303-MG4875 CWC 2222 9191 SHERIDAN BLVD WESTMINSTER 8003 GENERAL Se 2 2002-Feb ARAPAHOE COUNTY GENERAL BROOKRIDGE/GRANT OUTFALL $913,044.40 100% PIPELINE OUANG NGUYGEN 720874.05M CWC 2204 10730E. BRIARWOOD AVE-CENTENNIAL, CO 80112 Au -02 2002-Jan TOWN OF CASTLE ROCK GENERAL 2001 TRAFFIC SIGNAL IMPRV $785,358.50 100% CONCRETE R&R TIM CLEMENTS•SURLSTONE 303-877-3375 CWC 2206 100 N WILCOX-CASTLE ROCK 0080104 SSI 2002-Fab LOWRY REDEVELOPMENT AUTHORITY 8TH AVEIQUEBEC ST RECONSTRUCTION $809,599.59 100% STORM SEWER ROGER WINGATE- LRA 301380-6542 CONCRETE R&R CWC 2212 S88 UINTA WAY-DENVER 00 W= GENERAL Se -02 2002-May DOUGLAS COUNTY 2002 CONCRETE PAVEMENT REPAIR $630,812.94 100% CONCRETE PAVING KARL LUCERO- DOUG AS CO. 303.8867400 CWC 2238 100 THIRD ST-CASTLE ROCV, CO 80104 GENERAL Dee-02 2002-Sept RICHMOND HOMES RIVER RUN It $285,498.32 100% NEW MATT DEIBEL 303-220.4448 CWC 2264 35DO S YOSEMITE ST-DENVER CO 8=7 GENERAL DOO-02 CURB/GTTR 2002-Nov TOWN OF PARKER EAST MAINSTREET STREETSCAPE $106,629.50 000% MEDIANS RIS HUDSON 303-805-3203 CONCRETE R&R CWC 2284 20120 E MAIN SRPARKER, DO 80138 GENERAL Jan-03 2002-May OKLAND CONSTRUCTION HOLLY CREEK LIFESTYLE CENTER $145,618.52 100% NEW C & G ALAN COLLIER-1-480.860-3330 CWC 2260 1700 N mccoNTOCK DR -TEMPS, AZ 85281 SUB NOV-02 2002-Dec CITY OF LITTLEfON GENERAL BOWLES AVENUE CONCRETE $31,0 55.00 100% CROSSWALKS DAVID FWG 301785-3786 CURB RAMPS CWC 2298 2255 W. BERRY AVE., LITTLETON. C080186 Jan-03 2002-May TOWN OF CASTLE ROCK GENERAL PLUM CREEK WATERLINE $911,100.00 100% WATERLINE BILL WEMdERT-UR53038W-2770 CWC 2234 8181 ETUFTS AVE-DENVER, 0080237 NOv-02 2002-May CITY THORNTON GENERAL 2002 TURN LANE IMPROVEMENTS $576,283.05 100% CONCRETE R & R MATT CONDOM 30157E-736y O CWC 225D MW CIVIC CENTER DR-THORMON, C080228 Jan-03 REVISED PREQUAL JOB LIST.Ids 4/27/200410:03 AM Concrete Works of Colorado. Inc. COMPLETED CONTRACTS CONTRACT DATE TRACT OENERAU CONTACT CONTRA" %COMP. TYPE OF Sub OWNER10ONTRACT NAME AMOUNT WORK OWNER ADDRESS DATE Mar-00 CITY OF BRIGHTON - TONY HUERTA 12TH AVE AND EGBERT STORM DRAIN 407, 557.50 100% PIPELINE 22 SOUTH 4TH AVE., BRIGHTON, CO 8=1 303-855-2036 GENERAL Sep-00 Mar -DO MARK ELMORE 1-25 AND HYW 52 $27,0D6.00 000% PIPELINE 3768MVY52, ERIECO 8051E 070-227-1289 GENERAL Jun-00 Mar-00 COLUMBINE LAND RES.-D000 TIEFEL 24TH/ WADSWORTH $33,888.00 100% R & R P.O. BOX 17130 BOULDER CO 80308 3D3.8854165 GENERAL Jul-00 CURB/GTTR Mar-00 LAFARGE-TOM DREILING OTIS- CDOT SH34(WASHINGTONMIMA) $115,750.00 10D%R&R 1600 N. TAFT HILL RD., FT. COLLINS CO W522 970-407-3642 SUB 9e CURB/GTTR May-00 DOUGLAS COUNTY-KARL LUCERO 2DO0 CONCRETE 8585,091.00 100% R&R 100 THIRD Sr., CASTLE ROCK 00 30104 303-660.7490 GENERAL Nov-00 CURBIGTTR May-00 ENGLEWOOD-DAVE HENDERSON PARKWAY EKTENSION ROUNDABOUT $I,369,277.00 100% R&R 1000 ENGLEWOOD PKY ENGLEWOOD, CO 90110 303-762-2506 GENERAL Au -01 CURB/GTTR May-00 ENGLEWOOO-DAVE HENDERSON DARTMOUTH a INCA $177,808.00 100% R&R 10D0 ENGLEWOOD PKY ENGLEWOOD. Cc 80110 303.782-25M GENERAL Au -00 u" CUR CURB/GTTR May-W ENGLEWOOD-DAVE HENDERSON FLOYD AVENUE WIDENING $150,000.00 1000 ENGLEWOOD PKY ENGLEWOOD, CO $0110 303.762-2W6 GENERAL Nov-W CURB/GTTR May-00 ENGLEWOOD-DAVE HENDERSON S. BROADWAY WIDENING $4,145,186.00 100% R&R IWO ENGLEWOOD PKY ENGLEWOOD, CO W110 Jun-00 303-762-2506 GENERAL BOULDER-BARBARA KENYON N. BOULDER PARK WATERLINE $927,223.00 Nov-00 100% CURB/GTTR PIPELINE PO BOX 791 BOULDER, CO 8030E 303-441-3293 GENERAL Jun-01 Jan-00 ALIX MAY BOBOX SKUNK CREEK UNDERPASS $1,794.744.71 1 W% PED, & BIKE UNDERPASS Po BO%791 791 BOULDER, CO 8030E 303-4413286 GENERAL Au -01 Mar-01 CITY OF LAKEWOOD 2001 BIKEPA I HE. SIDEWALKS $614,478.45 1 W% CONCRETE R & R WAYNE CAMPBELL 303987-79W CWC 2130 480 s ALLISON PKWY LAKEWOOD w= GENERAL May-01 CITY OF GREENWOOD VILLAGE BELLEVIEW AND DAYTON $378,291.55 100% CONCRETE R & R WANDA DEVARGAS 303-70841140 CWC 2142 80808 QUEBEC GREENWOOD VLG 80111 GENERAL Ma -02 Jul-01 CITY OF THORNTON 120TH AVE WIDENING $1,230,351.69 100% STREET RECONSTRUCTION TT CONDON 303-5367368 CWC 2120 woo CIVK: CENTER DR THORNTON 80220 GENERAL 1 JUI-M ARAPAHOE COUNTY ARAPAHOE I DUEBEC INTERSECTION $4,983,207A9 100% STREET RECONSTRUCT ION VERN TABERT 72D 874-5570 OWC 2144 1D730 E BRIARWOOD CENTENNIAL $0112 GENERAL Jun-02 May02 CITY OF ARVADA 2D02 CONCRETE REPLACEMENT II $180, 185.00 IW% CONCRETE R & R PATRICK DOUGHERTY 303421-2550 CWC2236 1 8101 RALSTON RD ARVADA MM GENERAL Se 02 REVISED PREOUAL JOB UST.%Is 4/271200410:03 AM Concrete works of Colarado, Inc. COMPLETED CONTRACTS CONCRETE WORKS OF COLORADO, INC. CONTRACT OWNERKONTRACTOR OENERAU CONTRACT %COMP. TYPE OF DATE CONTACT SUB OWNERICONTRACT NAME AMOUNT WORK OWNER ADDRESS DATE SOP-97 CDOT - RON BUCK SANTA FEIBELLEVIEW PH II $16,596,858.00 100% PAVING, STRUCTURES, 4201 E. ARKANSAS AVE., DENVER CO 8=2 WATERLINE CWC 9790 303-798.7664 GENERAL Jan-99 CONCRETE Feb-98 ENGLEWOOD, CITY- DAVE HENDERSON INCA STREET $499,528.00 100% NEW STREET CONSTRUCT 3400 S. ELATI, ENGLEWOOD, CO 80110 CWC 9650 303-789-1125 GENERAL DOC-99 CONCRETE Apr-98 BOULDER, CITY-DAVE DOUGHERTY BOULDER CONCRETE PATCH $998,341.00 100% R 8 R 1777 BROADWAY, BOULDER, DO 80306 CWC 9805 303-4893794 GENERAL Au-9B CONCRETE Sep-98 ENGLEWOOD, CITY LARRY NIMMO ENGLEWOOD PAVING IMPRV $1,121,645.00 100% PAMNG,CONCRETE IMPR. 3440 S. ELATI ENGLEWOOD. 00 80110 CWC 9815 303-762-2300 GENERAL Dec-99 Nov-28 CDOT • RON BUCK SANTA FEIBELLEVIEW PHIII $5,892,379.00 100% R 8 R 4201 E. ARKANSAS AVE., DENVER CO 80222 303-798.7664 GENERAL Jun-00 CONCRETE Jun-99 LAFARGE, TERRI MAREZ SH 6 - GOLDEN $179,316.00 100% R 8 R IBM NORTH TAFT HILL RD., Fr. COLLINS CO SM22 970-4073600 SUB Se 99 CONCRETE Oct-98 HAMON - LARRY 1.225/ PARKER ROAD $1,156,705.00 100% PAVING 8870 FRANKLIN Sr., DENVER, CO 80210 303-297-0340 SUB Dec-00 Oct-98 ED KRAEMERISONS - TIM MALONEY 1-70 - FLOYD HILL $1, 152, 112.00 100% PAVING 880 ATCHINSON WAY ST., CASTLE ROCK 80104 303-SW7500 SUB Oct-00 Jan-99 BOULDER -DON VETTERLING VETTERLING IN912000 $200,000.00 100% R&R PO BOX 791 BOULDER, 00 00300 GENERAL Dec-00 CURBIGTTR May-99 LONGMONT- TOM THOMPSON 9THIHOVER $403,150.00 100% R 8 R 11D0 S. SHERMAN, LONOMONT CO MWi 303-851.8345 GENERAL Jun-00 CONCRETE Sep-99 BOULDER, CITY -DAVE DOUGHERTY PEDESTRIAN IMPROVE. 9 57,906,268.00 100% R & R 1777 BROADWAY. BOULDER 00 80300 303-441-3266 GENERAL Oct-00 CONCRETE Sep-99 LONGMONTILDDA- NEIL LOOKER LONGMONT DOWNTOWN D.A. $3,026,242.00 100% STREETSCAPE, CONCRETE $28 MAIN Sr., LONGMONT CO 80601 303-651-8494 GENERAL Se Nov-99 CENTRIC JONES - DAVID CAMPBELL ALLEN WATER TREAT. PLANT $69,636.80 100% CURBIGTTR 5490 W. 13TH AVE., LAKEWOOD, CO 80214 303-788-0864 GENERAL r-00 SIDEWALK Dec-99 LONGMONT, CITY -ALAN BRYNING 17THIPACE $2,662,057.00 100% INTERSCTN 1100 S. SHERMAN, LONOAIONT CO 80501 ?03-651-8494 GENERAL Mar-00 RECONSTR Feb-00 LEFT HAND WATER DIET.-K. PETERSON HWY 5211-25 $119,937.00 100% PIPELINE P.O. BOX 210 MWOT 00 805" 303-5304200 GENERAL Mar-00 Mar-00 HIGHLANDS RANCH METRO #3 STORM DRAINAGE - PIPE 53 $308,540.00 100% PIPELINE 62 W. PLAZA DR. HIGHLANDS RANCH 00 80128 CHRIS SEELEY 303-791-0430 GENERAL Jun-00 REVISED PREQUAL JOB UST.xIs 4127200410:03 AM CONCRETE 'WORKS CF CCLORACC kW;TFG FC:I IlPVFN7 ; IST MAKE ' MODEL TYPE ="'�i�iG;P1�iC 1P135'vV„D COr�iFR=�:.CF I jK-15A-89 COMPR_SSCR ^iG,'GA. ,�iD iP185V`J,;C CCiblP�ESS! CR iCASE VIBROMAX SL2 PLATE COMPACTOR CATERPILL4R ICP563C ROLL -COMPACTOR I'-PJHACK R BS80O JUMNPitiG JACK 'I`10 NIR-8GHSHP ROLL -COMPACTOR --' i`pliHACKER lj'JK WP 1550AW PLATE COMPACTOR MIT-74F JUMPiN JACK ) VBW R270 PLATE COMPACTOR may/ R270 S-P R&S VIS COMPACT WAKWP 1550AW PLATE - VIBRATORY 19.5X23 i95 M1BW GP3000H PLATE COMPACTOR ;r31 JVACKER BS 60 Y PLATE COMPACTOR '3 HYSTER C6108 ROLL -COMPACTOR C"' 'NHACKER OPU6065 REV VIBRATORY PLATE 99 WACKER RS-600 PLATE COMPACTOR MBW R270 JUMPING JACK WACKER DPU6065 PLATE COMPACTOR 99 MBW AP2000H PLATE COMPACTOR 92 MBW GP3000H PLATE COMPACTOR CO PLATE COMPACTOR 971 HV-2P VIBRATOR 981GOMACO TC600 CURE PAVER/C&G 67 GOMACO 9500 TRIMMR PAVER/C&G CO DENVER CONCRETE VIBRATOR 93 NORTON 35HP 26" CONCRETE SAW SOFF-CUT GX3000 CONCRETE SAW T HANDLE JACK HAMMER �9 PARTNER K950 14" CONCRETE SAW -10 PARTNER CONCRETE SAW 98 CORE CUT 65HP 20" CONCRETE SAW 38 CUTQUICK CONCRETE SAW 21062SRAN2151 DRILL EZ )O PARTNER K950 16" CONCRETE SAW )O TRANS-FLO 606MT CEMENT BLOWER 93 NORTON CLIPPER C18AKBT CONCRETE SAW DO CON-E-CO LO-PRO 10SCM BATCH PLANT 38 GOMACO COM III GT5300 PAVERIC&G 36 CUTQUICK CONCRETE SAW 34 CUTQUICK CONCRETE SAW 38 CUTQUICK CONCRETE SAW 32 JAB CLIPPER C188 CONCRETE SAW 32 GOMACO GP2500 SLIPFORM PAVER )l HONDA CC1313H-S HONDA PUSH SAW 32 CORE CUT 26" 37 ALLEN 12 SHED SCREED MACHINE 37 DRUM D-807 CEMENT BLOWER 38 CUTQUICK ICONCRETE SAW 33 NORTON ICONCRETE SAW 3C CENTRAL ISILO CONCRETE SILO 4/9/0310:33 AMEquipment List.xls ITem fjo• 12 CONCRETE lbORK'S OF CCLCRACC \1a"P Pr�f IIPA,IP'.17 11`;Y MAKE' MODEL TYPE ';DRILL �0-21C-2SR. !CPIL_ �GOA,IACC �C G �YCL: ' {C3S 3b" h,1CL� I 1 CUTCUICK CCNCRET_ SA'N cG+ CURS IMOLD ;9810ENVEP, CONCRETE VIBRATOR '--CCIPARTNER K-95014" lCONCRETE SAW _ :^ ;,iFER^!O H`�/20-24C0 WATER HEATER 140H ART. FRAME GRADER _:"CATERPILLAR `IJOHN DEERE 280 SKIDSTER 34jCATERPILLAR 436B BACKHOE _34 JOHN DEERE 500C BACKHOE 197 CATERPILLAR 3SO CATERPILLAR 916 AP.T. WHEEL LOADER S4 CATERPILLAR 966E SER.11 ART. WHEEL LOADER 399 CATERPILLAR 914G ART. WHEEL LOADER 102 BOBCAT 102 BOBCAT i02 BOBCAT ,95 JOHN DEERE 51OD-4VUD BACKHOE iC2 CATERPILLAR 95OG WHEEL LOADER '77 BOBCAT MELROE 773 S/S LOADER JOHN DEERE 7810 MFWD 83 CATERPILLAR 950E ART. WHEEL LOADER 281BOBCAT MELROE 743B S/S LOADER 93 CATERPILLAR D7H CRAWLER -DOZER 98 BOBCAT MELROE 873 S/S LOADER CO BOBCAT MELROE 873 S/S LOADER ?2. JOHN DEERE 350C CRAWLER -DOZER i11BOSCAT MELROE 773 S/S LOADER 95 JOHN DEERE 5100 BACKHOE 86 CATERPILLAR 140G ART. FRAME GRADER 90 CATERPILLAR EL300B EXCAVATOR 97 CATERPILLAR 3458L EXCAVATOR 01 GRADALL XL5200 EXCV W/ 96"BKT #1149 98 GRADALL G3WD EXCAVATOR 94 GRADALL 660C EXCAVATOR )1 GRADALL XL3300 EXCAVATOR/ATT )2 CATERPILLAR 320BL EXCAVATOR )2 GRADALL XL3300 EXCAVATOR )2 GRADALL XL3300 EXCAVATOR 95GRADALL XL5200 EXCAVATOR DO GRADALL XL2300 EXCAVATOR 37 HONDA EM3500 GENERATOR 32 HONDA EM3500 GENERATOR 39 YAMAHA YG6600DEX OHV GENERATOR )0 YAMAHA YG4500DX OHV GENERATOR )0 YAMAHA YG4600DX OHV IGENERATOR )0 YAMAHA YG46000X OHV GENERATOR 419/0310:33 AMEquipment List.xls t-or1(,Ae works at Co/or", Ire CONTRACTOR BY: rna�LGncu+ , pres# cn ADDRESS: Izoo feocY_ Creek (+7GlC, 8. BID SCHEDULE (Base Bid) Please use the attached Bid Schedule when submitting your bid. 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. 4ni F�U/LILY SUBMITTED: �2-oore Maxr, ,LGnar, 4- Date Taa�,Aenv Title LA — License Number (If Applicable) (Seal - if Bid is by corporation) Attest,__ �o i iGinGl� StCf'efa.(1{ Address LL" R,V e,(_ ln �Ceck Ct'y'ae, e{�t, CA Soo2,6 Telephone 3 0 3 - &(oS-2-433 7/96 Section 00300 Page 2 lnaCT�R—i�I,)F!V)EMT LIST +; ,MAKE IMCCEL ITYPE -'^CNCA cM3500 lGE`IERATCR GENE A.TOR IGE,,,iERATCR - 1 . it jGENERATCR � 1 i �iNvANC0 WTSP110-LSAC ARROW BOARD 9;BROCE RJ-3CC BROOM `.0 `,VANCO 14VTSP110-LSAC ARROW BOARD liVANCO LVTSP110-LS?,C AR.RCY/ EOARD i'''vVANCO WTSP110-LSAC ARROW BOARD i1,VANCO WTSP110-LSAC2y ARROW BOARD '37iHOTSY B3035H PRESSURE WASHER ,'2 BOBCAT SB200 SNOWBLOWER +:;1 HOTSY 803513H PRESSURE WASHER 98iTRAILBLAZER 251 WELDER . i , HOTSY 770A PRESSURE WASHER 84 IMPACT TOOL 99 RRP-1999-03-15 3/4" DRILL 92 GORMAN-RUPP PUMP ISO CONTAINER 8X20 210B2SRAN2151 DRILL EZ 38 BEALL E-DUMP 2XL SEMI -TRAILER 36 FONTAINE FLATBED 1 Pi P182 PINTLE HOOK TRAILER :Q CLEMENT FLEETSTAR 2 XL DUMP ;0 MERTZ ROCKMASTER ROCK TRAILER 10 MERTZ ROCKMASTER ROCK TRAILER )' PJ 102X30 GOOSENECK TRA)L '' BEALL DUMP 1/2 RND ROCK DUMP )4 BEALL DUMP 1/2 RND ROCK DUMP )0 LOADTRAIL CH7018 CARHAULER 14 BUTLER 1014 ELECT BRAKE TRAILER )0 TRAILBLAZER TB816TA2 CARGO TRAILER 34 HOBBS 42'X96" TRAILER/STORAGE )8 HAULMARK MC610BS TRAILER/ PROFILOGRAPH 12 JAYHAWK 2001 RCM 20' GOOSENECK TRAILER )6 BEAN SMALL TRAILER ;1 TK110HDG LOWBOY )1 )7 BUTLER LT1014 TILT TRAILER !0 WABASH DURAPLATE 53' i0 HEIL SUPERJET DRY BULK TRAILER )1 FRUEHAUF SEMI -TRAILER 12 TALBERT 3 AXLE LOW SEMI -TRAILER G FORD F-350 i TON DUMP TRUCK ;0 FORD F550 SERVICE TRUCK !0 PETERBILT 378 SERIES TRUCK/TRACTOR )1 VITM BOOSTER AXLE - MIXER #839 ,1 MTM BOOSTER AXLE - MIXER # 835 4iV/U ilU:33 AMCqulpmenL usc.xs LIAST=R =-QUIP-VENjT LIB- . =; IMAKcI MOCEL ITYPE — ' tiATM 8GCSTER AXLE - VI CER 4�037 !I�IITYI Brno' S T =R AxLE - AA IX 4 1 ; ILI nCOS-ER AXLE - MIXEP #,Q-lz GMC �ORG ��CF.;PJ I GMC 25CO X-CAB PICKUP ' ';=ORD F250 SUPERCA3 PICKUP F-ORD WATER TANKER VACK CL713 TRUCKITRA.CTOR UCDGE R kl 3500 OCAS PICKUP FORD F-250 4X4 PICKUP :DODGE RAM 3500 FLATBED �C''FORD SUPROUTY FLATBED :'DODGE 2500 X-CAB PICKUP DODGE 2500 X-CAB PICKUP DODGE RAM 3500 PICKUP 9:iiDODGE RAM 3500 FLATBED C' JJEEP CHEROKEE MISC. 9:30ODGE RAM 2500 PICKUP 89 FORD F-350 X-CAB PICKUP 02 FORD FORD FLATBED 97 CHEVY C6500 2TON FLATBED 97 GMC 2500 X-CAB PICKUP CC, PETERBILT 357 AXLE #238BYF 00 PETERBILT 357 AXLE #240BYF CO PETERBILT 357 AXLE #2446YF CO PETERBILT 357 AXLE #241BYF .0,PETERSILT 357 AXLE #2425YF CC PETERBILT 357 AXLE #239BYF 20 PETERBILT 357 AXLE #243BYF CC PETERBILT 357 AXLE #245BYF CHEVY 3/4 TON X-CAB PICKUP _? iFORD PICKUP 38 CHEVY C-70 SERVICE TRUCK 33 FORD F350 FLATBED 33 FORD F350 FLATBED 32 MACK TRUCKITRACTOR D21FORD F-350 X-CAB PICKUP 39 DODGE RAM FLATBED 39 DODGE RAM FLATBED 39 DODGE RAM FLATBED 39 DODGE RAM 3500 FLATBED 39 FORD F-350 CREWCAB PICKUP D2 GMC TC6H042 FLATBED DO FORD F250 SUPERCAB PICKUP D1 FORD F350 PICKUP D1 FORD F350 PICKUP 31 FORD F350 PICKUP D1 FORD F350 PICKUP 31 FORD F350 PICKUP 39 GMC Tc7h042 WATER TANKER 79 PETERBILT INACTIVE TRUCK/TRACTOR 32 FORD F-350 FLATBED 37 CHEVY S-10 112 TON PICKUP ;0 W PICKUP - - MAST=R POUIPNIENT L!ST — - w !INTAKE MODEL TYPE �8'PETE_RBiLT 3'3 TRUCK , RA TR RC = 3aJ PIC'FJF k I -A ( ^T=n AVl = N.IIY=m f I IVY a I r J`J- SOCSTEER AXLE- - MIX=- DiFOP.D F250 SUPERCAB PICKUP GMC 2500 X-CAB JFLATBED DODGE RAM 3500 OCAS JPICKUP FORD EXPEDITION ISUN., ".I'NI BOOSTER AXLE - MIXER #833 FORD F-350 X-CAS FLATBED _ 'ICHEVY 31'4 TON SUBURBAN ,' : `FORD PICKUP 9jCOOGE P.AM X-GAB DUMP { 31ALLEN SPRAYER 9-1 PULL CART ' 9jAIMIDA AL4060D-4MH LIGHT PLANT MONOLITHIC MOLD 73" TO 84" C/G MACHINE ATTACHMENT HOPPER CROSS AUGER ASSEMBLY C/G MACHINE ATTACHMENT PROFILE TRIMMERHEAD C/G MACHINE ATTACHMENT 99 KEN -LIFT KL9000 BARRIER LIFTER 60 BOBCAT MELROE SKID ATT.-BREAKER 97 KEN -LIFT #850 BARRIER LIFTER CO BOBCAT MELROE 72" SKID ATT.-BUCKET 01 GRADALL 96 " DITCHING BUCKET 95 BOBCAT MELROE 3500 SKID ATT.-BREAKER 9 BOBCAT MELROE 3570 SKID ATT.-BREAKER 20 BOBCAT MELROE 3570 SKID ATT.-BREAKER 35 BOBCAT MELROE 2560 SKID ATT.-BREAKER 37 ALLEN 12 SHED SCREED SECTION 'JBOBCAT MELROE 66" Cl SKID ATT -BUCKET 72" DITCH BUCKET 36 BOBCAT MELROE SKID ATT.-AUGER )0 EXCAV. ATT. BUCKET 36 GRADALL 60" FOR XL5200 SKID ATT.-DITCH BUCKET 34 GRADALL 60" FOR 660C EXC. ATT.-DITCH BUCKET 31 BOBCAT HYD BREAKER #987 34 CATERPILLAR 12" HD 2.5 CF BACKHOE ATT.-BUCKET 36 BOBCAT MELROE 9197 72" SKID ATT.-BUCKET 35 ALLIED HY RAM EXCAV. ATT.-HAMMER 34 MBW NPK C-2 TRACTOR ATT. TAMPER GRADALL ATTACHMENT 72" DITCH BUCKET 36 BOBCAT MELROE SKID ATT.-BIT 36 BOBCAT MELROE SKID ATT.-BIT 35 ALLIED 750 EXCAV. ATT.-HAMMER 34 DEERE BACKHOE ATT.-RIPPER 32 3" PUMP HOSE 37 PAVING HOSE 35 BOBCAT MELROE 66" Cl SKID ATT.-BUCKET 35 BOBCAT MELROE 5774 78" SKID ATT.-BUCKET 32 UNIDEN SMS815T RADIO 4/9/0310:33 AMEquipment List.xis cuNcn� i _ ViCKKj oi- CCLOHA�:C MASER EQU1F%IE;JNi7 L ;S- ' WAKE IMOCEL !TYPE iSONIC jMASTER ILAZER i ":NIDEN4 lS,%flZ8i57 R.A3i D ?'AG_ }GLGCCA. ;=.`r E LdS- i?�1C TiLT SVSR 1 ,-, TILT ?oVC BRCKT HYDRLC KIT SONAR 3! kIC SONIC RTATN ASSMBLY SONAR = IC INTFCE BOX ASSMBLY SONAR 41C PNL ASSY SONIC CNTRL 20CC SONAR -_ RADIO P.�.NASON!C !UF835 ICCPfER I : 1, MC C-111016 CtVIPTR IRROFILCGRAPH IELECTRON IC TOTAL STATION SURVEY EQUIP ;AGL GL2000AL PIPE LASER , PANASONIC 7728 FAX MACHINE - -01EFJ 8610 RADIO 4SY RADIO ?5INEXTEL EFJ8600 RADIO ,c!SOKKIA LT8300P T-LEVEL 6 SOKKIA C41 20X AUTOLEVEL 83 RADIO 831 RADIO 831 RADIO 8 t MOBILE PHONE 84 RADIO 851 RADIO 87 E.F.JOHNSON LTR8790 RADIO 831 PHONE '.9 VIDEO CAMERA RADIO 91 CELL PHONE 9 CELL PHONE 331 CONSTRUCTION SOFTWARE RADIO 35 HEADSET :i5l HP FAX MACHINE ;51 BASE STATION RADIO 361 CELL PHONE 361 RADIO '261 SUPERDUTY RADIO ;91 ESTIMATING SOFTWARE 39 SAFE 31 DESK 31 DESK 31 DESK ?3j TOOLBOX 41g/0310:33 AMEquipment List.xls CONCRETE WORKS CF CCLORADO M ASTFP F^I IIPVP:k1T 11ST MODEL TYPE I 14;i�iG;P.:`,;�+D F185'PIJD CGA.IPRE"F i K-15--89 CCh1PRE3�OF _ `G;laa�,c P13s,Ai;C c0M-G_ssc- I I :3" iCASE ( VIBROMA SL2 ELATE COMPACTOR 2'— CATERPILL4P, CP563C ROLL -COMPACTOR IL^/t-IACKER ISS600 JUNINPING JACK `V10 MR-8GH 8HP ROLL -COMPACTOR i�dHACKER WK VIP 1550AW PLATE COMPACTOR MT-74F JUMPIN JACK ;MBW R270 PLATE COMPACTOR ImBV'/ R270 S-P R&S VIB COMPACT WAKWP 1550AW PLATE - VIBRATORY 19.5X23 )75JMBW GP3000H PLATE COMPACTOR +9e 1'WACKER BS 60 Y PLATE COMPACTOR ?3 HYSTER C610B ROLL -COMPACTOR J1 WHACKER DPU6065 REV VIBRATORY PLATE S9 WACKER RS-600 PLATE COMPACTOR MBW R270 JUMPING JACK WACKER DRU6065 PLATE COMPACTOR 99 MBW AP2000H PLATE COMPACTOR 92 MBW GP3000H PLATE COMPACTOR CO PLATE COMPACTOR 9 7 HV-2P VIBRATOR 8(GOMACO TC600 CURE PAVERIC&G GOMACO 9500 TRIMNIR PAVERJC&G C DENVER CONCRETE VIBRATOR 93 NORTON 35HP 26" CONCRETE SAW 7 SOFF-CUT GX3000 CONCRETE SAW HANDLE JACK HAMMER : 9 PARTNER K950 14" CONCRETE SAW j0 PARTNER CONCRETE SAW 98 CORE CUT 65HP 20" CONCRETE SAW 98 CUTQUICK CONCRETE SAW 210B2SRAN2151 DRILL EZ D0 PARTNER K950 16" CONCRETE SAW 10 TRANS-FLO 60BMT CEMENT BLOWER 33 NORTON CLIPPER C18AKBT CONCRETE SAW 70 CON-E-CO LO-PRO 10SCM BATCH PLANT 38 GOMACO COM III GT6300 PAVER/C&G 36 CUTQUICK CONCRETE SAW 34 CUTQUICK CONCRETE SAW 38 CUTQUICK CONCRETE SAW :12 JAB CLIPPER C188 CONCRETE SAW 32 GOMACO GP2500 SLIPFORM PAVER )1 HONDA CC1313H-S HONDA PUSH SAW )2 CORE CUT 26" 37 ALLEN 12 SHED SCREED MACHINE 37 DRUM D-807 CEMENT BLOWER 38 CUTQUICK CONCRETE SAVE/ 33 NORTON ICONCRETE SAW 30 CENTRAL SILO ICONCRETE SILO 4i9/0310:33 AMEquipment List.xls CONCRETE `aNCRKS OP CCLCP4uC MASTER FClJlQkIR'VT !_IST =: '4IAKE• 1MOOEL TYPE :•';GRILL [C-21C-2SRA (GRILL , �011IACC 1C& j,MCLr. !G0�14CC C&O iCLC C&^v 38 MCL:--' 3; CUTOUfCK 1CCNCRETE SAT; Jcc i CURB MOLD -981DENVER CONCRETE VIBRATOR ':W10ARTNER K-950 14" CONCRETE SAW 1ifiFE,R�N0 H'jA/20-2400 jktiATER HEATER i � :?'CATERPILLAR 140H ART. FRAME GRADER C2?JOHN DEERE 230 SKIDSTER , , CATERPILLAR 436B BACKHOE :3-> JOHN DEERE SOOC BACKHOE i ICATERPILLAR CATERPILLAR 916 ART. WHEEL LOADER =: CATERPILLAR 966F SER.11 ART. WHEEL LOADER i99 CATERPILLAR 914G ART. WHEEL LOADER )02 BOBCAT 102 BOBCAT 102 BOBCAT +S5 JOHN DEERE 5100-4VJD BACKHOE i02 CATERPILLAR 950G WHEEL LOADER ,77 BOBCAT MELROE 773 S/S LOADER JOHN DEERE 781 O MFWD e3 CATERPILLAR 950E ART. WHEEL LOADER 38 BOBCAT MELROE 743B S/S LOADER 93 CATERPILLAR D7H CRAWLER -DOZER 68 BOBCAT MELROE 873 S/S LOADER CC BOBCAT MELROE 873 S/S LOADER ^._ JOHN DEERE 350C CRAWLER -DOZER < 1BOBCAT MELROE 773 S/S LOADER 95 JOHN DEERE 5100 BACKHOE 86 CATERPILLAR 140G ART. FRAME GRADER 90iCATERPILLAR EL3006 EXCAVATOR 97 CATERPILLAR 3456L EXCAVATOR 71 GRADALL XL5200 EXCV W/ 96"BKT #1149 98 GRADALL G3)ND EXCAVATOR 34 GRADALL 660C EXCAVATOR .1 GRADALL XL33(10 EXCAVATOR/ATT 32 CATERPILLAR 3208L EXCAVATOR 72 GRADALL XL3300 EXCAVATOR )2 GRADALL XL3300 EXCAVATOR 35;GRADALL XL5200 EXCAVATOR JO GRADALL XL2300 EXCAVATOR 37 HONDA EM3500 GENERATOR 32 HONDA EM3500 GENERATOR 39 YAMAHA YG6600DEX OHV GENERATOR )OIYAMAHA YG4600DX OHV GENERATOR )OiYAMAHA YG4600DX OHV GENERATOR )0 YAMAHA YG4600DX OHV IGENERATOR 4/9/0310:33 AMEquipment List.xls MaSTPP F.'J IIPfl PN7 11ST MAKE, MCCEL TYPE _!� CNCA lEm3qcc GE`IERATCR. ! " HO�IGa jGEi,iERATOR =CNCA iGENER_17CR jXCL'•..ti= VINANC0 WTSP110-LSAC JARROWBOARD CROCE RJ-300 ISROONI -' I`,VANCO `NVTSP110-LSAC ARROVI BOARD ? `N.�NCO L4TSP110-LS�1C ARROVl BOARG �AVANCO WTSPIIC-LSAC JARROW SOARC �CIbVANCO VLTSP110-LSAC25 JARROW BOARD .. i ':7!HOTSY B3035H PRESSURE WASHER ' _^ BOBCAT SE3200 SNOWBLOWER 1 HOTSY B03513H PRESSURE WASHER Z_�SiTRAILBLAZER 251 WELDER HOTSY 770A PRESSURE WASHER 34 IMPACT TOOL 99 RRP-1999-03-15 3/4" DRILL 92 GORMAN-RUPP PUMP ISO CONTAINER 8X20 210B2SRAN2151 DRILL EZ 38 BEALL E-DUMP 2XL SEMI -TRAILER 36 FONTAINE FLATBED l Pi P182 PINTLE HOOK TRAILER 0 CLEMENT FLEETSTAR 2 XL DUMP )0 MERTZ ROCKMASTER ROCK TRAILER �0 MERTZ ROCKMASTER ROCK TRAILER PJ 102X30 GOOSENECK TRAIL ;AjBEALL DUMP 112 RND ROCK DUMP ':4 BEALL DUMP 112 RND ROCK DUMP l0 LOADTRAIL CH7018 CARHAULER 14 BUTLER 1014 ELECT BRAKE TRAILER 70 TRAILBLAZER T8816TA2 CARGO TRAILER 34 HOBBS 42'X96" TRAILER/STORAGE 38 HAULMARK MC61OBS TRAILER/ PROFILOGRAPH 12 JAYHAVVK 2001 RCM 20' GOOSENECK TRAILER fE BEAN SMALL TRAILER ;1 TK110HDG LOWBOY li i7 BUTLER LT1014 TILT TRAILER l0 WABASH DURAPLATE 53' s0 HEIL SUPERJET DRY BULK TRAILER ti FRUEHAUF SEMI -TRAILER 12 TALBERT 3 AXLE LOW SEMI -TRAILER 13 FORD F-350 1 TON DUMP TRUCK 10 FORD F550 SERVICE TRUCK 10 PETERBILT 378 SERIES TRUCK/TRACTOR 11 JMTM BOOSTER AXLE - MIXER #839 I LMTM BOOSTER AXLE - MIXER # 835 4/U/U310:33 AMLqulpment List.xis MAS?"FR FO+'IPVFNT LIST I.'YIAKE JMOCEL TYPE . M T M 8CCSTER AX"E - % XER #e3 7 I i{a1T}fl BC DS I —R AXLE 1TM BCCS'=R AX = - NAIXE= #9 �! �1IC AIC IC-3C 27CN F_a � DPD IGMC 2500 X-CAS PICKUP FORD F250 SUPERCAB PICKUP :FORD WATER TANKER ',WCK CL713 TRL'CK/TR,a.CTCR CCOGE RAM 3500 CCA.o PICKUP i ORD F-250 4X4 PICKUP 'BODGE RAM 3500 FLATBED ::;FORO SUPROUTY FLATBED "•,DODGE 2500 X-CAB PICKUP iDODGE 2500 X-CAB PICKUP DODGE RAM 3500 PICKUP SSiDODGE RAM 3500 FLATBED C-? IJEEP CHEROKEE MISC. ,394DODGE RAM 2500 PICKUP 89 FORD F-350 X-CAB PICKUP 02 FORD FORD FLATBED 97 CHEVY C6500 2TON FLATBED 97 GMC 2500 X-CAB PICKUP CC PETERBILT 357 AXLE #238BYF 00 PETERBILT 357 AXLE #240BYF 00 PETERBILT 357 AXLE #244BYF 00 PETERBILT 357 AXLE #241 BYF _01 PETERBILT 357 AXLE #2426YF CC PETERBILT 357 AXLE #2396YF -0 PETERBILT 357 AXLE #2436YF C PETERBILT 357 AXLE #245BYF ?? CHEVY 314 TON X-CAB PICKUP FORD PICKUP 38 CHEVY C-70 SERVICE TRUCK 33 FORD F350 FLATBED 33 FORD F350 FLATBED 32 MACK TRUCK/TRACTOR 32 FORD F-350 X-CAB PICKUP 39 DODGE RAM FLATBED 39 DODGE RAM FLATBED 39 DODGE RAM FLATBED 39;DODGE RAM 3500 FLATBED 39 FORD F-350 CREWCAB PICKUP 32 GMC TC6H042 FLATBED 30 FORD F250 SUPERCAB PICKUP 31 FORD F350 PICKUP 31 FORD F350 PICKUP 31 FORD F350 PICKUP 31 FORD F350 PICKUP 31 FORD F350 PICKUP 39 GMC Tc7h042 WATER TANKER 79 PETERBILT INACTIVE TRUCK/TRACTOR 32 FORD F-350 FLATBED 37 CHEVY S-10 1/2 TON IPICKUP .0 1 W 1PICKUP - -" VASST'=ram u�,!PVEN� L IS_ ''.t iNIAKE IMOCEL TYPE j -2'?ET ERB;LT 3-3 TRUCK,7'R,A TCR FL AT:ED =CRD P b s AXE �ti (c . I :DIFORD F250SUPERCAB 1PICKUP 'IGMC 2500 X-CAB FLATBED iSd,DOOGE RAM 3500 QCAB JPICKUP C' IFORD EXPEDITION Isuv 'I NI BOGS TER AXLE - iIMIXER #833 FORD F-350 X-CAB FLATBED 'iCHEVY 3!4 TON SUBURBAN 9'FORD PICKUP ,9;DOOGE RAM X-CAB DUMP �3!ALLEN SPRAYER 971 PULL CART 39IAN11DA AL40600-4MH LIGHT PLANT MONOLITHIC MOLD 73" TO 84" C/G MACHINE ATTACHMENT HOPPER CROSS AUGER ASSEMBLY C/G MACHINE ATTACHMENT PROFILE TRIMMERHEAD C/G MACHINE ATTACHMENT 99 KEN -LIFT KL9000 BARRIER LIFTER u '0 BOBCAT MELROE SKID ATT.-BREAKER 97 KEN -LIFT #850 BARRIER LIFTER CO BOBCAT MELROE 72" SKID ATT.-BUCKET Cl GRADALL 96 " DITCHING BUCKET 95 BOBCAT MELROE 3500 SKID ATT.-BREAKER 99 BOBCAT MELROE 3570 SKID ATT.-BREAKER �0 BOBCAT MELROE 3570 SKID ATT.-BREAKER y5 BOBCAT MELROE 2560 SKID ATT.-BREAKER 37 ALLEN 12 SHED SCREED SECTION ',7 iSOBCAT MELROE 66" Cl SKID ATT.-BUCKET 72" DITCH BUCKET 36 BOBCAT MELROE SKID ATT.-AUGER JO EXCAV, ATT. BUCKET 36 GRADALL 60" FOR XL5200 SKID ATT.-DITCH BUCKET 34 GRADALL 60" FOR 660C EXC. ATT.-DITCH BUCKET ]1 BOBCAT HYD BREAKER #987 34 CATERPILLAR 12" HD 2.5 CF BACKHOE ATT.-BUCKET 38 BOBCAT MELROE 9197 72" SKID ATT.-BUCKET 35 ALLIED HY RAM EXCAV. ATT.-HAMMER 34 MBW NPK C-2 TRACTOR ATT. TAMPER GRADALL ATTACHMENT 72" DITCH BUCKET 36 BOBCAT MELROE SKID ATT.-BIT 36 BOBCAT MELROE SKID ATT.-BIT 35 ALLIED 750 EXCAV. ATT.-HAMMER 34 DEERE BACKHOE ATT.-RIPPER 32 3" PUMP HOSE 37 PAVING HOSE 35 BOBCAT MELROE 66" Cl SKID ATT.-BUCKET 35 BOBCAT MELROE 5774 78" SKID ATT.-BUCKET 32 UNIDEN SMS815T RADIO 4/910310:33 AMEquipment List.xls C UMCk� i ` V/CKKS UP CULUFA: 0 n.laS"•F!:� cr„!IP1 PM7Iic7 'vh MODEL (TYPE =-ISON1C IMASTER- NIDE`!I S,ildS215T R.,DIC -I+,1C TILT SNSF PiAR iJv�irlR, _ :,�dC 8RCK7 HYDRLO KIT SONAR i1,1C SONIC RTATN ASSMBLY SONAR 5' ilC INTFCE BOX ASSMMBLY SONAR r, PNL ASSY SONIC CNTRL 2000 SONAR - RADIO -=�A; jASONt;C UF835 CCPIER 'iIPMC f D-111018 C1%IPTR PROFILOGRAPH IELECTRONIC TOTAL STATION SURVEY EQUIP IAGL GL2000AL PIPE LASER iPANASONIC 7728 FAX MACHINE :. EFJ 8610 RADIO = ; 4SY RADIO ^]:.,NEXTEL EFJ8800 RADIO cISOKKIA LT8300P T-LEVEL 96 SOKKIA C41 20X AUTOLEVEL 83 RADIO 83 RADIO 33 RADIO �•k MOBILE PHONE 84 RADIO 851 RADIO 37 E.F.JOHNSON LTR8790 RADIO 881 PHONE VIDEO CAMERA i RADIO 1 CELL PHONE S^j CELL PHONE A3{ CONSTRUCTION SOFTWARE RADIO HEADSET 35 HP FAX MACHINE ;51 BASE STATION RADIO Dei CELL PHONE 361 RADIO 36 SUPERDUTY RADIO 39 ESTIMATING SOFTWARE 3g SAFE 31 DESK j1 DESK 31 DESK TOOL BOX 4/9/0310:33 AMEquipment List.xls SECTION •00410 BID BOND KN ALfL MEN BY THESE PRESENTS: that we, the undersigned oncrete orks o oloradn_ 7n�_ as Principal, and Hartford Fire Insurance Company as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $-------- 5%--------- for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort -Collins Project, WEST ELIZABETH STREETSCAPE IMPROVEMENTS; BID NO. 5951. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall he accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER; '7/96 Section 00410 Page 2 concrete works of colorado, inc, 1260 rock creek circle lafayeffe, colorado 80026 303-665-2933 \ fax 303-665-2980 Marc Lenart Concrete Works of'Colorado, Inc./ Platte River Pipeline, Inc. President/ Owner Professional Registrations Active, prominent member of the Colorado Contractors Association Active, prominent member of the ACPA (American Concrete Paving Association) Work History Marc has significant heavy highway and pipeline construction experience, which began in the early 1970's. In 1978, he formed his own construction company, Concrete Works of Colorado, and incorporated it in 1980. Marc has built Concrete Works up from a single pickup truck with a few employees to the current 125 employee, very successful company doing up to $26M worth of work per year. Marc is a very hands-on owner and values doing the highest of quality work, building tough, challenging projects with tough, challenging deadlines and building good, long lasting relationships with Owners, clients, suppliers, subcontractors and employees. Marc sets high standards for work ethic, quality work and integrity and sets similar, clear expectations of all employees of Concrete Works of Colorado, Inc. Marc's construction experience includes: sidewalk, curb and gutter and concrete replacement, mainline concrete paving, street and intersection construction and reconstruction, underpasses, retaining walls, bridges, and all pipeline and utility construction including waterline, sanitary sewer and storm sewer. Marc recently purchased a new concrete plant and currently operates this plant providing concrete for all Concrete Works projects as well as concrete to the general public. In 1999, Marc formed an affiliated company, Platte River Pipeline. Platte River Pipeline has increased Marc's ability to compete for and complete a wide range of utility projects and provides for all the utility related work connected with all Concrete Works' heavy highway projects. road building & street construction • curb & gutters & excavation/bridges 1'rF,M No • 14 concrete works of Colorado, inc. 1260 rock creek circle iafayefte, Colorado 80026 Richard Brasher, P.E. 303-665-2933 \ faX 303-665-2980 Concrete Works of Colorado, Inc. i Platte River Pipeline, Inc. General Manager Education B.S., Civil Engineering Professional Registrations Registered Professional Engineer, Colorado Professional Experience Dick Brasher has 22 years of experience in the engineering design, project management, construction management and construction industry. His experience ranges the spectrum from private sector, consulting engineering, to public sector, municipal engineering/ project management, to private sector, construction. His experience has consistently related to the design, management, construction and implementation of public works projects. Projects have included street and intersection construction and reconstruction, bridges, underpasses, bikepath and pedestrian improvements, waterline and storm sewer improvements and a wide variety of other public works related projects. He has managed professional engineering project management staffs and has been responsible for budget development, budget tracking and complete implementation of public works capital improvement programs. Work History KKBNA Consulting Eneineers — 1980 to 1986 Design and Project Engineer. Dick was responsible for the design and management of numerous public works related projects including transportation projects, bridge projects and utility projects. He had significant experience in the construction management and implementation of these projects as we1L Cim of Boulder. Public Works — 1986 to 1991 Engineering Project Manager. Dick was responsible for the design, management and construction of numerous transportation and utility projects. Projects included street improvements, bridge replacements, bikepaths, underpasses, overlay programs, sidewalk replacement programs, storm sewer improvements and water main relocations. His responsibilities included: project design and management, public involvement, budget development and tracking, scheduling, construction management and contractor negotiations. City of Boulder Public Works - 1991 to 2001. Eng. Project Management Coordinator. Dick managed a staff of 10, including 5 Engineering project managers, civil engineers, technicians and inspectors. He was responsible for the entire implementation of the Transportation Divisions Capital Improvement Program. Responsibilities included: budget development and tracking, design and construction management, contract administration, contract negotiations, board and city council presentations and considerable public involvement. Concrete Works ofC'olorado, Platte River Pipeline— 200 to present General Manager. Dick is responsible for day-ta-day operations, contract and cost negotiations, project management and iimp iementatioP., nlaiittnini%ig client and o'a'ner reladoris, scheduling, project cost development and Lra Cl•�in _. ;.i7d aft a -round `tneral -JrCblein Jiii\ inn and compa.^.v spokesman. road tb/'Jilding & Sireet ConstrUctlon • Curd N gutters & excavation/bridges concrete works of colorado, inc, 1260 rock crock circle lafcyoT;o, colorado 80026 303-665-2933 \ fax 303-665-2980 .Yuan Blanco Concrete forks of Colorado, Inc. Plane RiverPipehne, Inc. General Superintendent Profess,,orul Experience Mr. Blanco has over 26 years of pipeline and utility related construction experience. His experience ranges from hands on pipe laying and construction to general superintendence, running several crews and projects at a time. He has experience with all utilities including waterline, sanitary sewer, and storm sewer and in all pipe types and sizes. He has constructed city water main replacement projects as well as long, large diameter pipeline projects. Mr. Blanco is hard driven and values high quality work and building long lasting working relationships. `chile working in the Denver metro area, Mr. Blanco has developed an outstanding reputation with many municipalities, counties, water and sanitation districts, and with the Denver Water Board. Mork E_ rerience Aurora Pipeline Company - 1978 to 1983. Project foreman-' Superintendent. Mr. Blanco worked mostly on residential and commercial development utility installations inchading water, sanitary and sewer. TIC (The Tndust:-ial Cornpany)/ ERS - 1983 to 1989. General Superintendent. Mr. Blanco worked mostly on residential and commercial development utility installations, including water, sanitary and storm. He also worked on a number of lame diameter water and sanita-ry sewer pipeline projects. He managed and was responsible for several projects and several crews. Adam IT Construction Company - 1989 to 1994. General Superintendent. Mr. Blanco was responsible for several utility pipeline projects, mostly water and was responsible for several crews. Proto Construction - 1994 to 1999. General Superintendent. Mr. Blanco was responsible for several subdivision utility projects, several large diameter pipeline projects and several crews. Projects included installing ? miles of 3b" steel water pipeline and 1; miles of:6" ductile water pipeline. Platte Fiver Pipeline - 1999 to Present. Vice -President, General Superintendent, In 1999, Concrete Works of Colorado fo^red Plane River Pipeline (PRP) and D1r. Blanco was hired :s Vice- President and General Superintendent. Mr. Blanco is responsible for the day-to-day operation of Platte River Pipeline and is responsible for al's P RP pr ;eons. He is hands on and is intimately involved in all PRP projects. He has completed nlamero'Us projects. lnClt;f inS`.• City cf 1.1-n-amont - 17"� and Pao . Waternne, sa-:tan, se.ker and sto,-n sewer. City (.-f Boui:icr - 2 )OO water main replace^;eat. City of Boulder - 29 'and Colorado. 12" v, ater tnain instaaatien. City of Boulder - Broadwav and Bo`,16er Creek. 12'" water main --id 12" sarita:y sewer in c,v :an nn ___ nn.,.„�rnc.'rl �C=c_ _.__`fir.,.,. �.r�=�_ c•,c^.7 ""''i'..-.._� ..r.^.Ecnno Pla e Canvol. Water _-'1rs*m 'J ec:t C` i.4ter ptt�tlrrre .'s:'-_111^.:?:i. -1 i .ai;ie[e:. s C:t' OI ✓ i?t J,' 'Yitil _I_ i+»..:-I.1 ���'� 7Ulilili I a SiI ` _ ( i. JCTi�1!l Ll s'. �ia — �KC�V—it concrete works of Colorado, inc. 1260 rock creek circle, lafayeite, colorado 80026 303.665.2933 / 303.665.2980 fax COMPANY OFFICIALS: Marc Lenart: Marc is the president/owner of Concrete of Concrete Works of Colorado, Inc. Concrete Works was incorporated in June, 1980. Dick Brasher: Dick started with Concrete Works of Colorado, Inc. in 2001 and is the General Manager and Vice President. Jodi Michel: Jodi started with Concrete Works of Colorado, Inc. in 1999 and is presently the Secretary/Treasurer. She serves as the Office Manager and handles accounting, project administration and accounts receivable duties. ADMINISTRATIVE STAFF: Dick Brasher: Dick started with Concrete Works of Colorado, Inc. in 2001 and is the General Manager and Vice President. Brad Kivett: Brad started with Concrete Works of Colorado in 2004 and is the Controller. Jodi Michel: Jodi started with Concrete Works of Colorado, Inc. in 1999 and is presently the Secretary/Treasurer. She serves as the Office Manager and handles accounting and accounts receivable duties. Patti McCubbin: Patti started with Concrete Works of Colorado, Inc. in 1998. She is the Director of Human Resources. Sheree Clay: Sheree started with Concrete Works of Colorado, Inc. in 2000. She is the Safety/Risk Manager. ESTIMATING/PROJECT ADMINISTRATION: David Taylor: Dave started with Concrete Works of Colorado in February 2004 and is the Utilities Estimator. concrete works of colorado, inc. Rea Ann Fletcher: Rea Ann came to Concrete Works of Colorado, Inc. in 2002. She is the Project Administrator and Bid Coordinator. PROJECT SUPERINTENDENTS: Juan Blanco: Juan started with Concrete Works of Colorado, Inc./Platte River Pipeline in 1999. He is the Vice President and General Superintendent for Platte River Pipeline. Gary Coffey: Gary started with Concrete Works of Colorado, Inc. in 1992 and is presently a supervisor for the company. Jeff Darnell: Jeff started with Concrete Works of Colorado, Inc. in 1990 and is presently a supervisor for the company. Ryan Stice: Ryan started with Concrete Works of Colorado, Inc. in 1991 and is presently a supervisor for the company. John O'Brien: John started with Concrete Works of Colorado, Inc. in 1986 and is presently a supervisor for the company. Scott Jacobson: Scott started with Concrete Works of Colorado, Inc. in 2000 and is presently a supervisor for the company. concrete works IV of colorado, inc. 1260 rock creek circle, lafayette, colorado 80026 303.665.2933 / 303.665.2980 fax PUBLIC LLABILITY DETAILS Commercial General Liability: $1,000,000.00 (each concurrence), Fire Damage: $300,000.00 (any one fire), Medical Expense $5,000.00 (any one person), Personal and ADV Injury $1,000,000.00, General Aggregate $2,000,000,00, Products — Comp/OP AGG $2,000,000.00. The above is insured by Travelers Indemnity Company; agents are: Flood & Peterson Insurance, Inc., 9351 Grant St., Suite 600, Denver, CO 80229.Telephone: (720) 977-7100 Workers Compensation and Employers Liability: E.L. $500,000.00 (each accident), E.L. — Worker's Comp. $500,000.00 (each employee), E.L. Disease $500,000 (Policy Limit). The above is insured by Pinnacol Assurance; agents are: Flood & Peterson Insurance, Inc., 9351 Grant St., Suite 600, Denver, CO 80229.Telephone: (720) 977-7100 1 jC� W , Z-1 "PR-22-04 THU 12:00 PM CITY/FT COLLINS, PURCHAS FAX NO, 970 2216707 P, 01/08 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No.1 BID #5851 BID 85851 WEST ELIZABETH STREETSCAPE IMPROVEMENTS SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid *5851 West Eli2abeth Streetscape Improvements OPENING DATE: April 28, 2004, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. 1. Delete item 514, Fencing/Pedestrian Railing. - - 2. Add new item number 514- Ornamental -Metal Fence on Concrete Wall, 58 LF. - 3. Delete detail 6 on page 28 of the plan set and replace with detail 6/28 Concrete Retaining Wall, attached. 4. Add Item No. 614 Omamental Metal Fence with Mow Strip, 85 LF, 5. Add Detail No. 62/28 Ornamental Metal Fence with Mow Strip, attached, to the plan set. 6. Contractor must use revised bid schedule, attached. If you have any questions please contact John Stephen, CPPO, Senlor, Buyer, at 970-221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THATTHIS ADDENDUM HAS BEEN RECEIVED. 215 North Mason Street • 2nd Floor 9 P.O. Box 580 • Fort Collins, CO 80522�0580 • (970) Z21-6775 • FAX (970) 221-6707 APR-22-04 THU 12:00 PM CITY/FT COLLINS, PURCHAS FAX NO. 970 2218707 P. 02/08 1" CHAMFER EXPANSION JOINT FINISH GRADE OF CONCRETE WALK 40 BHA DESIGN, INC. 4803 Innovoiion Dr. Fort Co&4 CO 80525 pho (970)223-7577 4. ro7rno'7a_ia'J7 z N CONCRETE RETAINING WALL ORNAMENTAL METAL FENCE 2 1 /2" 8 X 12 GA. POST 5"X5" STEEL PLATE, WELD POST TO PLATE ANCHOR BOLT PLATE TO CONCRETE (4 PLACES PER POST) EXPANSION JOINT EXISTING CONC. PAVEMENT (5) #4 AS SHOWN COMPACTED SUBGRADE (95 SPO) I PRAT: WEST EUZABETH BIKE LANES WMRMA AND STREETSCAPE IMPROVEMENTS SKADI PROJECT N0, BID NO.5851 DATE: APRIL 2Q 2004 W E= Aftl120.2001 D1 SOMON: CONCRETE RETAINING WALL own TAI F. W T t APR-22-04 THU 12:01 PM i i. i CITY/FT COLLINS, PURCHAS FAX N0, 970 2216707 1. ORNAMENTAL METAL FENCE 2 1/2" Z X 12 GA. POST 1" CHAMFER 5"X5" STEEL PLATE, WELD POST TO PLATE ANCHOR PLANTING AREA BOLT PLATE TO CONCRETE (4 PLACES PER POST) -- - - - - - - - - - ---EXPANS1014 JOINT - - - EXISTING/NEW CONC. PAVEMENT 4010 BHA DESIGN, INC. 4803 Innovo►7on Or, Fort C Uns, CO 80525 phn (970)223-7577 6v ra7n+'77.q.7 A427 COMPACTED SUBGRADE (95 SPD) #4 AS SHOWN 6.2-� ORNAMENTAL METAL FENCE W/MOW STRIP 28 PRa1ECT: WEST ELIZABETH BIKE LANES w►nri "m AND STREETSCAPE IMPROVEMENTS SKAD2 PROJECTNO. BID NO. 5851 DATE APRIl20,2004 Siff= wra�o,soa DESO RON: ORNAMENTAL METAL FENCE W/MOW STRIP ,, nkw srAI I- N Ts P. 03/08 APR'-22-04 THU 12:01 PM CITY/FT COLLINS, PURCHAS '00330 DID SCHEDULE. - ADDENDUM NO. I City of Fort Collins West Eli2abeth Sawtscape Improvements Bid No. 5851 FAX NO, 970 2216707 P. 04/08 Item Ne. Description Unit Contract Quantity Esdmated Cost Unit Cost Total 201 CLEARING AND GRUBBING LS I $ S 202 REMOVAL OF ASPHALT PAVEMENT SY 928 $ $ 202 REMOVAL OF CONCRETE SY 63 $ S 203 EXCAVATION CY 166 $ $ 203 BORROW TON 350 S $ 207 FINE GRADING SF 9196 $ Is 207 TOPSOIL (IMPORT) CY 112 $ S 208 CONCRETE WASHOUT STRUCTURE LS I $ $ 208 EROSION CONTROL LS I $ S 210 RESET WHEEL STOPS EACH 37 $ $ 210 ADJUST MANHOLE. EACH 1 S $ 210 ADJUST WATER VALVESOX EACH 0 S S 210 - ADJUST JUNCTION BOXES EACH 25 S S 210 RESET BENCHES AND BIKE RACKS EACH - - 3 - $— _ _ __ _ 2W RESET BUSINESS SIGNS EACH 6 $ S 212 TURF SOD SF 6395 S S 212 SOIL PREPARATION SF 9196 S $ 213 WOOD MULCH SF 2151 S $ 213 GRAVEL MULCH SF 350 $ $ 213 CRUSHER FINES Sr 300 S $ 213 FULL TREE GRATE %W FRAME EACH 9 $ $ 213 U2 TREE GRATE W/ FRAME EACH 5 $ S 214 DECIDUOUS TREE (2" CAL) EACH 27 $ $ 214 ORNAMENTAL TREE (1-1/2" CAL) EACH 2 $ $ 214 SHRUBS (5 CAL) EACH 84 $ S 214 STEEL EDGER LF 121 S S 403 HOT BITUMINOUS PAVEMENT (PATCHING) ASPHALTI6" TON 50 $ S 514 FENCING / PEDESTRIAN RAILING LF 143 $ $ 608 SIDEWALK CHASE LF 91 S $ 608 CONCRETE SIDEWALK (6 INCH) SY 2459 S S 608 CONCRETE APRON 5Y 51 $ S 608 CONCRETE CURB RAMP SY 32 $ S 609 CURB TYPE 2 (6" BARRIER) (SECTION B) LF 50 $ $ 623 IRRIGATION SLEEVES (6" DIAMETER) LF 330 $ S 630 TRAFFIC CONTROL LS I $ $ 630 TRAFFIC CONTROL (SI2E A SPECIALTY SIGNS EACH 25 $ $ Total Base Construction Cost $ Dollars and CtntS. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 28th day of April , 20 04, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Name: Concrete Works of Colorado, Inc. Address: 1260 Rock Creek Circle Laffajette Co 80026 By: lM9 a.rc Lenar}- Title; ?re%aen+ A,TT By: i1;�t Vic' ,od m;dA't% (SEAL) 7/96 SURETY Hartford Fire Insurance Company 7670 South Chester Street Englewood, CO 80f112 By:r�� T Vicie F. ales Title: Attorney -in -Fact (SEAL) Section 00410 Page 3 APR-22-04 THU 12:01 PM CITYIFT COLLINS, PURCHAS FAX NO, 970 2216707 P.05108 003,10 BID SCHEDULE - ADDENDUM NO. I City of Fort Collins West Elizabeth Strcetacape lmprovementg Bid No. 3831 Signed Company Chock One: Individual Doing Business in Company Name Corporation Partnership Address PhoncTax A+ B BID The sum of these two amounts will be used to determine the lowest successful bidder according to the following formula: At TB x (the daily cost)? = Contractoesbid for evaluation for the lowest successful bidder Whcrc: A = Contractor's total bid for the work items B = Number of Calendar Days required to substantially complete the Work Daily Cost for this Projcct S3.828.00 The above formula will be used solely for the purpose of determining the lowest successful bidder and will have no effect on the actual total bid cost for completing, the work. A = Total Base Construction Cost S B = Total Number of Calendar Days Bid Total number of calendar days bid (B) x S3,828.00 = S TOTAL PROJECT COST - A+ 1B x (the daily cost){ = S BID ALTERNATES Item No. Description unit Contract Quantity I Estimated Cost Unit Cost Total 622 BENCH SEATING (ALTERNATE) EACH 4 is Is 608 (ALTERNATE) UPGRADES TO SIDEWALK (COLOR) SY 2459 S $ ... ..-..ram.-.. `. ..4V V.►{/ ._. PRE CONFERENCE Project: Bid #5851 WEST ELIZABETH STREETSCAPE IMPROVEMENTS Time: 2:00 P.M. Date: APRIL 16, 2004 Location: 215 N. MASON, 1ST FLOOR. CONFERENCE 16 FIRM NAME ADDRESS TELEPHONE FAX #E-MAIL ADDRESS nn rr0 Ati �O .T-�. C� iw:l, �� 33 " ix;3iJ 1� <•#IJV 1�11y cv)o -'�3� - , c �Id l7 cin J - Ya-j&% �'T�IC:�'1Y4��113Cr.WM E — G L , t7oFF CbCapsr c.�.:2t�: S-r- Anbv�O CO 805-37 4-7b-C A- c/-7Cj -&&-S - I 1Nl0 j{LP/N G1► S �24 5, cz"t-Ur- -Ave fq rcS 9'?0ZZ4 - "K& Sci ALf/N�E� q0 iI C ]��� /��C�► y�I- JTiL�•10� Q yin , nek 7,q 4ifN ©y/�E CSC 6N6�,vG��ii�vG ,ZB/ .✓ [GGl6 q�/ 9 - 21_/qa/ s21-,6.3%0 6W'Fwyif lJ�e�ou. �.arh g1o.22I•c�laaS ,�eQ�nC�lr�cal,GdvVl Ax. ♦ r �'e� ir-it�✓/6 J _ode=lCS ✓�i4' 40 �fi0a Z e i9 � si6/J .T 6%6•f UFa&.L%= l.c6e- r,o - 06C:)4 %'Lo Lawl•'*-.' ca . �94WoZ, 30'i 6s 1 . &-�oo "asp 1 MiRewsk � � , f ° N'"� ' zs 9'X WS 7rt7 ma u3 (az-r 1 S� S�a..�u (Sea.13•�,.••l z°4 s • a904V • • 47e Y8z- s'q zt 976 V%Z Q SA-0.. 1--cc. tom Le.,tS effL#45 Go-Jf- Twov,x Ft cof f to+f g653t 170 iZ�7 57a-Z79,aBY` W& •cc -n r x 0 co O N _N M CD 0 rn O m N ► I tivuNlutit nrL;uKD PRE CONFERENCE Project: Bid #5851 WEST ELIZABETH STREETSCAPE IMPROVEMENTS Time: 2:00 P.M. Date: APRIL 16, 2004 Location: 215 N. MASON, 1ST FLOOR, CONFERENCE 16 E FIRM NAME ADDRESS TELEPHONE FAX # E-MAIL ADDRESS .- Mf4Slr. cpr�e, Wn/fc.s ,� 0 tom, e •,tn �2ba �C-(a GL C.r rc4.e 903-GG�"'Z%';� �x?'il'24.9_� G�vC vas co10. Gam►+ L ti 5W57'Z�R��/ Gc� a ec �yJS A, a-- ! -1n777 5Af s x 2 O !o 0 fV N_ m O O O fb 0-2.2-04 THU 12:02 PM APRIL 21, 2004 CITY/FT COLLINS, PURCHAS FAX N0, 970 2216707 CITY OF FORT COLLINS PLANHOLDERS LIST FOR BID #5861 WEST ELIZABETH STREETSCAPE IMPROVEMENTS CARNES SERVICE P 0 BOX 1258 WELLINGTON, CO 80549 PH 970-568-3632 FAX 970-568-3165 LANDTECH CONTRACTORS 16777 E 2ND AVE AURORA, CO 80011 PH 303-344-4465 FAX 303-344-1518 - -- - --NARANJO-CIVIL CONSTRUCTORS 18632 NDAVE. GREELEY, CO 80631 PH 970-356-7909 FAX 970-356-0887 G L HOFF P 0 BOX 7448 LOVELAND, CO 80537-1448 PH 970-669-3255 FAX 970-663-1566 J-2 CONTRACTING COMPANY 929 38T" AVE. CT., SUITE 106 GREELEY, CO 80634 PH 970-392-0694 FAX 970-392-0695 CONCRETE WORKS OF COLORADO 1260 ROCK CREEK CIR. LAFAYETTE, CO 80026 PH 303-665-2933 FAX 303-665-2996 NORTHSTAR CONCRETE P.O. BOX Y BERTHOUD, CO 80513 PH 970-532-0805 FAX 970-532-4687 P. 08/08 Direct Inquiries/Claims to: THE HARTFORD POWER OF ATTORNEY 690 ASSYOLLUDMAVENUE HARTFORD, CONNECTICUT 06115 call: 888-266-3488 or fax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: _ Agency Code: 34-341738 0 Hartford Fire Insurance Company, a corporation duly organized under the laws of tilt State of Connecticut X� Hartford Casualty Insurance Company, a corporation duly organized under the laws ol'the Slate of Indiana XO Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut OHartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Conneciicut Twin City Fire Insurance Company, a corporation duly organized under the lags of tire, State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited: Loree Vanderhye, Vicie F. Reales, David Janssen of Denver, CO their true and lawful Alto rney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on July 21, 2003 the Companies have caused these presents to be signed by Its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. ,�t�oy �, to tw •;-.._.. , . a. �..u•nenil'^ i,V0Y _'. � t = ',m•roaircI,_ r��9N 87B7S a e ear .'uu.nty, 4•rMl• 1�: I / * \`�y�_..,7�7� S,ti•n� ��re �. t•�y • wxn"u•� .'tit �,_rtu. moa j'0 0", f Paul A. Bergenholtz, Assistant Secretary STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD David T. Akers, Assistant Vice President On this 23rd day of July, 2003, before me personally came David T. Akers, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hampden, Commonwealth of Massachusetts; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument, that he knows the seals of the said corporations, that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. ,�T E.P� O '� • Scott E. Paseka Notary Public CERTIFICATE My Commission Expires October 31, 2007 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of April 28 , 2004. Signed and sealed at the City of Hartford. ♦ � ,P.+eI....4 :'ve`. ems,/ �' s n � 90t - ``i�,eo oe<.ra:, �'z .x�rn•rwurto � �:deemnnrd: i t$_ �r {$ - �`\, xu m.v�� � t•sr•N• & '-�. 1074 1970 r�..• 4� *i �..- :i'; Ci `�'bns^d ���x `�..���4 • '�.ueoN `h}`t �`'lL..y/ '£�,. ^,[f' Yves Cantin, Assistant Vice President POA 2003 APR-22-04 THU 12:01 PM CITY/FT COLLINS, PURCHAS FAX NO, 970 2216707 00330 DID SCHEDULE. -ADDENDUM NO.1 City of Fort Collins West Eli2abeth Srreetsscape Improvements Bid No. 5851 Item No. Description Unit Contract Quantity Estimated Cost Unit Cost Total 201 CLEARING AND GRUBBING LS 1 S $0 000 — S 50 000 — 202 REMOVAL OF ASPHALT PAVEMENT SY 928 $ 2 0 — S / 8 5/otD - 202 REMOVAL OF CONCRETE SY 63 $ Z 0 - $ 203 EXCAVATION CY 166 $ Z5 - S SO - 203 BORROW TON 350 S 2-5- S g SO — 207 FINE GRADING SF 9196 S 207 TOPSOIL (IMPORT) CY 112 $ 35- E 392o - 208 CONCRETE WASHOUT STRUCTURE LS i $ 350 - $ -35p - 208 EROSION CONTROL LS I S SOYD- S / 5-0 0- 210 RESET WHEEL STOPS EACH 37- 210 ADJUST MANHOLE EACH 1 S 500 - $ .5-0 a - 210 ADJUST WATER VALVEBOX EACH 0 S Soo- S 0 - 210 ADJUST JUNCTION BOXES EACH 25 S /00 - S 2500 - 210 RESET HENCHESAND131KE RACKS = EACH ' - - - 3 5 Soo -v - 5- 210 RESET BUSINESS SIGNS EACH 6- 212 'TURF SOD SF 6395 S 2 - S /2 790 212 SOIL PREPARATION SF 9196 S S /37IF, $69 213 WOOD LIULCH SF 2151 S . So 4 S /0 75, -s0 213 GRAVEL MULCH SF 350 $ 2 . - S 700 - 213 CRUSHER FINES SF 300 $ 2 _ S /000 - 213 FULL TREE GRATE WlFRANNIE EACH 9 $ 2,500- $ 22, Soo - 213 112 TREE GRATE W/ FRAME EACH 5 S I SoO - S qvo o - 214 DECIDUOUS TREE (2" CAL) EACH 27 S 400 - S /2-9&0 - 214 ORNAMENTAL TREE (1-1/2" CAL) EACH 2 $ {.Sp - $ 900 - 2I4 SHRUBS (5 GAL) EACH 84 $ .29- $ 23<S2.- 2.14 STEEL EDGER LF 121 S 6 - $ 72fv - 403 HOT BITUMINOUS PAVEMENT(PATCHING) ASPHALT) 6" TON 50 S (2o -. S to coo - 514 FENCING / PEDESTRIAN RAILINCJ LF 143 $ 1 8O - S ZS 7qo , 603 SIDEWALK CHASE LF 91 S 2/0- S- 608 CONCRETE SIDEWALK (6 INCH) SY 2459 S if/- S 00 603 CONCRETE APRON Sy 51 S %0 — S 35 608 CONCRETE CURB RAMP SY 32 $ /�O — $ 38 0 — 609 CURB TYPE 2 (6" BARRIER) (SECTION B) LF 50 — 623 IRRIGATION SLEEVES (6" DIAMETER) LF 730 IS 30 -- $ 0O — 630 630 TRAFFIC CONTROL TRAFFIC CONTROL (SIZE A SPECIALTY SIGNS)EACH- LS 1 $o00- Total Base Construction Cost s 5 _ reL 6LLu red Sevj^n -AyeG `�Lousen j Nlhe. ku.ndre.d Twtni�-s,X Dollam and F+u Cents. APR-22-04 THU 12:01 PM CITY/FT COLLINS, PURCHAS FAX NO. 970 2218707 P.05/08 00330 BID SCHEDULE - ADDENDUM NO.1 City of Fort Collins West Elizabeth Sueetscape Improvements Bid No. 5851 Signed 1WAt- Maxr, en &c 4l es i ,—an Company k, � Co�ortxdoi �hLt i�jpM.!'4�� 1A18r S o Cluck One: Individual Doing Business in Company Name —Corporation Partnership Address 1 ab 0 V-w-,L Creek C; re l-?- LLa a4 4+-It, CO 2DO26 PhondPax 3o3_/6( -2-933 /303-669--2-ic! A+ B BID Thu sum of these two amounts will be used to determine the lowest wccessful bidder according to the following formula: ---r — - _ . _ _ __ - A+ Bx4-1 � (ihc Batty cost5l = Conttacrni'sbiS fPr evaluation for the lowest succ�ful biddy Mac: A = Conaacwt s total bid for the work items B = Number of Calendar Days required to substantially complete the Work Daily Cost for this Project - $3.828.00 The above formula will be used solely for the purpose of determining die lowest successful bidder and will have no effect on the actual total bid cost for completing the work. A = Total Base Construction Cost $ S 9a to. So B - Total Number of Calendar Days Bid = SQ Total number of calendar days bid (B) < S3.828.00 = S 191 boo — TOTAL PROJECT COST - A + IB a (the daily cost)] z s5(r-,7 3.2 G SO BID ALTERNATES Item No, Description Unit Contract Contract Estimated Cost Unit Cost Total 622 BFICH SEATING ALTERNATE) EACH 4 IS 21 O0 -- IS e I OD — 608 UPGRADES TO SIDEWALK (COL.OR) (ALTERNATE) SY 2459 5 12 -- S Z9 $oil — SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS Ali questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessarv, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Cor\ereA-e. (,u1orV5 t* al4or_ a_A6. lne_ 2. Permanent main office address: Lp0 fLCreZX G-r(:le, - -eico $0ou 3. When organized: LnG Iq$O 4. If a corporation, where incorporated: Co10raulO 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing the amount of each contract and - -- - - tfxe-=appr-G�prra-teant-rc-rpat- ��r 7. General character of Work performed by your company: fV1.AVLA I-`ia4uJorl� 6ritLei. 8. Have you ever failed to complete any Work awarded to you? �)o, If so, where and why? E 10. Have your ever defaulted on a contract? If so, where and why? Are you debarred by any government agency? If yes list agency name. 1j 0 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12. List your major equipment available for this contract. 13. Experience in construction Work similar in importance to this project: Se e- a_}C&cAe_A- 14. Background and experience of the principal members of your organization, including officers: _tom=tr_- 15. Credit available: $ Z.-I rodlton 16. Bank reference: We%15 Vdr`4a Bd_nl<-'Rr-E4 ftn - Wan lCrnons, 3o3-ww-3124 11) 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? 18. Are you licensed as a General CONTRACTOR? qe5. If yes, in what city, county and state? I Variot5 CciieJ 1r,k4&Yu"e-aWhat class, license and numbers? vAr;fl,,,s 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract?, >50/0 and to whom?- Al firne.: 6&tclai5 La4X85caplwq 20. Are any lawsuits pending against you oL your firm at this time?n40. If yes, DETAIL 7/96 Section 00420 Page 2