HomeMy WebLinkAboutRESPONSE - BID - 5851 WEST ELIZABETH STREETSCAPE IMPROVEMENTSSECTION 00300
BID FORM
PROJECT: WEST ELIZABETH STREETSCAPE IMPROVEMENTS; BID NO. 5851
Place Fort Collins, CO
Date April 28, 2004
1. In compliance with your Invitation to Bid dated April 5, 2004
and subject to all conditions thereof, the undersigned
G.L. Hoff Company a "(Corporation, lrrmrted-�iririCp Campa7ty,
P�ntnership _o-�_e�rt�rr�� o�-5e�e-�tQr) ** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of 5% of bid amount ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: Employers Mutual Casualty Company, PO Box.370010, Denver, CO 80237
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.1
through
-�/96 Section 00300 Page 1
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM SUBCONTRACTOR
Landscaping
Traffic Control
7/96
A&M Landscaping
Northern Colorado Traffic Control
Section 00430 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: G.L. Hoff Company
2. Permanent main office address: 1815 West 12th Street, Loveland, CO 80537
3. When organized: January 1984
4. If a corporation, where incorporated: Colorado, 1989
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 20 years
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
CSU Student Recreation Center Landscape Improvements: $332,606. 8-2004
7.
0
0
, 10
General character of Work performed by your company:
Commercial general contractor: we complete alteffokki concrete, carpentry,
_project management with our own forces.
Have you ever failed to complete any Work awarded to you? no
If so, where and why?
Have your ever defaulted on a contract?
If so, where and why?
Are you debarred by any government agency?
If yes list agency name.
7/96
no
no
Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
Please refer to the attached information
12. List your major equipment available for this contract.
dun truck, CAT 928 loader, CAT 320 Track excavator, backhoes, bobcats,
motor grader, grading tractor, concrete pump
13. Experience in construction Work similar in importance to this
project:
Please refer to the attached information
14. Background and experience of the principal members of your organization,
including officers:
Please refer to the attached information
15. Credit available: $100'000.
16. Bank reference: Loran Emmons, Bank one Loveland
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
ypn
18. Are you licensed as a General CONTRACTOR? yes
If yes, in what city, county and state? Fort Collins, others What
class, license and numbers? #B-6
19. Do you anticipate subcontracting Work under this Contract? yes
If yes, what percent of total contract? refer to bid information
and to whom?
20. Are any lawsuits pending against you or your firm at this time? no
If yes,
DETAIL
7/96 Section 00420 Page 2
21. What are the limits of your public liability? DETAIL
2 million plus 2 million umbreall
What company? Travelers, agent: Flood & Peterson Ihsurance
22. What are your company's bonding limitations? 5 million
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at Loveland this 27th day of April , 20 04
Name o
By:r
Title: Miriam T.-Hoff,
State of Colorado
County of
Larimer
Miriam T. Hoff being duly sworn deposes and says that he is
Secretary Treasurer of G.L. Hoff Company and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this 27* day of
20OV.
otary Public
My commission expires /2 -43 -OI
7/96 Section 00420 Page 3
G.L. Hoff Company
Construction Experience
Gregory L. Hoff, President and Construction Manager
For the past thirty years, Greg has been involved with all aspects of construction. Greg
established G.L. Hoff Company in 1984. Serving as president and project superintendent,
Greg is a driving force in the company.
Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering
Technology, his early work included surveying and architectural design and drafting. He
has held a Class B Commercial Contractor's License with the City of Fort Collins since
1976. Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, and
Boulder.
Prior to 1984, Greg worked with Al Hockett, Inc. initially as an architectural draftsman and
progressing to project superintendent. He was also a partner in H&M Builders from 1976
to 1980. This company specialized in custom homes, tenant finish and custom millwork.
Beginning in 1984, Greg established G.L. Hoff Company, a commercial general contracting
company which specializes in all types of commercial construction including sitework,
excavation, structural concrete, and commercial buildings. As president and construction
superintendent for G.L. Hoff Company, Greg supervises a wide variety of projects
including, schools, churches, city and government projects, city park developments, as well
as many light industrial and concrete construction jobs. Greg oversees project scheduling,
review of construction procedures and specifications, monitors quality control and safety
enforcement on job sites. As president and construction supervisor, Greg works closely
with project owners, architects and engineers throughout the project.
Greg is an active member of the Loveland construction community. He has volunteered his
time to the Loveland Construction Advisory Board for over 15 years. While serving as
Chairman, this Board, the city adopted licensing for contractors. He is currently serving on
a review committee to study the International Building Code prior to adoption by the City
of Loveland.
Joel S. Reger, Estimator and Project Manager
Joel has a Bachelor of Science Degree in Construction Management from Colorado State
University and seventeen years experience in the construction field. He has continued his
education with estimating seminars including training with American Building Company's
estimating Access workshop. He is also an active member of the Sigma Lambda Chi
honorary national construction fraternity.
During the past thirteen years, as the chief estimator with G.L. Hoff Company, Joel has
compiled bids and development estimates for projects valued at up to five million dollars.
As chief estimator, he directs the project bidding process as well as the review of
specifications. He also works directly with project management, coordinating proposal
requests and change orders with the architect or owner, overseeing material orders to insure
that the project is completed in a timely manner and according to specifications. Joel is an
important and effective member of every Design -Build project with G.L. Hoff Company.
He works closely with the owner and architect to understand project goals and provide
detailed project budgets and construction options to meet the owner's needs.
Patrick R. Norris, Estimator/Project Manager
Pat brings over twenty five years of construction experience to his position as estimator and
project manager. His background includes experience with residential, commercial and
industrial construction. Pat began his career as a carpenter, form setter and equipment
operator. With 18 years working as a field foreman, he has a broad understanding of
building methods and materials as well as site safety and personnel management. His
knowledge of construction has enabled Pat to be an effective estimator and project
manager. During the past 6 years, Pat has bid and managed projects valued up to $
G.L. Hoff Company
2004 Projects
CSU Transit Center
Construction of parking improvements at the Lory Student Center on
the Colorado State University campu s. The scope of work includes
site excavation and demolition, grading, landscaping, irrigation
system, fencing, and electrical lighting.
Owner: City of Fort Collins
215 North Mason Street
Fort Collins, CO 80524
Contact: Steve White, Project Manager, 970-221-6273
Contract: $208,761.
Completion: 4-2004
Loveland Industries Remodel
This remodel is a design -build tenant finish project for United Agri
Products, Inc. The work involves the complete remodel of an existing
metal building warehouse space into a laboratory. The scope of work
includes carpentry, dyrwall, RVAC, plumbing, electrical and all finishes.
Owner: United Agri Products, Inc.
14520 WCR 64
Greeley, CO 80631
Contact: Robert Bath, 970-356-8920 ext.201
Contract: $142,817.00
Completion: 4-2004
UNC Apartments Playground
Removal of existing playgournd equipment, sitework, concrete, irrigation
and installation of new playground equipment.
Owner: University of Northern Colorado
Greeley, CO 80631
Contact: George Galida, UNC Project Manager, 970-351-1892
Contract: $125,008.00
Completion: 2-2004
Rolland Moore Park Shelter Replacement
Remove four existing wood laminate picnic shelters and replace with
structural steel shelters for the City of Fort Collins Rolland Moore Park.
Owner: City of Fort Collins
215 North Mason, Fort Collins, CO 80521
Contact: Eileen School, Project Manager, 970-416-2062
Contract: $121,962.
Completion: 4-2004
G.L. Hoff Company
2003 Projects
East Riverside Drive Retaining Wall and Street Rehabilitation Project
Construction of approximately 200 feet of 10 foot high retaining wall with
associated brick trim and metal top railing along the Big Thompson River.
Removal of two city blocks of existing street asphalt. Installation of an 8
inch water line with two hydrants, new service connections to 10 buildings,
3 street inlets and piping. Installation of concrete curb & gutter, drives and
pans, sidewalk, and the roadway base course and asphalt pavement along a
two block section of East Riverside Drive in Estes Park. Phase One of the
project was completed in October and November of 2002 and Phase Two
was completed between March and May of 2003.
Owner: Town of Estes Park
PO Box 1200, Estes Park, CO 80517
Contact: John Spooner, Project Manager, 970-586-9388
Van Horn Engineering and Surveying
1043 Fish Creek Road
Estes Park, CO 80517
Contract: $373,388.00
Completion: June, 2003
Butch Butler Press Box and Bleachers Project
Construction of a single pre -cast concrete structure for use as a press box
at Butch Butler Field in Greeley. The scope of work also included new
stadium bleachers and a concrete slab.
Owner: City of Greeley
Contact: Ted Trujillo, Parks Program Manager, 970-350-9340
1000 loth Street, Greeley, CO 80631
Contract: $108,282.00
Completion: February 2004
Bellvue Hatchery French Drain
Installation of a perforated and solid wall drain pipe at the Bellvue
Research Hatchery for the Division of Wildlife. Scope of work included
sitework and pipeline work.
Owner: State of Colorado Division of Wildlife
6060 Broadway, Denver, CO 80216
Contact: Kay Sinclair, 970-472-4433, Fort Collins
Contract: $17,073.00
Completion: 10-2003
Routt/Spruce Hall Sewer Line Replacement
Completion of sitework and utility work to remove and replace 215 LF of
sanitary sewer from Routt Hall to manhole with 6 inch PVC pipe.
Owner: Colorado State University
365 Aylesworth SE, Fort Collins, CO 80523
Contact: Michael Davis, Project Manager, Facilities, 970-491-0075
Contract: $54,279.00
Completion: 1-2004
Edwards -Ellis Parking Lot
Construction of new parking lot on Colorado State University campus.
Scope of work included demolition, sitework, storm drainage, fire line and
hydrant, asphalt paving, concrete pavement, irrigation and landscape work.
Owner: Colorado State University
365 Aylesworth SE, Fort Collins, CO 80523
Contact: Steve Kiess, Project Manager, Facilities, 970-491-0017
Contract: $282,608.
Completion: 9-2003
Fish Creek Pedestrian Trail
Construction of a concrete pedestrian trail including sitework, erosion
control, culvert installation, rip rap, seeding, fencing, concrete bikeway,
curb & gutter and traffic control.
Owner: Town of Estes Park
170 MacGregor Ave., Estes Park, CO 80517
Contact: Mike Todd, 970-586-2458
Cornerstone Engineering, 437, S. St.Vrain, Estes Park, CO
Contract: $322,056.
Completion: 3-2004
G.L. Hoff Company
CONTRACTOR
BY: Gregory L. Hoff
President
ADDRESS: 1815 West 12th Street
Loveland CO 80537
8. BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (250) of the total Agreement Price.
RES
4-28-2004
Date
itle
B-6
License Number (If Applicable)
(Seal - if Bid is by corporatio )
Attest:
Miriam T. Ho , Sec4!efW Treasurer
Address PO Box 7448
Loveland, CO 80537
Telephone 970-669-3
7/96 Section 00300 Page 2
SECTION 00510
NOTICE OF AWARD
Date: May 14, 2004
TO: G. L. Hoff Company
PROJECT: WEST ELIZABETH STREETSCAPE IMPROVEMENTS; BID NO. 5851
OWNER: CITY OF FORT COLLINS
(hereinafter referred to as "the OWNER")
You are hereby notified that your Bid dated April 28, 2004, for the above project
has been considered. You are the apparent successful Bidder and have been awarded
an Agreement for WEST ELIZABETH STREETSCAPE IMPROVEMENTS; BID NO. 5851.
The Price of your Agreement is Two Hundred Twenty-one Thousand Four Hundred
Seventy-six Dollars Seventy-four cents ($221,476.74.
Three (3) copies of each of the proposed Contract Documents (except Drawings)
accompany this Notice of Award. Three (3) sets of the Drawings will be delivered
separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within fifteen (15) days
of the date of this Notice of Award, that is by May 29, 2004.
1. You must deliver to the OWNER three (3) fully executed counterparts of the
Agreement including all the Contract Documents. Each of the Contract
Documents must bear your signature on the cover of the page.
2. You must deliver with the executed Agreement the Contract Security (Bonds)
as specified in the Instructions to Bidders, General Conditions (Article
5.1) and Supplementary Conditions.
Failure to comply with these conditions within the time specified will entitle
OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare
your Bid Security forfeited.
Within ten (10) days after you comply with those conditions, OWNER will return to
you one (1) fully -signed counterpart of the Agreement with the Contract Documents
attached.
City of Fort Collins
OWNER
By:
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing and Risk Management
Title
9/12/01 Section 00510 Page 1
SECTION 00520
AGREEMENT
THIS AGREEMENT is dated as of the 6th day of May in the year of 2004 and shall be
effective on the date this AGREEMENT is signed by the City.
The City of Fort Collins (hereinafter called OWNER) and
G. L. Hoff Company (hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Project for which the Work under the Contract Documents may be
the whole or only a part is defined as the removal of asphalt sidewalk, concrete
sidewalk construction, pavement marking, landscaping, irrigation, installing site
furnishings, and construction traffic control on West Elizabeth Street between
Shields Street and City Park Avenue in the City of Fort Collins.
ARTICLE 2. ENGINEER
The Project has been designed by BHA Design, Inc./Sear-Brown, who is hereinafter
called ENGINEER and who will assume all duties and responsibilities and will have
the rights and authority assigned to ENGINEER in the Contract Documents in
connection with completion of the Work in accordance with the Contract Documents.
ARTICLE 3. CONTRACT TIMES
3.1 The Work shall be Substantially Complete by October 15, 2004, and ready
for Final Payment and Acceptance in accordance with the General Conditions within
70 calendar days after the date when the Contract Times commence to run.
3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work
is not completed within the times specified in paragraph 3.1. above, plus any
extensions thereof allowed in accordance with Article 12 of the General
Conditions.
They also recognize the delays, expenses and difficulties involved in proving in
a legal proceeding the actual loss suffered by OWNER if the Work is not completed
on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR
agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall
pay OWNER the amounts set forth hereafter.
1) Substantial Completion:
Three Thousand Eight Hundred Twenty-eight Dollars ($3 828 00) for each
calendar day or fraction thereof that expires after the 70 calendar
9/12/01 Section 00520 Page 1
day period for Substantial Completion of the Work until the Work is
Substantially Complete.
2) Final Completion:
After the City of Fort Collins representative has determined that
Substantial Completion has been met, the Contractor has 20 days to
reach Final Completion. The Contractor will be charged One Thousand
Dollars ($1,000.00) for each calendar day or fraction thereof that
expires after the 20 day period, until the Work is ready for Final
Payment and Acceptance.
3) Incentive:
A Three Thousand Eight Hundred Twenty-eight Dollars ($3,828 00) per
day, or fraction thereof, incentive will be awarded to the Contractor
for substantially completing the Work prior to the total number of
days bid. The maximum incentive is limited to five percent of the
contractor's total bid for the work items.
4) Project Start and Completion Dates:
All construction will be approved to begin as early as May 17, 2004,
and must be substantially complete by October 15, 2004. The number of
calendar days bid must fall within this construction window. The
total number of days established by the bidder to complete the work
shall not exceed 70 calendar days.
ARTICLE 4. CONTRACT PRICE
4.1. OWNER shall pay CONTRACTOR for performance of the Work in accordance
with the Contract Documents in current funds as follows: ($221,476.74),
Two Hundred Twenty-one Thousand Four Hundred Seventy Six Dollars Seventy-four
cents, in accordance with Section 00300, attached and incorporated herein by this
reference.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with Article
14 of the General Conditions. Applications for Payment will be processed by
ENGINEER as provided in the General Conditions.
5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of
the Contract Price on the basis of CONTRACTOR's Application for Payment as
recommended by ENGINEER, once each month during construction as provided below.
All progress payments will be on the basis of the progress of the Work measured
by the schedule of values established in paragraph 2.6 of the General Conditions
and in the case of Unit Price Work based on the number of units completed, and in
accordance with the General Requirements concerning Unit Price Work.
5.1.1. Prior to Substantial Completion, progress payments will be in the
amount equal to the percentage indicated below, but, in each case, less the
aggregate of payments previously made and less such amounts as ENGINEER shall
determine, or OWNER may withhold, in accordance with paragraph 14.7 of the
9/12/01 Section 00520 Page 2
General Conditions. 90% of the value of Work completed until the Work has been
50% completed as determined by ENGINEER, when the retainage equals 5% of the
Contract Price, and if the character and progress of the Work have been
satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may
determine that as long as the character and progress of the Work remain
satisfactory to them, there will be no additional retainage on account of Work
completed in which case the remaining progress payments prior to Substantial
Completion will be in an amount equal to 100% of the Work completed. 90% of
materials and equipment not incorporated in the Work (but delivered, suitably
stored and accompanied by documentation satisfactory to OWNER as provided in
paragraph 14.2 of the General Conditions) may be included in the application for
payment.
5.1.2. Upon Substantial Completion payment will be made in an amount
sufficient to increase total payments to CONTRACTOR to 95% of the Contract Price,
less such amounts as ENGINEER shall determine or OWNER may withhold in accordance
with paragraph 14.7 of the General Conditions or as provided by law.
5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in
accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the
remainder of the Contract Price as recommended by ENGINEER as provided in said
paragraph 14.13.
ARTICLE 6. CONTRACTOR'S REPRESENTATION
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the
following representations:
6.1. CONTRACTOR has familiarized himself with the nature and extent of the
Contract Documents, Work, site, locality, and with all local conditions and Laws
and Regulations that in any manner may affect cost, progress, performance or
furnishing of the Work.
6.2. CONTRACTOR has studied carefully all reports of explorations and tests
of subsurface conditions and drawings of physical conditions which are identified
in the Supplementary Conditions as provided in paragraph 4.2 of the General
Conditions.
6.3. CONTRACTOR has obtained and carefully studied (or assumes
responsibility for obtaining and carefully studying) all such examinations,
investigations, explorations, tests, reports, and studies (in addition to or to
supplement those referred to in paragraph 6.2 above) which pertain to the
subsurface or physical condition at or contiguous to the site or otherwise may
affect the cost, progress, performance or furnishing of the Work as CONTRACTOR
considers necessary for the performance or furnishing of the Work at the Contract
Price, within the Contract Times and in accordance with the other terms and
conditions of the Contract Documents, including specifically the provisions of
paragraph 4.2 of the General Conditions; and no additional examinations,
investigations, explorations, tests, reports, studies or similar information or
data are or will be required by CONTRACTOR for such purposes.
9/12/01 Section 00520 Page 3
6.4. CONTRACTOR has reviewed and checked all information and data shown or
indicated on the Contract Documents with respect to existing Underground
Facilities at or contiguous to the site and assumes responsibility for the
accurate location of said Underground Facilities. No additional examinations,
investigations, explorations, tests, reports, studies or similar information or
data in respect of said Underground Facilities are or will be required by
CONTRACTOR in order to perform and furnish the Work at the Contract Price, within
the Contract Times and in accordance with the other terms and conditions of the
Contract Documents, including specifically the provision of paragraph 4.3. of the
General Conditions.
6.5. CONTRACTOR has correlated the results of all such observations,
examinations, investigations, tests, reports and data with the terms and
conditions of the Contract Documents.
6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors
or discrepancies that he has discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to CONTRACTOR.
ARTICLE 7. CONTRACT DOCUMENTS
7.1 The Contract Documents which comprise the entire Agreement between OWNER
and CONTRACTOR concerning the Work consist of the General Conditions,
Supplementary Conditions, those items included in the definition of "Contract
Documents" in Article 1.10 of the General Conditions, and such other items as are
referenced in this Article 7, all of which are incorporated herein by this
reference.
7.2 Forms for use by CONTRACTOR in performing the Work and related actions
in carrying out the terms of this Agreement are deemed Contract Documents and
incorporated herein by this reference, and include, but are not limited to, the
following:
7.2.1Certificate of Substantial Completion
7.2.2 Certificate of Final Acceptance
7.2.3Lien Waiver Releases
7.2.4 Consent of Surety
7.2. 5 Application for Exemption Certificate
7.2. 6 Application for Payment
7.3 Drawings, consisting of a cover sheet and sheets with the following
general title:
City of fort Collins
West Elizabeth Streetscape Improvements
COFC Project No. 30522000
The Contract Drawings shall be stamped "Final for Construction" and dated. Any
revisions made shall be clearly identified and dated.
7.4. Addenda Numbers 1 to 1, inclusive.
9/12/01 Section 00520 Page 4
7.5. The Contract Documents also include all written amendments and other
documents amending, modifying, or supplementing the Contract Documents pursuant
to paragraphs 3.5 and 3.6 of the General Conditions.
7.6. There are no Contract Documents other than those listed or incorporated
by reference in this Article 7. The Contract Documents may only be amended,
modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General
Conditions.
ARTICLE 8. MISCELLANEOUS
8.1. Terms used in this Agreement which are defined in Article I of the
General Conditions shall have the meanings indicated in the General Conditions.
8.2. No assignment by a party hereto of any rights under or interests in
the Contract Documents will be binding on another party hereto without the
written consent of the party sought to be bound; and specifically but not without
limitations, moneys that may become due and moneys that are due may not be
assigned without such consent (except to the extent that the effect of this
restriction may be limited by law), and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or
discharge that assignor from any duty or responsibility under the Contract
Document.
8.3. OWNER and CONTRACTOR each binds itself, its partners, successors,
assigns and legal representatives to the other party hereto, its partners,
successors, assigns and legal representatives in respect to all covenants,
Agreement and obligations contained in the Contract Document.
9/12/01 Section 00520 Page 5
OWNER: CITY OF FORT COLLINS
By:
JOHN F. FISCHBACH, CITY MANAGER
BY:
JAMES B. O'NEILL II, CPPO, FNIGP
DIRECTOR OF PURCHASING
AND RISK MANAGEMENT
Date:
Attest:
ty Clerk
Address for giving notices:
P. 0. Box 580
Fort Collins, CO 80522
Approved as to Form
Assistant City Attorney
9/12/01
CONTRACTOR: G. L. Hoff Company
By:
Title:
Date:
(CORPORATE SEAL)
Attest:
Address for giving notices:
LICENSE NO.:
Section 00520 Page 6
APR-22-04 THU 11:56 An CITY/FT COLLINS, PURCHAS FAX NO, 970 2216707 P.04/08
00330
BID SCHEDULE - ADDENDUM NO.1
City of Fort Collins Wes[ Elizabeth scut mpe Immven mts
Bid No. 5851
Item No.
201
202
Detaiptlon
CLEARING AND GRUBBING
REMOVAL OF ASPHALT PAVEMENT
Unit
LS
SY
Contract
Qaaadb
1
928
6tNmttted Colt
Unit Cost
S _ p
$ 2.55
That
S 8,200.00
s 2 , 366.40
202
203
REMOVAL OF CONCRETE
EXCAVATION
SY
CY
63
166
$ 9.90
$ 10.00
$ 623.70
$ 7,660.00
203
207
207
BORROW
FINE GRADING
TOPSOIL (IMPORT)
TON
SF
CY
350
91%
112
$ 18.05
S 0.10
$ 25.00
S 6,317.50
S 919.60
S 2,800.00
208
CONCRETE WASHOUT STRUCTURE
LS
1
$ 607.00
S 607.00
208
EROSION CONTROL
LS
1
s 1,000.00
s 1, 000.00
210 ,RESET
WHEEL STOPS
EACH
37
s 9.60
S 355.20
zlo
ADJUST MANHOLE
EACH
t
$ 400.00
S 400.00
210
ADJUST WATER VALVEBOX
EACH
0
S 100.00
S 0.00
210
AD.IMJUNCTION BOXES
EACH
25
S 31.50
$ 787.50
210
RESET BENCHES AND BIKE RACKS
EACH
3
S 66.00
S 198.00
210
RESET BUSINESS SIGNS
EACH
6
S 1L
$ 71800.00
212
TURF SOD
SF
6395
S 0.66
$ 4,220.70
212
SOIL PREPARATION
SF
9196
S 0.24
$ 2,207.04
213
tt00DyU1.CH
SF
2151
S 1.00
S 2,151.00
213
GRAVEL MULCH
SF
350
s 0.66
S 231.00
213
CRUSHER FINES
SF
300
S 1.56
S 468.00
213
FULL TREE GRATE W/FRAME
EACH
9
s 11191.00
$ 10 719.00
213
I.'2 TREE GRATE W.' FRAME
EACH
5
S 610.00
s 3,050.00
214
DECIDUOUS TREE (r CAL)
EACH
27
$ 360.00
s 9.720.00
214
ORYAMENTALTREE (1.1/2"CAL)
EACH
2
s 270.00
$ 540.00
214
SHRUBS (5GAL)
EACH
84
$ 36.00
S 3,024.00
214
STEEL EDGER
LF
121
S 4.80
$580. 80
403
HOT BITUMINOUS PAVEMENT(PATCHING)
ASPHALTI6"
TON
50
s 165.00
S 8,250.00
314
FENCING / PEDESTRIAN RAILING
LF
143
s 93.00
S 13,299.00
608
SIDEWALK CHASE
LF
91
S 176.00
$ 16 , 016.00
608
CONCRETE SIDEWALK (6 INCH)
SY
2459
$ 26.70
S 65,655.30
608
CONCRETE APRON
SY
51
$ 43. 00
S 2.193.00
609
CONCRETE CURB RAMP
SY
32
$ 115.00
S 3,680.00
609
CURB TYPE 2 (60 BARRIER) (SECTION B)
LP
50
$ 10.50
S 525.00
623
IRRIGATION SLEEVES (6" DIAMETER)
LF
730 Is
10.20
S 7,446.00
630
TRAFFIC CONTROL
LS
!
s
S
630
TRAFFIC CONTROL (SIZE A SPECIALTY
SIGNS
EACH
25
S 24.00
S 600.00
Total Safe Coastraction Cost s
Dollars and
Pap 1 of 2
APR-22-04 THU 11:58 AN CITY/FT COLLINS, PURCNAS
00330
BID SCWDULE-ADDENDUM NO.1
City of Pon Collins Writ Elizabah Stratum" lroprovemants
Bid No. 5851
Signed
Company
Check One.
Individual Doing Sum=in Company Name
X Corporation
Partnership
FAX NO, 970 2218707
Address PO Box 7448
Loveland, CO 80537
PhondFsx 970-669-3255/663-1566
P. 05/08
A+BBA1
The sum'of drat two amonts will be used to determine the {swat successful bidder according w the followving formula:
A + [S x (the daily cost)] - Contrames bid for evaluslion for the lowest successful biddy
Whore:
A - Contractors total bid for the work items
B - Number of Catandar Deys required to substantially oompiete the Work
Daily Coat for this Proica - S3.828.00
The above formula will be used solely for the purpose of deteraddiag the lowest soeoecsfal bkt&r and wM have
no dha on the actual total bid cod for esmpledegg the worlt.
A a Total Base Conetruedon Coat
B = Total Number of Calendar Days Bid = 2Q_
Total numbs of calendar days bid (B) x S3.828.00 — SeR67 D
TOTAL PROJECT COST = A + IS x (the daily eost)I = S
BID ALTERNATES
[sent No.
Descr(ptba
Untt
Contract
0"atity
Esti dated Cost
Unit Cost
I Total
622
BENCH SEATING (ALTERNATE)
EACH
4
IS 941.UO
1$ 3,764.00
6M
UPGRADES TO SIDEWALK (COLOR)
ALTERNATE
SY
2459
S 7.40
$18,196.60
Pate 2 of 2
AR-22-04 THU 11:56 AN CITY/FT COLLINS, PURCHAS FAX NO. 970 2218707
Adminishmfive Savim
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No.1
BID $58$1
BID 36851 WEST ELIZABETH STREETSCAPE IMPROVEMENTS
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5851 West Elizabeth Streetecape Improvements
OPENING DATE. April 28, 2004. 3:00p.m. (Our Clock)
To all prospective bidders under the speoificationa and contract documents described above, the
following changes are hereby made.
1. Delete item 514, Fencing/Pedestrian Rolling.
2. Add new item number 514 Ornamental Metal Fence on Concrete Wail, 58 LF.
3. Delete detail 6 on page 28 of the plan set and replace with detail $28 Concrete
Retaining Wall, attached.
4. Add item No. 514 Ornamental Metal Fence with Mow Strip, 85 LF.
5. Add Detail No. 6.2/28 Ornamental Metal Fence with Mow Strip, attached, to the plan set
6. Contractor must use revised bid schedule, attached.
If you have any questions please contact John Stephen, CPPO. Senior Buyer, at 97G-221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THATTHiS ADDENDUM HAS BEEN RECEIVED-
G.L. Hoff Coribany acknowledge
Ep jj /eipt of Addendum #1 pages 1 through 8.
By: Gregory L. Hoff, President
215 North Munn Street • 2nd Floor 0 P.O. Box SW • Fort Collins, CO SMM- W - (970) 221-6775 - FAX MM 2Z1-6707
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
CPna ,o Is Principal, and Employers Mutual Casualty Company as
Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado,
as OWNER, in the sum of $ 5% of total bid for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITI(:N of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fort Collins Project, WEST ELIZABETH STREETSCAPE IMPROVEMENTS; BID NO. 5851.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor c:r furnishing materials in connection therewith, and shall in all
other- respects perform the Agreement created by the acceptance of said Bid,
then tl-As obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, :for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby -4raive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER. ,
7/96
Section 00410 Page 2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 28th day of April 2004, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
P1tINCIPAL
Name: G. L. Hoff Company
Address: 1815 W. 12th St.
_ Lovelan&C80537
By:Title:
ATTEST -
By
(SEAL)
7/96
SURETY
Employers Mutual Casualty Company
P.O. Box 370010
Denver, CO 80044
By:
Title: Attorney -in -Fact
(SEAL)
Section 00410 Page 3
No Text
4
I
I
IN
I
I
I
4
I
I
4 7/96
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
Section 00410 Page 1