Loading...
HomeMy WebLinkAboutPrebid - BID - 5850 WEST ELIZABETH BIKE LANE IMPROVEMENTS (2)West Elizabeth Bike Lane and Streetscape Projects City of Fort Collins Bid Nos. 5850 & 5851 Pre Bid Conference West Elizabeth Bike Lane & Streetscape Projects West Elizabeth Street Bike Lane and Streetscape Projects City or Fort Collins Bid Nos. SON 6 5851 Pre -Bid conference ZI Introductions • Rick Richter— Project Manager 221.6798 • Enka Keeton — Project Engineer 221.6605 • John Stephen — Purchasing 221.6777 • Participants.... i Scope .Yda�;4 n' • West ElWbdh i'. Sbost babvaan CRY ✓^ Park and Shields — campw West • Curb. QLIW, bike lane, median. I ekWAIK INK drive apprlweh and a, atreslaeape " improvements t. 4/16CON Pre -Bid Conference 1 West Elizabeth Bike Lane & Streetscape Projects Two Separate but Related Projects • Federal Funded Bike Lanes - Bid No. ON - May 17 to August - BId Qp AW127 • Streetecape - BW No. 5851 - August 1 to Odabw 15 - BMOPMAP 1125 • Working Days May Need to Overlap • Encourage Same Contractor Benefits of Same Contractor • Traft Control • Comdmctability • Temporary Asphalt Reduced • Impact to Businesses d Public Reduced • Incentives • Working oars - Ovedap • A+B Bidding Bike Lane Items • Davis Bacon Wages • Remove 3 Replace Curb and Gutter • Rampsirruncated Dames • Crosspart/AMoNDrive Approach • Medians . Temporary Patching • Inkls • Soul Prep, mulch, seed • Electrical Conduit • Traffic Cordrd ZI 4/16/2004 Pre -Bid Conference 2 West Elizabeth Bike Lane & Streetscape Projects Existing Conditions r LU Monolithic Bike cane, Curb & Gutter 0,.; - Bike Lane Bid Alternates • Shrub Irrigation • Irrigation Tap and Meter • Shrubs • Trees • Enhanced Concrete Crosswalk 4/16/20N Pre -Bid Conference 3 West Elizabeth Bike Lane & Streetscape Projects 4/16/2004 Streetscape Items • Remove Temp Asphalt Sidewalk • Reset Benches, Bike Reds, & Business Signs • Turf," prop, mulch • Tree Grates & Trees • Shrubs • Asphalt Patching • Sidewalk Chase • FencirgMedestrien Railing • Concrete Apron • Concrete Sidewalk tr • Curb Ramp • Barrier Curb • Irrigation Sleeves • Traffic Control Existing Conditions Streetscape Style Improvements Pre -Bid Conference 4 West Elizabeth Bike Lane & Streetscape Projects Streetscape Bid Alternates • Bench Seating • Sidewalk Color Upgrade of Traffic Control • Lump Sum • Specialty Signs • Pedestrian Traffic Control Business Access • Maintain Business Access • One Driveway Access — keep % open at all times • Two+ Driveways — closure of one is limited to 4 working days • Liquidated Damages $500/day 4/16/2004 Pre -Bid Conference 5 West Elizabeth Bike Lane & Streetscape Projects General Conditions & Requirements City Responsibility Contractor Responsibility • Surveying • 2 Year Warranty • Tesding • Temporary Utilities • Mitring and Paving • Noise, Dust, & Pollution • Field Ofte Conte • Utility Coordination Water, Eledric, Gas, APP, Traffic • Staging Area 1A A + B Bidding • Bid Not to Exosed 76 days • $MB per day InaenlNe for Subehrdlal C pWw — ibnted to 5% of contrad - Dilkcwrd" for Subatrnthl Completion ar psoied spxgk d"dlM • Papua 1 far eats Lams • October 15 fv supsh " • Final Completion - 2D days arw Wbst&nW ComO~ - Liquidated Damages $1000 per day Addendum 4/16/2004 Pre -Bid Conference 6 West Elizabeth Bike Lane & Streetscape Projects Questions? Thank Youl 4/16/2004 Pre -Bid Conference 7