HomeMy WebLinkAboutPrebid - BID - 5850 WEST ELIZABETH BIKE LANE IMPROVEMENTS (2)West Elizabeth Bike Lane and
Streetscape Projects
City of Fort Collins
Bid Nos. 5850 & 5851
Pre Bid Conference
West Elizabeth Bike Lane & Streetscape
Projects
West Elizabeth Street
Bike Lane and Streetscape Projects
City or Fort Collins
Bid Nos. SON 6 5851
Pre -Bid conference
ZI
Introductions
• Rick Richter— Project Manager 221.6798
• Enka Keeton — Project Engineer 221.6605
• John Stephen — Purchasing 221.6777
• Participants....
i
Scope
.Yda�;4
n' • West ElWbdh
i'. Sbost babvaan CRY ✓^
Park and Shields —
campw West
• Curb. QLIW, bike
lane, median. I
ekWAIK INK drive
apprlweh and
a, atreslaeape
" improvements
t.
4/16CON
Pre -Bid Conference 1
West Elizabeth Bike Lane & Streetscape
Projects
Two Separate but Related Projects
• Federal Funded Bike Lanes
- Bid No. ON
- May 17 to August
- BId Qp AW127
• Streetecape
- BW No. 5851
- August 1 to Odabw 15
- BMOPMAP 1125
• Working Days May Need to Overlap
• Encourage Same Contractor
Benefits of Same Contractor
• Traft Control
• Comdmctability
• Temporary Asphalt Reduced
• Impact to Businesses d Public Reduced
• Incentives
• Working oars - Ovedap
• A+B Bidding
Bike Lane Items
• Davis Bacon Wages
• Remove 3 Replace
Curb and Gutter
• Rampsirruncated
Dames
• Crosspart/AMoNDrive
Approach
• Medians
. Temporary Patching
• Inkls
• Soul Prep, mulch, seed
• Electrical Conduit
• Traffic Cordrd
ZI
4/16/2004
Pre -Bid Conference 2
West Elizabeth Bike Lane & Streetscape
Projects
Existing Conditions
r
LU
Monolithic Bike cane, Curb & Gutter
0,.; -
Bike Lane Bid Alternates
• Shrub Irrigation
• Irrigation Tap and Meter
• Shrubs
• Trees
• Enhanced Concrete Crosswalk
4/16/20N
Pre -Bid Conference 3
West Elizabeth Bike Lane & Streetscape
Projects
4/16/2004
Streetscape Items
• Remove Temp Asphalt
Sidewalk
• Reset Benches, Bike
Reds, & Business
Signs
• Turf," prop, mulch
• Tree Grates & Trees
• Shrubs
• Asphalt Patching
• Sidewalk Chase
• FencirgMedestrien Railing
• Concrete Apron
• Concrete Sidewalk tr
• Curb Ramp
• Barrier Curb
• Irrigation Sleeves
• Traffic Control
Existing Conditions
Streetscape Style Improvements
Pre -Bid Conference 4
West Elizabeth Bike Lane & Streetscape
Projects
Streetscape Bid Alternates
• Bench Seating
• Sidewalk Color Upgrade
of
Traffic Control
• Lump Sum
• Specialty Signs
• Pedestrian Traffic Control
Business Access
• Maintain Business Access
• One Driveway Access — keep % open at all
times
• Two+ Driveways — closure of one is limited to
4 working days
• Liquidated Damages $500/day
4/16/2004
Pre -Bid Conference 5
West Elizabeth Bike Lane & Streetscape
Projects
General Conditions & Requirements
City Responsibility Contractor Responsibility
• Surveying
• 2 Year Warranty
• Tesding
• Temporary Utilities
• Mitring and Paving
• Noise, Dust, & Pollution
• Field Ofte
Conte
• Utility Coordination Water,
Eledric, Gas, APP, Traffic
• Staging Area 1A
A + B Bidding
• Bid Not to Exosed 76 days
• $MB per day
InaenlNe for Subehrdlal C pWw — ibnted to 5% of
contrad
- Dilkcwrd" for Subatrnthl Completion ar psoied spxgk
d"dlM
• Papua 1 far eats Lams
• October 15 fv supsh "
• Final Completion
- 2D days arw Wbst&nW ComO~
- Liquidated Damages $1000 per day
Addendum
4/16/2004
Pre -Bid Conference 6
West Elizabeth Bike Lane & Streetscape
Projects
Questions?
Thank Youl
4/16/2004
Pre -Bid Conference 7