Loading...
HomeMy WebLinkAboutWORK ORDER - GENERAL CORRESPONDENCE - 19913EXHIBIT ''A" Q WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND HIGH PLAINS MECHANICAL DATED: JANUARY 1, 1997 Work Order Number: HV-03-2004 Purchase order Number: Project Title: REPLACE ROOFTOP UNITS AT 256 W. MOUNTAIN Commencement Date: February25, 2004 Completion Date: March30,2004 Maximum Fee (time and reimbursable direct costs): $8,650.00 Project Description: Remove and replace (1) 2 ton/ 80,000 BTU and (1) 3 ton/100,000 BTU gas heat rooftop units with economizers, and programmable thermostats. Scope of Services: Demolition and removal of existing roof top unit and hauling away. (1) 2 ton/80,000 btu and (1) 3 ton/] 00,000 BTU gas heat rooftop unit with economizers. Adapter roof curbs. Reclaim refrigerant and dispose of both units. Install new programmable thermostats, test and program. New condensable "P" trap drains. Includes crane for lifting new units and removal old units from roof. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. SERVICE PROVIDER By: Date: CC: Purchasing ACCEPTANCE USER The attached forms consisting of ( ) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given - CITY OF FORT By: f� Date: f/71Z1 Director of Purchasing and Risk Management over $30,000. FEB 26 2004 8:17RM HP LRSERJET 3200 p 2 rage rvo. oT Pages to , o —� HIGH PLAINS irECHANiCAL SERVICE, 1NE 2020 AiRWAYAVENUE FORT COLONS, CO 80524 (970)221-W45 FAX: (970) 221-51M PROPOSAL SUBMITTED TO PHONE DATE STREET JOB NAME CITY. STATEAND21P CODE JOB OCATIDN Ax NUv18ER We hereby submit specifications and estimate for. OW PROPOSALTQEURM H MATERIAL.AND LABOR IS AS FOLLOWS; WeLpcopoest to rarnowo and replace (1) 2 Toni 00A00 btu and (1) 3 Ton 1100,000 btu Use; host rooftop units with economizers, and programmabb tl»rmoststs. Included: • Demolition and mmoval of tha sida t 4 roof lop unit and hauling -away • (1) 2 Ton 180,000 btu and (1) 3 Ton 1100,800 btu gas heat rooftop unit wtth oconomb*m w- Adapter curbs • Reclaim rehigerant and dispose of both units • lest Wild proms • New condensate "P" trap drains • fncfudes crane lbr-110" new unit and rsrrfovatof old, frawroof ElecMcaf povmr wfrfng by others ExchaWd; FLECTRK At, STRWrURkL9UPIMMOFAWIFK NIM-FRENK, PERU 11TS, TAXES, CUTTING. or PATCM 01i Ovaftm houw We Vtopofithereby to furish material and labor -- complete in accordance with above specifications, for the serum of'. Tax a del+ars fi _ ). Payment to be made as follows: All material is guaranteed W be» speafa6. AN work to be completed In a wcrkmanlake Authorized ma�'S6 �rz !ff'r:'� _ �f ro'er aomrdingtb s and iws. (fiL lions involving extra costs coil be executed only upon vmnsn orders. and will become an extra charge over and above the estimate. AD agreements contingent upon strikes, s aCCidenhiordalays beyond ourcD-&&(hwwfoeanyFre,tomadoanrocdoeierrauT HAthdrawn byNate: This day-be .30 insurance. Our workers are hAly covered by Workman's compensation Insurance, days. 9tteptance of proposaI--The 23"Prkspec ifications - recent'.amp�srd raaumaizu%m.elnq tea. signature sourtl. Paymem coal be made ae legal "n saws. I turast r ut" mfletl that ,e in sn: aeceunta vdt * CMraed msxln,um legal mtersst and ,aooMCy rollerdial less, inclutling aROmayi and kbuR te01. Signature Data OfaCCeptanC@: