No preview available
HomeMy WebLinkAboutCHANGE ORDER - BID - 5836 ROLLAND MOORE SHELTER REPLACEMENT04/14/2004 07:58 6849 PARKS PAGE 02 CHANGE ORDER FORM PROJECT TITLE: Rolland Moore Shelter Replacement PROJECT NUMBER: Bid # 5836 PO # 4401391 CONTRACTOR: G L Hoff Cc CHANGE ORDER NUMBER: P1 in preparing change orders snow in order as separate numbs 1. Reason for change. 2. Description of change. 3, Change in contract cost. 4. Change in contract time. 1. A. Paint collars on columns constrasting color B, Add electrcal outlet box to 8 columns 2. A. Powdercoat collars for the columns a contrasting color B. Add waterproof electrical outlet Coxes attached to post with intedor conduit, 2 per shelter, 8 total 3. A. Add $1,411.53 B. Add $2,951.40 4. A. No Change S. No Change ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED SUBMITTED REVIEWED BY: APPROVED BY: cc: City Clark Contractor Purchasing Project File 3.58% 3.58% $121,962.00 $0.00 $0,00 $4,382.93 $126,324,93 DATE: 3 —)A 2 DATE: TE: TE: i5�6 y