HomeMy WebLinkAboutCHANGE ORDER - BID - PEDESTRIAN BRIDGE BIKE TRAIL EXTENSTIONCHANGE ORDER NO. 1 Pedestrian Bridge & Bike Trail Extension at Overland Trail Road & Cache PROJECT TITLE: LaPoudre River CONTRACTOR: Duckels Construction PROJECT NUMBER: 5821 PURCHASE ORDER NO.: DESCRIPTION: Minor changes to scope of work 1. Reason for change: Quantity adjustments and additional work required 2. Description of Change: See Change in Work Request forms (CWR's) attached for details ADD -Colored Concrete Trail -Channel Trail Section (10' wide) $ 564.00 DELETE 36 - Driven Steel Sheet Pile (Non -cofferdam) $ (9,375.00) ADD - Boulder Filled Trench Wall @ Sheet pile location $ 8,950.00 ADD - Boulder Filled Trench Wall along Delehoy prop. $ 22.600.00 ADD - Install 24" ADS Pipe planters between bridge piers $ 3,765.00 3. Change in Contract Cost: $ 26,504.00 4. Change in Contract Time: 0 calendar days TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST (Assuming all change orders ACCEPTED BY: Contractor's Rer ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor Engineer Project File Purchasing $0.00 $0.00 $ 26,504.00 3.12% 3.12% $87— 6 65.27 DATE: DATE: DATE: DATE: DATE: Owner: City of Fort Collins Department: Park Planning & Development Project Maofter: Jason Statztuaa, P.E. Project Inspector. AYRES Assoc. / Terracon E"Jacer: AYRES Associates Project Engineer. Chris Carlson • arcs Project: Pedestrian Bridge & Bike Trail Extension at Overland Trail Road & Cache LaPoudre River Contractor. Dgckels Construction ContractorReprwentative: Joe Backurz Prnjoct superin(micat Bud Shallls Number I219 Affiou m3 Application is made for PVmcnt as shown below in connection with the Contact #1 3I31l04 $2.6,504.00 The p:asent status of the account htt this Courrent is as t om%: Origins[ Contract Amount: Net Change by Change Order: CuTreru ConUMAmount: Application. Number: Application Dam: Ped"Begianing: Period finding BidN%: Aaehasa Order d, 3 (TiiREE) 29-Feb-04 31-Mar-04 582I 3307932 $949,66 Total Complecad and Stand to Dame: $676,219.50 Um Pfc'ious AmountComplete& $ 116 8.00 Amount Dun this Application - Deface Retainap: $559,961.50 Amount ofRetainage Due this Application- S0.00 Lass Ra-e cop of this parnem $55, 996. 75 Net Change by ChangeOrder S 26,504.00 AMOUNT DUE THIS APPLICATION $503,965.35 CERTMCATIONt The andusigned CONTRACTOR certifies That 96 obligations of CONTRACTOR intoned is nnnxtion with the NVORK have boon sstLsfined as required in Paragraph 14.3. Of tine General Conditions of the Connuct. The above Amount Due is requested by the CONTRACTOR Date: By. Payment of the above Amount Due This Application is recommended OWNER'S Inspector. Date: By: Payment of the above Amount Due This Application has en lowed a ENGINEER Date: 'T / ,7 !f gy ~ Payment of the above Amount Due This Application is appr ed by the O Date: Hy 4 - �) ok,4 0 C> 0 N 0 0 O z r w r '7.