Re: Bid #5473 Miscellaneous Concrete Program
The City of Fort Collins has elected to renew Bid #5473 Miscellaneous Concrete Program for the
City of Fort Collins with your firm. The terms and conditions of this renewal will be the same as
stated in the original bid documents and including 2% price increases for 2004 as listed on the
attached Bid Schedule.
If the renewal is acceptable to your firm, please sign this letter in the space provided and return
along with a current copy of your insurance to the City of Fort Collins, Purchasing Division,
before March 25, 2004. If delivered, please deliver to 215 North Mason Street, 2nd Floor, Fort
Collins, CO 80524. If mailed, the mailing address is P.O. Box 580, Fort Collins, Colorado
80522-0580.
If this renewal is not acceptable with your firm, please send us a written notice stating that you
do not wish to renew the bid. If you have any questions regarding this renewal, please contact
John Stephen, CPPO, Buyer, at 970-221-6777.
tSincerely, �Q
sB.l II, CPPO, FNIGP
asing and Risk Management
Signature Date
(Please indicate your desire to renew Bid #5473 by signing this letter and returning it with a
current copy of insurance forms to Purchasing Division on or before March 25, 2004.)
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
VOGEL CONCRETE, INC
1313 Blue Spruce Dr. Unit B
Ft. Collins, Co. 80524
Phone (970)484-3880
Fax (970)407-9484
March 2, 2004
Re: Bid #5473 Miscellaneous Concrete Program
Vogel Concrete would like to renew bid #5473.
Since 2002, there have been several price increases including twice on concrete, labor,
workmen's comp, liability insurance, and health insurance. We would like to request a
cost increase of 2%. Please let us know if this is acceptable.
"mc
Dan Vogel
President
SECTION 00330 City of Fort Collins
BID SCHEDULE Miscellaneous Concrete Project
Vogel Concrete - 2004 Contract Renewal
ITEM NO
DESCRIPTION
PRICE 2004 UNIT
UNIT
QUANTITY ESTIMATED
TOTAL COST
202.01
Remove Concrete/Asphalt
$ 2.46
SF
8,000
$ 19,68700
202.02
Remove and Haul Fillets
$ 27.29
EA
10
$ 272.90
202.03
Sawcut Concrete/Asphalt 0" - 4"
$ 2.19
LF
250
$ 545.00
202.04
Sawcut Concrete/Asphalt 4" - 6"
$ 2.62
LF
500
$ 1,310.00
202.05
Sawcut Concrete/Asphalt 6" - 8"
$ 3.71
LF
500
$ 1,855.00
202.06
Sawcut Concrete/Asphalt 8" - 10"
$ 4.37
LF
250
S 1,092.50
203.01
Excavation
$ 65.49
CY
300
$ 19,647.00
203.02
Excavation - Walls Only
$ 10.91
CY
150
$ 1,636.50
203.03
Embankment (Borrow CL-5 or CL-6, Complete In Place)
$ 30.57
TON
100
$ 3,057.00
210.00
Reset Flagstone
$ 5.46
SF
250
$ 1,365.00
212.10
sad
$ 2.18
SF
500
$ 1,090.00
403.01
Temporary Patching
$ 97.33
TON
100
$ 8,733.00
403.02
Asphalt Patching - 6" Depth
$ 65.49
TON
150
$ 9,823.50
403.03
Asphalt Patching - 10" Depth
$ 81.87
TON
150
$ 12,280.50
604.01
Reconstruct Inlet Deck
$ 1,009.73
EA
5
$ 5,048.65
604.02
Inlet Deck - Additional Foot Opening
$ 163.74
LF
15
$ 2,456.10
604.03
Curb Inlet - 4'Opening
$ 1,637.40
EA
l0
$ 16,374.00
604.04
Area Inlet
$ 1,026.10
EA
5
$ 5,130.50
604.05
Type R Inlet - 5' O ening
$ 1,746.55
EA
5
$ 8,732.75
604.06
Type R Inlet - Additional Foot Opening
$ 227.05
LF
5
$ 1,135.25
604.07
Curb Inlet w/Frame and Grate w/ Adjustable Curb Box
$ 1,471.47
EA
5
$ 7,357.35
604.08
Concrete Sidewalk Culvert
$ 327.48
EA
10
$ 3,274.80
604.09
Metal Sidewalk Culvert - 2'Opening, e" plate
$ 1,200.75
EA
5
$ 6,003.75
604.10
Metal Sidewalk Culvert - 2' Opening, 2" plate
$ t,160.36
EA
5
$ 5,801.80
604.11
Additional Square Foot e" Plate
$ 109.16
SF
5
$ 545.80
604.12
Additional Square Foot 2" Plate
$ 87.33
SF
5
$ 436.65
608.01
Aron
$ 4.92
SF
1,000
$ 4,920.00
608.02
Crosspan
$ 4.37
SF
1,000
$ 4,370.00
608.03
Driveover Curb, Gutter & 4" Sidewalk
$ 19.10
LF
1,500
$ 28,650.00
608.04
Driveover Curb, Gutter & 6" Sidewalk
$ 20.20
LF
1,500
$ 30,300.00
608.05
Driveover Curb and Gutter - No Sidewalk
$ 14.19
LF
200
$ 2,838.00
608.06
Driveover Curb, Gutter and Drive Approach
$ 21.83
LF
250
$ 5,457.50
608.07
Driveover Curb and Gutter Drive Approach - No
Sidewalk
$ 14.19
LF
100
$ 1,419.00
608.08
Vertical Curb, Gutter and 4" Sidewalk
$ 20.74
LF
500
$ 10,370.00
608.09
Vertical Curb, Gutter and 6" Sidewalk
$ 22.92
LF
100
$ 2,292.00
608.10
Vertical Curb and Gutter - No Sidewalk
$ 16.37
LF
1,200
$ 19,644.00
608.11
Vertical Curb, Gutter and Drive Approach
$ 22.92
LF
200
$ 4,584.00
608.12
Vertical Curb, Gutter and Drive Approach, No Sidewalk
$ 16.37
LF
l00
$ 1,637.00
608.13
12" Reinforced Vertical Curb
$ 15.83
LF
100
$ 1,583.00
608.14
Hollywood Curb, Gutter and 4" Sidewalk
$ 14.19
LF
900
$ 12,571.00
608.15
Hollywood Curb, Gutter and 6" Sidewalk
$ 15.28
LF
300
$ 4,584.00
608.16
Hollywood Curb, Gutter and No Sidewalk
$ 14.19
LF
100
$ 1,419.00
608.17
Hollywood Curb, Gutter and Drive Approach
$ 16.37
LF
200
$ 3,274.00
608.18
Hollywood Curb and Gutter Drive Approach, No
Sidewalk
$ 14.19
LF
100
$ 1,419,00
608.19
Highback Curb and Gutter
$ 21.83
LF
500
$ 10,915.00
608.2
Pedestrian Access Ramp, Driveover Curb
$ 28.38
LF
250
$ 7,095.00
608.21
Pedestrian Access Ramp, Vertical Curb
$ 27.29
LF
250
$ 6,922.50
608.22
Pedestrian Access Ramp, Hollywood Curb
$ 21.83
LF
250
$ 5,457.50
Pedestrian Access Ramp, Highback Curb
$ 4.92
SF
500
$ 2,460.00
M96"
4" Flatwork
$ 2.73
SF
6,000
$ 16,380.00
Flatwork
$ 3.27
SF
2,500
$ 8,175.00
Page 1 of 2
SECTION 00330 City of Fort Collins
BID SCHEDULE Miscellaneous Concrete Project
Vogel Concrete - 2004 Contract Renewal
ITEM NO
DESCRIPTION
2004 UNIT
PRICE
UNIT
ESTIMATED
QUANTITY
TOTAL COST
608.26
Replace Flatwork 1 " Additional Depth
$ 0.52
SF
500
$ 260.00
608.27
8" Concrete Pavement
$ 4.37
SF
2,000
$ 8,740.00
608.28
Concrete Staining/Sealing
$ 3.83
SF
250
$ 957.50
608.29
Valle Pan - 6" Depth
$ 6.01
SF
500
$ 3,005.00
608.3
5" Trail with Fibennesh
$ 2.73
SF
6,000
$ 16,380.00
608.31
5" Trail with Fibennesh - Colored (Yosemite Brown)
$ 3.71
SF
1,000
$ 3,710.00
608.32
12" Mow Strip - 4" Depth
$ 7.10
LF
1,000
$ 7,100.00
608.33
18" S lashblock - 4" Depth
$ 8.73
LF
Soo
$ 4,365.00
608.34
8" Non -reinforced Concrete Wall
$ 9.82
SFF
1,000
$ 9,820.00
608.35
16" Non -reinforced Footer - 8" Depth
$ 14.19
LF
300
$ 4,257.00
614.01
"NO PARKING" Sign With Stand
$ 1.53
Per Day Per Each
500
$ 765.00
614.02
Vertical Panel Without Light
$ 0.88
Per Day Per Each
50
$ 44.00
614.03
Type I Barricade Without Light
$ 0.88
Per Day Per Each
1,000
$ 880.00
614.04
Type 11 Barricade Without Light
$ 0.88
Per Day Per Each
20
$ 17.60
614.05
Type III Barricade Without Light
$ 4.37
Per Day Per Each
20
$ 87.40
614.06
Size A Sin With Stand
$ 1.64
Per Day Per Each
300
$ 492.00
614.07
Size B Sin With Stand
$ 1.64
Per Day Per Each
20
$ 32.80
614.08
Size A Specialty Sign - Cost of Manufacturing
$ 81.87
Each
2
$ 163.74
614.09
Size B Specialty Sign - Cost of Manufacturing
$ 81.87
Each
2
$ 163.74
614.10
Cone With Reflective Strip
$ 0.71
Per Day Per Each
5o0
$ 355.00
614.11
Safety Fence
$ 5.46
Per Day Per Roll
25
S 136.50
614.12
Light - Stead Burn
$ 0.55
Per Day Per Each
25
$ 13.75
614.13
Light - Flashing
$ 0.55
Per Day Per Each
400
$ 220.00
614.14
Advance Warning Flashing - or Sequencing Arrow Panel
$ 81.87
Per Unit Per Day
5
$ 409.35
614.15
Traffic Control Supervisor
$ 245.61
Per Day
100
$ 24,561.00
614.16
Traffic Control Supervisor
$ 29.48
Per Hour
100
$ 2,948.00
614.17
Flagging
$ 18.55
Per Hour
200
$ 3,710.00
626.01
Mobilization - Invoices Under $500
$ 153.00
Lump Sum
50
$ 7,650.00
705.01
BackerRod/Sealant
$ 2.18
LF
100
$ 218.00
$ 444,984.18
Four Hundred Forty Four Thousand, Nine Hundred Eighty Four Dollars and Eighteen Cents.
Signed Address 1313 Blue Spruce Drive, Suite B
Company Vogel Concrete, Inc.
Check One:
Individual Doing Business in Company Name
Corporation
Partnership
Fort Collins, CO 80524
Phone/Fax 970.484.3880 970.407.9484