Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5664 CONCRETE REQUIREMENTS FOR UTILITIES ANNUAL (4)Administrative Services Purchasing Division City of Fort Collins March 1, 2004 Aggregate Industries, Inc. 418 Linden St. Ft. Collins, CO 80524 Re: Bid #5664 Concrete Requirements For Utilities MAR 0 9 2004 The City of Fort Collins has elected to renew Bid #5664 Concrete Requirements For Utilities for the City of Fort Collins with your firm. The terms and conditions of this renewal will be the same as stated in the original bid documents and including the following increases which will take effect March 15, 2004: Flow Fill $40.35 3/8" Slurry $53.75 Sand & Water $37.50 Concrete, 3000 PSI $65.25 If the renewal is acceptable to your firm, please sign this letter in the space provided and return along with a current copy of your insurance to the City of Fort Collins, Purchasing Division, before March 15, 2004. If delivered, please deliver to 215 North Mason Street, 2Id Floor, Fort Collins, CO 80524. If mailed, the mailing address is P.O. Box 580, Fort Collins, Colorado 80522-0580. If this renewal is not acceptable with your firm, please send us a written notice stating that you do not wish to renew the bid. If you have any questions regarding this renewal, please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777. Sincerely, z Q) J erill I� CPPO, FNIGP Dir ch ing and Risk Management (Please indicate your desire to renew Bid #5664 bAsigning this letter and returning it with a current copy of insurance forms to Purchasing Division on or before March 15, 2004.) 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 February 201h, 2004 John Stephen �1 tid PA+ City of Ft. Collins -Purchasing Division�� P. O. Box 80522-0580 1 Ft. Collins, CO. 80522-0580 /re( ' 4� 5 `,- Re: Concrete Requirements for Utilities AA ' Ifiltf�{ / Dear John, >q x1j Thank you for extending an offer to renew the annual contract supplying ready mix concrete materials for the city utilities. We have experienced increases in the cost producing and delivering our product, as has most of the manufacturing sector. Please consider these nominal increases in the amount of our bid: Material 2003 $/CY 2004 $/CY Flow Fill $39.50 $40.35 3/8" Slurry $52.50 $53.75 Sand & Water $36.70 $37.50 Concrete, 3000 PSI $63.75 $65.25 You will find these prices reflect less than a 2.5% adjustment. Please feel free to contact me with questions and/or comments. Your Business Is Appreciated. Sincerely, Dennis W. Mouser Senior Sales Representative