HomeMy WebLinkAboutWORK ORDER - GENERAL CORRESPONDENCE - 19447FEB-23-2004 MON 03:55 PM CFO ENG.
F'KiiJ.t••It` P�Ix A{uciv '� I'� /•_ LI
........_�u. From i (1
WI1Pml ,.
hnw,a a
.. .. L:nr1I8lT "A"
FAX NO. 9702216378 P. 01
WORK ORDP R FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
DATEn:�c,<>Ic��l�
Work order Number:
Purchase Order Number:
Fr�sJnl�t T'iklr: // t
{�nf,r'iifYiPt'4Ca",rnEllikC�}:�t(�: _ (( �f• .^.�
Cara+'Iap1c:'tiun Date: -.—
fiulmi.im Feex (time sand rei nbursable direct casts):
prof ac:t Description:
`.:FI.:M'r"'.Pcµt i
scril.m of services; x. Fr 1 Gil c....
Acceptance
User
Pvofossional agrees to perfom the oorvices
klrsml8ed abovo and on'te attached forms in
ar..,cordaws with the tea and canditions
contairiod hrarobi and kn Mo Professional
Sewvir:es AV-eemorit between the parties. In the
ouisnt of a conflict t)etwrjen at ambiguity In the
Ipnns of the Professional $ervices Agreement
and lNu work order (including the attached
forms) the Professlr)nel Servk:es Agreement
allait coniml.
The aktadwd forms consistir" of �a pages
are hwoby accepted and incnrparated herein, by
this reference, and Notice to proceed Is hereby
given.
%r
Director of Purottaelr -and Mek Management
(over $M,W0.04)
1
FEB-23-2004 MON 03:55 PM CFC ENG, FAX NO. 9702216378
P. 02
Rtxhibil, A Ailachment
203-10
('allrge i►mcl Lake--mediml Wloslifientiaus
North Starr flcsip, lore. -- 20.1-10
Pity of Dart Collins Engineuing
Marc Anderson
PO Box 58b
Dort C'ollims, Colorado 90522-0520
Stt,tivn;,try:
IN.,; prraj;cL will modify the medims in College Avenue at L,alw; Street to eliminate the southbound left
Writ moveanont and the umt-wc,st through movement. The plans will need to be in COOT format. The
Fool do-sil'rrr Iktckago will be a term effort boAveen the Engineering Department and North Star Design,
inr.
i5coiN;
CA Assistance — Plim Preparation and Quality Control Review — Prepare a preliminary and
final set ofplans in CD0'i' ststtulard format with design supplied by the City.
Anticipatt'd plan sheds includc:
Title Sheet
e sianclnrd Man list
o OLrieral Noics
Summary of Approximate Quantities
Survey Comrol
m Removal Plan
a Typicrtl Sce(ions
Construelioa Ltiyont
� 1'roliles
e Sil;nint; anal Slrilring
a Traffic C'nrrtrol Plan
n Details
li.t.itmrtcd cost: $ 7,650 00 hours).
2. Reeling %' FIR rriMint;, FOR meeting and other project coordination mectings. Estimated cost:
yig50 (10 hours).
i, Relrnlmrs�Able Fxpearses-- Gstiniatcd cost `I200
Agslgir,ptioi ?xclusic ms-.
1. The City will provide a final design survey,
2. The City will lead a meeting with CDOT to discuss the proposed curb type, lane widths,
l:andsealied vs, Imrdsc.aMl median, ,and general design constraints prior to the final design.
3. No utility relocations are a rilicipate:d, After it rwiow of City maps, it appeairs that there is a
storm wwcr syacni at the intersection and there is an existing irrigalion tap in the north median.
4, 111(4 City will provide specifications.
5. 'Phis wolx, (tors not include any services during; or alter construction (eonstiviction staking,
ohse'rulion, reanril drawing'3' etc.).
.. �.... •......., a v.•.r. w... r,,.•,v •• Mee.wrlrwnwe