HomeMy WebLinkAboutRESPONSE - BID - 5826 CITY PARK MOSS ROCK WALL (3)SECTION 00300
BID FORM
PROJECT: CITY PARK MOSS ROCK WALL; Bid No. 5826
Place Fort Collins
Date December 4, 2003
1. In compliance with your Invitation to Bid dated November 5, 2003
and subject to all conditions thereof, the undersigned
G.L. Hoff Company a ** (Corporation, bimited--satrtttt7-nt g 7,
Pao weir -de �Fer}t�e,--e-Jo-l�-Pr3prtetrr) ** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of 5% of bid amount ($
in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
Employers Mutual Casualty Company, PO Box 370010, Denver, CO 80237
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through
7/96 Section 00300 Page 1
Chlorination System Improvements
Construction of a new 11 feet wide by 25 feet long by 6 feet deep concrete
chlorine contact basin with perimeter handrail, a new chlorine solution
pump and appurtenances for the wastewater treatment plant in Pierce.
Owner: Town of Pierce
240 Main Street
Pierce, CO 80650
Contact: Steven Butherus, Project Manager
Ketterling, Butherus and Norton Engineers LLC
820 8th Street Plaza, Greeley, CO 80631
970-395-9880
Contract: $33,811.50
Change Orders: none
Own Forces: 95%
Completion: June, 2002
Colorado State University Equine Center Detention Pond
Construction of a 6 acre-foot earthen retention pond including excavation,
sitework, seeding,
sluice gate, portable slurry pump and irrigation sprinkler.
Owner:
Colorado State University
Facilities Services
Fort Collins, CO 80523
Contact:
Jim Stoddard, Project Manager, 491-0138
Contract:
$1541410.00
Change Orders:
none
Own Forces:
94%
Completion:
August, 2002
Nick Davidson, Inc. Remodel
Remodeling of existing building for detailing, parts storage, and wash bay
for auto dealership.
Scope of work included landscaping, site concrete,
masonry, interior finishes, overhead doors, roofing, heating, air
conditioning, and electrical.
Owner:
Nick Davidson, Inc
1604 North Lincoln Avenue
Loveland, CO 80538
Contact:
Joe Gebhardt, owner, 970-667-3950
Contract:
$270,002.00
Change Order:
four Add $30,321.27
Own Forces:
58%
Completion:
August, 2002
Lower Hoffman Lake Spillway / Outlet Modification Project
Demolition and removal of existing bridge abutments and spillway outlet
structure including dewatering. Construction of structural concrete and
reinstallation of bridge and sluice gate. Removal and replacement of
concrete bike path and riprap.
Owner: Seven Lakes Reservoir Company
808 23rd Avenue, Greeley, CO
Contact: John Gauthiere, Engineer, 970-330-0855
Gauthiere Engineering
2157 Buena Vista Drive
Greeley, CO 80634
Contract: $103,135.07
Change Orders: none
Own Forces: 100%
Completion: October, 2002
Douglas Lake Boat Dock
Installation and construction of floating boat docks, concrete approach and
support ramps, pedestrian
pathway, and wood retaining wall.
Owner:
State of Colorado Division of Wildlife
6060 North Broadway
Denver, CO 80216
Contact:
Kay Sinclair, Project Manager, 970-472-4433
Contract:
$89,256.00
Change Order:
two Add $8,842.75
Own Forces:
100%
Completion:
October, 2002
Benner Office Building
Subcontracted a portion of the work for the construction of the office
building at 3760 East 15th Street, Loveland, CO. Scope or work included
all excavation, utilities and site concrete for phase 2 including the
completion of 15th Street and building concrete.
Owner: Benner Holdings, LLC
Loveland, CO
Contact: Jeryl Benner, Manager, 970-566-9778
Benner Development Company, LLC
3053 Nature Run
Loveland, CO 80537
Contract: $109,017.00
Change Orders: one Add $373.00
Own Forces: 100%
Completion: October, 2002
Johnstown Ready Mix Batch Plant
Construction of new concrete batch plant facility including excavation and
site work, caissons, foundation, construction of pre-engineered metal
building, mechanical, electrical, interior finishes, and construction of a
truck washing facility.
Owner: Loveland Ready Mix Concrete, Inc.
PO Box 299
Loveland, CO 80539
Contact: Steve Fancher, VP, 970-667-1108
Contract: $323,152.00
Change Orders: three Deduct: ($4,179.68)
Own Forces: 61%
Completion: October, 2002
Annual Trial Gardens Shade Structure
Construction of a custom metal structure and roof system for Colorado
State University shade gardens. The project included sitework, concrete
foundation, brick veneer and colored patterned concrete walkways.
Owner: Colorado State University
365 Aylesworth Hall Southeast
Fort Collins, CO 80523
Contact: Cass Bietler, Project Manager, 970-491-0158
Facilities Management
Colorado State University
Fort Collins, CO 80523
Contract: $165,480.33
Change Orders: three, Add: $46,507.33
Own Forces: 42%
Completion: January, 2003
G.L. Hoff Company
Construction Experience
Gregory L. Hoff, President and Construction Manager
For the past thirty years, Greg has been involved with all aspects of construction. Greg
established G.L. Hoff Company in 1984. Serving as president and project superintendent,
Greg is a driving force in the company.
Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering
Technology, his early work included surveying and architectural design and drafting. He
has held a Class B Commercial Contractor's License with the City of Fort Collins since
1976. Currently, Greg is a licensed contractor in the cities of Loveland, Fort Collins, and
Boulder.
Prior to 1984, Greg worked with Al Hockett, Inc. initially as an architectural draftsman and
progressing to project superintendent. He was also a partner in H&M Builders from 1976
to 1980. This company specialized in custom homes, tenant finish and custom millwork.
Beginning in 1984, Greg established G.L. Hoff Company, a commercial general contracting
company which specializes in all types of commercial construction including sitework,
excavation, structural concrete, and commercial buildings. As president and construction
superintendent for G.L. Hoff Company, Greg supervises a wide variety of projects
including, schools, churches, city and government projects, city park developments, as well
as many light industrial and concrete construction jobs. Greg oversees project scheduling,
review of construction procedures and specifications, monitors quality control and safety
enforcement on job sites. As president and construction supervisor, Greg works closely
with project owners, architects and engineers throughout the project.
Greg is an active member of the Loveland construction community. He has volunteered his
time to the Loveland Construction Advisory Board for over 15 years. While serving as
Chairman, this Board, the city adopted licensing for contractors. He is currently serving on
a review committee to study the International Building Code prior to adoption by the City
of Loveland.
Joel S. Reger, Estimator and Project Manager
Joel has a Bachelor of Science Degree in Construction Management from Colorado State
University and seventeen years experience in the construction field. He has continued his
education with estimating seminars including training with American Building Company's
estimating Access workshop. He is also an active member of the Sigma Lambda Chi
honorary national construction fraternity.
During the past thirteen years, as the chief estimator with G.L. Hoff Company, Joel has
compiled bids and development estimates for projects valued at up to five million dollars.
As chief estimator, he directs the project bidding process as well as the review of
specifications. He also works directly with project management, coordinating proposal
requests and change orders with the architect or owner, overseeing material orders to insure
that the project is completed in a timely manner and according to specifications. Joel is an
important and effective member of every Design -Build project with G.L. Hoff Company.
He works closely with the owner and architect to understand project goals and provide
detailed project budgets and construction options to meet the owner's needs.
William L. Vance, Project Superintendent
Bill brings over twenty six years of experience in construction related fields to his position
as project field supervisor. His background includes heavy equipment operating, truss
construction, carpentry, and cost estimating. He also has experience in both commercial
and residential property development from site work and utility lines through finish
carpentry. Bill has built over five hundred new homes as well as several light commercial
properties. He has supervised many projects with G.L. Hoff including the Elkhorn Retail
Shops, and the ATI Remodel and Addition. His commanding knowledge of construction
methods enables Bill to be an effective field superintendent.
Ae/ \
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
G. L. Hoff ComAany as Principal, and Employers Mutual Casualty Company
Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorados
as OWNER, in the sum of $5% of bid amount
truly tc be made, we herebyfor the payment of which, well and
assigns. Jointly and severally bind ourselves, successors, and
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fort Collins Project, CITY PARK MOSS ROCK WALL; BID NO. 5826.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto.(properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
7/96
Section 00410 Page 2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this 4th day of —December corporations have caused their corporate seals to Ee hereto affixed2003 r and such of as are
above.
presents to be signed by their proper officers, the day and year first set forth
PRINCIPAL
Name: G. L. Hoff Company
Address: 1815 W. 12th Street
80537
By:iTitle: I
l���
SURETY
Employers Mutual Casualty Company
P. 0. Box 370010
Denver CO 80237
By: , l
Title: Attorney -in -Fact
ATTEST:
By:
(SEAL)
7/96
(SEAL)
Section 00410 Page 3
No Text
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM
masonry
7/96
SUBCONTRACTOR
to be determined
Section 00430 Page 1
G.L. Hoff Company
CONTRACTOR
BY: Joel S. Reger
Vice President
ADDRESS: 1815 West 12th Street
Loveland, CO 80537
8. BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
RE FULLY SUBMITTED:
n Date
Vice President
Title
#B-6
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:
i m
AHoff, Se e a reasurer
Address 1 15 West 12th Street
Loveland, CO 80537
Telephone 970-669-3255
7/96 Section 00300 Page 2
CITY PARK MOSS ROCK WALL
BID SCHEDULE
Bid items are described in Section 01800
BID
ESTIMATED
ITEM #
DESCRIPTION
QUANTITY
UNIT
1
Mobilization
1
LS
2
Tree Protection
1
LS
3
Traffic Control
1
LS
4
Moss Rock Wall - One side veneer
222
LF
5
Moss Rock Wall - Two side veneer
25
LF
6
Moss Rock Column - 4' 6" height
2
EA
7
Moss Rock Column - 5' 6" height
2
EA
8
French Drain
235
LF
TOTAL BID
UNIT
PRICE
$ 1,557.00
$ 450.00
$ 250.00
$ 198.00
$ 396.00
$ 2,034.00
$ 2,389.00
$ 19.70
Sixty nine thousand five hundred eighty eight dollars and fifty cents
(written)
ITEM
TOTAL
$ 1,557.00
$ 450.00
$ 250.00
$ 43,956.00
$ 9,900.00
$ 4,068.00
$ 4,778.00
$ 4,629.50
Section 00300 Page 3
$ 69.588.50
Figure
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
st be
bemansweredve. This on separateatement attachedusheets. ThezBidderfmaycessaryqustions my
submit,anyenadditioa
information he desires. al
1. Name of Bidder: G.L. Hoff Company
2• Permanent main office address: 1815 West 12th Street, Loveland, C0 80537
3. When organized: January 1984
4. If a corporation, where incorporated: Coloradof October 1989 '
5•. How many years have you been engaged in the contracting business under your
present firm or trade name? 19 years
6• Contracts on.'hand: (Schedule these, showing the amotmt of each contract and
the appropriate anticipated dates of completion.)
Fish Creek Pedestr&An Trail, Estes Park, $262,922. 12-2003
IINC A artment Pla round Greele , ;116,004. 12-2
DM Bellvue Hatchery Drain Bellvue 17,073. in-2nna
7• General character of Work performed b
y your Company:
Commercial general contractor• compl to the following areas with our awnfor a sitework concrete ca ent ro ect management
8. Have you ever failed to complete any Work awarded to you? no
If so, where and why?
9. Have your ever defaulted on a contract?moo
If so, where and why?
10. Are you debarred by any government agency? no If yes list agency name.
7/96
Section 00420 Page 1
11. List the more important projects recently completed by your company, stating
the approximate cost of each, and the month and year completed, location
and type of construction.
Planno refer o the attached information
12. List your major equipment available for this contract.
thog truck. CAT 928 loader, CAT 320 track excavator, backhoe, bobcat,
MQtQX-Zxsd—erL.-&radinX tractor, concrete pump.
13. Experience in construction Work similar in importance to this
project:
please refer the attached lists
14. Background and experience of the principal members of your organization,
including officers:
P7 ARA refer to the attached lists
15. Credit available: $ 2009000.
16. Bank reference: Loran Emonds, Bank Me Loveland, CO
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
VPA -
18.
19.
20
Are you licensed as a General CONTRACTOR? yes
If yes, in what city, county and state? Fort Collins and of ers What
class, license and numbers? #B6
Do you anticipate subcontracting Work under this Contract? yes
If yes, what percent of total contract?less than 15%
and to whom? seeding
Are any lawsuits pending against you or your firm at this time?
If
DETAIL
no
7/96
Section 00420 Page 2
yes,
21. What are the limits of your public liability? DETAIL
2 million and 2 million umbrella
What company? Flood & Peterson (Travelers)
22. What are your company's bonding limitations? approx. 5 million range
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at Loveland this 4th day of December 2003.
Title: Miriam T. Hoff, Secretary Treasurer
State of Colorado
County of Larimer
Miriam T. Hoff being duly sworn deposes and says that he is
Secretary Treasurer of G.L. Hoff Company and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this day of
2 0C I.
� iJ h io � �
(5eotary Public
My commission expires C
7/96 Section 00420 Page 3
G.L. Hoff Company
2002 Projects
Estes Park Sanitation District Centrifuge Building
Construction of a new concrete block building with precast tee
construction for a centrifuge. The work included piping, valves, electrical
and instrumentation.
Owner: Estes Park Sanitation District
1201 Graves Avenue
Estes Park, CO 880517
Contact:
Jim Duell, District Manager 970-586-2866
John Burgeson,970-223-9600
Shepherd Miller Inc., Project Engineer
Contract:
$264,053.00
Change Orders:
one $2,586.00
Own Forces:
55%
Completion:
January, 2002
Rehabilitation of Owl Creek Ditch Hydraulic Structures
Removal and replacement of ten concrete hydraulic structures, providing
and installing 25 meter gates, 21 precast concrete flumes, and construction
of 4 cast -in -place flumes and other miscellaneous headwalls and structures
along the Owl Creek Ditch.
Owner: Owl Creek Supply and Irrigation Company
PO Box 206
Eaton, CO 80615
Contact: Duane Smith, 970-490-2620
Smith Geotechnical
Contract: $383,000.00
Change Orders: three $29,476.50
Own Forces: 100%
Completion: April, 2002
Sitework and Utilities for New Kuck Mechanical Building
Subcontracted the sitework and utilities for the new Kuck Mechanical
building to Delehoy Construction. Scope of work included overlot
grading, structural fill, building excavation, foundation insulation, underslab
gravel, fine grading, installation of sewer line, storm drainage, waterline,
fireline and asphalt patch.
Owner: Kuck Mechanical, Inc.
General Contractor: Delehoy Construction
3109 South Taft Hill Road
Fort Collins, CO 80526
Contact: Mark Delehoy, 970-226-0836
Contract: $125,840.00
Change Orders: three $7,008.00
Own Forces: 100%
Completion: March, 2002
Pedestrian Links to Transfer Areas
Street and sidewalk improvements for City of Loveland Bus system.
Scope included removal and replacement of concrete curb, gutter,
sidewalk, cross pans, bus pads and crosswalk, and asphalt paving as per
Federal and CDOT specifications.
Owner: City of Loveland
105 West 5th Street
Loveland, CO 80537
Contact: Donna Camilliere-Frye
Project Manager, 970-96202511
City of Loveland Engineering Department
Contract: $72,737.88
Change Orders: one $16,614.58 (quantity bid)
Own Forces: 85%
Completion: July, 2002