Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5826 CITY PARK MOSS ROCK WALL (9)SECTION 00300 BID FORM PROJECT: CITY PARK MOSS ROCK WALL; Bid No. 5826 Place City of Ft. Collins Purchasing Div. Date December 4, 2003 1. In compliance with your Invitation to Bid dated November 5, 2003 and subject to all conditions thereof, the undersigned Delta Construction, Inc. a **(Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% ($ Instructions to in accordance with the Invitation To Bid and Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows:United Fire & Casualty Company - Cedar Rapids, Iowa. 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through N/A 7/96 Section 00300 Page 1 PAUL HOFFMAN CEO DELTA CONSTRUCTION, INC. EXPERIENCE: 1993 — PRESENT DELTA CONSTRUCTION OF NORTHERN COLORAD09 INC., FORT COLLINS, COLORADO CEO Delta is a General Contracting firm with over 25 years of experience in Southeastern Wyoming and Northern Colorado. Annual sales of $11 million 1988 —1993 THE NEENAN COMPANY, FORT COLLINS9 COLORADO Project Manager Responsible for owner coordination, contract administration, subcontractor negotiation, project buyout, project scheduling and estimating. MAJOR PROJECTS INCLUDE: • Northgate Office Building: 10,200 square foot office building in Laramie, Wyoming. • First National Bank of Wyoming: Branch bank in Laramie, Wyoming. • First National Bank: Two banking facilities with drive -ups in Loveland, Colorado. • Centennial Medical Office Building: 70,000 square foot MOB in South Denver, Colorado. • First National Bank Plaza: Branch bank in Fort Collins, Colorado. • First National Bank: Drive -up remodel for main bank in Fort Collins, Colorado. • Custom Homes at Ptarmigan Golf Course in Fort Collins, Colorado. • Custom Homes in Laramie, Wyoming • McCarty Honda/KIA: Showroom and detail area in Laramie, Wyoming. • United States Wildlife: Tenant improvements for Government R&D Lab in Fort Collins, Colorado. • Front Range Steel: 14,000 square foot steel fabricating plant with separate office building in Wellington, Colorado. • River Bend Park Phase I & II: Self -developed 15,000 square foot industrial/commercial building in Laramie, Wyoming. • Bowman Brewpub in Downtown Laramie, Wyoming. • Fish's Liquor Mart: 10,000 square foot precast concrete building in Fort Collins, Colorado. • Orthopedic Center of the Rockies, MRI: 3,526 square foot magnetic imaging medical office building in Fort Collins, Colorado. • Oppenheimer Management Corporation: 42,970 square foot two-story office and production building in Denver, Colorado. • Gerry Baby Products: 385,000 square foot facility including an office building (40,000 S.F.), 3 production buildings (71,000 S.F. each), and a warehouse building (131,000 S.F.) in Thornton, Colorado. Pan[ Iloifinan, President. Delta C onstrtictioll. Inc. Page I • Donnelly Applied Films: 38,700 square foot office building in Boulder, Colorado. • First Interstate Bank Drive -up Facility: 1,400 square foot drive -through banking facility in Fort Collins, Colorado. • First Interstate Bank Branch Office Facility: 3,800 square foot office banking facility in Fort Collins, Colorado. • Western Forge: 56,000 square foot production and warehouse facility in Colorado Springs, Colorado. • Data Ray: 65,000 square foot production facility for computers in Westminster, Colorado. • D.I.S.C.: 40,200 square foot high -end office building in Boulder, Colorado. • Builder's Square: 90,000 square foot retail/warehouse building in Fort Collins, Colorado. • Valli Hi Plaza: Project included a Walgreen's retail space and a complete renovation of a retail strip center in Colorado Springs, Colorado. • Broomfield Family Practice: 16,000 square foot medical office building in Broomfield, Colorado. • ESAB Automation: 108,000 square foot office and manufacturing facility in Fort Collins, Colorado. • Avista Medical Office Building: 40,000 square foot three-story medical office building in Louisville, Colorado. • Orthopedic Center of the Rockies: 43,000 square foot two-story orthopedic facility in Fort Collins, Colorado. 1987 — 1988 WESTERN STATES CONSTRUCTION COMPANY, INC., LOVELAND, COLORADO. Cost and Scheduling Engineer: Developed and maintained project schedules and overall project cost control. Estimator: Responsible for lump sum and unit price bids ranging in contract price from $200,000 to $20 million. Contract Quality Control Representative: Responsible for quality control, field inspection, submittal review and report documentation. Project Engineer: Responsible for project control, submittal administration, estimating and buyout. 1985 -1987 COLORADO STATE UNIVERSITY, DEPARTMENT OF INDUSTRIAL SCIENCES, FORT COLLINS, COLORADO. Instructor: Taught an evening graduate class in Microcomputer Applications in Construction. Software taught includes Lotus 1-2-3, Primavera, as well as database and word processing applications. Graduate Teaching and Research Assistant: Taught a graduate -level course in Computer Applications. Assisted in teaching a senior -level Scheduling and Cost - Control course, and taught six drafting fundamentals courses. SUMMER 1986 DELTA CONSTRUCTION COMPANY, INC., LARAMIE, WYOMING Estimator Managed entire bidding process for lump sum projects. Developed a computerized estimating system. JANUARY 1985 - M.A. MORTENSON CONSTRUCTION COMPANY, LAKEWOOD, COLORADO JULY 1985 Carpenter Worked in all aspects of carpentry for the construction of a $20 million Marriott Hotel. 1'aul ll<>thnan, ['resident, Delta Col75tfucti()1a, Inc, Page 1983- 1986 INDEPENDENT CONTRACTOR Designed, estimated and constructed residential construction projects. 1980 - 1985 DELTA CONSTRUCTION COMPANY, INC., LARAMIE. WYOMING Labor Foreman Supervised laborers and general construction fieldwork. EDUCATION: MAY 1987 COLORADO STATE UNIVERSITY, FORT COLLINS, COLORADO Master of Science in Construction Management MAY 1984 UNIVERSITY OF WYOMING, LARAMIE, WYOMING Bachelor of Science in Manufacturing Technology Paul lloftrnan, President. Delta C onstructjon� lnci Page 3 EXPERIENCE: 2000 1992 — 2000 1991-1992 1988 —1989 1986 —1987 GREG ORR DIRECTOR OF OPERATIONS DELTA CONSTRUCTION, INC. DELTA CONSTRUCTION COMPANY9 INC.9 FORT COLLINS, COLORADO Director of Operations NEENAN COMPANY Senior Project Manager ADOLFSON & PETERSON Field Engineer WALTERS CONSTRUCTION MANAGEMENT Labor Foreman F.R. ORR CONSTRUCTION COMPANY Laborer MAJOR PROJECTS INCLUDE: • Kids Harbor Daycare: 11,200 square foot day care facility constructed of wood frame with EFIS and timber architecture, Loveland, Colorado. • Obermann Dental Office: 12,000 square foot dental office with the latest in technology and innovations, Fort Collins, Colorado. • Vision Graphics: 22,000 square foot tilt -up structural addition to existing production floor, Loveland, Colorado. • Cytomation Phase I and II: Two buildings totaling 80,000 square feet of storage/lab/R&D/office space, Fort Collins, Colorado. • Dovatron: 72,000 square foot office and production facility, Longmont, Colorado • Union Medical Campus Phases I and II: 6.5 million dollar, 145,000 square foot, medical office buildings, Colorado Springs, Colorado. • Boston Chicken Corporate Headquarters: 92,000 square feet ($9,600,000) Phase II of Boston Chicken/ Einstein Bagels Headquarters, Golden, Colorado. • Triad West: 105,000 square foot spec warehouse/office/production facility, Golden, Colorado. • Balzers Thin Films: $1,200,000 tenant finish with classroom and clean rooms, Golden, Colorado. • Quantum SSPG: 460,000 square foot office, warehouse, and production facility including a 700-person full service cafeteria, Colorado Springs, Colorado. • 1899 Wynkoop: 270,000 square foot, $17,600,000 office, retail and underground parking, Denver, Colorado. G"i'_; OU, PAIJOCI. VLina-goo- I)ttt;.a C_onsi "coon;. Inc, Page 1 EDUCATION: 1992 COLORADO STATE UNIVERSITY, FORT COLLINS, COLORADO Bachelors of Science, Construction Management 1996 Primavera training courses including P3 scheduling and expedition Cleanroom Design Build workshop, Arizona State University. 1997 Alliance for Construction Excellence Clean room Taskforce hosted by Arizona State University's Del E. Webb School of Construction. Greg Orr. [`rolie t Manat >r, 1Mia C.orlctruc,ion, inc. Page 2 JOHN BAKER CONSTRUCTION MANAGER DELTA CONSTRUCTION, INC. EXPERIENCE: 1999 - PRESENT DELTA CONSTRUCTION, INC., FORT COLLINS, COLORADO Preconstruction Manager 1992 -1999 THE NEENAN COMPANY, FORT COLLINS, COLORADO Preconstruction Manager/Project Manager 1986 -1992 HENSEL PHELPS CONSTRUCTION COMPANY, GREELEY, COLORADO Project Engineer MAJOR PROJECTS INCLUDE: • The Ranch at Larimer County Fair Grounds: five pre-engineered metal buildings totaling 230,000 square feet. These buildings include the Maintenance Building, Exhibition Building, Indoor Arena along with the East and West Livestock Pavilions, Loveland, Colorado. • Obermann Dental Office: 12,000 square foot dental office with the latest in technology and innovations, Fort Collins, Colorado. • Vision Graphics: Preconstruction services for a 22,000 square foot site -cast high bay warehouse addition to existing facility located near Loveland Airport, Colorado. • Cytomation I, II, III: Preconstruction services for three one-story brick buildings totaling 80,000 square feet. Consists of storage, lab, and office areas in Fort Collins, Colorado. • Hercules Industries: Preconstruction services for a 12,000 square foot masonry addition with matching facade to an existing building; including an additional 12,000 square foot spec office/warehouse. • Veeco/Ion Tech: 24,000 square foot pre -cast core and shell building. • Vi-Per Investments: Preconstruction services for a 12,000 square foot, two- story, core and shell finish. • Ball Aerospace & Technologies Corp: 117,700 square foot, $13 million R&D facility for the development of high tech communication devices. The facility includes a 30,000-gallon immersion tank, 90,000 square feet of high bay testing and integration space with 15-ton overhead cranes, and 27,000 square foot office space. This project is located adjacent to Jefferson County Airport and required extensive coordination with FFA and Airport Authority, Broomfield, Colorado. • Quantum Peripherals -Phase 2: An additional 67,000 square feet of research facility and approximately 20,000 square feet of two-story office space, Louisville, Colorado. • Quantum Peripherals -Phase 1: 190,000 square foot facility with 60,000 square feet of two-story office and cafeteria space and 130,000 square feet of high bay research and utility support spaces at a total project cost of $49 million, Louisville, Colorado. .tohn I3 her. Cmigrc€cNcit3 khmaLer Delta C'orasiruc�ti�>�q, istc. Pace I • Longmont United Hospital: Five story patient bed tower located on the existing LUH campus. Facility includes two floors of patient recovery rooms, NICU, cafeteria, meeting rooms, conference rooms, lobby and administrative space, Longmont, Colorado. • Rocky Mountain Cancer Center: This three story 39,000 square foot facility required extensive negotiations with Denver's Uptown Hospital District to meet their design and construction covenants, Denver, Colorado. • Midtown Surgery Center: 18,000 square foot outpatient surgery center consisting of pre and post operation, four operating rooms, twenty-three hour recovery rooms and administrative space, Denver, Colorado. • Plum Creek Medical Center: 12,000 square foot gatekeeper facility consisting of medical office, imaging and emergency care, Castle Rock, Colorado. • Poudre Valley Hospital -A, B and C Wing Remodel and Additions: $18 million addition of fourth and fifth floors to existing wing and new construction of B Wing and C Wing, Fort Collins, Colorado. • Colorado Convention Center: $95 million convention center for the City and County of Denver constructed in a fast track, design build format in eighteen months, Denver, Colorado. OTHER PROJECTS: Assignments with HPCC prior to being promoted to Project Engineer include Stapleton B Concourse for United Airlines in Denver, Colorado, the Atlas Centaur facility for General Dynamics in San Diego, California, the Device Assembly Buildings for the Department of Energy near Las Vegas, Nevada and the Blade Repair facility for the U.S. Air Force at Tinker Air Force Base, Oklahoma — among others. EDUCATION: DECEMBER 1985 COLORADO STATE UNIVERSITY, FORT COLLINS, COLORADO Bachelor of Science in Industrial Construction Management John Bakm C'on�t:rucnk.gj 1hi a_uien Delta ConsLruct on. lac. I'<:<y u Amended Bid Schedule Project: City Park Moss Rock Wall Date: 12/11/2003 Bid Description Delta Delta Item Contract Construction I Construction I Quantit Unit Unit Price TOTAL 1 Mobilization 1 LS $ 5,518.59 $ 5,518.59 2 Tree Protection 1 LS $ 1,055.44 $ 1,055.44 3 Traffic Control 1 LS $ 926.62 $ 926.62 4 Moss Rock Wall - One side veneer 222 LF $ 223.81 $ 49,685.82 5 Moss Rock Wall - Two side veneer 25 LF $ 223.12 $ 5,578.00 6 Moss Rock Column - 4'6" ht 2 EA $ 460.06 $ 920.12 7 Imoss Rock Column - 5'6" ht 2 EA $ 709.04 $ 1,418.08 8 French Drain 235 LF $ 8.80 $ 2,068.00 CONSTRUCTION TOTAL 67,170.67 gnature Corporate Seal Attest Date SECTION 00410 BID BOND KNOW ALL, MEN BY THESE PRESENTS: that we, the undersigned DELTA * as Principal, and UNITED FIRE & CASUALTY COMPANY as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of **$ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, CITY PARK MOSS ROCK WALL; BID NO. 5826. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shnil execute and deliver a Contract in the form of Contract attached hereto (properly complcted in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability -of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact- business in the State of Colorado and be accepted by the OWNER. * CONSTRUCTION OF NORTHERN COLORADO, INC., 208 Racquette Drive, Fort Collins, CO 80524 ** Five Percent (5%) of the Total Amount of the Bid 7/96 Section 00410 Paqe 2 w IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this 4th day of December 20 031 and such of them as are corporations have caused their corporate' -seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL DELTA CONSTRUCTION OF NORTHERN Name: COLORADO, INC. Address: 208 Racquette Drive Fort Collins, Colorado A0524 By: 1-j✓ Tyrf �t WMEW �. ✓ I.r� (SEAL) 7/96 SURETY UNITED FIRE & CASUALTY COMPANY 1660 S. Albion Street, Suite 907 Title: Atl (SEAL) Section 00410 Page 3 DElta Construction of Northern Colorado, Inc. CONTRACTOR BY: P ul Hof ADDRESS: 208 Racquette Drive Ft.Collins, CO 80524 8. BID SCHEDULE (Base Bid) Please use the attached Bid Schedule when submitting your bid. 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPEC UL SUBM T D: 10 Signa ure D!Y-I- PrPRident A-99 License Number (If Applicable) (Seal - if Bid is by cor ration) Attest Pill- I Address 208 Racquette Drive Collins. CO 80524 Telephone 970-498-8766 7/96 Section 00300 Page 2 No Text CITY PARK MOSS ROCK WALL BID SCHEDULE Bid items are described in Section 01800 BID ESTIMATED ITEM # DESCRIPTION QUANTITY UNIT 1 Mobilization LS 2 Tree Protection 1 LS 3 Traffic Control 1 LS 4 Moss Rock Wall - One side veneer 222 LF 5 Moss Rock Wall - Two side veneer 25 LF 6 Moss Rock Column - 4' 6" height 2 EA 7 Moss Rock Column - 5' 6" height 2 EA 8 French Drain 235 LF TOTAL BID (written) UNIT PRICE $ A, S/8. of- $ / O�' $ Section 00300 Page 3 ITEM TOTAL Figure SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 150 of the contract. ITEM *, �S,OVA y 7/96 SUBCONTRACTOR Section 00430 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Delta Construction of Northern Colorado, Inc. 2. Permanent main office address 3. When organized: 1975 208 Racquette Dr. Fort Collins, CO 4. If a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name? 5 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) Please see attached "Work Under Contract" 7. General character of Work performed by your General Contracting, Supervision, and compan : Car- Kry 8. Have you ever failed to If so, where and why? complete any Work awarded to you? No 9. Have your ever defaulted If so, where and why? on a contract? No 10. Are you debarred by any If yes list agency name. government agency? No 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Please see attached "Delta's Major Project List" 12. List your major equipment available for this contract. Skidster, one -ton truck theodilite, laser level 13. Experience in construction Work similar in importance to this project: CSU Ropes Course, I-80 Landscape for the City of Laramie, Timnath Town Hall Restoration and numerous landscaping and retaining wa s tied to various construction projects 14. Background and experience of the principal members of your organization, including officers: See attached resumes for Greg Orr, Paul Hoffman, and John Baker 4 15. Credit available: $ 500,000 16. Bank reference: First National Bank, Todd Campbell, 970-482-4861 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? .,... 18. Are you licensed as a General CONTRACTOR? yes If yes, in what city, county and state -Loveland, Ft. Collins & CFhytnne class, license and numbers?Glass A-99 and Class A # 04 12108 19. Do you anticipate subcontracting Work under this Contract?yes If yes, what percent of total contract? 80sk and to whom? _q,, Suhrnntrartors List 20. Are any lawsuits pending against you or your firm at this time?No If DETAIL yes, 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL $2,000,000 for General Aggregate, $3,000,000 for Excess Liability What company? Travelers Insurance 22. What are your company's bonding limitations? Single Project= $5,000,000 Aggregate Program = $8,000,000 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at 3:00 p.m. this 4th day of December 2003, iia�iuc.�rc�n or ivortnern Colorado, Inc. Name of Bidder By: Paul Hoffman t Title: CEO State of Colorado County of Larimer Paul Hoffman being duly sworn deposes and says that he is CEO of Delta Construction of N.C. and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. scribed and sworn to before me this 4 - day of ^L 200=1 lic My commission expires ,SPRY. Pv 20: hod 'JEANNA W. WHIPPLE _ ......;Q My CagYMiron Exp res Aug. 31. 2001 7/96 Section 00420 Page 3 CONSTRUCTION, INC. WORK UNDER CONTRACT Start Schedule Project Name Owner/Client Contract Amount Date Completion TriHydro TriHydro $ 1,935,000 Oct-03 May-04 Value Plastics Mike Rainsberger Value Plastics 970-223-9769 $ 300,000 Aug-03 Oct-03 Nortrak Nortrak Robert Krenser $ 302,048 Jul-03 Nov-03 Rio Grande Hospital Valley Citizens Foundations $ 525,000 Dec-03 Jan-04 City of Fort Collins Larimer County Babs Cornel Community Corrections 970-498-5907 $ 4,000,000 Mar-03 Apr-04 Colorado State University CSU Dairy Barn Bill Conn $ 80,862 Hold n/a Paul Hoffman Design DCI Windsor II 970-498-0827 $ 280,500 Phase N/A Total Work Under Contract $ 5,488,410 Work Under Contract Page 1 CONSTRUCTION, INC. Deltas Major Project List Consaactio Contract Name Description Project Address Facility Type n Type Amount Fiaish Date 327 S. Link Lane Carriage Shoppe Industrial Fort Collins, CO Addition Commercial $433,480 May-03 5225 Yellowstone Blvd. New Metal Cool River Wine _&_Spirits ` Retail Building_ _ Cheyenne, WY Building Commercial S483,487 Jun-03 625 Sherry Drive New Marrou Concrete Commercial Office Bldg. Fort Collins, CO Construction Commercial $500,000 Jan-99 7320 Greendale Road New Metal Legacy Counters Office/Manufacturing Windsor, CO Building Commercial $525,814 Jun-03 4715 Innovation Dr. AMCC Office Tenant Finish Fort Collins, CO Commercial TF Commercial $593,000 Jan-01_ 148 E. Foothills Pkway Retail Gear Tire Center Retail Rennovation Fort Collins, CO rennovation Commercial $60_0,000 Oct-00 7250 Greenridge Rd New Metal Schmidt Earthbuilders Office/Industiral Windsor, CO _ Building Commercial $624,660 Mar-03 311 W. Licolnway New Metal Cheyenne Tech Center New Office Building Cheyenne, WY — Building Commercial $630,000 Jul-99 3325 Timberline New Metal Value Plastics _ Airplane Hanger — Fort Collins, CO Building Commercial_ $750,000 Dec-98 2330 East Prospect __ New Veeco/Ion Tech High Tech R&D Fort Collins, CO Construction Commercial $806,000 Apr-00 4700 Innovation Drive New Merit Electric —_ Commercial Office Bldg. Fort Collins, CO Construction Commercial S900,000 Aug-98 4700 Innovation Drive New Cyotmation Bldg lI Office/Biomedical/R&D Fort Collins, CO _ Construction Commercial _ $1,029,887 Sep-01 1220 Oakpark Drive New ToothZone Dental Office Fort Collins, CO Construction Commercial $1,051,297 Mar-02 Patton Avenue in New Metal Advanced Manufacturing Office/Manufacturing _Loveland Building Commercial $1,098,845 Oct-03 1801 Piney River Drive New Kids' Harbor Daycare _!_ Daycare facility _ Loveland, CO _ Construction Commercial $1,100,000 Aug-02 New Cathedral Home for Children Educational Facility Laramie, WY Construction Commercial $1,100,000 Dec-02 4715 Innovation Dr. Hercules Industries office/ Warehouse Fort Collins, CO New Addition Commercial $1,162,760 Sep-00 4700 Innovation Drive New _ C�mation Bldg I Office/Biomedical/R&D Fort Collins, CO Construction Commercial $1,200,000 Feb-01_ 3693 County Rd. 30 New Scion Industries _ Office / Industrial Fort Collins, CO Construction Commercial $1,505,000 Mar-02 201 W. 67th Court New Vi-Per Vet Clinic 2 veterinary bldgs. Loveland, CO Construction Commercial $2,100,000 Aug-00 4 Pre-engineered Metal Crossroads Blvd. New _ Larimer County Fairgrounds Buildings Loveland, CO Construction Commercial $3,232,895 Jun-03 1267 N. 15th Street New _ Reynolds Crossing Office/Campus Laramie, WY Construction Commercial $4,200,000 On going 4373 N. Street New WyoTech Hotrod Shop Educational/industrial Laramie, WY Construction Commercial $5,299,650 Dec-02 4007 Automation Dr. New Healing Arts Institute Educational/Office Bldgs Fort Collins, CO Construction Commercial $8,000,000 Mar-99