HomeMy WebLinkAboutRESPONSE - BID - 5813 SPRING CREEK TRAIL REHABILITATION (5)SECTION 00300
BID FORM
PROJECT: SPRING CREEK TRAIL REHABILITATION; Bid No. 5813
Place L.Q
Date
1. In compliance with your Invitation to Bid dated
and subject all conditions thereof, the undersi ned
- r a **(Corporation, Limit d Liability
Company, R&rtnership, Joint Venture, or Sole Proprietor)** authorized to do
business in the State of Colorado hereby proposes to furnish' and do
everything required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules..
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bond
in the sum of J~elh ($
in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes t/Q��furl�nissh the specif�ped performance and payment bonds is as
fO11OWS: /IIVH-TIY/MAnnA/1 /I/1/L_ n_ _
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda�No.
through
7/96 Section 00300 Page 1
P W
740 S. Bryant Denver, CO 80219
Phone: 303.778.8381 Fax: 720-570-1894
City of Fort Collins — Spring Creek Trail Rehab
Equipment List
Attachment B
Below is the list equipment owned or leased by Meza Construction, Co. available for this contract.
Currently, Meza has available the following equipment:
1 John Deer 310E Backhoe
1 Case 1883 Skidsteer Loader
1 Caterpillar 928 Front End Loader
Compaction Equipment; Jumping Jack, Plate Compactor, Vibratory Roller
Small tools: SDS Max Roto Hammer, Demo Saw, SDS Rotory Hammer, Grinders, Skills
Saws, Drill Saws, Torch Sets, Generators, Air Compressors, Concrete Vibrator,
Measuring Equipment.
JOHN MEZA
UALIFICATIONS
Able to lead extensive construction projects from their inception to timely completion
whether it involves utility installation, site over -lot grading, the construction of pre -cast and
cast -in -place bridges, or curb, gutter and sidewalk installations. Skills include job site
supervision, coordination of subcontractors and interaction with owners and architects.
EDUCATION
B.S. — Construction Management, Colorado State University, Fort Collins, CO 1993
EXPERIENCE
fu1y2000-Present Meza Construction Company
President
Responsibilities are a culmination of all the experiences below. Primary responsibilities with
Meza include estimating, project supervision/management and the daily management
operations that are associated with the running of a successful construction company.
1996-2000 Randall & Blake, Inc. Littleton, CO
Heavy Construction Superintendent
Responsibilities included estimating, job -site supervision, coordination and supervision of
subcontractors and liaison to owners and architects. Managed projects worth as much as $9
million. Major projects included:
Denver Commons Park
Wewatta Street Bridge Relocation
Rockmont Park phases I and II
Windermere Bridge
Gates Crescent Park
1993-1996 Luna Construction Company Denver, CO
Estimator/Project Manager
Responsibilities included quality control, material testing coordination, construction
supervision, coordination of weekly progress schedules and delivery of materials, tracking
quantities for production and monthly pay estimates as well as coordination of subcontractors.
Estimating responsibilities included take -offs, quantification pricing and bid preparation.
Major projects included:
1994 Street Improvements
El Rancho Park N Ride
Five Points Plaza Entrance Re -design
Weld County Bridge Replacement over the South Platte River
Crescent Town Center Bridge
1992-1993 City of Fort Collins Fort Collins, CO
Field Inspector
Fort Collins 1992 Road Maintenance Program. Responsibities included monthly pay
estimates and ensuring that specifications were being met on project.
JOHN MEZA
Page 2
1989-1992 Siegnst Companies, Inc. Denver, CO
Assistant Project Manager/Field Office
Worked on projects with combined costs is excess of $4.3 million. Responsibilties included
weekly progress schedules, method statements, interaction with state project engineers, cost
accounting and tracking, coordinating dehevery of materials and scheduling of subcontractors.
Major projects included:
City of Fort Collins Road Maintenance
Taft Hill and Horestooth Road Reconstruction
Poudre Canyon/Laramie River Bridge Replacement
phone (303) 733-8009 • jmeza@mezaconstruction.com
2531 S. Franklin Street • Denver, CO 80210
2
CHRISTOPHER J. MEZA
1590 Little Raven Ct.#306
Denver, CO 80210
(303)419-3626
SUMMARY OF QUALIFICATIONS
- Excellent communications and oral presentation skills
- Proven marketing, public relations and sales skills
- Strong project management and organizational abilities
- Accomplished leadership, training and team motivation skills
- Proficient in most computer applications and platforms
WORK EXPERIENCE
Meza Construction Company, Vice President (July 14, 2000-present)
- For the past year and a half my duties at Meza Construction Company are primarily
managerial and financial in scope in addition to establishing Meza's market presence
with ongoing marketing efforts.
For the past 3 years I have been on the Board of the Academy of Friends which is a not
for profit organization. My work has been fully philanthropic, as I've had the
opportunity to devote my full energies to charitable work This has includes, but is not
limited to the following:
- Public relations and media relations specialist
- Assist with developing strategic advice for advancing the cause of the Academy of
Friends
- Implement public relations campaigns including pitching the media, writing press
releases, monitoring the successes of AOF fundraising efforts
Independent Mortgage Consultant and Wholesaler (June 93-July 1999)
- Responsible for cultivating leads and securing loan application through constant
follow-up, personal marketing, public relations and networking efforts
- Utilized problem solving skills to package strong application for clients
- Managed an underwriting team that processed loan applications
- Consulted with perspective home buyers to establish their purchasing ability by
assessing credit history and evaluating financial ratios
- Secured financing through investment portfolio by complying with each lenders
criteria
CHRISTOPHER J. MEZA
Page 2
Assistant to Small Business, United States Department of Defense/Small Business
Management Organization (December 92-May 93)
- Monitored Prime Contractors (business with government contracts over $1 M) for
their mandated compliance in contracting with small businesses, small minority
owned businesses and small woman owned businesses
- Provided instruction and guidance to small business owners to help demystify
military contracting
- Responsible for quarterly audits of Prime Contractors to ensure participation in the
Small Business program
EDUCATION
- University of Colorado - Bachelor of Science in Business Management
- Majored in Finance & Management with an emphasis in Political Science
- Language skills in Spanish
Assistant to Albert C. Yates, President - Colorado State University
Student Internship with the Office of the Honorable Governor Roy Romer, State of
Colorado
AFFILIATIONS
- Academy of Friends, present
- American Red Cross
- Student Ambassador for the University of Colorado, Denver
- Senator for the Business College, Colorado State University
- Associated Students of Colorado State University — Board Member
Cesar Villanueva
7175 West 131h Avenue
Lakewood, CO 80215
EXPERIENCE
10-07-2000 - Present
Meza Construction, Co., Inc. - Concrete Superintendent
Responsibilities include: Owner Correspondence, schedule work elements,
Safety, Construction labor tracking, production tracking, daily construction
reports, coordinate field tracking:
Projects include.
� Eisenhower Pedestrian Bridge
� DIA - Runway
� DIA - Pena Boulevard
DIA - De Ice Pad J
� RTD Bus Shelter at 12`h and Federal
� Green Valley Ranch Club House and Maintenance Building
Ellington Lofts Parking Structure
06-07-96 thru IO-01-2000
Randal & Blake, Inc. - Concrete Foreman
Responsibilities included: Layout construction staking, scheduling, quality
control, heavy equipment operator, forming carpentry supervisor.
Projects include.
� Rockmont Park Phases I and II
Denver Commons Park
Wewatta Street Bridge Relocation
� Windermere Bridge
+ Gates Crescent Park
II-01-03 thru 06-01-96
Luna Construction - Concrete Lahorer/CarpenterApprentice
Responsibilities included: Set forms, tie reinforcing steel, place concrete, operate
small equipment.
MEZA CONSTRUCTION CO.
FINANCIAL STATEMENTS
(See Accountants' Compilation Report)
JUNE 30, 2003
1
CONTENTS
Accountants' Compilation Report
Financial Statements
Balance Sheet
Statement of Income
Statement of Retained Earnings
Statement of Cash Flows
Notes to Financial Statements
Supplementary Information
Schedule of General and
Administrative Expenses
2
MARTIN, VEJVODA AND ASSOCIATES
INCORPORATED
3443 SOUTH GALENA STREET • SUITE 2D0
DENVER,COLORADO 80231
(303) 338-9277
ACCOUNTANTS' COMPILATION REPORT
Board of Directors
Meza Construction Co.
FAX: (303) 338.9281
We have compiled the accompanying balance sheet of Meza Construction Co. (an S
corporation) as of June 30, 2003, and the related statement of income, retained
earnings, and cash flows for the six months then ended, and the accompanying
supplementary information contained in the table of contents, which are presented
only for supplementary purposes, in accordance with the Statements of Standards for
Accounting and Review Services issued by the American Institute of Certified Public
Accountants.
A compilation is limited to presenting in the form of financial statements,
information that is the representation of management. We have not audited or
reviewed the accompanying financial statements and, accordingly, do not express an
opinion or any other form of assurance on it.
August 14, 2003
3
LIABILITIES AND STOCKHOLDERS' EQUITY
CURRENT LIABILITIES
Current Portion of Long -Term Debt - Note 4
Accounts Payable - Trade
Billings in Excess of Costs and Estimated Earnings
on Uncompleted Contracts - Notes i and 2
Accrued Insurance
Accrued Payroll and Payroll Taxes
Accrued Expenses
Total Current Liabilities
LONG-TERM LIABILITIES
Long -Term Debt, Less Current Portion - Note 4
Due to Stockholder - Note 3
Total Long -Term Liabilities
Total Liabilities
STOCKHOLDERS' EQUITY
Common Stock, $0.01 Par Value; 2,000 Shares
Authorized; 1,500 Shares Issued
Additional Paid -In Capital
Retained Earnings
Total Stockholders' Equity
TOTAL LIABILITIES AND
STOCKHOLDERS' EQUITY
See accompanying notes to financial statements.
5
$ 32,165
91,635
15
79,685
364,253
$ 6,749
185,484
17,807
10,000
43,294
5,620
268,954
123,800
392,754
443,953
$836,707
CONTMACTOR
ADDRESS:
6. BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (250) of the total Agreement Price.
RESPECTFULLY SUBMITTED:
Signature Date
Title
License Number Ki A plicable) )1e _ytyk�
(Seal *illBid is by corporation)
Attest
Address
D. 1
Telephone C30.3)79-339I
7/96 Section 00300 Page 2
MEZA CONSTRUCTION CO.
STATEMENT OF INCOME
FOR
THE SIX MONTHS ENDED JUNE 30, 2003
(See Accountants' Compilation Report)
REVENUE FROM CONSTRUCTION -
Note 1
$1,105,332
100.0%
COST OF CONSTRUCTION
569,813
51.6
- GROSS PROFIT
535,519
48.4
GENERAL AND ADMINISTRATIVE
EXPENSES - Schedule
332,376
30.1
INCOME FROM OPERATIONS
203,143
18.3
GAIN ON SALE OF ASSETS
742
NET INCOME
t 203,885
18.3%
See accompanying notes to financial statements.
11
MEZA CONSTRUCTION CO.
STATEMENT OF RETAINED EARNINGS
FOR THE SIX MONTHS ENDED JUNE 30, 2003
(See Accountants' Compilation Report)
RETAINED EARNINGS - BEGINNING OF PERIOD $160,368
NET INCOME FOR THE PERIOD 203,885
RETAINED EARNINGS - END OF PERIOD $364,253
See accompanying notes to financial statements.
7
MEZA CONSTRUCTION CO.
STATEMENT OF CASH FLOWS
FOR THE SIX MONTHS ENDED JUNE 30, 2003
(See Accountants' Compilation Report)
CASH FLOWS FROM OPERATING ACTIVITIES:
Net Income
Adjustments to reconcile net income to cash
provided by (used in) Operating Activities:
Depreciation
Gain on Sale of Assets
Net Changes in Assets and Liabilities:
Accounts Receivable
Costs and Estimated Earnings in Excess of
Billings on Uncompleted Contracts
Accounts Payable
Accrued Insurance
Accrued Payroll and Payroll Taxes
Billing in Excess of Costs and Estimated
Earnings on Uncompleted Contracts
Accrued Expenses
Net Cash Provided By (Used In)
Operating Activities
CASH FLOWS FROM INVESTING ACTIVITIES:
Purchase of Property and Equipment ($ 3,704)
Due from Stockholders ( 2,792)
Proceeds on House for Sale 166,468
Net Cash Provided By (Used In)
Investing Activities
CASH FLOWS FROM FINANCING ACTIVITIES:
Payment of Long -Term Debt ( 3.137)
Due to Stockholders 76,900
Net Cash Provided By (Used In)
Financing Activities
NET (DECREASE) IN CASH AND CASH EQUIVALENTS
CASH AND CASH EQUIVALENTS - BEGINNING OF PERIOD
CASH AND CASH EQUIVALENTS - END OF PERIOD
See accompanying notes to financial statements.
$203,885
19,372
( 742)
( 267,439)
( 13,188)
159,504
( 24,595)
( 77,519)
( 249,530)
5,620
( 244,632)
159,972
73,763
( 10,897)
42,281
$ 31,384
101
MEZA CONSTRUCTION CO.
STATEMENT OF CASH FLOWS (CONTINUED)
FOR THE SIX MONTHS ENDED JUNE 30, 2003
(See Accountants' Compilation Report)
Supplementary Disclosure of Cash Information:
Cash Paid During the Period for:
Interest $5,284
Supplemental Disclosure of Non -Cash Information:
During the six months ended June 30, 2003, the Company incurred debt obligations
of $38,914 when it acquired a vehicle, and traded -in a vehicle with a net book value
of $26,322 and a loan balance of $26,330.
See accompanying notes to financial statements.
QO
MEZA CONSTRUCTION CO.
NOTES TO FINANCIAL STATEMENTS
JUNE 30, 2003
(See Accountants' Compilation Report)
1 Summary of Significant Accounting Policies and Nature of Business
Nature of Business
The Company is a concrete construction company providing services ranging from
heavy to light construction in the state of Colorado. Services provided include
earthwork, concrete paving, retaining walls, foundations, and flatwork.
Revenue and Cost Recognition
The Company recognizes revenues from fixed -price and modified fixed -price
construction contracts on the percentage -of -completion method, measured by the
percentage of cost incurred to date to estimated total cost for each contract.
That method is used because management considers total cost to be the best
available measure of progress on the contracts. Because of inherent uncertainties
in estimating costs, it is at least reasonably possible that the estimates used
will change within the near term.
Contract costs include all direct material and labor costs and those indirect
costs related to contract performance. Selling, general, and administrative costs
are charged to expense as incurred. Provisions for estimated losses on
uncompleted contracts are made in the period in which such losses are determined.
Changes in job performance, job conditions, and estimated profitability may
result in revisions to costs and income, which are recognized in the period in
which the revisions are determined. Changes in estimated job profitability
resulting from job performance, job conditions, contract penalty provisions,
claims, change orders, and settlements, are accounted for as changes in estimates
in the current period.
The liability, "Billings in Excess of Costs and Estimated Earnings on
Uncompleted Contracts," represents billings in excess of revenues recognized.
Estimates
The preparation of financial statements in conformity with U.S. generally
_ accepted accounting principles requires management to make estimates and
assumptions that affect the reported amounts of assets and liabilities and
disclosure of contingent assets and liabilities at the date of the financial
statements and the reported amounts of revenues and expenses during the reporting
period. Actual results could differ from these estimates.
Income Taxes
The Company elected to be taxed under the S Corporation provisions of the
Internal Revenue Service. As an S Corporation, the stockholder is personally
liable for the income taxes on profits generated by the S Corporation.
10
MEZA CONSTRUCTION CO.
NOTES TO FINANCIAL STATEMENTS (CONTINUED)
JUNE 30, 2003
(See Accountants' Compilation Report)
1 Summary of Significant Accounting Policies and Nature of Business (Continued)
Cash and Cash Equivalents
For the purposes of these financial statements, the Company considers all
investments with a maturity of three months or less when purchased to be cash
equivalents.
Concentration of Credit Risk
Financial instruments that potentially subject the Company to a significant
concentrations of credit risk consist primarily of cash and contract receivables.
The Company's receivables consist entirely from two owners and one represents
approximately 80t of the outstanding balance. The Company occasionally has cash
in excess of insured limits.
The Company maintains the ability to lien projects if collection problems
should arise.
2 Costs and Estimated Earnings on Uncompleted Contracts
Costs Incurred on Uncompleted Contracts
$147,773
Estimated Earnings
53,268
Less: Billings to Date
201,041
205,660
($ 4,619)
Included in the accompanying balance sheet under the following
captions:
Costs and Estimated Earnings in Excess of
Billings on Uncompleted Contracts
Billings in Excess of Costs and Estimated
$ 13,188
Earnings on Uncompleted Contracts
( 17,807)
(t 4,619)
3 Related Party
A stockholder and officer of the Company was owed $91,635 as
at June 30, 2003. The Company has
long-term debt
a receivable of $23,090 from stockholders.
4 Long -Term Debt
A summary of long-term debt, at June 30, 2003, is as follows:
Note Payable - Bank - Due in monthly installments of
$769 including interest at 6.9Z, due June, 2008.
$38,914
Less Current Maturities
6,749
Total Long -Term Debt
$32,165
11
MEZA CONSTRUCTION CO.
NOTES TO FINANCIAL STATEMENTS (CONTINUED)
JUNE 30, 2003
(See Accountants' Compilation Report)
4 Long -Term Debt (Continued)
Long-term debt matures as follows:
Period Ending:
June 30, 2004
June 30, 2005
June 30, 2006
June 30, 2007
June 30, 2008
5 Rent
The Company leases equipment on a short-term basis
period is $54,282.
$ 6,749
7.230
7,746
8,298
8,891
$38,914
Total rent for the
6 _Working Capital and Current Ratio
The Company's working capital and current ratio are as follows:
Working Capital
Current Ratio
$397,500
2.48
12
SUPPLEMENTARY INFORMATION
13
MEZA CONSTRUCTION CO.
SCHEDULE OF GENERAL AND ADMINISTRATIVE EXPENSES
FOR THE SIX MONTHS ENDED JUNE 30, 2003
(See Accountants' Compilation Report)
GENERAL AND ADMINISTRATIVE EXPENSES
Automobile Expense
Contributions
Depreciation
Dues and Subscriptions
Employee Benefits
Insurance
Interest
Legal and Accounting
Licenses and Permits
Miscellaneous
Office Supplies and Expense
Rent
Repairs
Small Tools
Taxes
Telephone and Utilities
Training and Education
Travel and Entertainment
TOTAL GENERAL AND
ADMINISTRATIVE EXPENSES
See accompanying notes to financial statements.
$ 10,452
274
19,372
300
9,498
115,245
5,284
14,514
180
219
3,745
4,755
111
681
132,448
9,834
90
5,374
$332,376
14
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Meza Construction
Company as Principal, and N rth American Sipecialtv Insurance Com an as
Surety, are hereby held and firmly bound unto the City of Fort Cbll ns Colorado,
as OWNER, in the sum of $57*---------_----- for tha payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns. *Five Percent of the Total Amount Bid -------
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction
Of Fort Collins Project, SPRING CREEK TRAIL REHABILITATION; Bid No. 5813.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed in
accordance with said Biel) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,•
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said .Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 2
21. What are the limits of your public liability? DETAIL
�1.(YY).D1�n�0 07000 ooe � Q acra
What company? ;16 CdAII,; (1T'e � ,n. ,
22. What are your company's bonding 1-imitations? 7��/�j� �,,, 1�
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at ffooc5j this 7440 day of OA 20A3.
State of
County of
i,
being duly, sworn deposes and says that he is
°fn �Y1lJinrr j ( _ and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
cribed and sworn to before me this 1741U day of
Ze&2003.
li
My commission expires
7/96 Section 00420 Page 3
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
axed seals this th day of October , 2003, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL SURETY
Name: Meza Construction Company North American Specialty Insurance Company
Address: 740 S. Bryant
Denver CO 80219
By.;N
Titles:
4V/.///.AI
(SEAL)
7/96
2591 Dallas Parkway, Suite 503
Frisco, TX 75034
B :
Title:Sue Wood, Attorney -in -Fact
(SEAL)
Section 00410 Page 3
NAS SURETY GROUP
NORTH AMERICAN SPECIALTY INSURANCE COMPANY
WASHINGTON INTERNATIONAL INSURANCE COMPANY
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, THAT North American Specialty Insurance Company, a corporation duly organized and existing under
laws of the State of New Hampshire, and having its principal office in the City of Manchester, New Hampshire, and Washington International
Insurance Company, a corporation organized and existing under the laws of the State of Arizona and having its principal office in the City of Itasca,
Illinois, each does hereby make, constitute and appoint:
SARAH FINN, SHERYLL SHAW, NICOLE L. McCOLLAM
DOUG KOELTZOW, ROBERT L. COHEN, SUE WOOD and ROBERT J. REITER
jointly or severally
Its true and lawful Attomey(s)-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by
law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of.
TEN MILLION (10,000,000.00) DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held
on the 24th of March, 2000:
"RESOLVED, that any two of the President, any Executive Vice President, any Vice President, any Assistant Vice President, the Secretary or any
Assistant Secretary be, and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named in the given Power
of Attorney to execute on behalf of the Company bonds, undertakings and all contracts of surety, and that each or any of them hereby is authorized to
attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is
FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any
certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Company when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached."
01111111111p/y
y`�p�`Q��t ......Y JA(pK�G
a3 4YY',''�'P'��
-
Nnrcny
1t0itt1
By
t.
SEAL imp
dq a
�'
Pad D. AmstvMrmldmt&C►untEaeenave officer of Wallington International Insurance Company
Vice President of North American Specialty Insurance Company
?
$ n9EA
�s
O 6.Y73
nnmuntaa`ya
Ana
MW
By
h,"1NNIN'
Steven P. Anderson, Executive Vice PmWmt of Washington International Intucance Company &
Vice President of Needs American Specialty lusums ee Company
IN WITNESS WHEREOF, North American Specialty Insurance Company and Washington International Insurance Company have caused their
official seals to be hereunto affixed, and these presents to be signed by their authorized officers this 14 day of January 20 03
North American Specialty Insurance Company
Washington International Insurance Company
State of Illinois
County of Du Page SS:
On this 14 day of January 20 03 , before me, a Notary Public personally appeared Paul D. Amstutz , President and CEO of
Washington International Insurance Company and Vice President of North American Specialty Insurance Company and Steven P. Anderson
Executive Vice President of Washington International Insurance Company and Vice President of North American Specialty Insurance Company,
personally known to me, who being by me duly sworn, acknowledged that they signed the above Power of Attorney as officers of and
acknowledged said instrument to be the voluntary act and deed of their respective companies.
. Yasmin A. Patel, Notary Public
I, James A. Cementer , the duly elected Assistant Secretary of North American Specialty Insurance Company and Washington
International Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North
American Specialty Insurance Company and Washington Intemational Insurance Company, which is still in full force and effect.
IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this? th day of October , 20 03 .
9"M-*,e,6
James A. Caryenter, Vice President & Assistant Secretary of Washington international Imumnce Company &
Assistant secretary of North American Specialty Insurance Company
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All
questions must be answered and the data given must be
clear and
comprehensive.
be
This statement must be notarized. If necessary, questions may
information
answered on separate attached sheets. The Bidder may submit any
he
additional
desires.
1.
Name of Bidder:r
2.
Permanent main office address: %do �6h, A,,, f`JO�n�n
�ngoaiq
3.
When organized: / � e1—
4.
If a corporation, where incorporated: %
5.
How many years have you been engaged in the contracting business
under
present firm or trade name? N- 3 n h
your
6.
Contracts on hand: (Schedule these, showing the amount of each contract
and
/th appro riate anticipated dates of completion.)
f\
7.
Ge eral character of Work performed by your company:
8.
Have you ever failed to complete any Work awarded to you? Ifi-Q.
If so, where and why?
9.
Have your ever defaulted on a contract? Win
If so, where and why?
10.
Are you debarred by any government agency?
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company, stating
the approximate cost of each, and the month and year completed, location
sand typ e of construction.
12. Li t n your major equipment available for this contract.
UoD Y /t c'Li12
13. Experience in construction Work similar in importance to this
pr ject:
fi��l�.P 0 1.
14. Background and experience of the principal members of your organization,
ingludi officer l
15. Credit available: $f[�
16. Bank reference: V-JM&AX) �-`O�
17. Will you, upon request, fill out a detailed financial statement and furnish
an o ez i�fo mation that may be required by the OWNER?
n
18. Are you licensed as a General CONTRACTOR?
If yes, in what city, county and s ate?
_
� What
class, license and numbers? 0
19. Do you anticipate subcontracting Work undyrthi Contract? !Q
If yes, what percent of total contract? (K1'
and to whom?
20. Are any lawsuits pending against you or your firm at this time?
If
DETAIL
yes,
7/96 Section 00420 Page 2
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM
7/96
SUBCONTRACTOR
rr
��
Section 00430 Page 1
T Pr
MminiArAbve Serr
Ck Q* f 4ft Comm
Ste .#5813
SPRMS CREEK 7RAIL REHAZXffATMM
Spe-offieshom mW C-c-w*nft Docunwft
Dfto*m d ad * 154d W* 5S 13 SmV Criaek Trog R&tah�
OFETiANGOATE O=ter T2W3, 3W p m. (oil Cocri
TO 4 Pf**tCbV* WO&$ U"6--4 V* 5POZA i AT4 'Commd doaomwft 4ftra-twd aboift,
tM f0friwRIS Ckmka=r4 we nueby made.
I. 7b9CPy jAd qralv� Vw oorAvomur YAUh a mapp oL4Iw*q zjvbw jowAL 71W =*BCW VA
bA rASPkUMMIA for Addk,%%,, A
2. ftPlom &W ftsi&V *5 ? ==-zle *W uM SnDdr
carwete WRI1511, jw �d dzW dm%*V #5 tif XV 5,
RVMOv* ft Smy VonMft at ft notth w4 of" tail W4 r"f*M WRh gokxW IV Mwgo,
4, Re -move and replace Itme, comete flare at #ie end of ft bridge in hamficap a� area.
Leave tw S'concrete fat aria mnnmdmt*acqzcerA tDtfw badge.
5, ExtOnd 9w wwete to brx obWnaft at wcond h-ofte modh of on" Sbet* m&arlee.
6 Oty " randlO any Vae trarmV cor movirg doomd mctswy,
T. City wM mow qmn m are" as noedW.
213 Noth Mai-= Sum , 3nd ftcm 0 PO My 5W - Fr CoMns, CO 80522-MM * (WA-1) 2M-67A, - PAX OM =400
9-NAT mu -4) MCI" 1,13 "34 Ym cwv Ll, MAW FAX Wk 9101 222107UP
EUD5G-WMX-F(ffAWMD) For AddenudM #1
rumim
IXT
-n WIM
Ls
0
I's
a.
1 too)__—ALAM
ZF
L99V
4
Sub7.*
c 14, 4 W
P-RF
6
00� TIOR
%=-Z
3F
41.01
5 30115's-0
2�21009
SF
2's.
51 Z 570
s
F**; Pam
t 14, 5ao' Am=
®r
ZZ9
/0, 12ig,o
11 W- 1,
MAMAM
SF
M,==
v
oq
Isoo
s ( 09,4710 "'
TAWAL Of S" SM
Mena Construction, Co.
Work rn Progress Report
Print Date. 10/7IM3
DESCRIPTION OF70B:
STAICTING DATE
COMPLETION
DATE
eoero
O
CONTRACT PRICE
(b dudag ApV,.d Chm
ONm)
Cmtrx+as Ea Cou Whn,
Bid @, W* C Ia
App,o Chu OAm)
Taal BRed m Due
huhdim Raaiw. (FBI
Any Mp= Iaeu)
Rud„age HM 'o .
TOTAL COST TO DATE
ES'17MATED C0� �
COMPLETE
BgR Manufacturing
Fox Run/Ped. Bride
05/26/03
06/30/03
x $48,292.00
$39,523.00
$48,292.00
$0.00
$41,458.00
$0.00
US Homes Ped Bdd es
03/15/03
04/18/03
x
$23,150.00
$19,670.00
$23,150.00
$0.00
$13,627.00
$0.00
C ntax Homes
09/18/03
10/14/03
x
$22,280.00
$15,280.00
$22,280.00
$0.00
$10,530.00
$4,000.00
Park Side Homes
06/02/03
06/25/03
$11180.50
$8,500.00
$11,780.50
$0.00
$8,970.80
$0.00
Black&Won & Decker
BDI - Nederland PNR - RTD
08/01/03
11/01/03
x
$185,747.10
$142,800.00
$135.000.00
$13.500.00
$95,000.00
$25,000.00
Burlestone, Inc.
Buristone/RTD
06/01/03
09/30/03
x
$40,000.00
$33,000.00
$3,860.00
$386.00
$1,663.00
$28,000.00
City& County ofDenver
lCitv ParkCircle/CCD
06/01/03
10/30.03
x $159,150.00
$132,462.00
$143,000.00
$2,680.00
$121,420.00
$4,200.00
Eisenhower
11/16l02
03/22/03
x
$285,485.11
$235,546.00r$282,641.501$2,000.00
$213,137.97$1,500.00
IFICBuckle
AFB
06/01/03
08/30/03
x
$205.303.00
$154,108.0005,303.00
$0.00
$175,362.00
$0.00
De Ice Pad J DIA
08/01/01
08/15/02
x
$992,111.00
$756,784.0092,111.00
$49,605.00
$785,429.32
$0.00
Pena Boulevard DIA
02/01/02
08/01/02
x
$229,202.00
$185,075.0016,274.00
$10.813.70
$170,000.00
$0.00
Runway DIA)
04/01/02
07/01/03
x
$2,606,990.00
$2,238,010.00
$2,592,990.00
$129,649.00
$1,976,358.00
$7,800.00
Urban Framer/Macdata
05/01/03
05/16/03
x
$16,366.00
$7,265.00
$16,366.00
$0.001
$7,265.00
$0.00
Pena Boulevard DIA '03
07/01/03
12/30/03
x
$51,605.00
$42,895.00
$0.00
DIA Airfield Improvements
07/01/03
12/30/03
x
$121,950.00
$98.352.00
$35,400.00
$22,000.00
$52,000.00
IHC - PCL Terminal Conc
07/31/03
07/31/03
x
$5,318.00
$5,004,729.71
$3,900.00
$4,113,170.00
$5,318.00
$4,733,766.00
$0.00
$208.633.70
$3,900.00
$3,646,121.09
$0.00
1122,500.00
TOTALS
TOTAL UNCOMPLETED WORK: 122,500.00
SIGNATURE
TOTAL UNCOMPLETED WORK BY SUBCONTRACTOR: $0.00
TITLE President
REMARKS
BONDED:
UNBONDED: