Loading...
HomeMy WebLinkAboutCHANGE ORDER - GENERAL CORRESPONDENCE - 19135SECTION 00950 CHANGE ORDER NO.4 PROJECT TITLE: Meter Shop Building CONTRACTOR: Sinnett Builders, Inc. BID NUMBER: 5781 DESCRIPTION: Construction of an approximately 8,900 square feet building, including sitework, utilities, landscaping and an underground irrigation system. Exterior will be CMU and brick and CMU veneer over metal stud or CMU back-up. Interior finishes will include painted gypsum board partitions, ceramic tile, carpet, VCT, suspended acoustical ceiling, wood and hollow metal doors and frames. 1. Reason for change: Incorporation of various Proposal Requests and miscellaneous changes. 2. Description of change: PR #15 — Add metal soffit under canopy & outdoor storage area - $27,831.00; PR #18 — Install trim at joint between masonry and drywall in - $581.00; Rearrange fire & domestic backflow preventors - $1,388.00; Delete wood sills - $(590.00); Change door 118A to flush wood door - $393.00. 3. Change in Contract Cost: $29,603.00 4. Change in Contract Time: 0 Days (Attach additional sheets as required) ORIGINAL CONTRACT COST $1,198,000.00 TOTAL APPROVED CHANGE ORDERS $44,091.00 TOTAL PENDING CHANGE ORDERS 0 TOTAL THIS CHANGE ORDER $29,603.00 ADJUSTED CONTRACT COST $1,271,694.00 ACCEPTED BY: APPROVED BY: Contractor's Facilities Project cc: City Clerk Purchasing Architect Contractor Project File Date 1 30 03 Date