HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - 18511•DEC-19-2003 FRI 03:35 PM FT COLLINS UTILITIES FAX NO, 9702216593 P. 02 T. City of Fort Collitw Q �-4 1%417- Change Order Form 1-L117lo3 cs .L rim ;i -rr6 PROJECT TITLE: 2003 Street Maintenance Project PROJECT NUMBER: 30522131.6 (Asphalt Overlay Project) - Bid #5615 CONTRACTOR: Connell Resources, Inc. (PO #3302427) CHANGE ORDER NUMBER: 3 n prepanng change orders show in order a$ Separate numbered paragraphs the Tollowmg 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time, 1 &2. See attached sheet for detail. 3. The contract cost will increase by $23,644.47 4. There will be no change in Contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT F ADJUSTED CONTRACT COST (Assuming all change orders approved) J ACCEPTED BY: ACCEPTED BY' Wfl(,�T� HIe1th,Ut�e $1,701,220.50 . ($144,148,28) $0.00 $23,644.47 1.$9% -7-089a $1,680,718.71 DATE: DATE: / Z—/Z"�� (Project Manager - P ent Management) APPROVED BY DATE: I Z�� 7-! v3 (Project Mana er • Engineerin APPROVED BY: YI DATE I �— (Project Manger- Water ilities) APPROVED BY: _ __ DATE: (Department Head) APPROVED BY: _ DATE: (Purchasing Agent over $30,000) cc: Contractor Purenasing Project File Minor St, Capital $4,758.37 lingirmedng $815.38 Water Utilities y1e,070.72 nglneertng Department • 7-31 ?forth College Avenue • P.O. Box 586 • "ors Collins, CO 80522-d580 • (303) 22i-oe05 Whalers and Wheaton Monthly Estimate 2003 Asphalt Overlay project - I..amay at Change Order CpNjJLl L IaESOrlRCES Adjusted Cnrdraet unit Unit Cost Cost Quan+ffY i n rfEMN0. QE. gpTloN _. �'� par Day Ea. $ 1.60 $ iDsoo o ! I 614.07 Size B Sign with Stand D.OD EACH S 41.00 i r 614.98 Ste A Spec. Sign - Cost of hlaaufac. 0•00 EACH $ 47.DD S CD o 614 00 Size B Sign- Cost of 6tanufac. 150.00 Per Day Ea. ; 0.70 $ 105-00 co - 614.10 Cone with Relfedlve Strip BB.OD per Day Ea- i 1.6D S 108'00 r 814.11 Safety Fence 270.OD Per Day Ea. $ 0.20 i 54.OD 614.12 Light - Steady Burn ODDw per Day Ea. $ 0.20 S o 614.13 Light-Flasfiing Advance Warning Flashing or Sequencing Arrow 0.00 Per Day Ea. i 33.0D $ i cn 6+4.14 Panel D.DD Por Day $ 329.8D S -o 3 6+4.+5 Traffic Control Supervisor -23.90 Par Hour i 2832 i (851- 'rl $14.16 Traffic Cordrol Supervisor 10.DD Per Hour i 26.20 S t2�.0Dy i - 3 614.17 Flagging 1.D6 Lump 3unn ; 18,595.50 $ 18,535.5D c� CD Time and Materials for work on Whalers WAY S 23.644A7 Cfiango Order Total r z zn Vm" cinder R1 i11O111i1 f3 c r inlet Structure Removal• FRI i3,381.4D t r l C1� Pavement- Remove and Patch ;815.87 1f3rd of Trask Control $8 908.27 i4.+47.go s4,76B.s7 for Capital Projects [John Lan! r 113rd of Traffic Coryirol ;615.38 $815.38 ;616.38 t8+5.38 X z Total for PMP (Rick Richter) o Tonch Rerroval and Fig - ;11,826.00 ca CD CD Pavement- Remove and Patch ;31,66126 ;615.17 f V fv 113rd of Traffic Control $ 4,075.OD CM o MH and Valve Raising itepairs ;SD,406.90 ;18,070.72 co Total Ion Utilities {Owen) $5a8 289.27 TI1a4 .. 11 .=..: $23.644.47 -V O W DEC-19-2003 FRI 03:36 PM FT COLLINS UTILITIES FAX NO. 9702216593 P. 04 a O u VA zemo_ va! a lacemen of Water TrenchtMut a1 Wfralers at Loma co Item Rate 9.5 Total $712.50 D CCD Komatsu PC-200 $75 per hour 9.5 $313.50 )perator on PC-200 $33 per Hour 14 $336.00 0 Laborer $24 per Hour $55 per Hour 33.5 $1,842.50 m _Tandem Cat 416 # 468 $50 per Hour 6 $300.00 -o on 416 $30 per Hour 8 2.5 $180.40 $475.00 _operator Site Foreman wIPU $50 per Hour 4 $200.00 Cat 436 C _ $50 per Hour 1 $30.00 Operated by Foreman z _ Operator on 436C $30 per Hour Base. $7 or ton 304 Ton 2,128.00 Miscellaneous Total $17.50 = Removal and Re lacement of Water Tiench#Maµeena !Wheaton at Lemay _m Item Rate Total Komatsu PC-200 $75 per Hour 9.5 t $313.50 $720.00 Operator on PC-200 $33 per Hour so 30 $720.00 Laborer $24 per Hour $55 per Hour 10.5 $577.50 x Tandem Site Foreman wfPU $50 per Hour•5 $475.00 0 93B Cat Loader $75 per Hour 6 6 $450.00 $198.00 CD 0 938 Gat Operator $33 per Hour Base. $7 er ton 266 Tan 30 DO Miscellaneous — Total $6,308 a' :om lete T and M Totals- Storm $111826.00 -O