Change Order Form 1-L117lo3 cs
.L rim ;i -rr6
PROJECT TITLE: 2003 Street Maintenance Project
PROJECT NUMBER: 30522131.6 (Asphalt Overlay Project) - Bid #5615
CONTRACTOR: Connell Resources, Inc. (PO #3302427)
CHANGE ORDER NUMBER: 3
n prepanng change orders show in order a$ Separate numbered paragraphs the Tollowmg
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time,
1 &2. See attached sheet for detail.
3. The contract cost will increase by $23,644.47
4. There will be no change in Contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
F
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
J
ACCEPTED BY:
ACCEPTED BY'
Wfl(,�T� HIe1th,Ut�e
$1,701,220.50 .
($144,148,28)
$0.00
$23,644.47
1.$9%
-7-089a
$1,680,718.71
DATE:
DATE: / Z—/Z"��
(Project Manager - P ent Management)
APPROVED BY DATE: I Z�� 7-! v3
(Project Mana er • Engineerin
APPROVED BY: YI DATE I �—
(Project Manger- Water ilities)
APPROVED BY: _ __ DATE:
(Department Head)
APPROVED BY: _ DATE:
(Purchasing Agent over $30,000)
cc: Contractor
Purenasing
Project File
Minor St, Capital $4,758.37
lingirmedng $815.38
Water Utilities y1e,070.72
nglneertng Department • 7-31 ?forth College Avenue • P.O. Box 586 • "ors Collins, CO 80522-d580 • (303) 22i-oe05
Whalers and Wheaton Monthly Estimate
2003 Asphalt
Overlay project - I..amay
at
Change Order
CpNjJLl
L IaESOrlRCES
Adjusted Cnrdraet
unit
Unit Cost
Cost
Quan+ffY
i n
rfEMN0.
QE. gpTloN
_.
�'�
par Day Ea. $
1.60
$
iDsoo
o
! I
614.07
Size B Sign with Stand
D.OD
EACH S
41.00
i
r
614.98
Ste A Spec. Sign - Cost of hlaaufac.
0•00
EACH $
47.DD
S
CD
o
614 00
Size B Sign- Cost of 6tanufac.
150.00
Per Day Ea. ;
0.70
$
105-00
co
-
614.10
Cone with Relfedlve Strip
BB.OD
per Day Ea- i
1.6D
S
108'00
r
814.11
Safety Fence
270.OD
Per Day Ea. $
0.20
i
54.OD
614.12
Light - Steady Burn
ODDw
per Day Ea. $
0.20
S
o
614.13
Light-Flasfiing
Advance Warning Flashing or Sequencing Arrow
0.00
Per Day Ea. i
33.0D
$
i cn
6+4.14
Panel
D.DD
Por Day $
329.8D
S
-o
3
6+4.+5
Traffic Control Supervisor
-23.90
Par Hour i
2832
i
(851-
'rl
$14.16
Traffic Cordrol Supervisor
10.DD
Per Hour i
26.20
S
t2�.0Dy
i - 3
614.17
Flagging
1.D6
Lump 3unn ;
18,595.50
$
18,535.5D
c�
CD
Time and Materials for work on Whalers
WAY
S
23.644A7
Cfiango Order Total
r
z
zn
Vm" cinder R1
i11O111i1 f3
c
r
inlet Structure Removal• FRI
i3,381.4D
t r l
C1�
Pavement- Remove and Patch
;815.87
1f3rd of Trask Control
$8 908.27
i4.+47.go
s4,76B.s7
for Capital Projects [John Lan!
r
113rd of Traffic Coryirol
;615.38
$815.38
;616.38
t8+5.38
X
z
Total for PMP (Rick Richter)
o
Tonch Rerroval and Fig
-
;11,826.00
ca
CD
CD
Pavement- Remove and Patch
;31,66126
;615.17
f V
fv
113rd of Traffic Control
$
4,075.OD
CM
o
MH and Valve Raising itepairs
;SD,406.90
;18,070.72
co
Total Ion Utilities {Owen)
$5a8 289.27
TI1a4 .. 11
.=..:
$23.644.47
-V
O
W
DEC-19-2003 FRI 03:36 PM FT COLLINS UTILITIES FAX NO. 9702216593 P. 04
a
O
u
VA
zemo_ va! a lacemen of Water TrenchtMut a1 Wfralers at Loma
co
Item
Rate
9.5
Total
$712.50
D
CCD
Komatsu PC-200
$75 per hour
9.5
$313.50
)perator on PC-200
$33 per Hour
14
$336.00
0
Laborer
$24 per Hour
$55 per Hour
33.5
$1,842.50
m
_Tandem
Cat 416 # 468
$50 per Hour
6
$300.00
-o
on 416
$30 per Hour
8
2.5
$180.40
$475.00
_operator
Site Foreman wIPU
$50 per Hour
4
$200.00
Cat 436 C _
$50 per Hour
1
$30.00 Operated by Foreman
z
_
Operator on 436C
$30 per Hour
Base. $7 or ton
304 Ton
2,128.00
Miscellaneous
Total
$17.50
=
Removal and Re lacement of Water Tiench#Maµeena !Wheaton at Lemay
_m
Item
Rate
Total
Komatsu PC-200
$75 per Hour
9.5
t
$313.50
$720.00
Operator on PC-200
$33 per Hour
so
30
$720.00
Laborer
$24 per Hour
$55 per Hour
10.5
$577.50
x
Tandem
Site Foreman wfPU
$50 per Hour•5
$475.00
0
93B Cat Loader
$75 per Hour
6
6
$450.00
$198.00
CD
0
938 Gat Operator
$33 per Hour
Base. $7 er ton
266 Tan
30
DO
Miscellaneous —
Total
$6,308
a'
:om lete T and M Totals- Storm
$111826.00
-O