Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5819 PICNIC TABLESQUOTED. If you have any questions please contact Ed Bonnette, C.P.M., CPIM, Buyer; at 970-416-2247 or ebonnette()fcgov.com. Bid #5819 Picnic Tables Qty Description Unit Price Extended Leadtime Colors Available? 15 each &� Son Mesh Picnic Tables t,41fl,0 qb&ogo �-� Gee (see a ac� e j jypa( specifications 0(4,ao nLAIC0.00 W�,Lks above 70 each Aluminum Picnic Tables 'N,0o " 39Qo0 ( / -tip Sew I�vJweeYNsee P specifications ys3, p 31 �� 5�j,00s a"eA above Extended Total (if 3(0,9$5,00 Both Items Bid) g0Q,1U9,0 Vendor Name: enS Address: MQ_aJ LZC)4,.l,�_ l-WIMe:�RQn,C-o 47C�M!L.2 lam Telephone #jj 11 r)�0 FAX # '3 3 Respondent Name: r' u wV I Qowd (Plea M By: (Signature) `Qf c.SMQgiryE,Z.? ate � "� a U. u tR 1 0 PtayrruGTgRa Y Mountains Of Furl J 12441 Mead Way Uttletan, CO 80125 (303) 791-7626 Fax (303) 791-3314 (800) 874-9943 Proposed Playground Equipment/Layout For: Bid 95819 Picnic Tables Ft Collins, CO Quotation FAX: Phone: (970) 416-2247 Quote Number: Q-1540 Quote Date: Oct 24, 2003 Page: 1 Customer ID Customer Contact Payment Terms Sales Rep 03FT003 Ed Bonnette I Net 10 Days John Sphatt Ouantitv Description Unit Price Extension Belson Outdoors 15.00 8' ADA Accessible Plastisol Coated Picnic Table model R811-P 641.00 9,615.00 Equipment & Freight 70.00 6' Anodized Aluminum Picnic Table model AA-600-PC 391.00 27,370.00 Equipment & Freight (Freight is free for this product and quantity) Kay Park 15.00 8' ADA Accessible Plastisol Coated Picnic Table model 8J2GVP 694.00 10,410.00 Equipment & Freight 70.00 6' Anodized Aluminum Picnic Table model 6J2GA 453.70 31,759.00 Equipment & Freight 11�� 1 V .1U w U1W ICIw11 wua a copy of your rurcnase vraer anu tax exempt certrticate, it applicable. Quoted prices are valid for thirty (30) days from the date of proposal. Quote Excludes taxes, prevailing wages and site preparation unless otherwise noted. Owner is responsible for locating all irrigation and drainage system components. CPI is not responsible for system damages caused by failure to properly locate components. Owner is responsible for providing water, power and direct truck access to site for installation. Unless otherwise noted, site preparation is the responsibility of the owner and failure to properly prepare the site by the scheduled date of installation will result in liquidated damages in the amount of $325 per day. Due to the variation in soil conditions in mountainous or rocky areas, the quoted/contracted installation figures may need to be increased. If we encounter a problem with digging, we will notify you immediately and submit a change order prior to continuing.