HomeMy WebLinkAboutCORRESPONDENCE - BID - 5804 TROLLEY BARN INTERIOR REHABILITATION (3)W TRANSACTION REPORT P,01 T
AUG-21-03 THU 10:08 AM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
AUG-21 10:08
AM
91970353%74
**'*:K"
0
SEND
( M)
BUSY
190
09:25
AM
94932073
1'14"
5
SEND
( M)
OK
190
09:27
AM
913034446774
8106"
5
SEND
( M)
OK
190
09:35
AM
94935325
1151"
5
SEND
( M)
OK
190
09:38
AM
94932088
1'32"
5
SEND
( M)
OK
190
09:40
AM
94936065
1'53"
5
SEND
( M)
OK
190
09:42
AM
919703510530%v
4' 10"
1
SEND
( M)
COM, E-12
190
09:47
AM
913038147709
1115"
5
SEND
( M)
OK
190
09:49
AM
92781686
1'14"
5
SEND
( M)
OK
190
09:50
AM
94166965
2'09"
5
SEND
( M)
OK
190
09:53
AM
913034515636
1'22"
5
SEND
( M)
OK
190
TOTAL 24M 46S PAGES: 46
Administrative Services
Purchasing Division
CI F FORT C
ADDENDUM No.2
TROLLE BARN INTERIOR R ITATION
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5804 Trolley Barn Interior Rehabilitation
OPENING DATE: September 2, 2003, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described
above, the Following changes are hereby made.
Davis Bacon
GENERAL DECISION C0030008 08/15/03 C08
General Decision Number C0030008 08/15/2003
Superseded General Decision Number: C0020006
State: Colorado
Construction Type: Building
P. 01
TRANSACTION REPORT
AUG-18-03 MON 04:44 PM
BROADCAST
DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP
AUG-18 04:40 PM 913039378300 3'37" 11 SEND ( M) OK 177
TOTAL 3M 37S PAGES: 11
TRANSACTION REPORT P.02
AUG-18-03 MON 04:23 PM
BROADCAST
city of Fort Cabins
Administrative Services
YurcIlasing Division
CITY OF FORT COLLINS
ADDENDUM No. 1
BID #5804
TROLLEY BARN INTERIOR REHABILITATION
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid *5804 Trolley Barn Interior Rehabilitation
OPENING DATE: The opening date has been changed to September 2, 2003, 3:00p.m. (Our
Clock).
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet Al
Refer to attached detail ADD1 'For waliffloor condition between File Room 101 and Office 100.
This detail must be performed along the entire length of wall to be able to remove existing floor
joists in Office 100.
2. Sheet Al
A/lA rtnnn'r l Al'ti 17 0n4..4. --A -------
TRANSACTION REPORT P,01
AUG-19-03 TUE 08:21 AM
BROADCAST
DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP
AUG-19 08:14 AM 919703536974 3'30" 11 SEND ( M) OK 180
08:18 AM 913039378300 3'36" 11 SEND ( M) OK 180
TOTAL 7M 6S PAGES: 22
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No.1
BID #5804
TROLLEY BARN INTERIOR REHABILITATION
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #.5804 Trolley Sam Interior Rehabilitation
OPENING DATE: The opening date has been changed to September 2, 2003, 3:00p.m. (Our
Clock).
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet Al
Refer to attached detail ADD1 for wall floor condition between File Room 101 and Office 100.
This detail must be performed along the entire length of wall to be able to remove existing floor
joists in Office 100_
2. Sheet Al
Add General Note 17 — Patch and repair any walls where the existing ductwork is removed, and
P. 01
TRANSACTION REPORT
AUG-21-03 THU 10:11 AM
BROADCAST
DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP
AUG-21 10:09 AM 919703510530 V 14" 5 SEND ( M) OK 190
TOTAL 1M 14S PAGES: 5
TRANSACTION REPORT
P. 01
AUG-21-03
THU 10:06 AM X
BROADCAST
DATE START
RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP
AUG-21 09:56 AM
191
CONSTRUCTION NEWS
SV 1'54" 5 SEND
( M)
OK
09:58 AM
BUILDERS EXCHANGE
1'12" 5 SEND
( M)
OK
191
10:00 AM
REED!CONST*NEWS
1'36" 5 SEND
( M)
OK
191
10:02 AM
DAILY JOURNAL
1116" 5 SEND
( M)
OK
191
10:03 AM
PLAN ROOM
2'36" 5 SEND
( M)
OK
191
TOTAL
8M 34S
PAGES:
25 K
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
TROLLEY BARN INTERIOR REHABILITATION
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5804 Trolley Barn Interior Rehabilitation
OPENING DATE: September 2, 2003, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described
above, the following changes are hereby made.
Davis Bacon
GENERAL DECISION C0030008 08/15/03 C08
General Decision Number C0030008 08/15/2003
Superseded General Decision Number: C0020008
State: Colorado
Construction Type: Building
.a,,,... 4,4,4,4-. AA,A,�nmn`�FmA•mmmmmfimmTmmm�Fmms.m.FmmmTTd.TUF*A**TATTTm**AA'T„**AAA*A*AAA AAAAA*'*AAA A AAAAAAAA A TRH TAAAA'Y'AAAA
P. 01
*" TRANSACTION REPORT
AUG-21-03 THU 12:14 PM
SEND(M)
DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP
AUG-21 12:13 PM 919703536974 1'13" 5 SEND ( M) OK 198
TOTAL 1M 13S PAGES: 5
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
TROLLEY BARN INTERIOR REHABILITATION
SPI=CIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5804 Trolley Barn Interior Rehabilitation
OPENING DATE: September 2, 2003, 3:00p.m_ (Our Clock)
To all prospective bidders under the specifications and contract documents described
above, the following changes are hereby made.
Davis Bacon
GENERAL DECISION C0030008 08/15/03 C08
General Decision Number C0030008 08/15/2003
Superseded General Decision Number: C0020008
State: Colorado
Construction Type: Building
TRANSACTION REPORT
P.O1
AUG-18-03
MON 04:22 PM
BROADCAST
DATE START
RECEIVER
TX TIME PAGES
TYPE
NOTE
M#
DP
AUG-18 04:22
PM
919703535974/04"
W 0
SEND
( M)
BUSY
177
02:53
PM
913034515636✓9-
2'29" 6
SEND
( M)
COM.E-4
177
02:56
PM
913034446774
3'39" 11
SEND
( M)
OK
177
03:00
PM
94932073
3'32" 11
SEND
( M)
OK
177
04:13
PM
94840269
7'08" 11
SEND
( M)
OK
177
03:04
PM
94935325
6'11" 11
SEND
( M)
OK
177
03:11
PM
94932088
4'50" 11
SEND
( M)
OK
177
03:16
PM
94936065
6'12" 11
SEND
( M)
OK
177
�c
03:23
PM
919703510530
4'04" 11
SEND
( M)
OK
177
03:28
PM
92781686
3'33" 11
SEND
( M)
OK
177
03:32
PM
94166965
4'50" 11
SEND
( M)
OK
177
03:37
PM
92214656
6'11" 11
SEND
( M)
OK
177
03:43
PM
92263637
8'12" 11
SEND
( M)
OK
177
03:52
PM
94938020
8'11" 11
SEND
( M)
OK
177
04:01
PM
92212171 ��
4'50" 11
SEND
( M)
OK
177
04:06
PM
91303937830PP� /
58" 0
SEND
( M)
COM.E-3
177
04:20
PM
92060979 ✓294
38" 0
SEND
( M)
CANCEL
177
�
04:08
PM
94825575
3'32" 11
SEND
( M)
OK
177
TOTAL
III 19M OS
PAGES;
160
P. 01
TRANSACTION REPORT
AUG-18-03 MON 04:33 PM
SEND(M)
DATE START RECEIVER TX TIME PAGES TYPE NOTE Mt« DP
AUG-18 04:29 PM 913034515636 3'56" 11 SEND ( M) OK 178
TOTAL 3M 56S PAGES: 11
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No.1
BID #5804
TROLLEY BARN INTERIOR REHABILITATION
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5804 Trolley Barn Interior Rehabilitation
OPENING DATE: The opening date has been changed to September 2, 2003, 3:00p.m. (Our
Clock).
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet Al
Refer to attached detail ADD1 for wall/floor condition between File Room 101 and Office 100,
This detail must be perfarmed along the entire length of wall to be able to remove existing floor
joists in Office 100.
2. Sheet Al
Add C'�PnBrnl Notp 17 _,_ Patrth anri rannir anv Zvi ]To u.horo the
TRANSACTION REPORT
P,01
AUG-18-03
MON 05:10 PM
BROADCAST
DATE START
RECEIVER TX TIME PAGES TYPE
NOTE
M# DP
>K
�
179
AUG-18 04:45 PM
CONSTRUCTION NEWS SV 3'52" 11 SEND
( M)
OK
04:50 PM
BUILDERS EXCHANGE 3'31" 11 SEND
( M)
OK
179
04:54 PM
REED!CONST*NEWS 49" 2 SEND
( M)
COM E-7
179 >K
04:55 PM
DAILY JOURNAL 3'38" 11 SEND
( M)
OK
179
04:59 PM
PLAN ROOM 5'59" 11 SEND
( M)
OK
179
05:05 PM
918006422437 4'22" 11 SEND
( M)
OK
179
>K
�
TOTAL
22M 11S
PAGES:
57
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 9
BID #5804
TROLLEY BARN INTERIOR REHABILITATION
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5804 Trolley Barn interior Rehabilitation
OPENING DATE, The opening date has been changed to September 2, 2003, 3:00p.m. (Our
Clock).
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Drawings:
Sheet Al
Refer to attached detail ADDII for walllfioor condition between File Room 101 and Office 100.
This detail must be performed along the entire length of wall to be able to remove existing floor
joists in Office 100.
2. Sheet Al
&A,4 (_nnerol hi m 7 _ Dn+�h and rennir anv u,al[It WHOM fh& nvi¢finn A icfiemrle is ramnvarl nnrf
P. 01
TRANSACTION REPORT
AUG-18-03 MON 05:15 PM
BROADCAST
DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP
AUG-18 05:11 PM REED!CONST*NEWS 4'02" 10 SEND ( M) OK 179
TOTAL 4M 2S PAGES: 10
„,,,,,,,..i,m
mmmmmfimmmmmmmmmmmmm.�mmmTTmminTmTm.n�mminTTn,mmh.�mfifiTT�T�����fifi����JF��,F,�,��J�AI,��,�J�fi ��fi ��� fi� fiTTR.F Ac,��T,�,F �,n
TRANSACTION REPORT
P. 01
AUG-18-03
MON 04:39 PM
BROADCAST
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP
177
AUG-18 04:24 PM 913034515636
2'17” 6 SEND
( M) OK
04:27 PM 913039378300
1'07" 0 SEND
( M) COM.E-3
177
04:35 PM 92060979
3'37" 11 SEND
( M) OK
177
TOTAL
7M 1S PAGES:
17