Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5804 TROLLEY BARN INTERIOR REHABILITATION (3)W TRANSACTION REPORT P,01 T AUG-21-03 THU 10:08 AM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP AUG-21 10:08 AM 91970353%74 **'*:K" 0 SEND ( M) BUSY 190 09:25 AM 94932073 1'14" 5 SEND ( M) OK 190 09:27 AM 913034446774 8106" 5 SEND ( M) OK 190 09:35 AM 94935325 1151" 5 SEND ( M) OK 190 09:38 AM 94932088 1'32" 5 SEND ( M) OK 190 09:40 AM 94936065 1'53" 5 SEND ( M) OK 190 09:42 AM 919703510530%v 4' 10" 1 SEND ( M) COM, E-12 190 09:47 AM 913038147709 1115" 5 SEND ( M) OK 190 09:49 AM 92781686 1'14" 5 SEND ( M) OK 190 09:50 AM 94166965 2'09" 5 SEND ( M) OK 190 09:53 AM 913034515636 1'22" 5 SEND ( M) OK 190 TOTAL 24M 46S PAGES: 46 Administrative Services Purchasing Division CI F FORT C ADDENDUM No.2 TROLLE BARN INTERIOR R ITATION SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5804 Trolley Barn Interior Rehabilitation OPENING DATE: September 2, 2003, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the Following changes are hereby made. Davis Bacon GENERAL DECISION C0030008 08/15/03 C08 General Decision Number C0030008 08/15/2003 Superseded General Decision Number: C0020006 State: Colorado Construction Type: Building P. 01 TRANSACTION REPORT AUG-18-03 MON 04:44 PM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP AUG-18 04:40 PM 913039378300 3'37" 11 SEND ( M) OK 177 TOTAL 3M 37S PAGES: 11 TRANSACTION REPORT P.02 AUG-18-03 MON 04:23 PM BROADCAST city of Fort Cabins Administrative Services YurcIlasing Division CITY OF FORT COLLINS ADDENDUM No. 1 BID #5804 TROLLEY BARN INTERIOR REHABILITATION SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid *5804 Trolley Barn Interior Rehabilitation OPENING DATE: The opening date has been changed to September 2, 2003, 3:00p.m. (Our Clock). To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet Al Refer to attached detail ADD1 'For waliffloor condition between File Room 101 and Office 100. This detail must be performed along the entire length of wall to be able to remove existing floor joists in Office 100. 2. Sheet Al A/lA rtnnn'r l Al'ti 17 0n4..4. --A ------- TRANSACTION REPORT P,01 AUG-19-03 TUE 08:21 AM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP AUG-19 08:14 AM 919703536974 3'30" 11 SEND ( M) OK 180 08:18 AM 913039378300 3'36" 11 SEND ( M) OK 180 TOTAL 7M 6S PAGES: 22 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No.1 BID #5804 TROLLEY BARN INTERIOR REHABILITATION SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #.5804 Trolley Sam Interior Rehabilitation OPENING DATE: The opening date has been changed to September 2, 2003, 3:00p.m. (Our Clock). To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet Al Refer to attached detail ADD1 for wall floor condition between File Room 101 and Office 100. This detail must be performed along the entire length of wall to be able to remove existing floor joists in Office 100_ 2. Sheet Al Add General Note 17 — Patch and repair any walls where the existing ductwork is removed, and P. 01 TRANSACTION REPORT AUG-21-03 THU 10:11 AM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP AUG-21 10:09 AM 919703510530 V 14" 5 SEND ( M) OK 190 TOTAL 1M 14S PAGES: 5 TRANSACTION REPORT P. 01 AUG-21-03 THU 10:06 AM X BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP AUG-21 09:56 AM 191 CONSTRUCTION NEWS SV 1'54" 5 SEND ( M) OK 09:58 AM BUILDERS EXCHANGE 1'12" 5 SEND ( M) OK 191 10:00 AM REED!CONST*NEWS 1'36" 5 SEND ( M) OK 191 10:02 AM DAILY JOURNAL 1116" 5 SEND ( M) OK 191 10:03 AM PLAN ROOM 2'36" 5 SEND ( M) OK 191 TOTAL 8M 34S PAGES: 25 K Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 TROLLEY BARN INTERIOR REHABILITATION SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5804 Trolley Barn Interior Rehabilitation OPENING DATE: September 2, 2003, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Davis Bacon GENERAL DECISION C0030008 08/15/03 C08 General Decision Number C0030008 08/15/2003 Superseded General Decision Number: C0020008 State: Colorado Construction Type: Building .a,,,... 4,4,4,4-. AA,A,�nmn`�FmA•mmmmmfimmTmmm�Fmms.m.FmmmTTd.TUF*A**TATTTm**AA'T„**AAA*A*AAA AAAAA*'*AAA A AAAAAAAA A TRH TAAAA'Y'AAAA P. 01 *" TRANSACTION REPORT AUG-21-03 THU 12:14 PM SEND(M) DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP AUG-21 12:13 PM 919703536974 1'13" 5 SEND ( M) OK 198 TOTAL 1M 13S PAGES: 5 City of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 TROLLEY BARN INTERIOR REHABILITATION SPI=CIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5804 Trolley Barn Interior Rehabilitation OPENING DATE: September 2, 2003, 3:00p.m_ (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Davis Bacon GENERAL DECISION C0030008 08/15/03 C08 General Decision Number C0030008 08/15/2003 Superseded General Decision Number: C0020008 State: Colorado Construction Type: Building TRANSACTION REPORT P.O1 AUG-18-03 MON 04:22 PM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP AUG-18 04:22 PM 919703535974/04" W 0 SEND ( M) BUSY 177 02:53 PM 913034515636✓9- 2'29" 6 SEND ( M) COM.E-4 177 02:56 PM 913034446774 3'39" 11 SEND ( M) OK 177 03:00 PM 94932073 3'32" 11 SEND ( M) OK 177 04:13 PM 94840269 7'08" 11 SEND ( M) OK 177 03:04 PM 94935325 6'11" 11 SEND ( M) OK 177 03:11 PM 94932088 4'50" 11 SEND ( M) OK 177 03:16 PM 94936065 6'12" 11 SEND ( M) OK 177 �c 03:23 PM 919703510530 4'04" 11 SEND ( M) OK 177 03:28 PM 92781686 3'33" 11 SEND ( M) OK 177 03:32 PM 94166965 4'50" 11 SEND ( M) OK 177 03:37 PM 92214656 6'11" 11 SEND ( M) OK 177 03:43 PM 92263637 8'12" 11 SEND ( M) OK 177 03:52 PM 94938020 8'11" 11 SEND ( M) OK 177 04:01 PM 92212171 �� 4'50" 11 SEND ( M) OK 177 04:06 PM 91303937830PP� / 58" 0 SEND ( M) COM.E-3 177 04:20 PM 92060979 ✓294 38" 0 SEND ( M) CANCEL 177 � 04:08 PM 94825575 3'32" 11 SEND ( M) OK 177 TOTAL III 19M OS PAGES; 160 P. 01 TRANSACTION REPORT AUG-18-03 MON 04:33 PM SEND(M) DATE START RECEIVER TX TIME PAGES TYPE NOTE Mt« DP AUG-18 04:29 PM 913034515636 3'56" 11 SEND ( M) OK 178 TOTAL 3M 56S PAGES: 11 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No.1 BID #5804 TROLLEY BARN INTERIOR REHABILITATION SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5804 Trolley Barn Interior Rehabilitation OPENING DATE: The opening date has been changed to September 2, 2003, 3:00p.m. (Our Clock). To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet Al Refer to attached detail ADD1 for wall/floor condition between File Room 101 and Office 100, This detail must be perfarmed along the entire length of wall to be able to remove existing floor joists in Office 100. 2. Sheet Al Add C'�PnBrnl Notp 17 _,_ Patrth anri rannir anv Zvi ]To u.horo the TRANSACTION REPORT P,01 AUG-18-03 MON 05:10 PM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP >K � 179 AUG-18 04:45 PM CONSTRUCTION NEWS SV 3'52" 11 SEND ( M) OK 04:50 PM BUILDERS EXCHANGE 3'31" 11 SEND ( M) OK 179 04:54 PM REED!CONST*NEWS 49" 2 SEND ( M) COM E-7 179 >K 04:55 PM DAILY JOURNAL 3'38" 11 SEND ( M) OK 179 04:59 PM PLAN ROOM 5'59" 11 SEND ( M) OK 179 05:05 PM 918006422437 4'22" 11 SEND ( M) OK 179 >K � TOTAL 22M 11S PAGES: 57 Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 9 BID #5804 TROLLEY BARN INTERIOR REHABILITATION SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5804 Trolley Barn interior Rehabilitation OPENING DATE, The opening date has been changed to September 2, 2003, 3:00p.m. (Our Clock). To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Drawings: Sheet Al Refer to attached detail ADDII for walllfioor condition between File Room 101 and Office 100. This detail must be performed along the entire length of wall to be able to remove existing floor joists in Office 100. 2. Sheet Al &A,4 (_nnerol hi m 7 _ Dn+�h and rennir anv u,al[It WHOM fh& nvi¢finn A icfiemrle is ramnvarl nnrf P. 01 TRANSACTION REPORT AUG-18-03 MON 05:15 PM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP AUG-18 05:11 PM REED!CONST*NEWS 4'02" 10 SEND ( M) OK 179 TOTAL 4M 2S PAGES: 10 „,,,,,,,..i,m mmmmmfimmmmmmmmmmmmm.�mmmTTmminTmTm.n�mminTTn,mmh.�mfifiTT�T�����fifi����JF��,F,�,��J�AI,��,�J�fi ��fi ��� fi� fiTTR.F Ac,��T,�,F �,n TRANSACTION REPORT P. 01 AUG-18-03 MON 04:39 PM BROADCAST DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP 177 AUG-18 04:24 PM 913034515636 2'17” 6 SEND ( M) OK 04:27 PM 913039378300 1'07" 0 SEND ( M) COM.E-3 177 04:35 PM 92060979 3'37" 11 SEND ( M) OK 177 TOTAL 7M 1S PAGES: 17