Loading...
HomeMy WebLinkAboutAddenda - BID - 5804 TROLLEY BARN INTERIOR REHABILITATIONCity of Fort Collins Administrative Services Purchasing Division CITY OF FORT COLLINS ADDENDUM No. 2 TROLLEY BARN INTERIOR REHABILITATION SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid #5804 Trolley Barn Interior Rehabilitation OPENING DATE: September 2, 2003, 3:00p.m. (Our Clock) To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Davis Bacon GENERAL DECISION C0030008 08/15/03 C08 General Decision Number C0030008 08/15/2003 Superseded General Decision Number: C0020008 State: Colorado Construction Type: Building County: Larimer County in Colorado. BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 06/13/2003 1 08/15/2003 ASBE0028-001 01 /01 /2003 Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems) .................... $ 18.57 5.95 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 CARP 1001-001 05/01 /2003 Rates Fringes Carpenter (Including Formbuilding and Metal Stud Work) .................. $ 22.10 6.20 CARP2834-001 05/01 /2003 Rates Fringes Millwright ..................... $ 24.49 6.66 ELEC0068-009 06/01/2003 Rates Fringes Electrician (Including Low Voltage Wiring and Installation of Communications Systems, Security Systems, Telephones, and Temperature Controls) ................... $ 27.91 8.67 ELEV0025-002 01/01/2003 Rates Fringes Elevator Constructor ........... $ 26.935 9.355+a FOOTNOTE: a. Employer contributes 8% of basic hourly rate for over 5 years' service and 6% basic hourly rate for 6 months' to 5 years' service as Vacation Pay Credit. SEVEN PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Friday after Thanksgiving Day; and Christmas Day. I RON0024-001 08/01 /2002 Rates Fringes Ironworker, Structural ......... $ 22.00 5.75 PAI N0930-001 07/01 /2003 Rates Fringes Glazier ........................ $ 25.35 6.20 PLAS0577-001 05/01 /2003 Rates Fringes Cement Mason/Concrete Finisher ....................... $ 22.80 5.65 PLU M0003-001 07/01 /2002 Rates Fringes Plumber (Excluding HVAC work) ....... $ 26.52 6.64 PLU M0208-001 07/01 /2002 Rates Fringes Pipefitter (Including HVAC pipe) ....... $ 26.62 6.54 * SHEE0009-001 07/01/2003 Rates Fringes Sheet metal worker (Includes HVAC duct and installation of HVAC systems) .................... $ 29.25 9.59 SUCO2001-015 12/20/2001 Rates Fringes Laborer Common ......................$ 9.56 2.36 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: an existing published wage determination a survey underlying a wage determination a Wage and Hour Division letter setting forth a position on a wage determination matter " a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970- 221-6777. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.