HomeMy WebLinkAboutAddenda - BID - 5804 TROLLEY BARN INTERIOR REHABILITATIONCity of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
TROLLEY BARN INTERIOR REHABILITATION
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5804 Trolley Barn Interior Rehabilitation
OPENING DATE: September 2, 2003, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described
above, the following changes are hereby made.
Davis Bacon
GENERAL DECISION C0030008 08/15/03 C08
General Decision Number C0030008 08/15/2003
Superseded General Decision Number: C0020008
State: Colorado
Construction Type: Building
County: Larimer County in Colorado.
BUILDING CONSTRUCTION PROJECTS (does not include residential
construction consisting of single family homes and apartments
up to and including 4 stories)
Modification Number Publication Date
0 06/13/2003
1 08/15/2003
ASBE0028-001 01 /01 /2003
Rates Fringes
Asbestos Workers/Insulator
(Includes application
of all insulating
materials, protective
coverings, coatings and
finishings to all
types of mechanical
systems) .................... $ 18.57 5.95
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
CARP 1001-001 05/01 /2003
Rates Fringes
Carpenter
(Including
Formbuilding and Metal
Stud Work) .................. $ 22.10 6.20
CARP2834-001 05/01 /2003
Rates Fringes
Millwright ..................... $ 24.49 6.66
ELEC0068-009 06/01/2003
Rates Fringes
Electrician
(Including Low Voltage
Wiring and
Installation of
Communications
Systems, Security
Systems, Telephones,
and Temperature
Controls) ................... $ 27.91 8.67
ELEV0025-002 01/01/2003
Rates Fringes
Elevator Constructor ........... $ 26.935 9.355+a
FOOTNOTE:
a. Employer contributes 8% of basic hourly rate for over 5
years' service and 6% basic hourly rate for 6 months' to 5
years' service as Vacation Pay Credit.
SEVEN PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; Friday after
Thanksgiving Day; and Christmas Day.
I RON0024-001 08/01 /2002
Rates Fringes
Ironworker, Structural ......... $ 22.00 5.75
PAI N0930-001 07/01 /2003
Rates Fringes
Glazier ........................ $ 25.35 6.20
PLAS0577-001 05/01 /2003
Rates Fringes
Cement Mason/Concrete
Finisher ....................... $ 22.80 5.65
PLU M0003-001 07/01 /2002
Rates Fringes
Plumber
(Excluding HVAC work) ....... $ 26.52 6.64
PLU M0208-001 07/01 /2002
Rates Fringes
Pipefitter
(Including HVAC pipe) ....... $ 26.62 6.54
* SHEE0009-001 07/01/2003
Rates Fringes
Sheet metal worker
(Includes HVAC duct and
installation of HVAC
systems) .................... $ 29.25 9.59
SUCO2001-015 12/20/2001
Rates Fringes
Laborer
Common ......................$ 9.56 2.36
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates
listed under the identifier do not reflect collectively
bargained wage and fringe benefit rates. Other designations
indicate unions whose rates have been determined to be
prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
an existing published wage determination
a survey underlying a wage determination
a Wage and Hour Division letter setting forth a position on
a wage determination matter
" a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis -Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-
221-6777.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM
HAS BEEN RECEIVED.