8. BID SCHEDULE
II (Base Bid)
LUMP SUM j�SL. DOLLARS ($
Including four ADD Alternates as described on drawing: Sheet Al.
Add Alternate #1 �1 Provide and install five (5) new gas fired unit heaters $ J
Add Alternate #2
Provide and install new R-22 batt insulation $ �.
Add Alternate #3 —
Provide and install new light fixtures & electrical outlets $�
Add Alternate #4
Refurbish three (3) steel sash windows $ CN
9.. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete work in place of the several kinds called for.
7/96 Section 00300 Page 2
Kevin Shironaka
Owner / President
Equal Employment Opportunity Officer
Education:
1970 University of Northern Colorado
Bachelor of Science in Business Finance
Greeley, CO
Work History:
1974-Present Growling Bear Co. Inc. - Greeley, CO
1968-1974 Everitt Lumber Company - Greeley, CO
Purchasing Agent, Cost Accountant
Construction Salesman
Manager - Fencing Dept.
Kevin Shironaka, a Colorado native and longtime Weld County resident, born in
Denver and raised in Ordway and Greeley, graduated from University of Northern
Colorado with a Bachelor of Science Degree in Business Finance. He originally
founded and has been the owner and president of Growling Bear Co. Inc. since its
inception in 1974. Over the years, Kevin expanded his general contracting
construction business to include not only Colorado but other states as well, but has
chosen to concentrate his and the company's efforts in the Colorado Front
Range.....our "neighborhood'.
Kevin not only has expert personal knowledge as to the management of the overall
company but also extensive field experience in the construction of the various projects
undertaken by Growling Bear. He has negotiated over 800 commercial projects and
has been the successful bidder on many other projects, both public and private, along
the Front Range from Cheyenne to Pueblo ranging in price from $50,000.00 to
$8,000,000.00. Kevin has been operating his business, hiring locals, and contracting
with neighborhood businesses for 29 years. Under his leadership, the company has
grown from a few employees to sometimes as many as 60 employees.
His long history and solid reputation in the construction arena has afforded Kevin the
ability to recruit the most experienced and capable construction team in Colorado and
he is continually expanding that team.
Gary Shironaka
Corporate Secretary/Project Manager
Education:
Colorado State University, Ft. Collins, CO
Construction Management Degree 2000
Greeley, Central High School, Greeley, CO.
Graduate 1996
Work History:
2000-Present Growling Bear Co. (Inc.) - Greeley, CO.
Project Manager
Member, Building Trades Advisory Committee, Weld Board of
County Commissioners, 2001 through 2004
1996 -2000 Growling Bear Co. (Inc.) Greeley, CO.
Carpenter, Assistant Project Manager
1994-1995 Growling Bear Co. (Inc.) - Greeley, CO
Carpenter
Selected Projects:
Current Project New East Elementary School
Completion 6103 Greeley, CO
Colorado State University Service Center Remodel
Fort Collins, CO
I" United Methodist Church,
Brighton, CO
AT&T Regen Huts: Colorado, Wyoming,
Nebraska, UT
City of Greeley Various Projects
Greeley, CO
$8,034,433.00
$ 223,995.00
$ 663,000.00
$4,572,000.00
$1,400,000.00
Curtis C. Naibauer
Vice President/Estimator/Project Manager
Education:
Aims Community College
General Education
Greeley, CO
Work History:
1995-Present Growling Bear Co. Inc. - Greeley, CO
Project Manager/Estimator
1990-1994 Thissen Construction Corp. - Greeley, CO
Chief Estimator/Project Manager
1983-1989 Growling Bear Co. Inc. - Greeley, CO
Project Manager/Estimator
Curtis has been with Growling Bear for 13 years and can provide a range of pre -
construction service that includes cost estimating, value engineering, scheduling, budget
updates, and project coordination.
Curtis would be responsible for working closely with the Project Architect to determine the
most cost effective method to accomplish the goals that the Owner has set for his project.
Projects:
Hawkstone Clubhouse, Eaton, CO
Camelot Apartments, Greeley, CO
Weld County Training Center
Boulder Ranger Station, Boulder, CO
Weld County Walton Building- Renovation
North Range Behavioral Health, Greeley, CO
Weld County Social Services Addition, Greeley, CO
Q-Lube — New Construction, Greeley, CO
First National Bank of Johnstown, Johnstown, CO
Union Pacific Railroad Depot — Remodel, Greeley, CO
Island Grove Regional Treatment Center
Mary Blair Elementary Addition
Namaqua Elementary Addition
Remodel of Inmate Space - Weld County Jail
UNC Frasier Hall Life Safety Upgrade
Poudre Valley Hospital Addition
Platteville Town Hall, Platteville, CO
Cameron Elementary School Addition
Highland Daycare Center, Ault, CO
First Christ Church Addition
Charlie Morgan, Jr.
Project Manager
Education:
West Henderson High School
Hendersonville, NC
Work History:
2001-Present Growling Bear Co. Inc. — Greeley, CO
Project Manager
1995-2001 Growling Bear Co. Inc. - Greeley, CO
Superintendent
1988-1995 Thissen Construction Corp. - Greeley, CO
Superintendent
1983-1988 Big Thompson Drywall - Loveland, CO
Superintendent
1971-1983 A-1 Drywall & Plaster - Etowah, NC
Self - Employed
1966-1968 United States Army
Sergeant
Selected Projects:
Current Project World Savings Bank
Completion 4103 Thornton, CO — New Branch Bank $837,397.00
Brentwood Middle School, gym addition $995,701.00
Greeley, CO
Our Savior's Lutheran Church — Remodel $436,000.00
Greeley, CO
United Methodist Church $663,000.00
Brighton, CO
Charlie Morgan, Jr. continued
Centennial Bank of the West, Remodel $1341330.00
Eaton, CO
Centennial Bank of the West, Remodel $518,428.00
Longmont, CO
Eaton Country Club, Addition/Renovation $410,000,00
Eaton, CO
Mobility Ground Station (Buckley Air National Guard) $4,500,000.00
Greeley, CO
Weld County Social Services $1,277,333.00
Greeley, CO
Cameron Elementary Addition $ 435,000.00
Greeley, CO
Monfort Portions Office Addition $753,000.00
Greeley, CO
Remodel of Inmate Space - Weld County Jail $11800,000.00
& Communications Center
Greeley, CO
Mary Blair Elementary, Addition $1,400,000.00
Greeley, CO
Charlie Morgan, Jr. continued
I am the General Project Manger for Growling Bear Co Inc. As such I oversee and
coordinate a fluctuating work force anywhere from thirty to forty employees.
I oversee our mechanical maintenance department and production in our mill shop. Our
labor force is used to give us a greater measure of control over scheduling and the
quality of our finished product. A full time mechanic and professional mill shop also
help us maintain our aggressive scheduling. We have labor capable of the following:
• Site Labor
• Site Demolition
• Earthwork
• Concrete
• Site Concrete
• Metal Stud and Wood Framing
• Drywall Hanging and Finishing
• Complete Steel Erection
• Complete Custom Cabinetry
• Complete Vehicle and Equipment Maintenance
Dwayne `Doc' Shelton
Education:
Project Manager
Aloha High School
Aloha, OR
Community College of the Air Force
Aerospace Management
State of Wyoming Level 1 Water License (IWS 94-23)
Wastewater License (IWWS 94-16)
Work History:
2001-Present Growling Bear Co., (Inc.) - Greeley, CO
Project Manager
2000-2001 Asbestos Technology, Inc. Cheyenne, WY
General Manager
1999-2000 Mendez, Inc. Grand Junction, CO
Project Manager
Military Projects over $10M
1979-1999 United States Air Force:
'78 - 79 Draftsman
'79 —'85 Engineering Design Assistant
'85—'86 Contract Inspector
IN—IN
Construction Surveyor
'88 —'91 Mission Support, Runway Constr.
'91 —'97 Construction Inspector/Prof. Mgr.
'97 —'99 Chief of Eng./Project Manager
Selected Projects:
Current Project New East Elementary School $8,034,433.00
Completion 6103 Greeley, CO
Doc Shelton, continued
Salvation Army Early Childhood
Development Center $529,722.00
Greeley, CO
Franklin Elementary School
Art Room Addition $263,983.00
Greeley, CO
Our Savior's Lutheran Church $436,000.00
Remodel
Greeley, CO
Projects in Progress as of 8/15/2003
Growling Bear Co., Inc., 2330 4th Avenue, Greeley, CO 80631 Phone: (970) 3534964 Fax: (970) 353-6974 page I
% Work
Contract Scheduled W/Own
Project/Description/Location Owner Architect/Engineer Amount Start Completion Forces
Stephen's Center
7000sf Independent Living Facility
1500sf activity center
2774/2778 Reservoir Rd.
Greeley, CO
Lincoln Center HVAC and Roof
Replacement including new roof
and mechanical platform
Greeley LDS Church
Remove old and install new boiler,
misc. landscaping, concrete
and mechanical room deck
Heath Middle School
Finishes Replacement
2223 16th Avenue
Greeely, CO
Branch Bank Tenant Finish
3640 West 10th Street
Greeley, CO 80834
Plaza del Sol Farm Labor Housing
42 Houses, 1 Community Center
Greeley, CO
(this is a completion contract)
Greeley Center for Independence
2780 28th Avenue
Greeley, CO 80634
Hope Cassidy, Director
970.339.2444
City of Fort Collins
215 N. Mason Street
Ft Collins, CO 80522
Steve Seefeld, Project Manager
970.221.6227
LDS Church
3263 Fraser St., Ste. 1
Aurora, CO 80011
Ron Humphries, Representative
303.798.3970
Weld Cty. School Dist. #6
2204 5th Avenue
Greeley, CO 80631
J.W. Nelson, Facilities Supervisor
970.353.9100
Bank of Colorado
5628 West 19th Street #2
Greeley, CO 80634
Greg Ludlow, Branch Manager
970.506.0100
Catholic Charities
1311 11th Street
Greeely, CO 80631
970.484.5010
Emie Giron, Exec. Director
Larry E. Steele Associates $ 822,000.00 Aug '03 Jan '04 15%
2308 West 29th Street
Greeley, CO 80631
Larry Steele, Architect
970.353.6363
Aller-Lingle Architects, P.C. $ 332,226.00 Aug '03 Nov'03 10%
712 Whalers Way, Bldg. B-100
Ft Collins, CO 80525
Shaun Moscrip, Architect
970.223.1820
TSP Five, Inc. $ 104,263.00 Aug'03 Oct'03 �+}6
8751 E. Hampden Ave., Ste. A-1
Denver, CO 80231
Jeff Krueger, Architect
303.695.1997
Klipp Colussy Jenks DuBois $ 76,977.00 Jun'03 Aug'03 15%
1512 Larimer Street
Denver, CO 80202
Sam Miller, Architect
(303)893-1990
The Morganti Group $ 181,350.00 Jun'03 Aug'03 25%
2903 Aspen Drive, Suite B
Loveland, CO 80538
Marvin Morganti, President
(970)887-4000
John Dangler & Associates $1,056,000.00 May'03 Sep'03 15%
5338 Highcastle Court
Fort Collins, CO 80525
(970)223-1512
Projects in Progress as of 8/15/2003
Growling Bear Co., Inc., 2330 4th Avenue, Greeley, CO 80631 Phone: (970) 353-6964 Fax: (970) 353-6974 page 2
% Work
Contract Scheduled W/Own
Project/Description/Location Owner Architect/Engineer Amount Start Completion Forces
Cheyenne Substation Mods. US Dept. of Energy Owner $ 596,306.00 Mar'03 Mar'04 40%
400 Mc Farland Drive Western Area Power Assoc.
Cheyenne, WY 5555 E. Crossroads Blvd
Loveland, CO 80538
Sharon Gatenby 970.461.7301
SECTION 00300
BID FORM
PROJECT: TROLLEY BARN INTERIOR REHABILITATION; BID NO..5804
Place of
Date
q-a-
1. In compliance with your Invitation to Bid dated VZ`l/0 -;� ,
d subject to � all conditions thereof, the undersigned
�1VL a ** (Corporation, n...... an ,
)** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
tc Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
foll ws:_
iM LJ
� I Ca/ — �y.
S. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through
7/96 Section 00300 Page 1
Sample of Historical Renovation Projects Completed Last 5 Years (more available upon request)
Growling Bear Co., Inc., 2330 4th Avenue, Greeley, CO 80631 Phone: (970) 3534964 Fax: (970) 3534974
% of Work
Contract Comp- With Own
Project/Description/Location Owner Architect/Engineer Amount start lotion Forces
Renovate Bldg 212
Warren Air Force Base
Cheyenne, WY
Building 207 Renovation
Complete Renovation Including
HVAC, Fire Protection & Electrical
Warren Air Force Base
Cheyenne, WY
Dorm Building 244 Remodel
44,000sf Total Gut & Renovation of
all systems, Warren Air Force Base
Cheyenne, WY
Building 314 Renovation
Design/Build Proj.-Comp. Renovation
HVAC, Elec., Plbg., H.C. Access,
Aerobic and Dance Area - 24,000sf.
Warren AFB, Cheyenne, WY
F.E. Warren Air Force Base
Repair 52 Historic housing units.
Historic renovation of 52 family
housing units - 10 phases - 2 yr project
complete gut/renovation/new systems.
Cheyenne, Wyoming
Operational Contracting Division
Building #208
F.E. Warren AFB
Cheyenne, WY 82005
Lt. Mark Adams
307-773-5916
Operational Contracting Division
Building #208, F.E. Warren AFB
Cheyenne, WY 82005
Ms. Darlene Faulkner
307-773-3917
F.E. Warren Air Force Base
Building #208
Cheyenne, WY 82005-5000
Darlene Faulkner
307-773-3917
F.E. Warren Air Force Base
Building #208
Cheyenne, WY 82005-5000
Darlene Faulkner
307-773-3917
Operational Contracting Division
Building #208
F.E. Warren AFB
Cheyenne, Wyoming
Darlene Faulkner
307-773-3917
Owner
Owner
Owner
Growling Bear Co., Inc.
2330 4th Avenue
Greeley, CO 80631
John Sohl
970-353-6964
Noel Griffith & Associates
2232 Del Range Blvd,Ste. 200
Cheyenne, WY
307-632-2705
$ 805,000.00 Nov-00 Dec.-101
$ 850,000.00 Aug-99 Apr-00
$ 3,014,352.00 Sep-98 Oct-99
$ 1,200,000.00 Apr-99 Jul-99
$ 5,250,000.00 Mar-96 Mar-98
19%
19%
30%
19%
35%
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
Growling Bear Company, Inc. as Principal, and Employers Mutual Casualty Company as Surety, are
hereby held and firmly bound unto the City of Fort Collins, Colorado
as OWNER, in the sum of $ 5%of amount bid for the payment of which, well and
truly to be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation, is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fort Collins Project,
TROLLEY BARN REHABILITATION Project No. 5804
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid,
then this obligation shall be void; otherwise the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired. or affected by any
extension of the time within which the OWNER may accept such Bid; and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
7/96 Page 1
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this _2nd day of September 2003 , and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL
GROWLING BEAR COMPANY INC.
Name:
Address: 2330 4Ta Avenue
(SEAL)
SURETY
Employers Mutual Casualty Company
Address: P.O. Box 441098
Aurora, tColorado 0044-1098
By: �•`a't'Q'+'�
Title: Sharon Pond Attorney In Fact
(SEAL)
7/96 Page 2
No Text
the Agreement
Bidder acknowledgeestatthiseso�le discretionrwithout affecting the
in the Bid
or change quantities as the deletion or change does not exceed
or prices of any item so long
t (250) of the total Agreement Price.
twenty-five percen
RESPEC FULLY S D<
Date
Signature
r
Title
3 D licable)
License Number (If App
i Bi is b cc poration)
(Seal /
Attest: (
IA`S l
Address �-.�-�-
L, L'= AVE
62
Telephone
Section 00300 Page 3
�/96
COLORADO DEPARTMENT OF TRANSPORTATION
PROECT140.
AN71•COL.L.USION AFFIDAVIT
` A -so N t�vw� 5 Sir r
I hereby attest that I am the person responsible within my firm for the final decision as to the price(s) and amount of this
bid or, if not, that I have written authorization, enclosed herewith, from that person to make the statements set out below on
his or her behalf and on behalf of my firm-
1 further attest that:
f _ The price(s) and amount of this bid have been arrived at independently, without consultation, communication or
agreement for the purpose or with the effect of restricting competition with any other firm or pennon who is a bidder
or potential prima bidder.
2A. Neither the price(s) nor the amount of this bid have been disclosed to any other film or person who is a bidder or
potential prima bidder on this project, and will not be so disclosed prior to bid opening.
2B. Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential prime bidder on
this project have been disclosed to me or my firm.
3A. No attempt has been made to solicit, cause or induce any firm or person who is a bidder or potential prime bidder to
refrain from bidding on this project, or to submit a bid higher than the bid of this firm, or any intentionally high or non-
competitive bid or other form of complementary bid,
3B. No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder
on this project to submit an intentionally high, noncompetitive or other form of complementary bid on this project.
4. The bid of my firm is made in good faith and not pursuant to any consultation, communication, agreement or
discussion with, or inducement or solicitation by or from any firm or person to submit any intentionally high, noncom-
petitive or other form of complementary bid,
S. My firm has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or
services from any firm or person, or offered, promised or paid cash or anything of value to any firth or person,
whether in connection with this or any other project, in consideration for an agreement or promise by any firm or
person to refrain from bidding or to submit any intentionally high, noncompetitive or other form of complementary bid
or agreeing or promising to do so on this project.
s. My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or
services to any firm or person, and has not been promised or paid cash or anything of value by any firm or person,
whether in connection with this or any other project, in consideration for my firm's submitting any intentionally high,
noncompetitive or other form of complementary bid, or agreeing or promising to do so, on this project.
7. 1 have made a diligent inquiry of all members, officers, employees, and agents of my firth with responsibilities
relating to the preparation, approval or submission of my fir m's bid on this project and have been advised by each of
them that he or she has not participated in any communication, consultation, discussion, agreement, collusion, or
other conduct inconsistent with any of the statements and representations made in this affidavit.
8. 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent
concealment from the Colorado Department of Transportation, of the true facts relating to submission of bids for this
contract.
I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR
FEDERAL LAWS. THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST
OF MY KNOWLEDGE.
Cg1MYacfs l'vm or�npany rmAlme �
gy ,
09te
2ed oanbaaorsdim, or obtrpbry name. (it Ohl vomfe.)
Ry
Me
Tea
Sworn to before me this ,� j day of, 2003
(Ay mYmi oXpims /
LW
NOTE.. This document must be signed in ink.
apoY F r MW IA2
LORADO DEPARTMEOF TRANSPORTATIONERTIFICATION
OF EEO COMPLIANCE
rC
Instructions: Bidders and subcontractors must complete and submit this form with bid proposals for federally funded contracts
greater than $10,000. This is required by the Equal Employment Opportunity Regulations 141 CFR 60-1.7(b) (1)]. The regulation
also requires that R you have participated in a previous contract or subcontract and have not filed a Standard Form 100 (EEO-
1), you cannot be awarded this contract. You may file a report covering the delinquent period for consideration by the Federal
Highway Administration or the Director of the Office of Federal Contract Compliance, U.S. Department of Labor.
The Standard Form 100 (EEO-1) may be requested from the:
Joint Reporting Committee
P.O. Box 779
Norfolk, VA 23601
(757) 461-1213
1. Yes Q No I have developed and have on file at each establishment an affirmative action program as
required by 41 CFR Chapter 60, Part 60-2
2. , Yes U No I have participated in a previous oontract/suboontract subject to the equal opportunity
clause.
3. Yes ❑ No I have filed with the Joint Reporting Committee, the Director, or the Equal Employment
Opportunity Commission all reports due under the applicable filing requirements_
I declare under penaltyof perjury in the second degree and any other applicable state or federal laws, that the state-
ments made in this document are true and complete to the best of my knowledge.
company
���N,, �F✓at �. G, bidder U proposed subcontractor
er•
rme:
I cow raft fU7 Tim
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: Growling Bear Company (Inc.)
2. Permanent main office address: 2330 4th Avenue Greeley, CO 80631
3. When organized:1974
4. If a corporation, where incorporated: Colorado
5. How many years have you been engaged in the contracting business under your
present firm or trade name? qq
6_ Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
Please See Attached
7. General character of Work performed by your company:
General Construction
8. Have you ever failed to complete any Work awarded to you?
If so, where and why? NO
9. Have your ever defaulted on a contract?
If so, where and why? NO
10. Are you debarred by any government agency? NO
If yes list agency name.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
12. List your major equipment available for this contract.
13. Experience in construction Work similar in importance to this
project:
Please see Attac
14. Background and experience of the principal members of your organization,
including officers:
Please See Attached
15. Credit available: $ 500,000
16. Bank reference: Centennial Bank of The West
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
Yes
18. Are you licensed as a General CONTRACTOR? Yes What
If yes, in what city, county and state?Fort "- ^y CO --
class, license and numbers? B-310
19. Do you anticipate subcontracting Work under this Contract? Yes
If yes, what percent of total contract?
and to whom?
20. Are any lawsuits pending against you or your firm at this time? NO yes,
If
DETAIL
Section 00420 Page 2
7/96
21. What are the limits of your public liability? DETAIL
3,000,000 From Employees Mutual
What company? Employees Mutual
22. What are your company's bonding limitations? 20,000,000
23. The undersigned
corporation to
verification of
Qualifications.
Dated at
hereby authorizes and requests any person, firm or
furnish any information requested by the OWNER in
the recital comprising this Statement of Bidder's
this 2 day of September , 2003•
Growling Bear Co. (Inc.)
Name of Bidder
By:Kevin Shironaka
Title: President
State of Colorado
County of Weld
Kevin Shironaka being duly sworn deposes and says that he is
President of Growling Bear Co. (Inc.) and that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this 2 day of
September
Notary Public
My commission expires
7/96 Section 00420 Page 3
0
a
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and ail subcontractors
performing over 20e of the contract.
�ITEM
lA l7Li�
)z0(1
A- �rlc
7/96
SUBCONTRACT R
�P. SUBCONTRACT
Section 00430 Page 1