Loading...
HomeMy WebLinkAboutRESPONSE - BID - 5804 TROLLEY BARN INTERIOR REHABILITATION (2)} �rv�J I� •�C flees Cam. uy"�,L CONTRACTOR-4<< Ifr BY: Vew;vt. sLVV�nnQL VE ADDRESS: 8. BID SCHEDULE II (Base Bid) LUMP SUM j�SL. DOLLARS ($ Including four ADD Alternates as described on drawing: Sheet Al. Add Alternate #1 �1 Provide and install five (5) new gas fired unit heaters $ J Add Alternate #2 Provide and install new R-22 batt insulation $ �. Add Alternate #3 — Provide and install new light fixtures & electrical outlets $� Add Alternate #4 Refurbish three (3) steel sash windows $ CN 9.. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete work in place of the several kinds called for. 7/96 Section 00300 Page 2 Kevin Shironaka Owner / President Equal Employment Opportunity Officer Education: 1970 University of Northern Colorado Bachelor of Science in Business Finance Greeley, CO Work History: 1974-Present Growling Bear Co. Inc. - Greeley, CO 1968-1974 Everitt Lumber Company - Greeley, CO Purchasing Agent, Cost Accountant Construction Salesman Manager - Fencing Dept. Kevin Shironaka, a Colorado native and longtime Weld County resident, born in Denver and raised in Ordway and Greeley, graduated from University of Northern Colorado with a Bachelor of Science Degree in Business Finance. He originally founded and has been the owner and president of Growling Bear Co. Inc. since its inception in 1974. Over the years, Kevin expanded his general contracting construction business to include not only Colorado but other states as well, but has chosen to concentrate his and the company's efforts in the Colorado Front Range.....our "neighborhood'. Kevin not only has expert personal knowledge as to the management of the overall company but also extensive field experience in the construction of the various projects undertaken by Growling Bear. He has negotiated over 800 commercial projects and has been the successful bidder on many other projects, both public and private, along the Front Range from Cheyenne to Pueblo ranging in price from $50,000.00 to $8,000,000.00. Kevin has been operating his business, hiring locals, and contracting with neighborhood businesses for 29 years. Under his leadership, the company has grown from a few employees to sometimes as many as 60 employees. His long history and solid reputation in the construction arena has afforded Kevin the ability to recruit the most experienced and capable construction team in Colorado and he is continually expanding that team. Gary Shironaka Corporate Secretary/Project Manager Education: Colorado State University, Ft. Collins, CO Construction Management Degree 2000 Greeley, Central High School, Greeley, CO. Graduate 1996 Work History: 2000-Present Growling Bear Co. (Inc.) - Greeley, CO. Project Manager Member, Building Trades Advisory Committee, Weld Board of County Commissioners, 2001 through 2004 1996 -2000 Growling Bear Co. (Inc.) Greeley, CO. Carpenter, Assistant Project Manager 1994-1995 Growling Bear Co. (Inc.) - Greeley, CO Carpenter Selected Projects: Current Project New East Elementary School Completion 6103 Greeley, CO Colorado State University Service Center Remodel Fort Collins, CO I" United Methodist Church, Brighton, CO AT&T Regen Huts: Colorado, Wyoming, Nebraska, UT City of Greeley Various Projects Greeley, CO $8,034,433.00 $ 223,995.00 $ 663,000.00 $4,572,000.00 $1,400,000.00 Curtis C. Naibauer Vice President/Estimator/Project Manager Education: Aims Community College General Education Greeley, CO Work History: 1995-Present Growling Bear Co. Inc. - Greeley, CO Project Manager/Estimator 1990-1994 Thissen Construction Corp. - Greeley, CO Chief Estimator/Project Manager 1983-1989 Growling Bear Co. Inc. - Greeley, CO Project Manager/Estimator Curtis has been with Growling Bear for 13 years and can provide a range of pre - construction service that includes cost estimating, value engineering, scheduling, budget updates, and project coordination. Curtis would be responsible for working closely with the Project Architect to determine the most cost effective method to accomplish the goals that the Owner has set for his project. Projects: Hawkstone Clubhouse, Eaton, CO Camelot Apartments, Greeley, CO Weld County Training Center Boulder Ranger Station, Boulder, CO Weld County Walton Building- Renovation North Range Behavioral Health, Greeley, CO Weld County Social Services Addition, Greeley, CO Q-Lube — New Construction, Greeley, CO First National Bank of Johnstown, Johnstown, CO Union Pacific Railroad Depot — Remodel, Greeley, CO Island Grove Regional Treatment Center Mary Blair Elementary Addition Namaqua Elementary Addition Remodel of Inmate Space - Weld County Jail UNC Frasier Hall Life Safety Upgrade Poudre Valley Hospital Addition Platteville Town Hall, Platteville, CO Cameron Elementary School Addition Highland Daycare Center, Ault, CO First Christ Church Addition Charlie Morgan, Jr. Project Manager Education: West Henderson High School Hendersonville, NC Work History: 2001-Present Growling Bear Co. Inc. — Greeley, CO Project Manager 1995-2001 Growling Bear Co. Inc. - Greeley, CO Superintendent 1988-1995 Thissen Construction Corp. - Greeley, CO Superintendent 1983-1988 Big Thompson Drywall - Loveland, CO Superintendent 1971-1983 A-1 Drywall & Plaster - Etowah, NC Self - Employed 1966-1968 United States Army Sergeant Selected Projects: Current Project World Savings Bank Completion 4103 Thornton, CO — New Branch Bank $837,397.00 Brentwood Middle School, gym addition $995,701.00 Greeley, CO Our Savior's Lutheran Church — Remodel $436,000.00 Greeley, CO United Methodist Church $663,000.00 Brighton, CO Charlie Morgan, Jr. continued Centennial Bank of the West, Remodel $1341330.00 Eaton, CO Centennial Bank of the West, Remodel $518,428.00 Longmont, CO Eaton Country Club, Addition/Renovation $410,000,00 Eaton, CO Mobility Ground Station (Buckley Air National Guard) $4,500,000.00 Greeley, CO Weld County Social Services $1,277,333.00 Greeley, CO Cameron Elementary Addition $ 435,000.00 Greeley, CO Monfort Portions Office Addition $753,000.00 Greeley, CO Remodel of Inmate Space - Weld County Jail $11800,000.00 & Communications Center Greeley, CO Mary Blair Elementary, Addition $1,400,000.00 Greeley, CO Charlie Morgan, Jr. continued I am the General Project Manger for Growling Bear Co Inc. As such I oversee and coordinate a fluctuating work force anywhere from thirty to forty employees. I oversee our mechanical maintenance department and production in our mill shop. Our labor force is used to give us a greater measure of control over scheduling and the quality of our finished product. A full time mechanic and professional mill shop also help us maintain our aggressive scheduling. We have labor capable of the following: • Site Labor • Site Demolition • Earthwork • Concrete • Site Concrete • Metal Stud and Wood Framing • Drywall Hanging and Finishing • Complete Steel Erection • Complete Custom Cabinetry • Complete Vehicle and Equipment Maintenance Dwayne `Doc' Shelton Education: Project Manager Aloha High School Aloha, OR Community College of the Air Force Aerospace Management State of Wyoming Level 1 Water License (IWS 94-23) Wastewater License (IWWS 94-16) Work History: 2001-Present Growling Bear Co., (Inc.) - Greeley, CO Project Manager 2000-2001 Asbestos Technology, Inc. Cheyenne, WY General Manager 1999-2000 Mendez, Inc. Grand Junction, CO Project Manager Military Projects over $10M 1979-1999 United States Air Force: '78 - 79 Draftsman '79 —'85 Engineering Design Assistant '85—'86 Contract Inspector IN—IN Construction Surveyor '88 —'91 Mission Support, Runway Constr. '91 —'97 Construction Inspector/Prof. Mgr. '97 —'99 Chief of Eng./Project Manager Selected Projects: Current Project New East Elementary School $8,034,433.00 Completion 6103 Greeley, CO Doc Shelton, continued Salvation Army Early Childhood Development Center $529,722.00 Greeley, CO Franklin Elementary School Art Room Addition $263,983.00 Greeley, CO Our Savior's Lutheran Church $436,000.00 Remodel Greeley, CO Projects in Progress as of 8/15/2003 Growling Bear Co., Inc., 2330 4th Avenue, Greeley, CO 80631 Phone: (970) 3534964 Fax: (970) 353-6974 page I % Work Contract Scheduled W/Own Project/Description/Location Owner Architect/Engineer Amount Start Completion Forces Stephen's Center 7000sf Independent Living Facility 1500sf activity center 2774/2778 Reservoir Rd. Greeley, CO Lincoln Center HVAC and Roof Replacement including new roof and mechanical platform Greeley LDS Church Remove old and install new boiler, misc. landscaping, concrete and mechanical room deck Heath Middle School Finishes Replacement 2223 16th Avenue Greeely, CO Branch Bank Tenant Finish 3640 West 10th Street Greeley, CO 80834 Plaza del Sol Farm Labor Housing 42 Houses, 1 Community Center Greeley, CO (this is a completion contract) Greeley Center for Independence 2780 28th Avenue Greeley, CO 80634 Hope Cassidy, Director 970.339.2444 City of Fort Collins 215 N. Mason Street Ft Collins, CO 80522 Steve Seefeld, Project Manager 970.221.6227 LDS Church 3263 Fraser St., Ste. 1 Aurora, CO 80011 Ron Humphries, Representative 303.798.3970 Weld Cty. School Dist. #6 2204 5th Avenue Greeley, CO 80631 J.W. Nelson, Facilities Supervisor 970.353.9100 Bank of Colorado 5628 West 19th Street #2 Greeley, CO 80634 Greg Ludlow, Branch Manager 970.506.0100 Catholic Charities 1311 11th Street Greeely, CO 80631 970.484.5010 Emie Giron, Exec. Director Larry E. Steele Associates $ 822,000.00 Aug '03 Jan '04 15% 2308 West 29th Street Greeley, CO 80631 Larry Steele, Architect 970.353.6363 Aller-Lingle Architects, P.C. $ 332,226.00 Aug '03 Nov'03 10% 712 Whalers Way, Bldg. B-100 Ft Collins, CO 80525 Shaun Moscrip, Architect 970.223.1820 TSP Five, Inc. $ 104,263.00 Aug'03 Oct'03 �+}6 8751 E. Hampden Ave., Ste. A-1 Denver, CO 80231 Jeff Krueger, Architect 303.695.1997 Klipp Colussy Jenks DuBois $ 76,977.00 Jun'03 Aug'03 15% 1512 Larimer Street Denver, CO 80202 Sam Miller, Architect (303)893-1990 The Morganti Group $ 181,350.00 Jun'03 Aug'03 25% 2903 Aspen Drive, Suite B Loveland, CO 80538 Marvin Morganti, President (970)887-4000 John Dangler & Associates $1,056,000.00 May'03 Sep'03 15% 5338 Highcastle Court Fort Collins, CO 80525 (970)223-1512 Projects in Progress as of 8/15/2003 Growling Bear Co., Inc., 2330 4th Avenue, Greeley, CO 80631 Phone: (970) 353-6964 Fax: (970) 353-6974 page 2 % Work Contract Scheduled W/Own Project/Description/Location Owner Architect/Engineer Amount Start Completion Forces Cheyenne Substation Mods. US Dept. of Energy Owner $ 596,306.00 Mar'03 Mar'04 40% 400 Mc Farland Drive Western Area Power Assoc. Cheyenne, WY 5555 E. Crossroads Blvd Loveland, CO 80538 Sharon Gatenby 970.461.7301 SECTION 00300 BID FORM PROJECT: TROLLEY BARN INTERIOR REHABILITATION; BID NO..5804 Place of Date q-a- 1. In compliance with your Invitation to Bid dated VZ`l/0 -;� , d subject to � all conditions thereof, the undersigned �1VL a ** (Corporation, n...... an , )** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation tc Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as foll ws:_ iM LJ � I Ca/ — �y. S. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through 7/96 Section 00300 Page 1 Sample of Historical Renovation Projects Completed Last 5 Years (more available upon request) Growling Bear Co., Inc., 2330 4th Avenue, Greeley, CO 80631 Phone: (970) 3534964 Fax: (970) 3534974 % of Work Contract Comp- With Own Project/Description/Location Owner Architect/Engineer Amount start lotion Forces Renovate Bldg 212 Warren Air Force Base Cheyenne, WY Building 207 Renovation Complete Renovation Including HVAC, Fire Protection & Electrical Warren Air Force Base Cheyenne, WY Dorm Building 244 Remodel 44,000sf Total Gut & Renovation of all systems, Warren Air Force Base Cheyenne, WY Building 314 Renovation Design/Build Proj.-Comp. Renovation HVAC, Elec., Plbg., H.C. Access, Aerobic and Dance Area - 24,000sf. Warren AFB, Cheyenne, WY F.E. Warren Air Force Base Repair 52 Historic housing units. Historic renovation of 52 family housing units - 10 phases - 2 yr project complete gut/renovation/new systems. Cheyenne, Wyoming Operational Contracting Division Building #208 F.E. Warren AFB Cheyenne, WY 82005 Lt. Mark Adams 307-773-5916 Operational Contracting Division Building #208, F.E. Warren AFB Cheyenne, WY 82005 Ms. Darlene Faulkner 307-773-3917 F.E. Warren Air Force Base Building #208 Cheyenne, WY 82005-5000 Darlene Faulkner 307-773-3917 F.E. Warren Air Force Base Building #208 Cheyenne, WY 82005-5000 Darlene Faulkner 307-773-3917 Operational Contracting Division Building #208 F.E. Warren AFB Cheyenne, Wyoming Darlene Faulkner 307-773-3917 Owner Owner Owner Growling Bear Co., Inc. 2330 4th Avenue Greeley, CO 80631 John Sohl 970-353-6964 Noel Griffith & Associates 2232 Del Range Blvd,Ste. 200 Cheyenne, WY 307-632-2705 $ 805,000.00 Nov-00 Dec.-101 $ 850,000.00 Aug-99 Apr-00 $ 3,014,352.00 Sep-98 Oct-99 $ 1,200,000.00 Apr-99 Jul-99 $ 5,250,000.00 Mar-96 Mar-98 19% 19% 30% 19% 35% BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Growling Bear Company, Inc. as Principal, and Employers Mutual Casualty Company as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado as OWNER, in the sum of $ 5%of amount bid for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation, is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, TROLLEY BARN REHABILITATION Project No. 5804 NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired. or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Page 1 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this _2nd day of September 2003 , and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL GROWLING BEAR COMPANY INC. Name: Address: 2330 4Ta Avenue (SEAL) SURETY Employers Mutual Casualty Company Address: P.O. Box 441098 Aurora, tColorado 0044-1098 By: �•`a't'Q'+'� Title: Sharon Pond Attorney In Fact (SEAL) 7/96 Page 2 No Text the Agreement Bidder acknowledgeestatthiseso�le discretionrwithout affecting the in the Bid or change quantities as the deletion or change does not exceed or prices of any item so long t (250) of the total Agreement Price. twenty-five percen RESPEC FULLY S D< Date Signature r Title 3 D licable) License Number (If App i Bi is b cc poration) (Seal / Attest: ( IA`S l Address �-.�-�- L, L'= AVE 62 Telephone Section 00300 Page 3 �/96 COLORADO DEPARTMENT OF TRANSPORTATION PROECT140. AN71•COL.L.USION AFFIDAVIT ` A -so N t�vw� 5 Sir r I hereby attest that I am the person responsible within my firm for the final decision as to the price(s) and amount of this bid or, if not, that I have written authorization, enclosed herewith, from that person to make the statements set out below on his or her behalf and on behalf of my firm- 1 further attest that: f _ The price(s) and amount of this bid have been arrived at independently, without consultation, communication or agreement for the purpose or with the effect of restricting competition with any other firm or pennon who is a bidder or potential prima bidder. 2A. Neither the price(s) nor the amount of this bid have been disclosed to any other film or person who is a bidder or potential prima bidder on this project, and will not be so disclosed prior to bid opening. 2B. Neither the prices nor the amount of the bid of any other firm or person who is a bidder or potential prime bidder on this project have been disclosed to me or my firm. 3A. No attempt has been made to solicit, cause or induce any firm or person who is a bidder or potential prime bidder to refrain from bidding on this project, or to submit a bid higher than the bid of this firm, or any intentionally high or non- competitive bid or other form of complementary bid, 3B. No agreement has been promised or solicited for any other firm or person who is a bidder or potential prime bidder on this project to submit an intentionally high, noncompetitive or other form of complementary bid on this project. 4. The bid of my firm is made in good faith and not pursuant to any consultation, communication, agreement or discussion with, or inducement or solicitation by or from any firm or person to submit any intentionally high, noncom- petitive or other form of complementary bid, S. My firm has not offered or entered into a subcontract or agreement regarding the purchase or sale of materials or services from any firm or person, or offered, promised or paid cash or anything of value to any firth or person, whether in connection with this or any other project, in consideration for an agreement or promise by any firm or person to refrain from bidding or to submit any intentionally high, noncompetitive or other form of complementary bid or agreeing or promising to do so on this project. s. My firm has not accepted or been promised any subcontract or agreement regarding the sale of materials or services to any firm or person, and has not been promised or paid cash or anything of value by any firm or person, whether in connection with this or any other project, in consideration for my firm's submitting any intentionally high, noncompetitive or other form of complementary bid, or agreeing or promising to do so, on this project. 7. 1 have made a diligent inquiry of all members, officers, employees, and agents of my firth with responsibilities relating to the preparation, approval or submission of my fir m's bid on this project and have been advised by each of them that he or she has not participated in any communication, consultation, discussion, agreement, collusion, or other conduct inconsistent with any of the statements and representations made in this affidavit. 8. 1 understand and my firm understands that any misstatement in this affidavit is and shall be treated as a fraudulent concealment from the Colorado Department of Transportation, of the true facts relating to submission of bids for this contract. I DECLARE UNDER PENALTY OF PERJURY IN THE SECOND DEGREE, AND ANY OTHER APPLICABLE STATE OR FEDERAL LAWS. THAT THE STATEMENTS MADE ON THIS DOCUMENT ARE TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. Cg1MYacfs l'vm or�npany rmAlme � gy , 09te 2ed oanbaaorsdim, or obtrpbry name. (it Ohl vomfe.) Ry Me Tea Sworn to before me this ,� j day of, 2003 (Ay mYmi oXpims / LW NOTE.. This document must be signed in ink. apoY F r MW IA2 LORADO DEPARTMEOF TRANSPORTATIONERTIFICATION OF EEO COMPLIANCE rC Instructions: Bidders and subcontractors must complete and submit this form with bid proposals for federally funded contracts greater than $10,000. This is required by the Equal Employment Opportunity Regulations 141 CFR 60-1.7(b) (1)]. The regulation also requires that R you have participated in a previous contract or subcontract and have not filed a Standard Form 100 (EEO- 1), you cannot be awarded this contract. You may file a report covering the delinquent period for consideration by the Federal Highway Administration or the Director of the Office of Federal Contract Compliance, U.S. Department of Labor. The Standard Form 100 (EEO-1) may be requested from the: Joint Reporting Committee P.O. Box 779 Norfolk, VA 23601 (757) 461-1213 1. Yes Q No I have developed and have on file at each establishment an affirmative action program as required by 41 CFR Chapter 60, Part 60-2 2. , Yes U No I have participated in a previous oontract/suboontract subject to the equal opportunity clause. 3. Yes ❑ No I have filed with the Joint Reporting Committee, the Director, or the Equal Employment Opportunity Commission all reports due under the applicable filing requirements_ I declare under penaltyof perjury in the second degree and any other applicable state or federal laws, that the state- ments made in this document are true and complete to the best of my knowledge. company ���N,, �F✓at �. G, bidder U proposed subcontractor er• rme: I cow raft fU7 Tim SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Growling Bear Company (Inc.) 2. Permanent main office address: 2330 4th Avenue Greeley, CO 80631 3. When organized:1974 4. If a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name? qq 6_ Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) Please See Attached 7. General character of Work performed by your company: General Construction 8. Have you ever failed to complete any Work awarded to you? If so, where and why? NO 9. Have your ever defaulted on a contract? If so, where and why? NO 10. Are you debarred by any government agency? NO If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12. List your major equipment available for this contract. 13. Experience in construction Work similar in importance to this project: Please see Attac 14. Background and experience of the principal members of your organization, including officers: Please See Attached 15. Credit available: $ 500,000 16. Bank reference: Centennial Bank of The West 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General CONTRACTOR? Yes What If yes, in what city, county and state?Fort "- ^y CO -- class, license and numbers? B-310 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? and to whom? 20. Are any lawsuits pending against you or your firm at this time? NO yes, If DETAIL Section 00420 Page 2 7/96 21. What are the limits of your public liability? DETAIL 3,000,000 From Employees Mutual What company? Employees Mutual 22. What are your company's bonding limitations? 20,000,000 23. The undersigned corporation to verification of Qualifications. Dated at hereby authorizes and requests any person, firm or furnish any information requested by the OWNER in the recital comprising this Statement of Bidder's this 2 day of September , 2003• Growling Bear Co. (Inc.) Name of Bidder By:Kevin Shironaka Title: President State of Colorado County of Weld Kevin Shironaka being duly sworn deposes and says that he is President of Growling Bear Co. (Inc.) and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this 2 day of September Notary Public My commission expires 7/96 Section 00420 Page 3 0 a SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and ail subcontractors performing over 20e of the contract. �ITEM lA l7Li� )z0(1 A- �rlc 7/96 SUBCONTRACT R �P. SUBCONTRACT Section 00430 Page 1