HomeMy WebLinkAboutRESPONSE - BID - 5800 POUDRE TRAIL REHABILITATION (9)SECTION 00300
BID FORM
PROJECT: POUDRE TRAIL REHABILITATION; BID NO. 5800
Place Fort Collins, Colorado
Date July 28, 2003
1. In compliance with your Invitation to Bid dated July 2, 2003 ,
and subject to all conditions thereof, the undersigned
Sun Construction & Design Services, Inc. a ** (Corporation, �sxaxCc�xcixk�cicLyxXxxalxacac
�iax�tzxD[$psa�xtxgt�paXXxcx8ffi$xx�$�g�s** authorized to do business
in the State of Colorado hereby proposes to furnish and do everything
required by the Contract Documents to which this refers for the
construction of all items listed on the following Bid Schedule or Bid
Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal
is made in good faith, without collusion or connection with any other
person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation
to Bid and Instructions to Bidders, the Agreement, the detailed
Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of 5% of estimated Project value ($
) in accordance with the Invitation To Bid and
Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this Bid.
The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
The Linden Company, 4100 East Mississippi Avenue,.Suite 900, Denver, CO 80246
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by the
CONTRACTOR under one of the items listed in the Bid Schedule, irrespective
of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through 1
7/96 Section 00300 Page 1
CONTRACTOR'S LICENSE NUMBERS
CITY
LICENSE #
EXPIRES
In Renewal Process
City of Aurora
2003 037712 00 CL Class B
1/l/03
Errol Unverzagt Supervisor Certification E011598
11/30/03
City of Boulder
LIC-0001670-08
5/15/03
City of Boulder -Right -of -Way LIC-000167-28
5/15/03
City of Broomfield
Class A — A2003-529
12/31/03
City of Cheyenne
Class B — 03 05174
8/15/03
Larry Hill Certificate Holder
035175
8/15/03
In Renewal Process
City of commerce City
Class B 102270
I V31/02
City of Denver
Bldg. B 18209
8/31/03
John Sargent Certificate Holder #1016167
5131105
City of Erie
1388 Class A
12/31/03
City of Federal Heights
94-0129
12/31/03
City of Fort Collins
C-1 #84
4/18/04
John Sargent Certificate Holder #872
4/18/04
Town of Frederick
03-112
12/31/03
City of Golden
328
7/22/03
City of Lafayette
Class A 103-220
1/31/04
City of Longmont
Class A - A-00000002
6/30/03
City of Louisville
Class A — 00273
12/31/03
In Renewal Process
City of Loveland
Class 12220
11/03/02
City of Thornton
A2447
8/31/03
City of Westminster
Class A -63599
6/30/03
Updated 4n103
2001
Job Name
Contract Amount
VALLEY FORD DEALERSHIP
$2,748,406.00
F&PS BUILDING 9 CHILLER ADDITION
$1,612,528.00
WALL TECH NEW BUILDING INSTALL
$1,514,928.24
CSU WAGAR CONT MAINTENANCE
$1,166,796.00
STA LABS NEW OFFICE/LAB
$1,045,817.21
SIGNAL SOFT RENOVATION
$693,453.21
ARAMARK COORS LUNCHROOM
$667,924.00
GILEAD 2970 PHASE I OFFICE RENOVATION
$662,635.93
GSA CDC LAB REMODEL
$573,674.89
AT&T HVAC BUILD OUT
$547,852.00
AVAYA CELESTICA DEMISING
$529,600.76
SUN CONSTRUCTION 2001 NEW BUILDING ADDITION
$518,356.00
STURGEON METRO WASTE WATER
$513,248.00
JACOBS COORS U3 UPGRADES
$384,249.00
MARKETWISE 3RD INTERIOR FINISH
$355,000.00
JACOBS COORS U5 EXIT UPGRADE
$296,511.00
RAYTHEON TRENCH FIBRO DUET
$257,552.52
F&PS BUILDING 9 STEEL ERECT
$246,197.00
F&PS BUILDING 2 NCFC
$245,629.00
GILEAD 2ND FLOOR OFFICE RENOVATION
$228,413.73
F&PS BUILDING 6 COMMERCIAL CENTER
$221,991.00
VALLEY SUBARU REMODEL
$221,520.97
CSU OLD FTC HIGH ELEVATOR
$184,921.00
CU-FAC EXTERIOR LIGHT UPGRADES
$180,544.00
BW SYSTEM DENVER MINT
$175,729.00
AVAYA Q&R LABS
$175,361.00
WELD COUNTY WEST ANNEX
$159,059.00
CU-FAC STANDING ORDER T&M
$153,259.16
UNC SIGN PROJECT
$151,062.00
CENTRAL FIRE CU KETCHUM FIRE
$148,237.00
CU-FAC FARRAND HALL ARCH
$144,516.14
CU-FAC CIRES CATWALK
$135,873.00
AMGEN LONGMONT STANDING ORDER
$127,309.50
PRATT HAWTHORN SITE REMODEL
$126,749.00
F&PS BUILDING 25-1 ALTER CUBE
$122,529.00
ADAMSI2 AUTO SHOP
$122,372.00
RAYTHEON SKIF 3RD FLOOR
$121,328.50
CELESTICA GATE 3 ENTRY
$117,387.00
UNC TENNIS COURT REPLACE
$115,727.00
PRATT MAXTOR
$106,522.94
TOTAL GROSS VOLUME 2001 $18,368,623.00
2000
Job Name
Contract Amoun
AMGEN AC22 BUILD OUT
$1,2 .0
CSU LAUREL HALL
50,203
$ ,.0
IBM BUILDING 6 CUBICLE SPACE
676,291.0
$676
GILEAD NEXSTAR PHARMACEUTICAL (2860)
$591,843.0
GILEAD NEXSTAR PHARMACEUTICAL
$449,405.0
IBM BUILDING 25-2 BUILD OUT
$430,394.0
UNC BUTLER HANCOCK
$422,683.0
AT&T ADMINISTRATION RELOCATE
$276,856.0
CSU HUGHES STADIUM
$263,048.0
YMCA BOULDER LOCKER ROOM
$262,536.0
FRCC PENTHOUSE MODIFICATIONS
$222,193.0
LEXMARK BUILDING 31 PACKAGING
$200,000.0
HP BUILDING 6 LOBBY REMODEL
$197,000.0
LUCENT BUILDING 30 CONFERENCE ROOM
$195,884.0
IBM BUILDING 6 FIBER OPTICS
$192,791.0
CSU CDC REMODEL
$170,940.0
IBM BUILDING 6
$170,057.0
UNC RESIDENCE HALL LANDSCAPE
$160,625.0
CITY OF LONGMONT WASTE WATER
$146,778.0
CICSCO WASTE WATER —FRITO LAY
$121,347.0
AT&T PROSPECT VALLEY VANDALISM
$115,491.0
PIC MH3BCH COORS BREWING
$107,333.0
MISC. STANDING ORDER JOBS UP TO $100k
$14,421,575.0
TOTAL GROSS VOLUME 2000
$_2242,247.0
COLORADO VOLUME
$22,342,247.0
OUTSIDE COLORADO VOLUME
$0.0
1999
Job Name
Contract Amount
LUCENT TOILET RENOVATIONS
$2,218,099.00
HILLESHOG MONO-HY
$1,416,800.00
ADA, PHASE II MODIFICATIONS
$1,189,700.00
SUPERIOR TOWN HALL REMODEL
$607,562.00
AT&T ZUNI MMOC6
$517,873.00
COORS NB 1 SOUTH EXTERIOR STAIR
$509,425.00
RAYTHEON REMODEL 3RD FLOOR
$403,868.00
AT&T CHEYENNE MAIN RE -ROOF
$383,843.00
AT&T BATTERY ROOM PROJECT -MEAD
$351,628.00
LSI HARMONY BUILDING KITCHEN
$351,576.00
AT&T ZUNI BATTERY ROOM
$330,919.00
AT&T ZUNI IAQ PROJECT
$296,000.00
CU ENGINEER CENTER CHILLED H2O
$288,366.00
CSU EDDY FLOOD WALLS
$270,258.00
HELM CONST-MOORE MIDDLE SCHOOL
$249,682.00
SOUTH AGGIE VILLAGE
$233,879.00
AT&T WYOMING REGEN HVAC
$219,795.00
UNC BIKE TRAIL PHASE II
$215,899.00
COORS CELLAR 8 SOUTH STORAGE UPGRADE
$208,185.00
COORS SOUTHEAST STAIR ENCLOSURE
$200,201.00
UNC ADA PHASE II SITE IMPROVE
$189,151.00
AT&T 4TH FLOOR VESTIBULE
$180,581.00
ADAMS 12 WESTLAKE MIDDLE SCHOOL
$174,301.00
F&PS - IBM BUILDING 25 DEMO
$170,245.00
F&PS - IBM BUILDING 22 CALL CENTER
$168,982.00
ELEVATOR UPGRADE
$167,500.00
DENTAL HEALTH - NEW CLINIC
$161,759.00
CICSCO UNLOAD BUILDING FRITO LAY
$157,259.00
DR. MCCARTY DENTIST OFFICE
$155,320.00
CASE- LOGIC SOUTH RESTROOM ADDITION
$133,065.00
CENTER DISEASE CONTROL BSL3-LB
$133,014.00
CSU CLARK HALL
$123,517.00
CU HOUSE HARD; LIBBY HALL DOOR
$116,839.00
MISC. STANDING ORDER JOBS UP TO $100k
$6,128,907.00
TOTAL GROSS VOLUME 1999
$18,624,000.00
COLORADO VOLUME
$18,236,257.00
OUTSIDE COLORADO VOLUME
$387,743.00
1998
Job Name
Contract Amount
NCC WEST EXPANSION
$1,416,800.00
AT&T NGLN PHASE 2
$1,188,521.00
RHBU AREA FIT -UP
$1,185,033.00
MOUNTAIN VIEW COMPONENTS
$805,779.00
GIBBONS BUILDING
$667,365.00
CELLAR 9 STAIRS & CATWALK
$650,461.00
SINDELIR REMODEL
$650,461.00
AT&T NCC WEST SYSTEM 85 HVAC
$602,306.00
BUILDING 8 RHTC RELOCATE
$441,733.00
STK BUILDING 8 MPBG OFFICE FIT -UP
$415,344.00
AT&T NGLN PHASE 1
$399,958.00
EXEC. LOBBY & CONFERENCE ROOM
$356,232.00
IBM BRS REMODEL
$235,967.00
SINDELIR WAREHOUSE
$222,241.00
REMODEL SECOND FLOOR
$208,576.00
CIGNA 4TH GENERATOR
$205,087.00
IBM BUILDING 26 REMODEL OFFICES
$169,647.00
UCAR ATRIUM TENANT FINISH
$148,151.00
RESTROOM UPGRADE PHASE 6 FIT -UP
$145,693.00
UNIVERSITY VILLAGE PHASE 3
$145,426.00
BATHROOM RENOVATION PHASE V FIT -UP
$140,738.00
RESTROOM UPGRADE PHASE VII FIT -UP
$137,791.00
BUILDING 2 CLASSROOM FIT -UP
$111,013.00
MISC. STANDING ORDER JOBS UP TO $100k
$6,165,531.00
TOTAL GROSS VOLUME 1998
$21991f63100
COLORADO VOLUME
$19,916,383.00
OUTSIDE COLORADO VOLUME
$2,075,248.00
Sun Construction $ Design Services, Inc.
General Contractor
Company Owned Equipment - Rental Rates
Description 0A Days Used Daily Rate Weekly Rate Monthly Expendables Extension
Telescopic Manlift - 24' �a nn nn cyan nn Bann nn
Scissor Lift - 24'
$110.00
$270.00
$850.00
Scissor Lift - 20'
$85.00
$240.00
$750.00
Scissor Lift -18'
$85.00
$240.00
$650.00
12' 1 Ton Trucks
$180.00
$350.00
$550.00
Fuel
16 2 Ton Trucks
$180.00
$350.00
$550.00
Fuel
69 Extension Ladder
$35.00
$100.00
$350.00
Laser & Tripod
$45.00
$135.00
$450.00
TP 800 Chipping Hammer
$30.00
$100.00
$300.00
Electric Jack Hammer 40#
$50.00
$150.00
$450.00
Gas Welder
$40.00
$120.00
$400.00
Gas
Wire Welder
$55.00
$150.00
$200.00
Wire
Torch & Gas Tanks
$30.00
$90.00
$300.00
Gas -
Large Hammer Drill
$25.00
$80.00
$290.00
6000 # Fork Lift
$275.00
$900.00
$3,000.00
Fuel
Walk behind Saw
$60.00
$180.00
$425.00
Blades
Compressor & Jack Hammer
$100.00
$300.00
$800.00
Gas
45' Snorkel Lift
$375.00
$800.00
$1,800.00
Gas
Scaffolding r section
$10.00
$30.00
$50.00
Texture Machine
$30.00
$90.00
$300.00
Large Generator
$35.00
$140.00
$425.00
Gas
Demo Saw with Blades
$50.00
$150.00
$275.00
Blades
2.5 Cubic Feet Concrete Mixer
1
$25.00
$75.00
$300.00
4 Cubic Feet Concrete Mixer
$50.00
$150.00
$450.00
62' Snorkel Lifts
$400.00
$1,200.00
$3.500.00
Gas
10,000# all terrain Forklift
$400.00
$1,200.00
$3,500.00
Gas
Equipment Rental Rates
Updated 2/19/02
Personnel Profile
(Continued)
Tim Strong
Operations Manager / Project Manager
Years of Experience: 21
Tim's responsibilities through the years with the company have grown and changed as the needs
have arisen. His position as Operations Manager requires his attention to labor and personnel
issues, office and yard management, policy implementation, fleet and equipment management,
quality control, safety and training. Tim's Project Manager experience has allowed him to work
on multiple projects ranging from high tech facilities maintenance, pharmaceutical offices and
labs, higher education campus projects, ground up construction, design build projects and tenant
finish build -outs.
Mark McMahon
Project Manager - Cabinet Shop
Years of Experience: 24
Before taking the position as the Project Manager for the Cabinet Shop, Mark worked eleven
years at Sun Construction. After six years as a project superintendent, Mark took on the duties of
managing Sun Construction's Cabinet Shop. The Cabinet Shop has serviced Sun Construction
for 16 years, and specializes in standard wood and plastic laminate casework fabrication and
millwork. Projects have varied from restaurants and kitchens to labs and classrooms. The
Cabinet Shop has completed projects for CU Boulder, CSU, University of Colorado Health
Sciences Center, IBM, Amgen, Hewlett Packard, Lucent Technologies, just to name a few.
Anthony M. Landi, Jr.
Project Manager
Years of Experience: 25
Tony has a B.A. in Architecture from Kent State University. After receiving his architect's
license, he worked for an interior contractor in Cleveland, whose projects included new tenant
finish, shopping centers, hotels and hospitals. In 1987, he opened his own interior contracting
company, which he owned and operated until his move to Colorado in 1997. He is currently
project manager for a variety of projects including tenant improvement jobs, ground -up new
construction and design built projects.
Personnel Profile
(Continued)
George Warner
Project Manager
Years Experience: 40
With an extensive background and 40 years of experience in architecture and construction,
George has coordinated and managed the construction of a variety of projects. These projects
have ranged from relatively small tenant finish projects to large and complex retail, industrial,
institutional and public works projects. Thoroughly versed in all aspects of construction project
management, he is proficient in maintaining cost and the established construction schedule.
George is experienced in effectively interfacing with the client to produce a high quality finished
product.
Dennis L. Haney
Project Manager
Years of Experience: 29
Dennis has served as a senior landscape architect and project manager at the University of
Colorado - Boulder campus for 20 years. He has prior work experience including three (3) years
in private practice and two (2) years in the Peace Corps. Dennis has gained a wide variety of
experience in building construction; renovation; planning; budgeting; specification writing; cost
estimating; project management as well as landscape and irrigation design and construction. His
experience, proven organizational skills and effectiveness contribute significantly to his projects'
success.
Tom Gilliland
Project Manager
Years of Experience: 32
Tom comes from the Project Control Group of Coors Brewing Company where he served as a
project estimator for 15 years. He has estimated projects valued up to $20 million with an
expertise in structural and mechanical construction. Tom is currently responsible for work
throughout the northern metropolitan Denver area with projects ranging from renovations and
additions to new facilities.
Personnel Profile
(Continued)
R. J. (Bob) Ferenc
Staff Architect
Years of Experience: 33
Bob comes to Sun with a diverse background in the full service design -build arena. His career in
building began early with immersion in general construction trade work for his father, a
Colorado custom -builder. This grounding in the practical side of design -build relationship was
broadened by advanced academic training on the design side of the equation, culminating in
licensing as an Architect. His career has encompassed industrial design, facilities planning,
design & management, and construction project management on projects up to $25 million. His
past clients include Colorado Memory Systems; Hewlett-Packard; Storage Technology
Corporation; ARAMCO (Saudi Arabia); U.S. Dept. of Energy, Sandia Labs; The University of
Colorado; Rocky Mountain Solar Glass; and numerous private commercial, ecclesiastic, and
residential entities.
David Bode
Project Manager
Years of Experience: 14
David employs practical working knowledge of the construction industry with over 14 years of
field and management experience in design build, construction management and construction
projects. David is currently engaged in project management at Colorado State University and
pursues tenant, finish and construction opportunities in the Northern Colorado metro area,
including State and Federal projects.
Joel Johnson
Project Manager
Years of Experience: 29
Before taking a Project Manager position, Joel held a Project Superintendent position with Sun
Construction. He has been regularly involved in projects at Lexmark and the IBM Facility in
Boulder for the past 24 years. Joel has been involved with tenant finish, interior and exterior
demolition, all phases of concrete and additions to various buildings on the IBM campus,
including recently completing a $2 million chiller building addition. Joel started out working as
a laborer/carpenter for his father in residential construction, was employed by a painting
contractor for 2 years and then returned to commercial general contracting as a laborer, worked
into carpenter, foreman and then superintendent.
Personnel Profile
(Continued)
Douglas Wagner
Project Manager
Years of Experience: 20
Doug has provided comprehensive project management services for a variety of facilities in the
Western region for 20 consecutive years. Starting out as a sheet metal craftsman for a
mechanical firm in the Southwest, he understands and appreciates the efforts and skills it takes to
make a construction project a success. In 1986, Doug received a Bachelor of Science degree
from The School of Engineering and Applied Sciences at Arizona State University and started
his career in construction management. With projects ranging from $100,000 to over $24
million, he has extensive experience with office buildings, light industrial buildings, auditoriums,
classrooms, high -end tenant finish, along with general practice medical offices, hospital bed
tower, and outpatient surgery centers.
Mark Lepro
Assistant Project Manager
Years of Experience: 10
Mark has an associate's degree in architectural and mechanical drafting, and a two-year
certificate of completion in drafting, Mark has extensive training in the computer aided drafting
field. He has experience on the following systems: AutoCAD, versions 12-14, AutoCAD 2000,
Pro -Engineer, and Draft Choice. Along with the CAD training Mark also has a good deal of
knowledge in Microsoft windows 98-2000, Microsoft Excel, Microsoft Project, and
programming and HTML experience. Mark has experience working in the field with residential
homebuilders, electricians, and painting contractors as well. His responsibilities include: Drafting
plans, shops, elevations, etc., estimating, project coordination, bid administration, client
relations, budget spreadsheets and the many other tasks that project management includes.
Ginni Ayres
Assistant Project Manager
Years of Experience: 11
Ginni has work with residential homebuilders as well as commercial general contractors. She
has been involved with renovation, design -build and ground up projects. Ginni has worked with
a variety of Owners including State and Government Projects. She acts as the principal
coordinator for project manager assistants for the Company.
Sun Cons uction & De 'gn Services, Inc.
CONTR T R
BY:
William B. Prout
Vice President/General Manager
ADDRESS: 1232 Boston Avenue
Longmont, Colorado 80501
8. BID SCHEDULE (Base Bid)
Please use the attached Bid Schedule when submitting your bid.
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid
or change quantities at his sole discretion without affecting the Agreement
or prices of any item so long as the deletion or change does not exceed
twenty-five percent (25%) of the total Agreement Price.
RESP C FULLY S MIT E
July 28, 2003
Signature William B. Prout Date
Vice President/General Manager
Title
C-1 #84
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:-2
Pamela K. Belcamino
Address 1232 Boston Avenue
Longmont, Colorado 80501
Telephone 303-444-4780
7/96 Section 00300 Page 2
Personnel Profile
(Continued)
Andy Welch
Operations Coordinator
Years of Experience: 10
Andy has worked up through the trades, starting as a laborer and working his way through
superintendent, on to assistant project manager and Operations Coordinator. While starting as an interior
finish apprentice in residential construction, Andy made the move to commercial construction where he
has been responsible for all carpentry and supervisory levels of construction. In his current capacity
Andy handles labor distribution and various other aspects of human resources and safety. Andy also acts
as a project manager including estimating, quality control and labor management.
Sun Construction & Design Services, Inc.
General Contractor
ATTACHMENT 4.1
AIA 305 - General Contractor's Qualification
Architectural and Trade References
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
Sun * as Principal, and United States Fire Insurance Company
as
Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado
as OWNER, in the sum o� SFive Percent of** for the payment of which, well and
truly Co be made, we hereby jointly and severally bind ourselves, successors, and
assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby
made a part hereof to enter into a Construction Agreement for the construction of
Fort Collins Project, POUDRE TRAIL REHABILITATION; BID NO. 5800.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a
Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnimhing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of .,a.id Bid,
then this obligation .shall be void; othr_rwi_e the same shall remain in
force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims liereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations
of said Surety and its BOND shall be in no way impaired or affected by any
extension of the time within which the OWNER may accept such Bid,, and said Surety
does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the
State of Colorado and be accepted by the OWNER.
*Construction & Design Services, Inc.
**Total Amount Bid (5%)
1/96 Section 0041.0 Page 2
IN WITNESS WHEREOF, the Princep 41 and the Surety hne hereunto set their hands
and seals this 24th day of `'u y , 20 , and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set forth
above.
PRINCIPAL
Sun Construction & Design
Name: garuirpQ - Tnr -
Address:-1232 Boston Ave.,
n olo-"'o 805AOI
By:
Wi iam- rout
Title: Vice President/General Manager
ATTEST:
By - �ex2thAj"4��
Pamela K. Belcamino
(SEAL)
SURETY
United States Fire Insurance Company
P.O. Box 469025
Denyer, Colorado 80246-9025
By: VVY1
Title:Pamela J. ansen, Attorney -In -Fact
(SEAL)
i/96 Section 00410 Page 3
POLICY NUMBER: Bid Bond IL 09 85 01 03
THIS ENDORSEMENT IS ATTACHED TO AND MADE PART OF YOUR POLICY IN
RESPONSE TO THE DISCLOSURE REQUIREMENTS OF THE TERRORISM RISK
INSURANCE ACT OF 2002. THIS ENDORSEMENT DOES NOT GRANT ANY COVERAGE
OR CHANGE THE TERMS AND CONDITIONS OF ANY COVERAGE UNDER THE POLICY.
DISCLOSURE PURSUANT TO TERRORISM RISK
INSURANCE ACT OF 2002
SCHEDULE"
Terrorism Premium (Certified Acts)
$ -0-
Additional information, if any, concerning the terrorism premium:
Information required to complete this Schedule, if not shown on this endorsement, will be shown in the
Declarations_
A. Disclosure Of Premium
In accordance with the federal Terrorism Risk
Insurance Act of 2002, we are required to provide
you with a node disclosing the portion of your
premium, if any, attributable to coverage for
terrorist acts certified under that Act. The portion of
your premium attributable to such coverage is
shown in the Schedule of this endorsement or in
the policy Declarations.
B. Disclosure Of Federal Participation In Payment
Of Terrorism Losses
The United States Government, Department of the
Treasury, will pay a share of terrorism losses
insured under the federal program. The federal
share equals 90% of that portion of the amount of
such insured losses that exceeds the applicable
insurer retention.
IL 09 35 01 03 c3 ISO Properties, !nc., <003 Page 1 of 1 ❑
POWER OF ATTORNEY
UNITED STATES FIRE INSURANCE COMPANY 180500
PRINCIPAL OFFICE, NEW YORK, N.Y.
KNOW ALL MEN BY THESE PRESENTS: That the UNITED STATES FIRE INSURANCE COMPANY a Corporation duly
organized and existing under the laws of the State of New York, and having its administrative offices in the Township of Morris, New
Jersey, has made, constituted and appointed, and does by these presents make, constitute and appoint Kevin W. McMahon, Donald
E. Appleby, Frank C. Penn, Pamela J. Hansen, Dilynn Guern, Gloria C. Blackburn, Kristen L. McCormick, and Florietta
Acosta, of Denver, Colorado, each
its true and lawful Agent(s) and Attomey(s)-in-Fact, with full power and authority hereby conferred in its name, place and
stead, to execute, seal, acknowledge and deliver: Any and all bonds and undertakings----------------- --------
-
----------- —----------------------------- ------------------------------ --- - -----------------------------------
and to bind the Corporation thereby as fully and to the same extent as if such bonds had been duly executed and
acknowledged by the regularly elected officers of the Corporation at its offices in Morris Township; New Jersey, in their
own proper persons.
This Power of Attorney limits the act of those named therein to the bonds and undertakings specifically named therein,
and they have no authority to bind the Company except in the manner and to the extent therein stated.
This Power, of Attorney, revokes all previous powers issued in behalf of the;attomey(s)-in-fact named above.
IN WITNESS WHEREOF the United States Fire insurance Company has caused these presents to be signed and attested
by its appropriate officers and its corporate seal hereunto affixed this 2°d. day of July. 2002.
UNITED STATESIRE INSURANCE COMPANY
Vice President
Craig M. Golden
STATE OF NEW JERSEY)
ss.:
COUNTY OF MORRIS )
On this 2_° day of 7uly, 2002, before the subscriber, a duly qualified Notary Public of the State of New Jersey, came the
above -mentioned Vice President and Assistant Secretary of United States Fire Insurance Company, to me personally
known to be the officers described in, and who executed the preceding instrument, and they acknowledged the execution
of the same, and being by me duly sworn, deposed and said, that they are the officers of said Company aforesaid, and that
the seal affixed to the preceding instrument is the Corporate Seal of said Company, and the said Corporate Seal and their
signatures as officers were duly affixed and subscribed to the said instrument by the authority and direction of the said
Company.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my seal at the Township of Morris, the day and
year first above written.
(Signed) :\E A`•S/Nc44��i
OTA)q •.�
(Seal) _ UQ /'
•.,,(/.B1... -k
�w/��� J EFtr?(i�����
Notary Public
Catherine A Sincavage
Notary Public of New Jersey
My Commission Expires July IS, 20%
This Power of Attorney is granted pursuantto Article IV of the By -Laws of the UNITED STATES FIRE INSURANCE
COMPANY as now in full force and effect.
ARTICLE IV Execution of Instruments. "The Chairman of the Board, Vice -Chairman of the Board, President, or any
Vice -President, in conjunction with the Secretary, or any Secretary, if more than one shall be appointed by the Board, or
an Assistant Secretary, shall have power on behalf of the Corporation:
(a) to execute, affix the corporate seal manually or by facsimile to, acknowledge, verify and deliver any contracts,
obligations, instruments and documents whatsoever in connection with its business including, without limiting the
foregoing, any bonds, guarantees, undertakings, recognizances, powers of attorney or revocations of any powers of
attorney, stipulations, policies of insurance, deeds, leases, mortgages, releases, satisfactions and agency agreements;
(b) to appoint, in writing, one or more persons for any or all of the purposes mentioned in the preceding
paragraph (a), including affixing the seal of the Corporation."
This Power of Attorney is signed and sealed under and by the authority of Article III, Section 9 of the By -Laws of the
UNITED STATES FIRE INSURANCE COMPANY as now in full force and effect.
ARTICLE III Section 9 Facsimile Signatures. "The signature of any officer authorized by the Corporation to sign any
bonds, guarantees, undertakings, recognizances, stipulations, powers of attorney or revocations of any powers of attorney
and policies of insurance issued by the Corporation may be printed facsimile, lithographed, or otherwise produced ...
The Corporation may continue to use for the purposes herein stated the facsimile signature of any person or persons who
shall have been such officer or officers of the Corporation, notwithstanding the fact that he may have ceased to be such at
the time when such instruments shall be issued."
CERTIFICATE
State of New Jersey
County of Morris
I, the undersigned, Assistant Secretary of UNITED STATES FIRE INSURANCE COMPANY, DO HEREBY CERTIFY
that the foregoing POWER OF ATTORNEY remains in full force and effect and has not been revoked and furthermore
that the above quoted abstracts of Article IV and Article III, Section 9 of the By -Laws of the Corporation are now in full
force and effect.
In Testimony Whereof, I have hereunto subscribed my name and affixed the corporate seal of the said Company, this
24th day of July 2003
By
cy>` Assistant Secretary
':' David Pesce
Project: Poudre Trail Rehabilitation
BID SCHEDULE (BASE BID)
Bid items are described in Section 01800
BID ESTIMATED UNIT ITEM
ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL
1 Mobilization 1.00 LS 4W
2 Traffic Control 1.00 LS
3 Demolition 36,643.00 SF -iLy
4 Subgrade Prep 51,732.00 sf I .(D
5 Concrete Trail
a. Yosimite Brown colored concret 43,110.00 SF {.�q
b. Standard gray concrete 3,500.00 SF Inq
6 Landscape Restoration 43,110.00 SF
7 Seeding 43,110.00 SF ,
TOTAL OF BASE BID
E1
(written) ITAG-+ Kq I66.�eS
Section 00300 Page 3
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410Bid Bond
00420Statement of Bidder's Qualifications
00430Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may be
answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: Sun Construction & Design Services, Inc.
2. Permanent main office address: 1232 Boston Avenue, Longmont, CO 80501
3. When organized: February 1985
4. If a corporation, where incorporated
Colorado
5. How many years have you been engaged in the contracting business under your
present firm or trade name? 18 Years
6. Contracts on hand: (Schedule these, showing the amount of each contract and
the appropriate anticipated dates of completion.)
Please See Attached Work in Progress
7. General character of Work performed by your company:
Concrete, misc. light metal work, cabinetry and casework door, frame and hardware
installation, painting, drywall, SAT installation, building erection
8. Have you ever failed to complete any Work awarded to you? No.
If so, where and why?
M
Have your ever defaulted on a contract?
If so, where and why?
10. Are you debarred by any government agency?
If yes list agency name.
No.
7/96 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
Please See Attached Major Jobs Completed.
12. List your major equipment available for this contract.
Please See Attached Equipment List
13. Experience in construction Work similar in importance to this
project:
Please See Attached Project Narratives.
14. Background and experience of the principal members of your organization,
including officers:
Please See Attached Personnel Profiles
15. Credit available: $ Line of Credit
16. Bank reference: First Natinnal Rank, P.O. Box 1159, Longmont, CO 80502
17. Will you, upon request, fill out a detailed financial statement and furnish
any other information that may be required by the OWNER?
Yes.
18. Are you licensed as a General CONTRACTOR? Yes.
If yes, in what city, county and state? Colorado What
class, license and numbers? Please See Attached ist of Licenses Held
19. Do you anticipate subcontracting Work under this Contract? Yes.
If yes, what percent of total contract? 80%
and to whom? Concrete, Excavation, Landscaping Subcontractors
20
Are any lawsuits pending against you or your firm at this time? No.
If
DETAIL
7/96 Section 00420 Page 2
yes,
21. What are the limits of your public liability? DETAIL
Please See Attached Certificates of Insurance
What company? First National Bank Insurance GrQup
22. What are your company's bonding limitations? $10M - Aggregate
23. The undersigned
corporation to
verification of
Qualifications.
Dated at L=gmont, CO
hereby authorizes and requests any person, firm or
furnish any information requested by the OWNER in
the recital comprising this Statement of Bidder's
this 28th day of July
Sun C n truction & De 'gn Services, Inc.
Name o id er
By:
..111161LL 1. I1Vuu
Title: Vice President/General Manager
State of
County of
Colorado
Boulder
20 03
William B. Prout being duly sworn deposes and says that he is
Vice President GM of Sun Constriction & Design Services, Inca nd that
(name of organization)
the answers to the foregoing questions and all statements therein contained are
true and correct.
Subscribed and sworn to before me this 28th day of
July 20_0.
Notary Public Pamela K. Belcamino
1232 Boston AyPnnP
Longmont, CO 80501
My commission expires
7/96 Section 00420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM . SUBCONTRACTOR
7/96
Section 00430 Page 1
JANUARY 2003-WORK IN PROGRESS
JOB NAME
AMONT
CSU: CSFS Controlled Maint
$78,263.00
RKMech: CSU Cross Conne
$1,334.00
VEECO:Training Rooms
$8,605.00
CSU:USDA
$590,139.00
RK:CSU Boiler Replace
$3,381.00
CSU:Zoology Lab Remodel
$64,563.00
CSU:Telecom Rms Phase lI
$19,452.00
RK:CSU Atmos Science
$2,027.00
RKMI:CSU Crystal Lab Cool
$874.00
Bluespruce:CUUMC Kiosk
$11,090.00
Creative:Sampsons Cabinet
$3,401.00
CUFAC: Dalward Pool
$113,853.00
Encompass:CU HVAC Upgrade
$131,396.00
CUFAC:Muenzinger Fire Spr
$384,529.00
CUFAC:Eng Ct ECCH 101
$33,106.00
CUFAC:Armory S. Entry
$31,850.00
CUFAC:Eng ECCH 1BII Lab
$118,080.00
CUFAC:Jila Concrete Pit
$28,202.00
CUFAC:Environment Design
$43,050.00
Power Motive
$60,000.00
Longmont Florist: Design
$31,200.00
CUHSC:Roof, Window
$141,937.00
FIR Greeley Stucco Repr
$10,398,00
HP:S.Outbldg Relocate
$46,453.00
CityLngmt:Power & Comm
$103,429.00
LSI: Air Separator
$1,082.00
DynaElectric:HP Pad
$3,254.00
Thompson:Music Lockers
$6,641.00
AT&T:NCC West Demo
$2,131.00
Tuscarora:Boiler Rm
$4,479.00
Valley Hyundai Remodel
$63,200.00
F&PS Pipe Labeling
$5,004.00
F&PS Export Soil
$3,904.00
F&PS Repr Polyvision Wind
$914.00
Intermtn:Cathodic
$27,222.00
F&PS:IBM Replace Door
$1,574.00
BW:US Mint Lobby
$4,842.00
Stonehedge:Police Substation
$56,775.00
Mees/Kaminski Eye Clinic
$124,539.00
TS Skyway 1822-L tenant fin
$32,000.00
LucentTed Systems Exp
$799,684.00
SCIF:Build Conference Rm
$73,189.00
C.Louisville,Cottonwood
$27,484.00
OSI Lab 252 Renovation
$16,971.00
Ward:Flex Building
$765,085.00
Longmont Fd:Engine Rm
$58,900.00
Conagra:Lower Batch Oven
$332,941.00
$4,472,427.00