HomeMy WebLinkAboutCORRESPONDENCE - BID - 5821 PEDESTRIAN BRIDGE AND BIKE (6)P. 01
TRANSACTION REPORT
NOV-12-03
WED 09:23 AM
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP
NOV-12 09:21 AM 92290846
1'25" 3 SEND
( M) OK
155
TOTAL
1M 25S PAGES:
3
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 4
BID #5821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 14, 2003 — 3:00 p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
SPECIFICATIONS
Clarificagg0 to Section 0101011.22, Summary of Work. Restoration, and Section�p�sgaoe Work.
As stated in Section 01010/1.22A, Contractor shall return all areas disturbed by the Work to their original or
better conditions in both function, topography, and appearance. All replacement vegetation shall be of the
same kind as disturbed unless otherwise approved by Owner. For example, wetlands shall be restored as
wetlands (1:1 area ratio minimum), willows restored with willows, grass with grass_ A seed mixture is
included in Section 01010/1.22B for dry land grass restoration. Plant warranty and tree protection
standards are included in Section 02950. Restoration also Includes topography. Unless otherwise
indicated by proposed contours in the Drawings, Sheet 2 of 23 (Site Plan), the topography of all disturbed
TRANSACTION REPORT P,01
MOV-04-03 TUE 02:52 PM
BROADCAST
DATE START RECEIVER TX TIME PAGES TYPE
NOTE
M# DP *
NOV-04 02:17
PM
92212907
57"
2
SEND
( M)
OK
105
02:49
PM
917205701894':K"
0
SEND
( M)
BUSY
105
02:50
PM
95324687
0
SEND
( M)
BUSY
105
02:20
PM
913036888811
59"
2
SEND
( M)
OK
105
02:21
PM
96696411
55"
2
SEND
( M)
OK
105
02:23
PM
94079484
1'12"
2
SEND
( M)
OK
105
02:24
PM
96631566
56"
2
SEND
( M)
OK
105
02:25
PM
913038333353
57"
2
SEND
( M)
OK
105
02:43
PM
95930583
58"
2
SEND
( M)
OK
105
02:28
PM
919707852515
57"
2
SEND
( M)
OK
105
02:29
PM
96866059
1'22"
2
SEND
( M)
OK
105
02:51
PM
922908eOO&
0
SEND
( M)
BUSY
105
02:32
PM
96673930
58"
2
SEND
( M)
OK
105
02:33
PM
913208527067
1101"
2
SEND
( M)
OK
105
02:45
PM
913032739354
56"
2
SEND
( M)
OK
105
02:35
PM
917404397349
58"
2
SEND
( M)
OK
105
02:47
PM
912568459760
57"
2
SEND
( M)
OK
105
02:37
PM
919703527792
1'12"
2
SEND
( M)
OK
105
02:39
PM
919703569621
57"
2
SEND
( M)
OK
105
02: S
9Y796748
0
SEND
( M)
BUSY
105
TOTAL 16M 12S PAGES: 32
TRANSACTION REPORT
P.02
NOV-04-03 TUE 02:53 PM
BROADCAST
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 3
BID 05821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 12, 2003 •- 3:00p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
SPECIFICATIONS
i. The bid opening date has been changed. The bid will be opened on November 12, 2003 at 3:00p.m. (Our
Clock).
2. Clarification to Section 01010/1.09, Summary of Work, Regulatory Requirements. Contractor is not
responsible for obtaining a 404 permit from the U.S. Army Corps of Engineers (USACE). Owner will obtain
the permit and provide a Copy to the Contractor. Contractor shall follow any special provisions of the
permit. After discussions with the USACE, it is expected that a nationwide permit will be issued for this
project. At this time, construction disturbance to the existing sand bar/island near Pier 1 is not expected to
P, 01
TRANSACTION REPORT
NOV-04-03
TUE 03:01 PM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
NOV-04 02:54
PM
92233191
59"
2
SEND
( M)
OK
106
02:56
PM
94828658
57"
2
SEND
( M)
OK
106 >K
02:57
PM
919529292909
57"
2
SEND
( M)
OK
106
02:58
PM
913207635672
1'11"
2
SEND
( M)
OK
106
03:00
PM
919703518629
57"
2
SEND
( M)
OK
106
TOTAL
5M 1S
PAGES:
10
Administrative Services
Purchasing Division
City of, Fort Collins CITY OF FORT COLLINS
ADDENDUM No. 3
BID #W21
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 12, 2003 — 3=p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
SPECIFICATIONS
1. The bid opening date has been changed. The bid will be opened on November 12, 2003 at 3:00p.m. (Our
Clock).
2. Clarification to Section 01010/1.09, Summary of Work, Regulatory Requirements. Contractor is not
responsible for obtaining a 404 permit from the U.S. Army Corps of Engineers (USAGE). Owner will obtain
the permit and provide a copy to the Contractor. Contractor shall follow any special provisions of the
permit. After discussions with the USACE, it is expected that a nationwide permit will be issued for this
project. At this time, construction disturbance to the existing sand bar/island near Pier 1 is not exnected to
,T,+***MMt(AMc>I(UUXAAXXXA)KA>K�XK XXX A*"**7 X*X%k0*9X0*AA***X**XAA A� *A*)"*A��%K%KMXXXAA*)K* *A
P. 01
TRANSACTION REPORT
NOV-04-03
TUE 03:15 PM
BROADCAST
>K
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
NOV-04 03:03
PM
95324051
1'22"
2
SEND
( M)
OK
107
03:04
PM
913037707667
56"
2
SEND
( M)
OK
107
03:06
PM
912019333961
1'27"
2
SEND
( M)
OK
107
03:07
PM
918122821485
1'13"
2
SEND
( M)
OK
107
03:14
PM
912534445168
1'02"
2
SEND
( M)
OK
107
03:10
PM
913036593243
57"
2
SEND
( M)
OK
107
TOTAL
611 57S
PAGES:
12
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 3
BID #5821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 12, 2003 — 3:00p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
SPECIFICATIONS
1. The bid opening date has been changed. The bid will be opened on November 12, 2003 at 3:00p,m. (Our
Clock).
2. Clarification to Section 01010M.09, Summary of Work, Regulatory Requirements. Contractor is not
responsible for obtaining a 404 permit from the U.S. Army Corps of Engineers (USAGE). Owner will obtain
the permit and provide a copy to the Contractor. Contractor shall follow any special provisions of the
permit. After discussions with the USACE, it is expected that a nationwide permit will be issued for this
Project. At this time, construction disturbance to the existing sand bar/island near Pier 9 is nnf ooyn f. ,a Mn
P. 01
TRANSACTION
REPORT
NOV-03-03
MON 04:04 PM
>K
�
BROADCAST
tc
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
MI« DP
X NOV-03 03:55
PM
94828658
55"
3
SEND
( M)
OK
094
03:56
PM
913207635672
1'07"
3
SEND
( M)
OK
094
03:58
PM
95324051
1'22"
3
SEND
( M)
OK
094
03:59
PM
912019333961
1'45"
3
SEND
( M)
OK
094
04:02
PM
912534445168
1109"
3
SEND
( M)
OK
094
t 04:03
PM
913036593243
55"
3
SEND
( M)
OK
094
TOTAL
7M 13S
PAGES:
18
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5821
PEDESTRIAN BRIDGE BIKE TRAIL EXTENSION AT
OVERLAND TRAIL ROAD AND CACHE LA POUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5821 Pedestrian Bridge Bike Trail Extension at Overland Trail Road and Cache
La Poudre River,
OPENING DATE: November 6, 2003, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Clarification to Section 01010/1.09, Summary of Work, Regulatory
Requirements. Contractor is not responsible for obtaining a 404 permit from
the U.S. Army Corps of Engineers. Owner will obtain the permit and provide
a copy to the Contractor. Contractor shall follow any special provisions of
the permit.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777
P. 01 >K
TRANSACTION REPORT
NOV-03-03
MON 02:39 PM
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP
NOV-03 02:38 PM 95324687
54" 3 SEND
( M) OK
093
TOTAL
54S PAGES:
3
City of Fort Collins
Administrative Services
rurcnasing Ljj sion
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5821
PEDESTRIAN BRIDGE BIKE TRAIL EXTENSION AT
OVERLAND TRAIL ROAD AND CACHE LA POUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5821 Pedestrian Bridge Bike Trail Extension at Overland Trail Road and Cache
La Poudre River.
OPENING DATE: November 6, 2003, 3:OOp.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Clarification to Section 0101011.09, Summary of Work, Regulatory
Requirements. Contractor is not responsible for obtaining a 404 permit from
the U-S. Army Corps of Engineers. Owner will obtain the permit and provide
a copy to the Contractor. Contractor shall follow any special provisions of
the permit.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777.
P.01
TRANSACTION REPORT
OCT-30-03
THU 04:00 PM
BROADCAST
DATE START
RECEIVER
TX TIME PAGES
TYPE
NOTE
M# DP
OCT-30 03:35
PM
92212907
29" 1
SEND
( M)
OK
074
03:36
PM
917205701894
33" 1
SEND
( M)
OK
074
03:59
PM
953246824
0
SEND
( M)
BUSY
074
03:38
PM
913036888811
28" 1
SEND
( M)
OK
074
03:56
PM
96696411
27" 1
SEND
( M)
OK
074
04:00
PM
94079484
0
SEND
( M)
BUSY
074
03:40
PM
96631566
28" 1
SEND
( M)
OK
074
03:41
PM
913038333353
28" 1
SEND
( M)
OK
074
03:42
PM
95930583
30" 1
SEND
( M)
OK
074
03:42
PM
919707852515
28" 1
SEND
( M)
OK
074
03:43
PM
96866059
36" 1
SEND
( M)
OK
074
03:44
PM
92290846
29" 1
SEND
( M)
OK
074
03:45
PM
96673930
30" 1
SEND
( M)
OK
074
03:46
PM
913208527067
33" 1
SEND
( M)
OK
074
03:47
PM
913032739354
27" 1
SEND
( M)
OK
074
03:48
PM
918122821485
31" 1
SEND
( M)
OK
074
03:57
PM
912568459750
28" 1
SEND
( M)
OK
074
03:50
PM
917404397349
30" 1
SEND
( M)
OK
074
03:51
PM
919703569621
28" 1
SEND
( M)
OK
074
03:51
PM
919703527792
30" 1
SEND
( M)
OK
074
TOTAL
8M 53S
PAGES:
18
�c
�
P. 01
TRANSACTION REPORT
OCT-30-03
THU 04:16 PM
SEND(M)
tc
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
Mt« DP
OCT-30 04:15 PM 92260391
56" 1 SEND
( M) OK
077
t<
�
TOTAL
56S PAGES:
1
City of Port Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #6821
PEDESTRIAN BRIDGE BIKE TRAIL EXTENSION AT
OVERLAND TRAIL ROAD AND CACHE LA POUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5821 Pedestrian Bridge Bike Trail Extension at Overland Trail Road and Cache
La Poudre River,
OPENING DATE: November 6, 2003, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Clarification to Section 01010/1.09, Summary of Work, Regulatory
Requirements. Contractor is not responsible for obtaining a 404 permit from
the U.S. Army Corps of Engineers. Owner will obtain the permit and provide
a copy to the Contractor. Contractor shall follow any special provisions of
the permit.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777.
P.01
TRANSACTION REPORT
OCT-30-03
THU 04:22 PM
BROADCAST
DATE START
RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP
OCT-30 04:17 PM
CONSTRUCTION NEWS
SV 33" 1 SEND
( M)
OK
078
04:18 PM
BUILDERS EXCHANGE
26" 1 SEND
( M)
OK
078
04:19 PM
REED!CONST*NEWS
31" 1 SEND
( M)
OK
078
04:20 PM
DAILY JOURNAL
27" 1 SEND
( M)
OK
078
04:21 PM
PLAN ROOM
44" 1 SEND
( M)
OK
078
TOTAL
2M 41S
PAGES:
5
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5821
PEDESTRIAN BRIDGE BIKE TRAIL EXTENSION AT
OVERLAND TRAIL ROAD AND CACHE LA POUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5821 Pedestrian Bridge Bike Trail Extension at Overland Trail Road and Cache
La Poudre River.
OPENING DATE: November 6, 2003, 3:OOp.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Clarification to Section 01010/1.09, Summary of Work, Regulatory
Requirements. Contractor is not responsible for obtaining a 404 permit from
the U.S. Army Corps of Engineers. Owner will obtain the permit and provide
a copy to the Contractor. Contractor shall follow any special provisions of
the permit.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777
P,01
TRANSACTION REPORT
OCT-30-03
THU 04:14 PM
t<
�
BROADCAST
DATE START
RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP
OCT-30 04:07 PM
92233191
29" 1 SEND
( M)
OK
075
04:03 PM
919529292909
27" 1 SEND
( M)
OK
075
04:03 PM
913037610505
29" 1 SEND
( M)
OK
075
04:04 PM
919703518629
27" 1 SEND
( M)
OK
075
04:13 PM
913037707667
0 SEND
( M)
BUSY
075
04:14 PM
9226039P e kC
**' 0 SEND
( M)
BUSY
075
TOTAL
1M 52S
PAGES:
4
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5821
PEDESTRIAN BRIDGE BIKE TRAIL EXTENSION AT
OVERLAND TRAIL ROAD AND CACHE LA POUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5821 Pedestrian Bridge Bike Trail Extension at Overland Trail Road and Cache
La Poudre River.
OPENING DATE: November 6, 2003, 3:OOp.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Clarification to Section 01010/1.09, Summary of Work, Regulatory
Requirements_ Contractor is not responsible for obtaining a 404 permit from
the U.S. Army Corps of Engineers. Owner will obtain the permit and provide
a copy to the Contractor. Contractor shall follow any special provisions of
the permit.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777.
P. 01
TRANSACTION REPORT
NOV-10-03
MON 10:03 AM
BROADCAST
DATE START
RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP >K
�
>K
NOV-10 09:55 AM
96866059
1'53" 3 SEND
( M)
OK
127
10:03 AM
92290846 4gk�
**'**" 0 SEND
( M)
BUSY
127
09:58 AM
912568459750
1'14" 3 SEND
( M)
OK
127
TOTAL
3M 7S
PAGES:
6
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 4
BID #5821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 14, 2003 — 3:00 p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
SPECIFICATIONS
Clarification to Section 01010/1 222. Summary of Work Restoration, and Section 02950, Landscaog Work_ .
As stated in Section 01010/1.22A, Contractor shall return all areas disturbed by the Work to their original or
better conditions in both function, topography, and appearance. All replacement vegetation shall be of the
same kind as disturbed unless otherwise approved by Owner. For example, wetlands shall be restored as
wetlands (1:1 area ratio minimum), willows restored with willows, grass with grass. A seed mixture is
included in Section 0101011,22E for dry land grass restoration. Plant warranty and tree protection
Standards are included in Section 02950. Restoration also includes topography. Unless otherwise
indicated by proposed contours in the Drawings, Sheet 2 of 23 (Site Plan), the topography of all disturbed
areas shall be restored to match existing topography subject to the maximum permissible deviation from
P.02
TRANSACTION REPORT
OCT-30-03 THU 04:01 PM
BROADCAST
City of Fort Collins
EMMEM
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. Z
BID #5821
PEDESTRIAN BRIDGE BIKE TRAIL EXTENSION AT
OVERLAND TRAIL ROAD AND CACHE LA POUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5821 Pedestrian Bridge Bike Trail Extension at Overland Trail Road and Cache
La Poudre River.
OPENING DATE: November 6, 2003, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Clarification to Section 0101011.09, Summary of Work, Regulatory
Requirements. Contractor is not responsible for obtaining a 404 permit from
the U.S. Army Corps of Engineers. Owner will obtain the permit and provide
a copy to the Contractor. Contractor shall follow any special provisions of
the permit.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777.
P. 01
TRANSACTION REPORT
NOV-03-03
MON 02:12 PM
>K
�
BROADCAST
>K DATE. START
RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP >K
092
NOV-03 02:11 PM
9532468f%
*X'**" 0 SEND
( M) BUSY
02 : 12 PM
94079484
0 SEND
( M) BUSY
092
TOTAL
OS PAGES:
0
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5821
PEDESTRIAN BRIDGE BIKE TRAIL EXTENSION AT
OVERLAND TRAIL ROAD AND CACHE LA POUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid *5821 Pedestrian Bridge Bike Trail Extension at Overland Trail Road and Cache
La Poudre River.
OPENING DATE: November 6, 2003, 3:00p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Clarification to Section 01010/1.09, Summary of Work, Regulatory
Requirements. Contractor is not responsible for obtaining a 404 permit from
the U.S. Army Corps of Engineers. Owner will obtain the permit and provide
a copy to the Contractor. Contractor shall follow any special provisions of
the permit.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777
P. 01
TRANSACTION REPORT
NOV-03-03
MON 10:29 AM
BROADCAST
>it
�
DATE START
RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP
NOV-03 10:29 AM
95324682
0 SEND
( M)
BUSY
086
10:29 AM
94079484
'>K>K" 0 SEND
( M)
BUSY
086
10:23 AM
913037707667
27" 1 SEND
( M)
OK
086
TOTAL
27S
PAGES:
1
>K
�
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 2
BID #5821
PEDESTRIAN BRIDGE BIKE TRAIL EXTENSION AT
OVERLAND TRAIL ROAD AND CACHE LA POUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid #5821 Pedestrian Bridge Bike Trail Extension at Overland Trail Road and Cache
La Poudre River.
OPENING DATE: November 6, 2003, 3:00p.m_ (Our Clock)
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Clarification to Section 01010/1.09, Summary of Work, Regulatory
Requirements. Contractor is not responsible for obtaining a 404 permit from
the U.S. Army Corps of Engineers. Owner will obtain the permit and provide
a copy to the Contractor. Contractor shall follow any special provisions of
the permit.
If you have any questions please contact John Stephen, CPPO, Senior Buyer, at 970-221-6777.
P. 01
TRANSACTION
REPORT
NOV-06-03
THU 04:20 PM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
NOV-06 03:04
PM
92212907
1'13"
3
SEND
( M)
OK
118 K
03:06
PM
917205701894
1110"
3
SEND
( M)
OK
118
03:08
PM
95324687
I'll"
3
SEND
( M)
OK
118
03:09
PM
913036888811
1'17"
3
SEND
( M)
OK
118
03:11
PM
96696411
1'13"
3
SEND
( M)
OK
118
03:13
PM
94079484
1'36"
3
SEND
( M)
OK
118
03:15
PM
96631566
1'13"
3
SEND
( M)
OK
118
03:16
PM
913038333353
1'13"
3
SEND
( M)
OK
118
03:18
PM
95930583
1115"
3
SEND
( M)
OK
118
03:19
PM
919707852515
1'32"
3
SEND
( M)
OK
118
04:19
PM
94-@-706866059
W,
0
SEND
( M)
BUSY
118
04:19
PM
9229089fl�& p t(�
�K ' W,
0
SEND
( M)
BUSY
118
03:23
PM
96673930
1115"
3
SEND
( M)
OK
118
03:24
PM
913208527067
1118"
3
SEND
( M)
OK
118
03:26
PM
913032739354
1'12"
3
SEND
( M)
OK
118
03:28
PM
917404397349
1115"
3
SEND
( M)
OK
118
04:20
PM
9125W459750 OX
**' W,
0
SEND
( M)
BUSY
118 �
03:30
PM
919703527792
1'35"
3
SEND
( M)
OK
118
03:32
PM
919703569621
1115"
3
SEND
( M)
OK
118
03:34
PM
919708796748
12'26"
3
SEND
( M)
OK
118 K
TOTAL
33M 9S
PAGES;
51
TRANSACTION REPORT
P.02
NOV-06-03 THU 04:22 PH
BROADCAST
City of Fort Collins
Atiminictrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 4
BID #b821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 14, 2003 — 3:00 p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made_
SPECIFICATIONS
Clarification to Section 0 10 1011.22Summary of Work. Reston. and Section 02950, Landscape Work.
As stated in Section 0101011.22A, Contractor shall return all areas disturbed by the Work to their original or
better conditions in both function, topography, and appearance. All replacement vegetation shall be of the
same kind as disturbed unless otherwise approved by Owner. For example, wetlands shall be restored as
wetlands (1:1 area ratio minimum), willows restored with willows, grass with grass. A seed mixture is
included In Section 0101011,228 for dry land grass restoration. Plant warranty and tree protection
standards are included in Section 02950. Restoration also includes topography. Unless otherwise
indicated by proposed contours in the Drawings, Sheet 2 of 23 (Site Plan), the topography of all disturbed
arnnc chAl hP rPetnraA to match eYistino t000aranhv subject to the maximum Dermissible deviation from
P. 01
TRANSACTION
REPORT
NOV-06-03
THU 04:24 PM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
NOV-06 03:49
PM
92233191
1116"
3
SEND
( M)
OK
119
03:51
PM
94828658
1115"
3
SEND
( M)
OK
119
03:53
PM
919529292909
1'31"
3
SEND
( M)
OK
119
03:55
PM
913207635672
1'37"
3
SEND
( M)
OK
119
03:57
PM
919703518629
1'14"
3
SEND
( M)
OK
119
03:58
PM
95324051
1'52"
3
SEND
( M)
OK
119
04:01
PM
913037707667
1113"
3
SEND
( M)
OK
119
04:02
PM
912019333961
1'54"
3
SEND
( M)
OK
119
04:04
PM
918122821485
1'37"
3
SEND
( M)
OK
119
04:06
PM
912534445168
1119"
3
SEND
( M)
OK
119
04:08
PM
913036593243
1115"
3
SEND
( M)
OK
119
04:23
PM
CONSTRUCTION NEWS
SV 1124"
3
SEND
( M)
OK
119 x
04:11
PM
BUILDERS EXCHANGE
1'13"
3
SEND
( M)
OK
119 x
04:12
PM
DAILY JOURNAL
1'16"
3
SEND
( M)
OK
119 x
04:14
PM
PLAN ROOM
1'48"
3
SEND
( M)
OK
119
04:16
PM
REED!CONSTXNEWS
1'28"
3
SEND
( M)
OK
119
TOTAL
23H 12S
PAGES:
48 :K
P.02
TRANSACTION REPORT
NOV-06-03 THU 04:25 PN
BROADCAST
City of Fort Collins
Administrative Services
purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 4
BID #5821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 14, 2003 — 3:00 p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
SPECIFICATIONS
Clarification to Section 0101011 22 Summary of Work R,ggtoration and Section 02950, Landscape Work.
As stated in Section 01010/1.22A, Contractor shall return all areas disturbed by the Work to their original or
better conditions in both function, topography, and appearance. All replacement vegetation shall be of the
same kind as disturbed unless otherwise approved by Owner. For example, wetlands shall be restored as
wetlands (1:1 area ratio minimum), willows restored with willows, grass with grass. A seed mixture is
included in Section 01010/1.22B for dry land grass restoration. Plant warranty and tree protection
standards are included in Section 02950_ Restoration also includes topography_ Unless otherwise
indicated by proposed contours in the Drawings, Sheet 2 of 23 (Site Plan), the topography of all disturbed
areas shall be restored to match existing topography subject to the maximum permissible deviation from
P. 01
TRANSACTION REPORT
NOV-07-03
FRI 11:30 AM
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
Mt«
DP
NOV-07 11:29 AM 913036882331
1115" 3 SEND
( M) OK
126
TOTAL
1M 15S PAGES'
3
�
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. A
BID #5821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 58.21 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 14, 2003 — 3:00 p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
SPECIFICATIONS
1. Clarification to Section 0101 till 99
.. �w•waw c vvu:n.
As stated in Section 01010/t.22A, Contractor shall return all areas disturbed by the Work to their original or
better conditions in both function, topography, and appearance. Alf replacement vegetation shall be of the
same kind as disturbed unless otherwise approved by Owner. For example, wetlands shall be restored as
wetlands (1:1 area ratlo minimum), willows restored with willows, grass with grass. A seed mixture is
included in Section 01010/1.22B for dry land grass restoration. Plant warranty and tree protection
standards are included in Section on50- Restoration also Includes topography. Unless otherwise
indicated by proposed contours in the Drawings, Sheet 2 of 23 (Site Plan), the topography of all disturbed
--� --ffL----a-.---1 t.. -- -• • . , . .. .. ..
P. 01
TRANSACTION REPORT
NOV-06-03
THU 04:28 PM
SEND(M)
DATE START
RECEIVER TX TIME PAGES TYPE
NOTE
M# DP
NOV-06 04:26 PM
92260391 2'03" 3 SEND
( M) OK
120
TOTAL
2M 3S PAGES:
3
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 4
BID #5821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Sid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LaPoudre River
OPENING DATE: November 14, 2003 — 3:00 p.m. (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
SPECIFICATIONS
Qarl&iglon to Section,01010/1.22, Summary of Work. Restoration, and Section 02950, Landscape Work.
As stated in Section 01010/1.22A, Contractor shall return all areas disturbed by the Work to their original or
better conditions in both function, topography, and appearance. All replacement vegetation shall be of the
same kind as disturbed unless otherwise approved by Owner. For example, wetlands shall be restored as
wetlands (1:1 area ratio minimum), willows restored with willows, grass with grass. A seed mixture is
included in Section 01010/1.22B for dry land grass restoration. Plant warranty and tree protection
standards are included in Section 02950. Restoration also includes topography. Uniess otherwse
indicated by proposed contours in the Drawings, Sheet 2 of 23 (Site Plan), the topography of all disturbed
areas shall be restored to match existing topography subject to the maximum permissible deviation from
P. 01
TRANSACTION REPORT
NOV-04-03
TUE 04:46 PM
BROADCAST
DATE START
RECEIVER
TX TIME
PAGES
TYPE
NOTE
M# DP
NOV-04 04:32
PM
917205701894
56"
2
SEND
( M)
OK
109
04:33
PM
92290846
58"
2
SEND
( M)
OK
109
04:34
PM
919708796748
58"
2
SEND
( M)
OK
109
04:36
PM
95324687
55"
2
SEND
{ M)
OK
109
04:37
PM
92260391
1'37"
2
SEND
( M)
OK
109
04:39
PM
CONSTRUCTION NEWS
SV 1'02"
2
SEND
( M)
OK
109
04:41
PM
BUILDERS EXCHANGE
56"
2
SEND
( M)
OK
109
K 04:42
PM
REED!CONST*NEWS
1'06"
2
SEND
( M)
OK
109
04:44
PM
DAILY JOURNAL
58"
2
SEND
( M)
OK
109
04:45
PM
PLAN ROOM
1'25"
2
SEND
( M)
OK
109 :K
�
>Ic
TOTAL
10M 51S
PAGES:
20
City of Fort Collins
Administrative Services
Purchasing Division
CITY OF FORT COLLINS
ADDENDUM No. 3
BID #5821
PEDESTRIAN BRIDGE AND TRAIL EXTENSION
AT OVERLAND TRAIL ROAD AND CACHE LAPOUDRE RIVER
SPECIFICATIONS AND CONTRACT DOCUMENTS
Bid No. 5821 — Pedestrian Bridge and Trail Extension at Overland Trail Road and Cache LsPoudre River
OPENING DATE: November 12, 2003 — 3:00p.m_ (Our Clock)
To all prospective bidders under the specification and contract documents described above, the following
changes are hereby made.
SPECIFICATIONS
1. The bid opening date has been changed. The bid will be opened on November 12, 2003 at 3:00p_m. (Our
Clock).
2. Clarification to Section 01010/1,09, Summary of Work, Regulatory Requirements. Contractor is not
responsible for obtaining a 404 permit from the U.S. Army Corps of Engineers (USACE). Owner willobtain
the permit and provide a copy to the Contractor. Contractor shall follow any special provisions of the
permit. After discussions with the USACE, it is expected that a nationwide permit will be issued for this
project. At this time, construction disturbance to the existing sand bar/island near Pier 1 is not expected to